Trooper_Package_Plans_-_17-B-0003_-_RFK_-_10_April_2017.pdf
PDF 4 MB Posted
- Solicitation number
- W911RX-17-B-0003
About this file
Amendment 04 - Trooper Package - Plans - Revision 02 - 10 April 2017 - FINAL
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ð
50 1
.1
STATE YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
Partial
60%
13% sht. 1
AADT(2017)
AADT(2037)
FORT RILEY DIRECTORATE OF PUBLIC WORKS
RILEY COUNTY KANSAS
TASK ORDER NO.
45 MPH
20 FT
2- O O PLAN & STANDARD SHEETS
KANSAS 1
GROSS LENGTH OF PROJECT
EXCEPTIONS
NET LENGTH OF PROJECT
NET LENGTH OF BRIDGES
NET LENGTH OF ROAD
FT. (Includes Equations)
FT.
FT.
FT. MILES
MILES
MILES
Clear Zone
C of A
V
D
DHV
T
DESIGN DESIGNATION
CONVENTIONAL SIGNS
COUNTY LINE
CITY LIMITS
STATE OR NATIONAL LINE
PROPERTY LINE
HIGHWAY FENCE
EXISTING FENCE
CONSTRUCTION LIMITS
RIGHT OF WAY LINE
TRAVELED WAY
RAILROADS
TOWNSHIP, SECTION or GRANT LINE
GUARDRAIL
CENTER LINE OF PROJECT
TERRACE
CULVERTS
DROP INLET & STORM SEWER
ACCESS CONTROL
POWER POLE
TELEPHONE POLE
MARSH
HEDGE
TREES
PROFILE ELEVATION
STREAM or CREEK
INDEX OF SHEETS
TITLE SHEET1
FORT RILEY DIRECTORATE OF PUBLIC WORKS
Project Manager, Public Works Engineering Division
Approved
Date
By:
FEDERAL PROJECT
Civil Engineer PE, PTOE
SEEDING
PAVEMENT
GRADING
CULVERTS
MILL & OVERLAY PROJECTS
Marshall Army Airfield Project
STA 0+00 Dickman Ave.
BEGIN PROJECT
STA 17+50 Dickman Ave.
END PROJECT
STA 10+90 Caisson Hill Rd
BEGIN PROJECT
STA 0+00 Trooper Rd
BEGIN PROJECT
STA 19+20 Trooper Rd
END PROJECT
STA 91+12 Caisson Hill Rd
END PROJECT
3-9-2017
Contractor Shall Verify Quantities for Bidding Purposes.
Quantities Provided on the Plans are Estimated and for |nformation Only.
Coordinate system EPSG:102677 NAD 1983 State Plane Kansas North FIPS 1501 feet. Bench marks equal elevation 1000'.
scott.r.sutherland Line scott.r.sutherland Typewritten Text 04-03-2017 scott.r.sutherland Typewritten Text Revision 1 04-03-2017
FILL SECTION
3:1 Ground line
STA. 0+00 to STA. 60+60
TROOPER RD
ì
FILL SECTION
3:1 Ground line
1: 1 Typ.
FILL SECTION
3:1 Ground line ì
FILL SECTION
3:1 Ground line ì
FILL SECTION
3:1 Ground line
STA. 65+40 to STA. 68+50
TROOPER RD
ì
FILL SECTION
3:1 Ground line
FILL SECTION
3:1 Ground line ì
FILL SECTION
3:1 Ground line
STA. 99+80 to STA. 103+10
TROOPER RD
STA. 107+25 to STA. 111+20
STA. 71+00 to STA. 96+10
STA. 64+25 to STA. 65+10
TROOPER RD
ì
STA. 114+95 to STA. 119+20
TROOPER RD
Varie s Varies
Varies
Varies
Varies Varies
Varie s
Varie s
Varie s
* 2017
STATE
KANSAS
YEARPROJECT N0. SHEET NO.
SHEETS
TOTAL
Fort Riley Directorate of Public Works
FILL SECTION
3:1 Ground line ì
FILL SECTION
3:1 Ground line
2'-6"
STA. 112+70 to STA. 114+65
TROOPER RD
Varies
Varie s
3:1
Ground line
4:1 6:1
Saw Cut
SHOULDER RECONSTRUCTION
Geogrid ì
4'-0"
3:1
Ground line
4:1 6:1
12'-0" 12'-0"
Slope 2.00%Slope 2.00%
4'-0" 12'-0"
Slope 2.00%
RAP
2.5'
Saw Cut
Geogrid
LANE WIDENING
Width Varies to 10' Saw Cut
FULL DEPTH PATCH
Geogrid
Width Varies
STA. 0+00 to STA. 60+60
CAISSON HILL RD (SHOULDERS ONLY)
STA. 0+00 to STA. 60+60
DICKMAN AVE (32' ROADWAY)
Varies
Base
2.5'
4.2%
4'
Slope 2.0% ì
STA. 112+70 to STA. 114+65
TROOPER RD
STA. 0+00 to STA. 60+60
CAISSON HILL RD (SHOULDERS ONLY)
Travelway
STA. 112+70 to STA. 114+65
TROOPER RD DICKMAN AVE
CAISSON HILL RD
TROOPER RD
4'-0"
2'-6"
2'-6" 2'-6"
2'-6" 2'-6"
2'-6"2'-6"
2'-6"
2'-6"
TYPICAL SECTIONS
Bidding Purposes.
for |nformation Only. Contractor Shall Verify Quantities for
Quantities Provided on the Plans are an Estimate and
Follow 2015 KDOT Standard Specifications for all Materials.
Type-B (MR-90)
6" Rap Base w/ Geogrid
8" HMA Comm. (Class A) w/ Geogrid
Type-B MR-90
6" Rap Base w/ Geogrid
2" HMA Comm. (Class A)
Type-B MR-90
6" RAP Base w/ Geogrid
Millings
Edge Wedge
2" Milling & HMA Comm. (Class A)
Millings
Edge Wedge
Note:
Slope 2.00%
Milling (2")
12'-0"
Slope 2.00%
Milling (2")
12'-0"
Slope 4.2%
4'-0" Sho.
Slope 2.00%
Milling (2")
12'-0" 12'-0"
Slope 4.2%
4'-0" Sho.
Milling (2")
12'-0" 12'-0"
2" HMA Comm. (Class A)
2" HMA Comm. (Class A)
Slope 2.00%Slope 2.00%Slope 2.00%
Slope 4.2%
4'-0" Sho.
Slope 2.00%
Milling (2")
12'-0" 12'-0"
Milling (2")
12'-0" 12'-0"
2" HMA Comm. (Class A)
Slope 2.00%Slope 2.00%Slope 2.00%
4'-0" 12'-0"
Slope 2.00%
Slope 4.2%
4'-0" Sho.
Milling (2")
12'-0"
Milling (2")
12'-0" 12'-0"
2" HMA Comm. (Class A)
Slope 2.00%Slope 2.00%Slope 2.00%
6'-0" 6'-0" 12'-0"
Slope 2.00%2.00% 2.00% Slope 4.2%
4'-0" Sho.
Slope 2.00%
Milling (2")
12'-0" 12'-0"
Milling (2")
12'-0" 12'-0"
2" HMA Comm. (Class A)
Slope 2.00%Slope 2.00%Slope 2.00%
Slope 4.2%
4'-0" Sho.
Milling (2")
12'-0"
Milling (2")
12'-0" 12'-0"
2" HMA Comm. (Class A)
Slope 2.00%Slope 2.00%Slope 2.00%
12'-0"
Slope 2.00%Slope 4.2%
4'-0" Sho. 12'-0"
Slope 2.00%
Crown Offset
Field Verify
Millings
Edge Wedge
Millings
Edge Wedge
Millings
Edge Wedge
Millings
Edge Wedge
Millings
Edge Wedge
4" HMA Commercial Grade (Class A) w/ Geogrid
8" HMA Comm. (Class A) w/ Geogrid
2" HMA Comm. (Class A)
Slope 4.2%
8'-6" Sho.
Slope 4.2%
8'-6" Sho.
4.2%
0' to 8.5'
Shld. Varies
Caisson Hill to Meet Gradation Specifications for Geogrid.
2" HMA Commerical (Class A). Adjust Milling Blade Width w/ Geogrid and 4" HMA Commerical (Class A) and
Guardrail Locations. Replace Shld.w/ 6" RAP (100%) and 8.5' Paved Shld on Cassion Hill Rd. except at
Needed to Maintain 4' Paved Shld on Trooper Rd.
Saw Cut and Remove Existing Pavement as
Pavement Widening and 4' Shld. Reconstruction.
" x
' C
M P
+0
+0
+0
25+00
C a n yo n
R d
E= 1659638.82
N= 273674.27
Begin Mill & Overlay Project
{ Caisson Hill Sta. 10+90
" x
' C
M P
SCALE
100'050' 50'
Fort Riley Directorate of Public Works
PLAN
SHOULDER MILL & OVERLAY
CAISSON HILL RD
KANSAS
STATE PROJECT N0.
SHEETS
TOTAL
SHEET NO.YEAR
98. PVMT Marking (Multi-Component)(Yellow)(4") (16000 LNFT
94. PVMT Marking (Multi-Component)(White)(6") (16050 LNFT)
228. Pavement Edge Wedge (Millings)(|nstall Only) (1600 Tons)
6. Common Excavation (Rural Small) (100 CUYD)
12. Rock Excavation (100 CUYD)
24. Aggregate Base (Special)(RAP)(|nstall Only)(6") (400 SQYD)
80. Geosynthetic Reinforcement (For Base) (800 SQYD)
54. HMA Commercial Grade (Class A)(4") (400 SQYD)
52. HMA Commercial Grade (Class A)(2") (15160 SQYD)
62. Milling (Asphalt)(2") (15160 SQYD)
Estimated Material |tems |nclude:
See Typical Sheet
4' Paved Shld Width
At Guardrail Locations use a Minimum
Reconstruct Shld to Maintain 8.5' Width
2" Mill & Overlay on 8.5' Shlds Lt. & Rt.
{ Caisson Hill Sta. 10+90 to 91+12 Const.
R
70+00
75+00
80+00
85+00
90+00
22'
E= 1659638.82
N= 273674.27
End Mill & Overlay Project
{ Caisson Hill Sta. 91+12
"W"
Vares
:1
W/ + 21' 50'
R =2
5'
50'
Sl op e V a r
S lo p e
N o r m a l S id e
R o a d
S lo p e
R=25'
N o r m a l S id e
R o a d
S lo p e
V a r
S lo p e
Var.
for Entrances ì
R/W
L Projectc
Variable slope approx.
Variable slope approx.
Shoulder line
Edge of Surface
Ditch
6:1
Typical drainage structure
50' or as available.
50' or as available.
c
N o r m a l
S lo p e
L
S id e
R o a d o r
E n tr a n c e
:1
Rad. Pt. 32.69'
(From edge of lane)
Edge of Through Lane and mound side roads to 10' fill height.
6:1 Slope over 10' fill height.
6: 1 Slope at approximate ì
Structure or appropriate clear
8: 1 Slope at the appropriate clear zone width.
zone shall apply to all mound entrances
Field entrances will not be surfaced.
AT ENTRANCES AND SIDE ROADS
FLARE OF SHOULDERS
i
2/ + 21'W
Approx.
20'
Approx.
20'
WITH DRAINAGE STRUCTURE MOUND ENTRANCE OR SIDE ROAD
slope toward the highway, a low point divert surface drainage into the high-approx. 6" deep shall be constructed to
On side roads and entrances which way ditch, the plans.
unless otherwise shown on
SCALE
150'075' 75'
Fort Riley Directorate of Public Works
PLAN
SHOULDER MILL & OVERLAY
CAISSON HILL RD
KANSAS
STATE PROJECT N0.
SHEETS
TOTAL
SHEET NO.YEAR
W illis t o n
P in t
R d
{ Caisson Hill Rd.
R= 50'
22'
244. Seeding (0.5 KSQFT)
228. Pavement Edge Wedge (Millings)(|nstall Only) (20 Tons)
52. HMA Commercial Grade (Class A)(2") (250 SQYD)
56. HMA Commercial Grade (Class A)(4") (45 SQYD)
80. Geosynthetic Reinforcment (For Base) (90 SQYD)
24. Aggregate Base (Special)(RAP)(6")(|nstall Only) (45 SQYD)
Estimated Material |tems |nclude:
See Typical Section
Edge w/ Shoulder Reconstruction as Needed
2" HMA Surface. Reconst. Pavement
Mill & Overlay 22' Entrance w/
{ Caisson Hill Sta. 77+30 20' Lt.
BLDG 330
BLDG 332
BLDG 310
BLDG 380
0+0
5+
10+00
15+00
H o lb r o k
A v e
P e r s h g e
Di ck m an A ve
E= 1659145.97
N= 267799.14
Begin Mill & Overlay Project
{ Dickman Sta. 0+00
E= 1660274.50
N= 268962.13
Begin Mill & Overlay Project
{ Dickman Sta. 17+50
SCALE
100'050' 50'
W911RX-174-D-0001 2016
Fort Riley Directorate of Public Works
PLAN
MILL & OVERLAY
DICKMAN AVE
KANSAS
STATE PROJECT N0.
SHEETS
TOTAL
SHEET NO.YEAR
98. PVMT Marking (Multi-Component)(Yellow)(4") (2800 LNFT)
52. HMA Commercial Grade (Class A)(2") (6950 SQYD)
62. Milling (Asphalt)(2") (6950 SQYD)
Estimated Material |tems |nclude:
See Typical Sheet
2" Mill & Overlay
{ Dickman Sta. 0+00 to 17+50 Const.
Pvmt Marking (Multi-Component)(White)(12") (168 LNFT)
4" Sidewalk (36 SQFT)
Detectable Warning (2 EA)
Sidewalk Ramp (2 EA)
Estimated Material |tems |nclude:
w/ Detectable Warning
4' Sidewalk and Sidewalk Ramp
{ Dickman Sta. 8+20 Const.
Remove Sidewalk
Remove Sidewalk
Remove Sidewalk
After June 4, 2017, but Shall be Completed and Open to All Traffic by July 21, 2017.
Traffic by June 2, 2017. Contractor has the Option to Begin Work on Dickman Ave.
Note: Contractor shall be completed with Work on Dickman Ave. and Open to All
Remove Sidewalk
Seeding (1000 SQFT)
Common Excavation (9 CUYD)
4" Sidewalk (992 SQFT)
Estimated Material |tems |nclude:
Signs at Sta. 6+00 to Sta. 8+20
Relocate Existing Pedstrian Crossing
Remove 93' of Existing 4" Sidewalk
4' Sidewalk w/ Sidewalk Ramps
{ Dickman Sta. 6+00 to 8+20 Const.
Revision 1 04-03-2017
Marshall Dr.
BLDG BLDG
BLDG
BLDG
BLDG BLDG
Crack Sealing
Crack Sealing
H e n r y
D r
Ray Rd.
Crack Sealing
SCALE
500'0250' 250'
W911RX-174-D-0001 2016
Fort Riley Directorate of Public Works
PLAN
MILL & OVERLAY
MARSHALL ARMY AIRFIELD
KANSAS
STATE PROJECT N0.
SHEETS
TOTAL
SHEET NO.YEAR
222. Sealing Asphalt Cracks (>1/8"<=1/2") (5000 LNFT)
221. Sealing Asphalt Cracks (>1/2"<2") (2000 LNFT)
Estimated Material |tems |nclude:
Along Runways, Taxiways, and Aprons. Areas are Hatched on Sheet
Seal Asphalt Cracks in Asphalt Shld.
, 2017.
th
Note: Work at Marshall Army Airfield shall be completed and cleaned up prior to 5:30 CDT August 11
Pavement Marking (FS TT-P-1952) (White)(36") (460 LNFT)
50. HMA Commercial Grade (Class A)(2") (3800 SQYD)
62. Milling Asphalt (2") (3800 SQYD)
Estimated Material |tems |nclude:
on Overrun Area
Const. 2" Mill & Overlay
Pavement Marking (FS TT-P-1952) (White)(36") (460 LNFT)
50. HMA Commercial Grade (Class A)(2") (3800 SQYD)
62. Milling Asphalt (2") (3800 SQYD)
Estimated Material |tems |nclude:
on Overrun Area
Const. 2" Mill & Overlay scott.r.sutherland Line scott.r.sutherland Typewritten Text Begin on or after Sept 18, 2017.
scott.r.sutherland Typewritten Text Revision 1 04-03-2017 scott.r.sutherland Line scott.r.sutherland Callout Yellow scott.r.sutherland Callout Yellow scott.r.sutherland Stamp scott.r.sutherland Stamp scott.r.sutherland Stamp scott.r.sutherland Stamp scott.r.sutherland Line scott.r.sutherland Stamp scott.r.sutherland Typewritten Text Revision 2 04-06-2017
0+00
5+00
10+00
B
IK
E
LA
N E
R
See KDOT Std. Sht. TE406, TE466 Steel Tubing Post |nstall Sign R3-17 w/ { Trooper Sta. 8+00 Rt.
S H
A R
E
T H
E
R O
A D
W P
W
See KDOT Std. Sht. TE406, TE466 Steel Tubing Post |nstall Sign W11-1 & W16-1P w/ { Trooper Sta. 20+00 Lt.
SCALE
100'050' 50'
W911RX-174-D-0001 2016
Fort Riley Directorate of Public Works
PLAN
MILL & OVERLAY
TROOPER RD
KANSAS
STATE PROJECT N0.
SHEETS
TOTAL
SHEET NO.YEAR
108. PVMT Marking (|ntersection Grade) (Only) (3 EA)
97. PVMT Marking (Multi-Component)(White)(24") (200 LNFT)118. PVMT Marking (|ntersection Grade) (Thru-Lt Arrow) (3 EA)119. PVMT Marking (|ntersection Grade) (Thru-Rt Arrow) (5 EA)114. PVMT Marking (|ntersection Grade) (Thru Arrow) (8 EA)109. PVMT Marking (|ntersection Grade) (Right Arrow) (8 EA)106. PVMT Marking (Intersection Grade)( Left Arrow) (6 EA)103. PVMT Marking (|ntersection Grade) (White)(Bicycle) (10 EA)94. PVMT Marking (Multi-Component)(White)(6") (24560 LNFT)101. PVMT Marking (Multi-Component)(Yellow)(12") (310 LNFT)98. PVMT Marking (Multi-Component)(Yellow)(4") (26400 LNFT)227. Pavement Edge Wedge (
Millings)(|nstall Only) (2400 Tons)61. HMA Commercial Grade (Class A)(Patc hing)(8") (Combined Project Total= 19250 SQYD)50. HMA Commercial Grade (Class A)(2") (
64332 SQYD)
59. Milling (Asphalt)(2")(Tran
s. to Camp Funston) (64332 SQYD)Estimated Material |tems |nc lude:
Const. 2' Edge Wedge except at Curb Sections as Needed.
Const. 2" Mill and Overlay w/ Full Depth Patches
{ Trooper Sta. 0+00 to 119+
N=271544.5502 E=1643400.9202
35+00 40+00
45+00
T h o m a s e
B
IK
E
LA
N E
R
See KDOT Std. Sht. TE406, TE466 Steel Tubing Post |nstall Sign R3-17 w/ { Trooper Sta. 42+50 Rt.
SCALE
100'050' 50'
W911RX-174-D-0001 2016
Fort Riley Directorate of Public Works
PLAN
MILL & OVERLAY
TROOPER RD
KANSAS
STATE PROJECT N0.
SHEETS
TOTAL
SHEET NO.YEAR
Paving Limits
4'
B a s e
60+00
65+00
70+00
75+00
L =1
T h o m a s eR
=2 .5
R .5
L
40' LT
Sta 68+50
L =8
R =5
3:1 6:1
Var.
Typical
B E G
IN
R
IG
HT
TU
R N
LA
N E
Y
IE
LD
TO
B
IK
ES
O N
L Y
O N
L Y
O N
L Y
R
IG
H T
L A
N E
M U
S T
T U
R N
R
IG
H T
R
R
B
IK
E
LA
N E
L.P.
L.P.
B
IK
E
LA
N E
R
R
R b
R
See KDOT Std. Sht. TE406 Relocate Existing Sign (1 Ea
Line Items |nclude:
Relocate Existing R3-7R Sig n { Trooper Sta. 73+00 Lt.
See KDOT Std. Sht. TE406, TE466 Steel Tubing Post |nstall Sign R3-17 w/ { Trooper Sta. 68+00 Rt.
See KDOT Std. Sht. TE406, TE466 Steel Tubing Post |nstall Sign R4-4 w/ { Trooper Sta. 70+00 Lt.
See KDOT Std. Sht. TE406, TE466 Steel Tubing Post |nstall Sign R3-8b w/ { Trooper Sta. 67+00 Lt.
See KDOT Std. Sht. TE406, TE466 Steel Tubing Post |nstall Sign R3-17 w/ { Trooper Sta. 60+00 Lt.
Geogrid
SCALE
100'050' 50'
W911RX-174-D-0001 2016
Fort Riley Directorate of Public Works
PLAN
MILL & OVERLAY
TROOPER RD
KANSAS
STATE PROJECT N0.
SHEETS
TOTAL
SHEET NO.YEAR
244. Seed (0.5 KSQFT)
6. Comon Excavation (Rural Small) (6 CUYD)
201. Curb and Gutter Combined (AE) (25 LNFT)
80. Geosynthetic Reinforcmen t (For Base) (18 SQYD)
24. Aggregate Base (Special)
(RAP)(6")(|nstall Only) (9 SQYD)12. Rock Excavation (2 CUYD) Estimated Material |tems |nc lude:
See KDOT Std. Sht. RD635 Replace w/ 20' of Type | Cu rb and Gutter Remove 20' of Existing Curb and
Gutter { Trooper Sta. 65+00 30' Rt
244. Seed (0.5 KSQFT)
6. Comon Excavation (Rural Small) (6 CUYD)
201. Curb and Gutter Combined (AE) (25 LNFT)
80. Geosynthetic Reinforcmen t (For Base) (18 SQYD)
24. Aggregate Base (Special)
(RAP)(6")(|nstall Only) (9 SQYD)12. Rock Excavation (2 CUYD) Estimated Material |tems |nc lude:
See KDOT Std. Sht. RD635 Replace w/ 20' of Type | Cu rb and Gutter Remove 20' of Existing Curb and
Gutter { Trooper Sta. 66+00 30' Rt to 2' Aggreagte Shld (Milling s)(4")(|nstall Only) (50 SQYD)
Transition from 4' Paved Sh ld
{ Trooper Sta. 68+50 to 71+
50. HMA Commercial Grade (Class A)(2") (
1670 SQYD)
54. HMA Commercial Grade (Class A)(4") (
1670 SQYD)
6. Comon Excavation (Rural Small) (280 CUYD)
80. Geosynthetic Reinforceme nt (For Base) (3340 SQYD)
24. Aggregate Base (Special)
(RAP)(|nstall Only)(6") (1670 SQYD)12. Rock Excavation (185 CUYD) Estimated Material |tems |nc lude:
Saw Cut and Removed Existing Pavement as N eeded Width to a 4' Paved Shld. as
Needed Reconst. Paved Shld. from E xisting { Trooper Sta. 62+00 to 114
+00 Lt. & Rt.
244. Seed (0.5 KSQFT)
6. Comon Excavation (Rural Small) (15 CUYD)
50. HMA Commercial Grade (Class A)(2") (
92 SQYD)
59. HMA Commercial Grade (Class A)(8") (
92 SQYD)
193. Slope Drain (Concrete) (
16 LNFT)
192. Flume |nlet (Concrete) (1 EA)
201. Curb and Gutter Combined (AE) (90 LNFT)
80. Geosynthetic Reinforcmen t (For Base) (324 SQYD)
24. Aggregate Base (Special)
(RAP)(6")(|nstall Only) (162 SQYD)12. Rock Excavation (5 CUYD) Estimated Material |tems |nc lude:
See KDOT Std. Sht. RD635, RD628 w/ 8" HMA Base and 2" HMA Surface Const. Pavement Widening w/
90' of Type | Curb and Gut terRemove 70' of Existing Curb and
Gutter { Trooper Sta. 65+75 to 71+
00 Lt.
24'
80+00
85+00
R =2
L .3
50'
KANSAS
STATE PROJECT N0. YEAR SHEET NO.
SHEETS
TOTAL
SCALE
030' 30'
W911RX-174-D-0001 2016
Fort Riley Directorate of Public Works
PLAN
MILL & OVERLAY
TROOPER RD.
"W"
24'
Vares
:1
W/ + 21' 50'
R =2
50'
Sl op e V a r
S lo p e
N o r m a l S id e
R o a d
S lo p e
R=25'
N o r m a l S id e
R o a d
S lo p e
V a r
S lo p e
Var.
for Entrances ì
R/W
L Projectc
Variable slope approx.Variable slope approx.
Shoulder line
Edge of Surface
Ditch
6:1
Typical drainage structure
50' or as available.50' or as available.
c
N o r m a l
S lo p
L
S id e
R o a d o r
E n tr a n c e
:1
Rad. Pt. 32.69'
(From edge of lane)
Edge of Through Lane and mound side roads to 10' fill height.
6:1 Slope over 10' fill heigh t.
6: 1 Slope at approximate ì
Structure or appropriate cl ear
8: 1 Slope at the appropriate clearzone width.
zone shall apply to all mound entrances
Field entrances will not be surfaced.
AT ENTRANCES AND SIDE ROADS
FLARE OF SHOULDERS
i
2/ + 21'W
Approx.
20' Approx.
20'
WITH DRAINAGE STRUCTURE
MOUND ENTRANCE OR SIDE ROAD
slope toward the highway, a low point divert surface drainage int o the high-approx. 6" deep shall be co nstructed to
On side roads and entranc es which way ditch, the plans.
unless otherwise shown on
244. Seeding (0.5 KSQFT)
227. Pavement Edge Wedge (
Millings)(|nstall Only) (12 Ton s)50. HMA Commercial Grade (Class A)(2") (
195 SQYD)
53. HMA Commercial Grade (Class A)(4") (
195 SQYD)
6. Comon Excavation (Rural Small) (60 CUYD)
80. Geosynthetic Reinforcmen t (For Base) (390 SQYD)
24. Aggregate Base (Special)
(RAP)(6")(|nstall Only) (195 SQYD)Estimated Material |tems |nc lude:
w/ 2' Aggregate Shoulder 4" HMA Base with 2" HMA Surface Const. 24' Entrance w/ { Trooper Sta. 82+73 28' Lt
Contractor Staging Area
83'
B a s e
95+00 100+00 105+00
J a c k s n e
L ' L
=3 'R
' R
=3
B
IK
E
LA
N E
B
IK
E
LA
N E
L.P.
L.P.
L.P.
L.P.
L.P.
3:1 6:1
Var.
Sta. 100+85 to 101+20 Lt.
Typical
R
R
244.
See d (0 .5 K
SQFT)
6. Co mon E xcav ation
(Ru ral S mall) (15
CUYD)
201.
Cur b an d Gu tter Combined
(AE) (3
0 LNFT)
19. A ggre gate Base
(AB-3)
(6")
(18
SQYD)
12. R ock
Exca vatio n (3
CUYD)
Line |tem s |n clude
See
KDOT S
td. S
ht. R D635
Repl ace w/ 30' o f Ty pe |
Curb and
Gut ter
Remove 3 0' of
Exi sting
Cur b an d Gu tter
{ Tr ooper
Sta . 101
+00 36' L t.
244.
See d (0 .5 K
SQFT)
6. Co mon E xcav ation
(Ru ral S mall) (15
CUYD)
201.
Cur b an d Gu tter Combined
(AE) (3
0 LNFT)
19. A ggre gate Base
(AB-3)
(6")
(18
SQYD)
12. R ock
Exca vatio n (3
CUYD)
Line |tem s |n clude
See
KDOT S
td. S
ht. R D635
Repl ace w/ 40' o f Ty pe |
Curb and
Gut ter
Remove 4 0' of
Exi sting
Cur b an d Gu tter
{ Tr ooper
Sta . 102
+22 34.4 ' Lt.
See KDOT Std. Sht. TE406, TE466 Steel Tubing Post |nstall Sign R3-17 w/ { Trooper Sta. 99+00 Lt.
See KDOT Std. Sht. TE406, TE466 Steel Tubing Post |nstall Sign R3-17 w/ { Trooper Sta. 104+00 Rt.
Geogrid
SCALE
100'050' 50'
W911RX-174-D-0001 2016
Fort Riley Directorate of Public Works
PLAN
MILL & OVERLAY
TROOPER RD
KANSAS
STATE PROJECT N0.
SHEETS
TOTAL
SHEET NO.YEAR
244. Seed (0.5 KSQFT)
6. Comon Excavation (Rural Small) (15 CUYD)
201. Curb and Gutter Combined (AE) (30 LNFT)
80. Geosynthetic Reinforcment (F or Base) (36 SQYD)
24. Aggregate Base (Special)(RAP)(6")(|nstall Only) (18 SQYD)
12. Rock Excavation (3 CUYD) Estimated Material |tems |nclude
See KDOT Std. Sht. RD635 Replace w/ 30' of Type | Curb and Gutter Remove 30' of Existing Curb and Gu tter { Trooper Sta. 101+00 36' Lt.
244. Seed (0.5 KSQFT)
6. Comon Excavation (Rural Small) (15 CUYD)
201. Curb and Gutter Combined (AE) (30 LNFT)
80. Geosynthetic Reinforcment (F or Base) (36 SQYD)
24. Aggregate Base (Special)(RAP)(6")(|nstall Only) (18 SQYD)
12. Rock Excavation (3 CUYD) Estimated Material |tems |nclude
See KDOT Std. Sht. RD635 Replace w/ 40' of Type | Curb and Gutter Remove 40' of Existing Curb and Gu tter { Trooper Sta. 102+22 34.4' Lt.
Typ.
25'
B a s e
110+00
115+00
D e s e r t
S to r m
Sta 113+97.00 Sta 114+95.00
Sta 115+20.00 Sta 115+90.00
Off 40.00 RT
Sta 113+65.00
End Mill & Overlay
Sta 119+20.00
Sta 118+70
Sta 117+90
Sta 117+05
Sta 117+15
L.P.
L.P.
L.P.
L.P.
L.P.
B
IK
E
LA
N E
R
244.
See d (0 .5 K
SQFT)
6. Co mon E xcav ation
(Ru ral S mall) (10
CUYD)
193.
Slop e Dr ain (
Conc rete)
(2
LNFT)
192.
Flume | nlet (Con crete ) (1
EA)
201.
Cur b an d Gu tter Combined
(AE) (3
0 LNFT)
19. A ggre gate Base
(AB-3)
(6")
(27
SQYD)
12. R ock
Exca vatio n (4
CUYD)
Line |tem s |n clude
See
KDOT S
td. S
ht. R D635 and Conc
. Flu meRepl ace w/
30' o f Ty pe | Curb and Gut ter
Remove E xisti ng C urb and Gutte r
{ Tr ooper
Sta . 113
+75 Lt.
See KDOT Std. Sht. TE406, TE466
Steel Tubing Post
|nstall Sign R3-17 w/
{ Trooper Sta. 112+00 Lt.
S H
A R
E
T H
E
R O
A D
W P
W
See KDOT Std. Sht. TE406, TE466
Steel Tubing Post
|nstall Sign W11-1 & W16-1P w/
{ Trooper Sta. 110+00 Rt.
3:1 6:1
Var.
Typical
Geogrid
SCALE
100'050' 50'
W911RX-174-D-0001 2016
Fort Riley Directorate of Public Works
PLAN
MILL & OVERLAY
TROOPER RD
KANSAS
STATE PROJECT N0.
SHEETS
TOTAL
SHEET NO.YEAR
244. Seed (0.5 KSQFT)
6. Comon Excavation (Rural Small) (10 CUYD)
193. Slope Drain (Concrete) (2 LNFT)
192. Flume |nlet (Concrete) (1 EA)
201. Curb and Gutter Combined (AE) (30 LNFT)
80. Geosynthetic Reinforcment (For Base) (54 SQYD)
24. Aggregate Base (Special)(RAP)(6")(|nstall Only) (27 SQYD)
12. Rock Excavation (4 CUYD)
Estimated Material |tems |nclude:
See KDOT Std. Sht. RD635 and Conc. Flume
Replace w/ 30' of Type | Curb and Gutter
Remove Existing Curb and Gutter
{ Trooper Sta. 113+75 Lt.
244. Seed (0.5 KSQFT)
6. Comon Excavation (Rural Small) (10 CUYD)
201. Curb and Gutter Combined (AE) (30 LNFT)
80. Geosynthetic Reinforcment (For Base) (54 SQYD)
24. Aggregate Base (Special)(RAP)(6")(|nstall Only) (27 SQYD)
12. Rock Excavation (4 CUYD)
Estimated Material |tems |nclude:
See KDOT Std. Sht. RD635 and Conc. Flume
Replace w/ 30' of Type | Curb and Gutter
Remove Existing Curb and Gutter
{ Trooper Sta. 113+75 Rt.
N=282606.0234
E=1647472.9509
1 6 Changed bituminous to asphalt J.O.B.S.W.K.
J.O.B.S.W.K.
J.O.B.S.W.K.
CURB, GUTTER
AND
COMBINED CURB & GUTTER
GENERAL NOTE
where concrete pavement is constructed.
Contractor has the option of thickening the curb and gutter as
All exposed edges shall be finished with an edging tool.
Longitudinal construction joint and #4 x 3'-0" bars @ 2'-6" ctrs., Note: Use Concrete Grade 3.0 (AE) throughout.
shown.
Concrete Grade 3.0 (AE) per lin. ft..
Note: Concrete gutter contains 0.065 cu. yds.
Note: Conc. C.&G. | contains 0.060 cu. yds. Conc. Grade 3.0 (AE) per lin.ft.
Note: Conc. C.&G. || contains 0.053 cu. yds. Conc. Grade 3.0 (AE) per lin.ft.
2'-0"
"D
" 8 ƒ
2'-10"
10"
2'-10"
1'-9" 9"
2'-6" ƒ
Smooth Finish (Steel trowel) ƒ
1'-9" 9"
2'-6" ƒ
Smooth Finish (Steel trowel) ƒ
3•"1•" 4"
1'-9"
9"
Smooth Finish
(Steel trowel) ƒ
3•"1•" 4" ƒ
1'-0"
GUTTER
DETAIL OF GUTTER
TAPERED GUTTER
COMBINED CURB & GUTTER - TYPE ||(2'-6" WIDTH)
(2'-6" WIDTH)COMBINED CURB & GUTTER - TYPE |
COMBINED CURB & GUTTER - TYPE ||| (1'-9" WIDTH)
SECTION A-A
SECTION D-D
TYPICAL NOSE DETAILS FOR RAISED MEDIANS
PROTECTION CURB 8"
E d g e o f p a v e m e n t
Long. Construction
Joint
Optional pour line
(Normal section)
Contractor has the option of thickening the curb and gutter as shown.
" 1 " R
E d g e o f p a v e m e n t
Optional pour line
" R
Top of expansion joint filler
Long. const. joint
E d g e o f p a v e m e n t
Optional pour line
Long. const. joint o r
M .T .S
E d g e o f p a v e m e n t
Optional pour line
Long. const. joint o r
M .T .S
Extension of pavement subgrade
Extension of pavement subgrade
Extension of pavement subgrade
Extension of pavement subgrade
#4 x 4'-0" bars @ 2'-6" ctrs.
TYPICAL SECTION
TYPICAL SECTION
TYPICAL SECTION
" R
" R
" R
" R
PLAN
A
D
D
C o n c
10'-0" Mountable Curb m in
10'-0" Mountable Curb
A
Edge with 3" R.
4" Concrete or Asphalt
Edge with 3" R.
4" Concrete or Asphalt
Note: Shaping of gutter is to be Subsidiary to "Gutter (AE)".
2'-6" 4"
Bridge roadway width
Bridge roadway width
Transition
5'-0"5'-0"
"2'-0"
Pay length of gutter ƒ
" 10"2'-0"
2'-0"
2'-0"
6"
6" 4"
2'-6"
2'-0" 10"
Slope 1.6%
Normal shoulder line
Normal shoulder line
Normal shoulder line
Bridge abutment wings
E .W .S
L c optional
L GutterF
Bridge floor
Bridge floor
Align face of Guardrail with upper face of curb
TYPICAL GUTTER @ BRIDGE ENDS
B
B
SECTION B-B
C
C
SECTION C-C
D
D
SECTION D-D
E
E
SECTION E-E
(Drawn for down grade end and "U" Type Abutments)
CONTROL POINT FOR FULL
WIDTH ROADWAY BRIDGE
CONTROL POINT FOR BRIDGE
WITH SAFETY TYPE CURB
GUTTER NEAR E.W.S.
FULL GUTTER SECTION
FOR RETROFIT OF BRIDGE APPROACHES WITH GUTTER
At locations where the centerline grade is relatively flat and the pavement grade is such that the gutter will direct drainage onto the bridge, the flowline depth may be re-duced as directed by the Engineer to facilitate drainage.
Transition gutter to standard 2'-10" gutter section.
1 7 7-2-09
J.O.B.S.W.K.
1-1 0-07
Rev. nose details, jt. sealant& retro.
Specify (curb height and type) ƒ ƒ
(6
C u r b
(8
C u r b
P a v e m e n t th ic k n e s s ƒ
#4 x 3'-0" bars @ 2'-6" ctrs.
4•" 4•"
9"
Road surface
Ground line
#4 Longitudinal bar
SECTION ELEVATION
R
Note: Conc. C.&G. ||| contains 0.054 (8") & 0.051 (6") cu. yds. Conc. Grade
3.0 (AE) per lin. ft.
RD635
TRACED Bowser
TRACE CK. King
APP'D. James O. Brewer
If constructed monolithically, the longitudinal joint is not required.
Gutter".& Curb
"Combined item bid the to subsidiary be shall nose median complete to needed
(AE) 3.0 Grade Concrete Additional Note:
Place a 1" Preformed Expansion Joint Filler (Nonextruding, Type asphalt is used in median.
Omit Expansion Joint material when
B) at a spacing not to exceed 250'.
B)(Type Filler Joint Expansion Preformed •" gutter.and curb in weakness of plane match shall median the in weakness of Plane 125'. of spacing maximum a with gutter and curb the in joints expansion match shall median the in joints Expansion surface.the with flush installed B) (Type Filler Joint Expansion Preformed •" be shall joints expansion runs long In follows. as median concrete in placed be shall joints Expansion Note:
B)(Type Filler Joint Expansion Preformed •"
B)(Type Filler Joint Expansion Preformed 1•"
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
rd .d g n
F il e
D ra w n B y tr h o a d s
P lo tt e d -J
U N -2
:4
DATE REVISIONS BY APP'DNO.
KANSAS DEPARTMENT OF TRANSPORTATION
FHWA APPROVAL
DESIGNED
DETAILED
DESIGN CK. DETAIL CK. QUAN.CK.
RD
TRACED
TRACE CK.
QUANTITIES
APP'D.
Specifications.
Standard see sealant, joint with sealed and sawed be shall joints Longitudinal wing on a U-type abutment see bridge drawings.
bridge a abuts gutter or gutter and curb combined where treatment joint expansion For through gutter section, shaped to fit gutter or curb and gutter. See Std. Drawing RD712.
adhesive bonding with installed sealant membrane 4"x4" use 10', than more for on continued is gutter and curb or gutter and pavement, the across placed is joint relief pressure Where end of a bridge. Inlets shall be located so as not to fall within this transition section.
the at as such curb, a abuts gutter the where except gutter of run each of ends the at used be shall section gutter tapered the to section gutter normal from transition of length 4' A the ends of curb returns. Planes of weakness shall be constructed at 10'-0" intervals.
at and 250' exceed to not spacing a at gutter, or gutter and curb combined the of dimensions the to cut B) (Type Filler Joint Expansion Preformed 1" a place and bars tie omit course, base concrete or pavement concrete abut not does gutter or gutter and curb combined Where joints in the pavement.
expansion opposite placed be to are gutter and curb combined the in joints Expansion used for the pavement joints.
as material same the with filled be to are gutter or gutter and curb combined the in Joints required. be will weakness of planes other no and gutter or curb through continued be shall
Joints Pavement gutter. or gutter and curb combined the from omitted be shall bars tie and joint longitudinal the monolithically, constructed If plans. the on shown as section same the have shall gutter or gutter and curb combined The (AE). 3.0 Grade Concrete or pavement concrete the in used mix the either using separately, or monolithically either constructed be option, contractor's the at may, pavement concrete adjoining gutter or gutter and curb Combined
8-13-1218 Revised General Note
4" 3 •"
2 •" R
7 •"
1-29-1319 Added Detail, Comb. C&G (Sp.)
is constructed.
ctrs., where concrete pavement and #4 x 3'-0" bars @ 2'-6"
Longitudinal construction joint
1'-9" E.O.P.
COMBINED CURB AND GUTTER (SPECIAL) (1'-9" WIDTH)
V a r
Note: Thickness to match adjacent pavement.
5-21-2013
K D
O T G r a p h ic s C e r ti fi e
KDOT Graphics Certified 06-06-2013
6' R
C
C ƒ
•"38 14•"
5 9-12-07
Does not include guide vanes.
Reorg. sheet, add. slope drain stone ì
QUANTITIES (For information only) ì m in î
D it c h o r n o r m a l g r o u n d li n e
DIAGRAM of FLUME INLET at PRESSURE RELIEF JOINT
F
F
1'-6" 1'-6"
Geotech fabric linedÜ
ÙGeotech fabric linedÛ
SECTION F-F
Flume Inlet
G G
ÚGround Line
Geotextile Fabric
SLOPE DRAIN (CONCRETE/STONE)
0.25 cu. yds. 4" Agg. (D50) per lin. ft.
SLOPE DRAIN CONCRETE
SLOPE DRAIN STONE
into toe wall
Bend welded wire reinforcement
Flume Inlets shall be paid for by unit price per each. Slope Drains
Shape of guide vane shown is approximate and may be altered slight-ly to simplify construction. Height and width dimension shall be as shown regardless of shape.
Transverse expansion and contraction joints of same type in pave-ment are to extend through the flume inlet and 4" edge curb, omitting load transfer devices. The edge curb section will be made continuous through any expansion joint by using a filler material
Concrete Grade 3.0 (AE) shall be used in Flume Inlet and Slope Drain.
On concrete pavement projects, the contractor may substitute the mix used in concrete pavement.
Flume inlet shall be tied to the pavement with #4 x 4'-0" tie bars at 2'-6" centers. Tie bars shall be subsidiary to the Flume Inlet.
Aggregate for the Slope Drain (STONE) shall meet the reqirements of stone for Aggregate Ditch Lining and have a D of 4" unless otherwise noted on the plans. The Contractor shall place stone from bottom to the top of slope to produce a well graded mass without segregation of mater-ial sizes. Placement, measurement, and payment shall conform to KDOT
Flow line
1'-0" Lap (min.) Geotextile fabric
SECTION F-F
0.90 sq. yds. Geotextile fabric per lin. ft.
P a id f o r a s li n f t.
S lo p e
D r a in
(S to n e
P a id f o r a s li n f t.
S lo p e
D r a in
(C o n c r e te
10'-1‚"
See Toe Wall Details
9'-4ƒ"
F
Flume Inlet Concrete:
2.2 cu. yds. Concrete
44 lbs. reinf. steel and WWR
Flume Inlet & Toe Wall Concrete:
Slope Drain (STONE) shall be underlain with geotextile fabric that meets the KDOT Standard Specification. All work and materials for the geotextile fabric shall be subsidiary to the Slope Drain (STONE).
Standard Specifications.
F lu m e
In le t (C o n c
B id a s
F lu m e
In le t (C o n c r e te
Lin. Ft. of Slope Drain (Stone)
Lin. Ft. Slope Drain (Stone)
Lin. Ft. of Slope Drain (Concrete)
Lin. Ft. Slope Drain (Concrete)
Ground lineÜ ÚGround line
2'-0" 4" Aggregate (D50)
ÙGeotech fabric lined
SECTION G-G
5'-0"
6" 6"3 m in (T y p
PARTIAL PLAN with GUIDE VANE
Location of Construction Joint or Plane of Weakness
Ú E x p a n s io n
J o in t
Ù P r e s s u r e
R e li e f
J o in t
Ú E
W S ƒ
(C o n c d r a
(S to n e d r a in
Toe WallÜ
1•" Clear
Slope 1„" per ft.
e d g e o f f lu m e in le t.
G r a d e s lo p e to to p
(Stone or Concrete) shall be paid for by unit price per linear foot.
SLOPE DRAIN (CONCRETE)
SLOPE DRAIN (STONE)
Slope Drain is shown with (STONE) or (CONCRETE) option, type to be determined by the Designer.
ÚSlope Drain (Stone)
Slope Drain (CONCRETE):
Slope Drain (STONE): 4" Aggregate (D50)
GENERAL NOTE
All exposed edges shall be finished with an edging tool.
monolithic and struck off with a uniform thickness of 6 inches.
The entire area of the Flume Inlet & Slope Drain shall be placed
Flume Inlets will be constructed without Guide Vanes except at locations noted in plans or as directed by the Engineer. Construction of guide vanes, when required, shall be subsidiary to the bid item
Guide Vanes may be formed monolithic with the Flume Inlet or tied
Flume inlet shall only be constructed adjacent to concrete pavement.
to the Flume Inlet in the manner shown if constructed separately. Al-proval of the Engineer.
ternate methods of constructing Guide Vanes may be used with ap-
For details of 4" edge curb see Standard Drawing RD711.
"Flume Inlet ".
Joints will not extend into the Slope Drain.
No adjustment of guardrail post spacing will be permitted.
Flume Inlet and Slope Drain.
Reinforcing steel & welded wire reinforcement are subsidiary to
0.0833 cu. yds. Concrete per lin. ft.
Toe wall shall be paid for as 1.5 lin. ft.
of Slope drain.
0.79 lbs. WWR per lin. ft.
1.9 cu. yds. Concrete
42 lbs. reinf. steel and WWR
3 J.O.B.7-26-04 Revised guard fence to guardrail S.W.K.
S.W.K. J.O.B.4 1-28-05 Chg. Class to Grade conc., reinf.
S.W.K. J.O.B.
FLUME INLET and
Parallel guardrail location. If guardrail is installed with a flare this dimension will be variable.
On projects with concrete paved shoulders where, due to skew of the bridge, the flume inlet extends beyond the 4" pressure relief joint of the special concrete bridge approach, the portion of inlet or to the concrete shoulder with tie bars.
gutter extending beyond the pressure relief joint shall not be tied
12"
2'-0"
4: 1
12" 12" 12" 12"
4'-0"
12"
9"
12"12"12"12"12"
InletFlume
W a r p to ƒ
10'-0"
31"
3•"
4'-0"
18'-0"
See Bridge Approach Detail
4" Edge curb
3•"
42ƒ"
6" 6"
29ƒ"
C le a r
15‚" Wood Po. Guardrail
14‚" Steel Po. Guardrail 6"
4" 3•"
Roadway 2'-9‚"
2'-0"
Rounding
4" Edge Curb
12" 12"
12"12"12"
4'-0"
(Bend one bar each length) (Typical both ends of vane)
(Guide Vane formed monolithic)
SECTION B-B
PLAN
END ELEVATION
SIDE ELEVATION
B
A
A
SECTION C-C
D
SECTION D-D
SLOPE DRAIN & TOE WALL DETAILS
B
E
SECTION E-EBending Diagram
METHOD of CONNECTING GUIDE VANE to FLUME INLET
E
SECTION A-A
D
Lc c
Ground lineGround line
1„"/ft. Slope
Variable slope
Edge of Shoulder
2-#4 bars - 17'-2" long
Edge of shoulder
4" Edge Curb
4: 1
#4 x 4'-0" tie bars @ 2'-6" ctrs. (Conc. Pvt. Only)
#3 c - bars
#3 c - bars
L Guardrail posts. Form opening(s) in
Flume Inlet for guardrail post(s).
Welded Wire Reinforcement 6 x 6 - W1.4 x W1.4 or WWR used in concrete pavement.
Welded wire reinforcement
2•" R
Variable slope
2•" R
1„"/ft. Slope
Variable slope
Edge of shoulder
Welded Wire Reinforcement 6 x 6 - W1.4 x W1.4 or WWR used in concrete pavement.
f a b r ic li n e
Ü
G o te c h
4" edge curb to 4 : 1 slope
Smooth transition from
Tie bar
2" R.
W
W for details.
See Standard Drawing RD712 approved by the Engineer to fill the void to the full height of the curb.
6 1-25-16 T.T.R.Added Note to Designer S.W.K.
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
rd .d g n
F il e
D ra w n B y tr h o a d s
P lo tt e d -F
E B -2
:5
DATE REVISIONS BY APP'DNO.
KANSAS DEPARTMENT OF TRANSPORTATION
FHWA APPROVAL
DESIGNED
DETAILED
DESIGN CK. DETAIL CK. QUAN.CK.
RD628
TRACED
TRACE CK.
QUANTITIES
APP'D. Scott. W. King
N o te to
D e s ig n e r
W h e n c o n c r e te f lu m e in le ts a r e u s e d o n p r o j e c ts w it h a s p h a lt p a v m e n t u s e a b r id g e a p p r o a c h
2-1-16
K D
O T G r a p h ic s C e r ti fi e
KDOT Graphics Certified 02-08-2016 ra w n B y
F il e m u s h o c k
P lo tt e d
T E .d g n
T E
-S
E P -2
:1
T ra ff ic
REVISIONS BY APP’DDATENO.
TRACED
TRACE CK.
APP’D
QUANTITIES
QUAN. CK.
DETAILED
DETAIL CK.
FHWA APPROVAL
DESIGNED
DESIGN CK.
KANSAS
STATE PROJECT NO. YEAR
TOTAL
SHEETS
SHEET NO.
KANSAS DEPARTMENT OF TRANSPORTATION
TE406
7/22/2003
D.D.G.
S.A.B. D.D.G.
W.S.B.
Steven A. Buckley
AND LONGITUDINAL ADJUSTMENTS
LATERAL OFFSETS
DETAILS FOR MOUNTING HEIGHTS
7/1/03
CONVENTIONAL ROADWAY IS 100 FEET.
THE MINIMUM SPACING BETWEEN SIGNS ON A RAMP OR
EXPRESSWAY OR FREEWAY IS 800 FEET.
THE MINIMUM SPACING BETWEEN GUIDE SIGNS ON AN
CHECKED AND MODIFIED AS NEEDED.
ADJUSTED, THE DISTANCE TO THE DESTINATION SHALL BE
IF ANY SIGN WITH A DISTANCE IS LONGITUDINALLY
MILEPOST - 50 FEET
MERGE OR ANY SIGNS IN AN INTERCHANGE - 50 FEET
MILEAGE - 2640 FEET
EXIT DIRECTION - 100 FEET
MOTORIST SERVICE - 1320 FEET
SUPPLEMENTAL GUIDE - 1320 FEET
ADVANCE GUIDE - 1320 FEET
SIGNS ARE:
THE MAXIMUM ALLOWABLE LONGITUDINAL ADJUSTMENTS OF
AND IF IT WILL PROTECT THE SIGN MORE.
WILL IMPROVE THE VISIBILITY OF THE SIGN OR OTHER SIGNS
SIGNS MAY BE MOVED LATERALLY OR LONGITUDINALLY IF IT
ADJUSTMENTS:
AREA IS 3 FEET.
THE POST CENTERLINE TO THE BACK EDGE OF THE PAVED GORE
BEYOND THE SHOULDER EDGE. THE MINIMUM DISTANCE FROM
STATION. THE EDGES OF THE GORE SIGN SHALL NOT EXTEND
PROVIDED, THEN LOCATE THE GORE SIGN AT THE PLAN
BLOCKOUT IN THE PAVED GORE AREA. IF NO BLOCKOUT IS
THE GORE SIGN SHALL BE INSTALLED IN THE FOOTING
S H
O U
L D
E R E
D G
E
P A
V E
M E
N T E
D G
E
S H
O U
L D
E R E
D G
E
P A
V E
M E
N T E
D G
E
S H
O U
L D
E R E
D G
E
P A
V E
M E
N T E
D G
E
S H
O U
L D
E R E
D G
E
P A
V E
M E
N T E
D G
E
S H
O U
L D
E R E
D G
E
S H
O U
L D
E R E
D G
E
P A
V E
M E
N T E
D G
E P
A V
E M
E N
T E
D G
E
B R
E A
K
C R
O S
S S
L O
P E
* - 8’6" WITH SECONDARY SIGN
** - 60’ MAX.
* - 8’6" WITH SECONDARY SIGN
* - 8’6" WITH SECONDARY SIGN
* - 8’6" WITH SECONDARY SIGN
* - 8’6" WITH SECONDARY SIGN
GROUND LINE
MAX. SLOPE= 3:1
C R
O S
S S
L O
P E B
R E
A K
SIGN POST
CENTERLINE OF
M
A I N
L I N
E P
A V
E M
E N
T E
D G
E
R A
M P P
A V
E M
E N
T E
D G
E
R A
M P P
A V
E M
E N
T E
D G
E
R A
M P P
A V
E M
E N
T E
D G
E
RAMP
SHOULDER
RAMP GORE SIGN
SHOULDER
MAINLINE OR RAMP
AREA
PAVED GORE
(DIMENSIONS ARE MINIMUMS)
SHOULDER MOUNT SHOULDER MOUNT
CONVENTIONAL ROADWAY
SHOULDER MOUNT SHOULDER MOUNT
FREEWAY AND EXPRESSWAY ROADWAY
FREEWAY AND EXPRESSWAY ROADWAY
OFFSET MOUNT
SHOULDER MOUNT SHOULDER MOUNT
RAMPS AND SIDE ROADS
FREEWAY AND EXPRESSWAY ROADWAY
TYPICAL MEDIAN SIGN LOCATION
NARROW MEDIAN WIDE MEDIAN
(RAMP/RAMP)
WITH TWO T1/OM’S
GORE INSTALLED SIGN
(MAINLINE/RAMP)
GORE INSTALLED SIGN
(CROSS-SLOPE BREAK)
POST PLACEMENT CRITERIA
5’6’’
5’6’’
12’
12’
12’ MIN.
12’ MIN.
12’ MIN.
12’ MIN.
12’ MIN.
12’ MIN.
6’
6’
6’
6’
6"
6"
6"
6"
MIN.
7’
MIN.
7’ MIN.
7’
MIN.
7’
MIN.
7’
MIN.
7’
MIN.
7’
MIN.
7’
7’6"
7’6"
7’6"
7’6"
5’6"
30’ MIN.
5’6’’ 5’6’’
5’6’’
5’6’’ 5’6’’
4’6" 4’6"
MIN.
7’
MIN.
7’
MIN.
7’
4’6"4’6"
MIN.
7’6"
MINIMUM
3’
MINIMUM
3’
A B A B
7’6"7’6"
4’6"
RAMP/RAMP
RAMP
MAINLINE/
TYPE
GORE
(FT)
A
(FT)
B
3 3
A
B
P A
V E
M E
N T E
D G
E
OR BE CLOSER THAN 2 FEET FROM THE BACK OF THE CURB.
SHOULD NOT EXCEED THE DISTANCE OF THE SHOULDER MOUNT
BACK OF THE CURB AS THE RADIUS OF THE MEDIA NOSE, BUT
MEDIAN NOSE SHOULD BE SET THE SAME DISTANCE FROM THE
THE BACK EDGE OF THE CURB. SIGNS LOCATED AT THE
CURB, BUT IN NO CASE SHALL THE SIGN EDGE EXTEND BEYOND
MAY BE PLACED A MINIMUM OF 2 FEET FROM THE BACK OF THE
THE MEDIAN IS TOO NARROW FOR THIS PLACEMENT THE SIGN
PLACEMENT SHOULD BE THE SAME AS A SHOULDER MOUNT. IF
WHEN SIGNS ARE MOUNTED IN A MEDIAN, THE LATERAL
BEYOND THE NOSE OF THE GUARD FENCE.
LOCATED BETWEEN 100 FEET IN ADVANCE OF AND 50 FEET
FENCE. THERE SHALL NOT BE ANY SHOULDER MOUNTED SIGNS
A MINIMUM OF 5 FEET FROM THE FACE OF THE GUARD
OF THE GUARD FENCE AND THE NEAREST SIGN POST SHALL BE
EDGE OF THE SIGN SHALL NOT EXTEND BEYOND THE BACK SIDE
WHEN SIGNS ARE MOUNTED BEHIND GUARD FENCE, THE NEAR
HEIGHT MAY BE USED.
CLEARANCE OF 2 FEET WITH A 7’6" MINIMUM MOUNTING
WHERE LATERAL OFFSETS ARE LIMITED, A MINIMUM LATERAL
IN BUSINESS, COMMERCIAL, OR RESIDENTIAL DISTRICTS
RIGHT OF WAY LINE.
FREEWAYS, SHALL BE A MINIMUM OF 10 FEET FROM THE
THE OUTER EDGE OF THE SIGN, ON EXPRESSWAYS AND
NOTES:
ONE OR TWO OM1-3 PRIMARY SIGN WITH OM1-3
Sh. No.
XXXXXX-XX XX-XXXX-XX XXXXXX
XXX
K D
O T G r a p h ic s C e r ti fi e
KDOT Graphics Certified 09-08-2010 ra w n B y
F il e m u s h o c k
P lo tt e d
T E .d g n
T E
-S
E P -2
:1
T ra ff ic
REVISIONS BY APP’DDATENO.
TRACED
TRACE CK.
APP’D
QUANTITIES
QUAN. CK.
DETAILED
DETAIL CK.
FHWA APPROVAL
DESIGNED
DESIGN CK.
KANSAS
STATE PROJECT NO. YEAR
TOTAL
SHEETS
SHEET NO.
KANSAS DEPARTMENT OF TRANSPORTATION
TE466
7/22/2003
D.D.G.
S.A.B. D.D.G.
A.A.D.
Steven A. Buckley
TUBE POSTS (PSST)
PERFORATED SQUARE STEEL
DETAILS FOR
7/1/03
B B
SIGN
SIGN POST
A A
GROUND LINE
ANCHOR SLEEVE
SIGN POST ANCHOR
BB
SIGN
SIGN POST
GROUND LINE
SIGN POST ANCHOR
CC
36"
18"
6" 6"
36"
1 1/2" 1 1/2"
MATERIAL REQUIREMENTS
LINE FOR INSERTION OF THE CORNER BOLT.
SIGN POST, POST ANCHOR, AND POST ANCHOR SLEEVE (IF REQUIRED) MUST BE IN
IN ALL INSTALLATIONS, THE FIRST HOLE ABOVE THE GROUND LINE ON THE
NOTE:
INSTALL SIGN POST INTO THE POST ANCHOR.3.
THE POST ANCHOR.
DRIVE POST ANCHOR SLEEVE (IF REQUIRED) INTO SUBGRADE OVER2.
DRIVE POST ANCHOR INTO SUBGRADE.1.
INSTALLATION SEQUENCE
OF 60,000 P.S.I.
14 GA. POSTS MUST MEET A CERTIFIED MINIMUM YIELD STRENGTHNOTE:
POST ANCHOR POST ANCHOR SLEEVE
FOOTING
MATERIALS TABLE FOR SIGN POST AND FOOTING
2 1/2" X 2 1/2"
2 1/4" X 2 1/4"
2" X 2"
1 3/4 " X 1 3/4 " 2" X 2" X 12 GA.
2 1/4" X 2 1/4" X 12 GA.
2 1/2" X 2 1/2" X 12 GA.
3" X 3" X 7 GA. NOT REQUIRED
3" X 3" X 7 GA.
2 1/2" X 2 1/2" X 12 GA.
2 1/4" X 2 1/4" X 12 GA.
12 GA. OR 14 GA.
SIGN POST
POST ANCHOR
SIGN POST
JAM NUT
5/16" HEX
CORNER BOLT
5/16" STD.
WASHER
FLAT
POST ANCHOR SLEEVE
POST ANCHOR
SIGN POST
JAM NUT
5/16" HEX
CORNER BOLT
5/16" STD.
WASHER
FLAT
JAM NUT
5/16" HEX
CORNER BOLT
5/16" STD.
WASHER
FLAT
SIGN POST
SIGN
SECTION A-A
SECTION C-C
SECTION B-B
DETAILS FOR 1 3/4", 2", OR 2 1/4" SIGN POST
DETAILS FOR 2 1/2" SIGN POST
DIMENSIONAL REQUIREMENTS.
CONSTRUCTION (1990 EDITION) AND VISUAL INSPECTION FOR CONDITION AND
2600 OF THE STANDARD SPECIFICATIONS FOR STATE ROAD AND BRIDGE
RECEIPT AND APPROVAL OF A TYPE D CERTIFICATION AS DESCRIBED IN SECTION
FURNISHED TO COMPLY WITH THE ABOVE REQUIREMENTS WILL BE BASED ON
ACCEPTANCE OF THE STEEL POSTS, ANCHORS, SLEEVES, AND FASTENERS
BASIS OF ACCEPTANCE:
ITEM ’SQUARE STEEL POST’.
THE BOLTS, NUTS, AND WASHERS SHALL BE BID SUBSIDIARY TO THE BID
CONSTRUCTION (1990 EDITION).
OF THE STANDARD SPECIFICATIONS FOR STATE ROAD AND BRIDGE
THE BOLTS, NUTS, AND WASHERS SHALL COMPLY WITH SUBSECTION 1614
FASTENING ACCESSORIES:
AND SHARP EDGES ARE TO BE SMOOTHED OFF BEFORE APPLICATION OF FINISH.
ALL HOLES SHALL BE DRILLED OR PUNCHED AND ALL WELDS, CUTS, BURRS,
IMMEDIATELY ABOVE THE GROUND LINE.
THE BOLT HOLES ON ALL FOUR SIDES WITH THE EXCEPTION OF THE HOLES
THE POST ANCHOR AND POST ANCHOR SLEEVE MAY BE FURNISHED WITHOUT
LENGTH OF POST.
( DIE-CUT KNOCKOUTS) AT 1" CENTERS ON ALL FOUR SIDES FOR TOTAL
THE SIGN POST SHALL HAVE 7/16" DIA. HOLES OR 7/16" DIA. EMBOSSED RING
CONFORMING TO ASTM A-525, DESIGNATION G-90.
COLD ROLLED CARBON STEEL ASTM A-446 GRADE A WITH A GALVANIZING
LINKED POLYURETHANE ACRYLIC EXTERIOR COATING OR (2) A GALVANIZED FINISH
WITH AN INLINE SYSTEM FOLLOWED BY A CHROMATE CONVERSION AND A CROSS-
QUALITY C 1021 WITH A HOT-DIPPED GALVANIZING CONFORMING TO AASHTO M-120
TO (1) HOT ROLLED CARBON STEEL ASTM A-570 GRADE 33 OR ASTM STRUCTURAL
THE SIGN POSTS, POST ANCHORS, AND POST ANCHOR SLEEVES SHALL CONFORM
SIGN POSTS, POST ANCHORS, AND POST ANCHOR SLEEVES:
Sh. No.
XXXXXX-XX XX-XXXX-XX XXXXXX
XXX
K D
O T G r a p h ic s C e r ti fi e
KDOT Graphics Certified 09-08-2010
| Title Sheet |
| Typical sheet |
| 01 Caisson Hill |
| 02 Caisson Hill |
| Dickman |
| MAAF |
| 01 Trooper |
| 02 Trooper |
| 03 Trooper |
| 04 Trooper |
| 05 Trooper |
| 06 Trooper |
| RD 635 Curb and gutter |
| RD628 Concrete Flume |
| TE406 lateral offset |
| TE466 square steel tube |
File details come from the government source that posted it. Updated .