Statement_of_Work.pdf

PDF 111 KB Posted

Attached to
4 post vehicle lift Federal contract opportunity
Solicitation number
W911RP-19-T-0003
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to 4 post vehicle lift, newest first.
File Type Posted
W911RP-19-T-0003_P00001_Soliciation_Amendment.pdf PDF
W911RP-19-T-0003_Soliciation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements Statement

30,000 Lb. 4 Post Vehicle Lift

Background

The U.S. Department of Defense – Army, Pine Bluff Arsenal (PBA) has a requirement for purchase and installation of a Hydraulic 4 post vehicle lift with at least a 30,000 Lb. capacity this lift will be installed at building 32-035 mobile equipment maintenance shop and will be used for lifting vehicles and equipment for service and repair. The lift that personnel were using is a 2001 model and is not up to safety standards. The safety latches failed with a vehicle on it and broke the lift chains and twisted the hydraulic cylinder rod, it is not feasible to try to have this unit repaired.

Minimum Requirements

The Contractor shall furnish and install the hydraulic lift to include any equipment and components necessary for total installation.

Equipment:

30,000 Lb. Hydraulic 4 Post vehicle lift following specifications

Rise 67”, Overall Length with 6” Extensions 371 3/8”, Width 147 ¾”, Height 91 ½”, Inside of Columns 130 ¾”, Between Columns 234”, Column Height 74 7/8”, Runway Width 24”, Runway Length 256 ½” See attached sheet for bolt pattern.

Installation Instructions:

Contractor will uninstall and remove existing damaged lift, disconnecting all electrical and air connections, Relocate damaged lift to designated location, Furnish a new 30,000 Lb. lift, lift is required to fit exactly in the existing 16 bolt anchoring pattern, Contractor will connect air lines and electrical wiring and set and adjust to factory specifications.

Place of Performance

Installation of 30,000 Lb. lift shall be performed at building 32-035 (Mobile Equipment Maintenance Shop) at the Pine Bluff Arsenal, 10020 Kabrich Circle, Pine Bluff, AR 71602.

Period of Performance

Contractor shall complete the project within ninety (90) calendar days after award.