Statement_of_Work.pdf
PDF 111 KB Posted
- Attached to
- 4 post vehicle lift Federal contract opportunity
- Solicitation number
- W911RP-19-T-0003
About this file
Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911RP-19-T-0003_P00001_Soliciation_Amendment.pdf | ||
| W911RP-19-T-0003_Soliciation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirements Statement
30,000 Lb. 4 Post Vehicle Lift
Background
The U.S. Department of Defense – Army, Pine Bluff Arsenal (PBA) has a requirement for purchase and installation of a Hydraulic 4 post vehicle lift with at least a 30,000 Lb. capacity this lift will be installed at building 32-035 mobile equipment maintenance shop and will be used for lifting vehicles and equipment for service and repair. The lift that personnel were using is a 2001 model and is not up to safety standards. The safety latches failed with a vehicle on it and broke the lift chains and twisted the hydraulic cylinder rod, it is not feasible to try to have this unit repaired.
Minimum Requirements
The Contractor shall furnish and install the hydraulic lift to include any equipment and components necessary for total installation.
Equipment:
30,000 Lb. Hydraulic 4 Post vehicle lift following specifications
Rise 67”, Overall Length with 6” Extensions 371 3/8”, Width 147 ¾”, Height 91 ½”, Inside of Columns 130 ¾”, Between Columns 234”, Column Height 74 7/8”, Runway Width 24”, Runway Length 256 ½” See attached sheet for bolt pattern.
Installation Instructions:
Contractor will uninstall and remove existing damaged lift, disconnecting all electrical and air connections, Relocate damaged lift to designated location, Furnish a new 30,000 Lb. lift, lift is required to fit exactly in the existing 16 bolt anchoring pattern, Contractor will connect air lines and electrical wiring and set and adjust to factory specifications.
Place of Performance
Installation of 30,000 Lb. lift shall be performed at building 32-035 (Mobile Equipment Maintenance Shop) at the Pine Bluff Arsenal, 10020 Kabrich Circle, Pine Bluff, AR 71602.
Period of Performance
Contractor shall complete the project within ninety (90) calendar days after award.