16-R-0002 Amendment 0001 Boilers

View the file

Other files

File Type Posted
DD1423-5.pdf PDF
Statement_of_WorkR4B.pdf PDF
WageDetermination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W41G26607800RH

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Extend Solicitation Closing date to 30 June 2016

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Jun-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911RP-16-R-0002

X 9B. DATED (SEE ITEM 11)

02-May-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Jun-2016

CODE

ARMY CONTRACTING COMMAND - ROCK ISLAND

PINE BLUFF ARSENAL CONTRACTING OFFICE

10-020 KABRICH CIRCLE

ATTN: CCRC-ISP

PINE BLUFF AR 71602-9500

W911RP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911RP-16-R-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

PROPOSAL REQUIREMENTS

REQUIREMENTS FOR SUBMISSION OF PROPOSALS

1. Send all Proposals directly to address shown in block 7 of SF 1442 – Which is:

ARMY CONTRACTING COMMAND‐ ROCK ISLAND

PINE BLUFF ARSENAL CONTRACTING OFFICE

10‐020 KABRICH CIRCLE

ATTN: CCRC‐ISP

PINE BLUFF, AR 71602‐9500

2. ALL PROPOSED CONTRACTORS SHALL BE REGISTERED AND CURRENT IN SYSTEM FOR AWARD

MANAGEMENT (SAMS’s)

3. The basis for award will be the Lowest Price, Technically acceptable offer; however all contractors submitting a proposal must show that they are submitting the correct material, and also capable of installing the equipment. All proposals must include :

a. Break down in Price, installation of equipment and installation of Roof

b. Provide Salient Characteristic for Boilers to include Type, Model Number, and

Specifications.

c. You must provide written documentation on how you will install the Boilers. .

4. For this solicitation the components and equipment shall be newly manufactured, not be used, refurbished or previously used for demonstration.

5. A price reasonableness approach will be utilized by the Government to determine that the proposed price offered is fair and reasonable and that a “buy‐in” or unbalanced pricing is not occurring. The Government will examine price proposals for artificially low prices or unreasonable high prices, and these prices may be considered unacceptable and may be rejected on that basis.

6. Do not submit your proposal or pricing electronically.

7. This Solicitation will result in a Firm‐Fixed Price Award.

QUESTION & ANSWERS

QUESTION (Q)

ANSWERS (A)

Q: The equipment replacement requirements are not detailed enough to properly bid without the following clarifications:

A: Per SOW: Pine Bluff Arsenal (PBA) has a requirement for two (2) each complete High Efficiency Steam Boilers systems… to include, inside delivery, installation, start-up and testing at Bldg. 34-125. The contractor shall furnish all labor, travel, material, parts, kits, permits, tools, components (valves, controls, fittings, etc.), subparts and equipment necessary to install two (2) each steam boilers systems… Equipment, including both the boilers and all ancillary equipment, shall be tested once installed to verify all aspects of the system are operating within parameters of the required specifications. Essentially, this contract is a turn-key solution provided by the winning contractor.

Q: Existing boilers are rated at 350 HP and 12,075 LBS/HR steam. Statement of work indicates boilers LBS/HR steam to be 13,500 LBS/HR that would equate to 391.3 HP. This would be a size between a Standard 350 HP Boiler or a 400 HP Boiler. If we go with a 400 HP Boiler the stack outlet would increase to 24” in lieu of the existing 20” boiler stack and the 20” that would be furnish on a 350 HP Boiler. This would require the boiler stacks to be changed.

A. Provide equipment capable of producing 13,500 lbs. /hr. of steam. It is acceptable to increase the tack size.

Q: The existing boilers are gas #2 oil fired. Do you want just gas fired burners and you mention low NOx with no specific NOx level. Typical low NOx would be 30 PPM. What level do you want?

A: Provide natural gas fired burners. Firing with #2 fuel oil is not a requirement. The maximum desired NOx emission is 60 ppm

Q: Do you want boiler surface blowdown and would it be manual or auto conductivity?

A: Provide for auto conductivity surface blowdown and ability for manual blowdown. The Government requires a complete turn-key boiler system to including installation and all ancillary equipment.

Q: Existing boilers have a blowdown separator for each boiler, you can get by with one or do we provide a blowdown separator per boiler?

A: Provide a new blowdown separator for each boiler.

Q: The control system is indicated to have independent actuators for optimal efficiency in low NOX application. Do you require oxygen trim?

A: Provide for oxygen trim as necessary to achieve optimum fuel efficiency while meeting the NOx specification.

Q: Existing boilers have modulating feedwater controls. There is no statement to type of Feed‐water controls to be supplied on the boiler.

A: The intended application is to provide steam to production operations at PBA. Steam demand is expected to vary significantly with very little condensate return. Provide feed water valves consistent with the intended application. The government requires a complete turn‐key boiler system to including installation and all ancillary equipment.

Q: The existing feed water system is a 24,000 LBS/HR deaerator rated at .005 cc/liter with factory Supplied jacket, (3) boiler feedwater pumps, one per boiler with a standby pump and control panel with indicating lights and disconnect. There is no detailed description of replacement feed system as to oxygen removal, supplied with or without factory jacked, number of pumps or controls required.

A: The intended application is to provide steam to production operations at PBA. Steam demand is expected to vary significantly with very little condensate return. Provide independent feed water system for each boiler consistent with the intended application with one (1) auxiliary pump for back up to support operation of either boiler. The government requires a complete turn‐key boiler system to including installation and all ancillary equipment. . Provide desecrator rated for oxygen removal down to levels of 7 ppb by weight (0.005 cm³/L) or less.

Q: The existing Kewanee boilers arc rated at 350 BHP each, however both the synopsis and SOW state a steam output of 13,500 lbs./hr., which depending on the operating conditions, (assuming feed water temperature of 227 F and operating steam pressure of 100 psig) would equal approximately 400 BHP. What is the desired size for the replacement boilers?

A: Provide equipment capable of producing 13,500 lbs./hr. of steam.

Q: What will be the normal desired operating steam pressure for these boilers?

A: 125 psig

Q: What will be the "Design" steam pressure?

A: 150 psig

Q: What will be the desired set pressure for the boiler safety relief valves?

A: Manufacture’s recommended set pressure. Conform to ASME boiler and pressure vessel code.

Q: The SOW states Low NOx burner. What is the actual desired ppm level for NOx? We can provide 60 ppm, 30 ppm, or we do have as low as 9 ppm available. To my knowledge, Pine Bluff Arkansas area is uncontrolled.

A: 60 ppm

Q: What is the available gas pressure to the inlet of the gas trains on the new boilers?

A. Up to 60 lbs.

Q: Would P.B.A. want the boilers to be hydro‐static tested in the factory or in the field? Factory hydro includes testing of all piping to the first valve as standard.

A: The government requires a complete turn‐key boiler system to including installation and all ancillary equipment. Contractor is responsible for all testing, installation, and system startup consistent with the specification.

Q: Would you want to include a chemical feed connection and piping to the stop valve?

A: Yes. The government requires a complete turn‐key boiler system to including installation and all ancillary equipment.

Q: Would you want to include a surface blowdown manual valve and piping to the valve?

A: Yes. The government requires a complete turn‐key boiler system to including installation and all ancillary equipment.

Q: Would you want to include an automatic surface blowdown system with each boiler? These would be shipped loose for field installation. Piping and wiring by installer.

A: Yes. The government requires a complete turn‐key boiler system to including installation and all ancillary equipment. Contractor is responsible for all testing, installation, and system startup as required.

Q: If the hydro test is to be performed at the factory, then the SOW should state that the following valves should be supplied by the boiler manufacturer; Main Steam stop valve, Main Steam Non‐Return stop/check valve with free blow drain mounted to the valve, feed water stop and check valves, (with or without full 3 valve by‐pass), blowdown valves (recommend front and rear quick open valves and one slow open blowdown valve), manual surface blowdown throttling valve and chemical feed stop valves, if these last two options are desired ( highly recommended).

A: The government requires a complete turn‐key boiler system to including installation and all ancillary equipment. Contractor is responsible for all testing, installation, and system startup as required per SOW.

Q: Main Steam Non‐Return Valve can be a standard 2: 1 turndown or as high as 10:1 turndown.

Please specify type of valve desired and the materials of construction desired for this valve.

A: The intended application is to provide steam to production operations at PBA. Steam demand is expected to vary significantly with very little condensate return. Provide turndown ratio consistent with the intended application.

Q: Will the boilers operate with modulating feed water valves? ON/Off is not recommended on this size boiler at high pressure.

A: The intended application is to provide steam to production operations at PBA. Steam demand is expected to vary significantly with very little condensate return. Provide feed water valves consistent with the intended application.

Q: Would you want to include a sample cooler with each boiler? If yes, would you prefer a steam sample cooler or water sample cooler?

A. Yes, provide a sample cooler. Steam sample cooler

Q: What will be the actual mode of operation of the boilers? We assume burners to be fully modulating, but will you want a lead/lag system, one boiler as lead and one in hot standby, or will only one boiler run at time with the other boiler in cold standby?

A: Fully modulating, alternating lead/lag system but require the capability to operate with one boiler running and other boiler in cold standby.

Q: The SOW calls out independent actuators. These would be for fuel, air and FGR (assuming Low NOx requires FGR.) -SOW states for optimal efficiency. Can we assume you would want Oxygen trim and parallel positioning for each boiler?

A: Provide for oxygen trim as necessary to achieve optimum fuel efficiency while meeting the NOX specification consistent with the modes of operation described in question 16.

Q: Is there an existing Emergency Stop Button (required by code). We prov ide terminals, and switch is by others.

A: The contractor shall furnish all labor, travel, material, parts, kits, permits, tools, components (valves, controls, fittings, etc.), subparts and equipment necessary to install two (2) each steam boilers systems…

Q: How is combustion air supplied to the boiler room? What terminals/relays will we need to provide to interface with fans, louvers, dampers, etc.?

A: The government requires a complete turn‐key boiler system to including installation and all ancillary equipment. The existing boiler equipment utilizes open louvers for combustion air.

Q: What is the boiler vent stack configuration?

A: Vertical vent stack configuration. New stack maybe required to accommodate new boilers.

Q: Will draft dampers or draft controls be required?

A: The contractor shall furnish all labor, travel, material, parts, kits, permits, tools, components (valves, controls, fittings, etc.), subparts and equipment necessary to install two (2) each steam boilers systems…

Q: In addition to standard gas train components, what additional items will be desired, i.e. pilot gas strainer, main gas strainer, high pressure gas pressure regulator, vent valves, etc.

A: The contractor shall furnish all labor, travel, material, parts, kits, permits, tools, components (valves, controls, fittings, etc.), subparts and equipment necessary to install two (2) each steam boilers systems…

Q: SOW states natural gas as the primary fuel. Will you need number 2 fuel oil back up? The Kewanee model number indicates that it is G02 burner, meaning gas and number 2 oil.

A: #2 fuel oil is not required.

Q: What NEMA rating is required for panels and boxes?

A: NEMA1

Q: Would want motors above 1 1/2Hp to be upgraded to TEFC "Premium" High Efficiency or is standard TEFC sufficient?

A: TEFC Premium High Efficiency motors are required.

Q: Is a main Power Disconnect required with the boiler?

A: Yes, contractor to install.

Q: Is a remote boiler status Relay required?

A: Yes, provide for remote monitoring.

Q: Please clarify type and detail of submittals required.

A: As‐built, O&M manuals, warranty information, DD1354, troubleshooting guides, User Manuals, MSDS

Q: SOW states UL "B" label. With the controls and burner required to meet the SOW, a "B" label cannot be offered. I believe that the B label is for units that UL labeled for the complete boiler/burner package. We design and manufacture to UL standards, however some component adds desired will mean the total package would not be UL approved. Additional clarificat ion is available upon request.

A: U.L. labeled burners. All electrical components shall bear U.L. label.

Q: SOW states U.L. or F.M. or I.R.I.? - I believe I.R.I. is no longer available? Our Standard units are designed and built to UL and ASME code requirements and follow GE-Gap Insurance guidelines. Factory Mutual (F.M.) approval can be prov ided at additional cost.

A: At minimum meet UL and ASME code requirements.

Q: If F.M. is required, will you want Fu ll Factory Mutua l Submittals and calcs?

A: N/A

Q: The existing boilers that are in place now have a Lead/Lag system installed on the, should we propose a new replacement for it, reuse the old system?

A: Provide new complete turn‐key system.

Q: There is an annunciator panel installed in the boiler room now, does it have to be replaced with a new one?

A: Provide new complete turn‐key system.

Q: Blow down separators only get used for a few seconds once or twice a day. There is a blow down separator on each boiler now that are in good shape, do you still want to replace them also?

A: Provide new complete turn‐key system. Provide a separate blow down for each boiler.

Q: If the roof was to be replaced "Due to rusted out metal and fallen insulation" we could offer you a 4 pass boiler which is more efficient instead of a 3 pass boiler. What's the status on the roof issue?

A: Based on observations and safety concerns at the site visit the roof and insulation shall be replaced with new.

Q: Do you have any information on the insulation for the project at the Pine Bluff Arsenal. The wrap, Stainless or Aluminum, the type of insulation, and the thickness

A: Aluminum wrap, fiberglass, 2" thickness.

END OF QUESTIONS AND ANSWERS

FROM STATEMENT OF WORK

Period of Performance:

Previous: Inside delivery, installation, start-up and testing shall be completed within sixty (60) calendar days after date of award.

CHANGE TO: Period of Performance:

Inside delivery, installation, start-up and testing shall be completed within (150) calendar days after Notice to Proceed.

SECTION 00010 - SOLICITATION CONTRACT FORM

CLIN 0001

The CLIN extended description has changed from:

Furnish all labor, equipment, materials, and transportation required to install two (2) each High Efficiency Steam Boilers in building 34-125. See Statement of Work for additional requirements.

To:

Furnish all labor, equipment, materials, and transportation required to install two (2) each High Efficiency Steam Boilers in building 34-125. See Statement of Work for additional requirements.SUBMIT PRICES AS FOLLOWS:

BOILERS (2 Each) - Price: $ _______________ INSTALLATION - $ ______________________ROOF