Sail Shade Bid Form.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Installation of four Exterior Shading Systems
Solicitation number
W911QY-26-R-SHAD
Issued by

About this file

This is a Sail Shade Bid Form, a pricing template for the Installation of four Exterior Shading Systems solicitation (W911QY-26-R-SHAD) issued by the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground for work at Natick Soldiers Systems Center. The form is structured to capture labor and material costs organized by 24 CSI divisions, including General Requirements, Site Construction, Concrete, Masonry, Metals, Wood and Plastics, Thermal and Moisture Protection, Doors and Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Plumbing, Fire Suppression, HVAC, Integrated Automation Controls, Electrical, Communications, Electronic Safety and Security, Earthwork, Exterior Improvements, and Utilities.

The bid form includes both a Base Bid section dated 07/22/2026 and an Alternate Bid section dated 08/18/2026 for outdoor shaded work areas in Buildings #1, #65, #5, and #3. Offerors are required to input labor costs, material costs, and total bid amounts for each division, with the form automatically calculating totals for material and labor, then applying a 10% overhead markup, 10% profit markup, and 3% bond cost to arrive at the final total bid. This is a small business set-aside acquisition with an offeror due date of 08/24/2026 at 1600 EST, a 180 working day period of performance from Notice to Proceed, and deliveries to 15 General Green Ave, Natick, MA 01760 with inspection and acceptance by CCDC-SC.

View the file

Other files

File Type Posted
QA Shades Update 2.xlsx XLSX spreadsheet
QA Shades Update 1.xlsx XLSX spreadsheet
QandA Shaders.xlsx XLSX spreadsheet
Install Shaders Combined Synopsis Solicitation.pdf PDF
Sail Shade SOW Attachments 07 22 2026.pdf PDF
SOW Sail Shades 08 03 2026.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Bid

IGCE - Outdoor Shaded Work AreaDate: 07/22/2026
Outdoor Shaded Work Area (Building#1, #65, #5 & #3)
DIVISIONUNIT OF MEASURELABORMATERIALSBID AMOUNT
Division 1 - General RequirementsJOB
01500 Temporary Construction Facilities & ControlsJOB
Division 2 - Site ConstructionJOB
02221 Building DemolitionJOB
Division 3 - ConcreteJOB
Division 4 - MasonryJOB
Division 5 - MetalsJOB
Division 6 - Wood and PlasticsJOB
Division 7 - Thermal and Moisture ProtectionJOB
Division 8 - Doors and WindowsJOB
Division 9 - FinishesJOB
Division 10 - SpecialitiesJOB
Division 11 - EquipmentJOB
Division 12 - FurnishingsJOB
Division 13 - Special ConstructionJOB
Division 22 - PlumbingJOB
Division 21 - Fire SuppressionJOB
Division 23 - Heating Ventilation, and Air Conditioning (HVAC)JOB
Division 25 - Intergrated Automation - controlsJOB
Division 26 - ElectricalJOB
Division 27 - CommunicationsJOB
Division 28 - Electronic Safety and SecurityJOB
Division 31 - EarthworkJOB
Division 32 - Exterior ImprovementsJOB
Division 33 - UtilitiesJOB$ - 0$ - 0
TOTAL LABOR$ - 0
TOTAL MATERIAL$ - 0
TOTAL MATERIAL AND LABOR$ - 0
OVERHEAD 10%$ - 0
PROFIT 10%$ - 0
BOND 3%$ - 0
TOTAL BID$ - 0

Alternate Bid

IGCE - Outdoor Shaded Work Area (Add Alternate)Date: 08/18/2026
Outdoor Shaded Work Area (Building#1, #65, #5 & #3) (Add Alternate)
DIVISIONUNIT OF MEASURELABORMATERIALSBID AMOUNT
Division 1 - General RequirementsJOB
01500 Temporary Construction Facilities & ControlsJOB
Division 2 - Site ConstructionJOB
02221 Building DemolitionJOB
Division 3 - ConcreteJOB
Division 4 - MasonryJOB
Division 5 - MetalsJOB
Division 6 - Wood and PlasticsJOB
Division 7 - Thermal and Moisture ProtectionJOB
Division 8 - Doors and WindowsJOB
Division 9 - FinishesJOB
Division 10 - SpecialitiesJOB
Division 11 - EquipmentJOB
Division 12 - FurnishingsJOB
Division 13 - Special ConstructionJOB
Division 22 - PlumbingJOB
Division 21 - Fire SuppressionJOB
Division 23 - Heating Ventilation, and Air Conditioning (HVAC)JOB
Division 25 - Intergrated Automation - controlsJOB
Division 26 - ElectricalJOB
Division 27 - CommunicationsJOB
Division 28 - Electronic Safety and SecurityJOB
Division 31 - EarthworkJOB
Division 32 - Exterior ImprovementsJOB
Division 33 - UtilitiesJOB
TOTAL LABOR
TOTAL MATERIAL
TOTAL MATERIAL AND LABOR$ - 0
OVERHEAD 10%$ - 0
PROFIT 10%$ - 0
BOND 3%$ - 0
TOTAL BID$ - 0