FOGTESTER SOFTWARE ANALYSIS QA PART 3_27AUG2026.pdf
PDF 43 KB Posted
- Solicitation number
- W911QY-26-R-FOG
About this file
This document is a Questions and Answers (Q&A) Part Three response for Army Open Solicitation W9128Z-25-S-A002, Project Number W911QY-26-R-FOG.
The solicitation utilizes a two-phase evaluation process, with Amendment 2 (dated 25 August 2026) governing current procedures and establishing a Phase 3 Request for Solution Proposal. Phase 1 requires submission of an eight-page Solution Brief in 12-point Times New Roman font with 1-inch margins and 1.15 line spacing, addressing minimum content including a Title Page, Executive Summary, and Software Assurance Requirements. The Solution Brief should reference the Requirements section of the Call for specific guidance on addressing evaluation factors (Technical Merit and Relevance, Innovation and Uniqueness, Company Visibility, and Price and Affordability). No price submission, Statement of Work, or firm-fixed price estimate is required for Phase 1. The Solution Brief may be submitted in PDF or Word format, with Organizational Conflict of Interest (OCI) analysis included either separately or combined with the submission. Phase 2, if conducted, will involve demonstration of either a working prototype or technical/architectural solution, with specific details provided via email to acceptable Phase 1 offerors. The resulting Firm-Fixed-Price contract has an anticipated period of performance of 12 months from date of Award. Sample data sets, BarTarget source, and calibration reference images are not marked as Controlled Unclassified Information (CUI). Current Fog Tester configuration parameters include dual-camera imagery at 2590 x 1942 resolution, 16-bit PNG format, acquired at approximately 0.2-2 frames per second (roughly 120 frames per camera per 60-second test), with future ability to edit code for parameter changes desired but not currently required. The reference in Section 4.1.7 to source code deliverable requirements in Section 9 has been removed from the Call document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARMY OPEN SOLICITATION W9128Z-25-S-A002
PROJECT NUMBER W911QY-26-R-FOG
Q&A PART THREE
QUESTION: Section 8.1 identifies the minimum required content as (a) Title Page, (b) Executive Summary, and (c) Software Assurance Requirements. Section 11 establishes four evaluation factors, including Technical Merit and Relevance, Innovation and Uniqueness, and Company Visibility. Would the Government confirm that Offerors should include discrete sections addressing each evaluation factor within the eight-page limit?
ANSWER: Please refer to the Requirements section of the Call when submitting a Solution Brief.
QUESTION: The SAM.gov notice description for this Call references Amendment 2, dated 25 August 2026, adding Section 8.3, “Phase 3 Request for Solution Proposal.” The Call document in our possession states at Section 8 that the Government will utilize up to two (2) phases, and Section 8.2 addresses a Phase 2 Live Demonstration. Would the Government confirm which version governs, and whether a revised Call document will be posted to SAM.gov?
ANSWER: Amendment 2 governs the most accurate and up-to-date information on Call procedures. The contractor is responsible for acknowledging any and all Amendments to this Call as the Call document will not be continuously reposted to SAM.gov.
QUESTION: Section 11 lists Price and Affordability as an evaluation factor, but Section 8.1 does not identify a price submission among the required Solution Brief content. Is a price or rough order of magnitude required in Phase 1? If so, does it count against the eight-page limit, or may it be submitted as a separate attachment in the manner of the OCI analysis?
ANSWER: A price submission should not be included with your Solution Brief.
QUESTION: Section 8.1 specifies eight written pages in 12-point Times New Roman. Would the Government specify the required margins and line spacing?
ANSWER: Normal margins (1” Top, 1” Bottom, 1” Right, 1” Left) Line Spacing: 1.15
QUESTION: Section 12 states that O erors shall ensure the specified Antiterrorism and OPSEC language is included in “the proposed SOW.” Is a Statement of Work required as part of the Phase 1 submission? If so, does it count against the eight-page limit?
ANSWER: A Statement of Work is not required for Phase 1.
QUESTION: Section 8.1 does not specify a file format for the Solution Brief submission. Would the Government confirm its preferred format, and whether the OCI analysis should be submitted as a separate file or combined with the Solution Brief?
ANSWER: Submission can either be via PDF or Word, there is no preference on whether the OCI analysis is submitted separately or combined.
QUESTION: Would the Government state the anticipated period of performance for the resulting Firm-Fixed-Price contract?
ANSWER: 12 months from date of Award.
QUESTION: For Phase 2, if conducted, should offerors expect to demonstrate a working prototype, or is a technical/architectural demonstration anticipated?
ANSWER: Either demonstration would be accepted, specific details would be sent via email to the o erors� whose Phase 1 brief was considered acceptable, if the Government chooses to proceed with Phase 2.
QUESTION: Does the Phase 1 Solution Brief need to include a firm-fixed price or estimated price range? If so, please confirm the expected delivery period or period of performance that offerors should use in developing pricing.
ANSWER: No.
QUESTION: Are the sample data sets, the BarTarget source, and the calibration reference images marked CUI, and if any of them are, what handling do you expect from a contractor working at their own facility?
ANSWER: None of those items are CUI.
QUESTION: The predecessor Sources Sought amendment indicated dual-camera imagery at 2590 x 1942, 16-bit PNG, acquired at approximately 0.2-2 frames per second (roughly 120 frames per camera per 60-second test). Please confirm these remain representative of the current 4th generation Fog Tester configuration, or provide the current parameters.
ANSWER: Those camera parameters are correct, but in the future may change, so ability to edit the code in that respect would be useful but not required at this time.
QUESTION: Section 4.1.7 refers to “the source code deliverable required in Section 9,” but Section 9 of the Call is titled “Non-Government Advisors.” Would the Government confirm the intended reference and identify where the source code deliverable requirements are specified?
ANSWER: “Consistent with the source code deliverable required in Section 9” has been striked out from Section 4.1.7