Questions and Answers - S2PRINT Integrated Data Collection Lab - 05 FEB.pdf
PDF 488 KB Posted
- Attached to
- Integrated Data Collection Lab (IDCL)
- Solicitation number
- W911QY-24-R-IDC1
About this file
This document contains a combined synopsis and solicitation for an integrated data collection lab. The U.S. Army seeks a contractor to provide a design review and report identifying hardware and software solutions to fulfill capability requirements for laboratories and spaces at the Soldier & Squad Performance Research Institute. The contractor will also purchase, install, integrate, and provide warranty support for proposed systems and equipment within the specified labs and spaces, including two applied ergonomics labs and a portable data gathering system. Offerors must submit proposals by 12:00 PM EST on 19 February 2024 addressing technical capability, pricing, and past performance. The Army intends to award a firm-fixed-price contract and provide a report within 45 days of award, with equipment installation and training completed within 60 days of report acceptance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
05 February 2024
Questions and Answers in Response to Combined Synopsis/Solicitation W911QY-24-R-IDC1 S2PRINT Integrated Data Collection Lab
Question 1:
It looks like proposal should not include any extra desktop or laptop computers. Is it correct to assume that the required laptops/desktops will be procured elsewhere? Just want to make sure they will be gotten somewhere else, as the system is not functional without them. I can specify in the RFP the required number and specs to make the system functional.
Answer 1:
This is correct. We do want/need the number and specs for the computers to run the system because that info will be needed for acquiring computers for IDCL through CHESS or other government avenues.
Question 2:
Is it possible for us to include pricing for optional items in the proposal (so not required for the scope listed, but potentially beneficial)? Examples include a corrective lens kit for eye tracking glasses (so the glasses would work with subjects who wear glasses), as well as extra eye tracking glasses.
Answer 2:
Yes, pricing for optional items would be acceptable.
Question 3:
For the eyetrackers, is there a minimum number required for the large UX lab? I can put extras in the optional component section.
Answer 3:
One (1) is the minimum, but yes add additional in the optional section.
Question 4:
For the eyetrackers, is there a use case where the subject will need to be moving around while wearing the eye tracker/ or an instance where they will not be in front of a screen?
Answer 4:
Yes, they may be moving around some.
Question 5:
For the optional physiology equipment, how many subjects will be wearing the equipment at the same time?
Answer 5:
Similar to eye trackers, minimum is one (1), but additional in optional section would be useful.
Question 6:
Could we get a rough schematic/floorplan of the location of the rooms involved?
Answer 6:
Please see attached floorplans.
Question 7:
Is there only one control room for the Large UX Lab and HSI lab, or does each lab have its own control room?
Answer 7:
One control room for both.
Question 8:
Do the observation rooms have one way glass/mirrors in them?
Answer 8:
Yes.
05 February 2024
Question 9:
For the camera mounted to the monitor, would a tripod next to the monitor or a camera mounted to the wall behind the monitor suffice (will the monitor be located close to a wall?)
Answer 9:
Yes, Tripod would be okay. Wall mounted may be an option also.
Question 10:
Given the scope of this solution, is there flexibility on delivery time (currently stated in the RFP as 30 days after report is accepted)?
Answer 10:
The solicitation has been amended to update the delivery schedule: the report on technical needs is due 45 days after award and the installation, integration, and training is due 60 days after award.
Question 11:
For the extended hardware warranty/expedited repair, what turnaround is expected for expedited repair?
Answer 11:
Two (2) to four (4) weeks seems reasonable taking into consideration the scope of the repair needed.