W911QY20R0037 ETS Solicitation 06-01.pdf

PDF 1 MB Posted

Attached to
Force Provider Expeditionary (FPE) Triple Container (TRICON) Systems (ETS) DRAFT SOLICITATION
Solicitation number
W911QY20R0037
Issued by

About this file

This is a draft solicitation notice for the U.S. Army Contracting Command - Aberdeen Proving Ground for Force Provider Expeditionary (FPE) Triple Container (TRICON) Systems (ETS). The government intends to issue a solicitation and award a single Firm-Fixed-Price Indefinite Delivery/Indefinite Quantity contract with a five year period of performance to a small business. The solicitation will have a total small business set-aside for showers, latrines, kitchens, and food sanitation centers in accordance with NAICS code 332439 and a 500 employee size standard. The government encourages potential offerors to provide comments on the draft solicitation by mid-July 2020, and plans to formally release the solicitation with any amendments thereafter on the System for Award Management website.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until local time

X

A X B X C X D

EX

X

G F 90 - 100

101 - 113 H 114 - 121

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 120

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W911QY 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2 3 - 54

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

55 - 64 65 - 67

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

68 - 69 70 - 73

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 74 - 77 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

78 - 87

PART II - CONTRACT CLAUSES

W6QK ACC-APG NATICK

CONTRACTING DIVISION

BLDG 1 GENERAL GREENE AVENUE

NATICK MA 01760-5011

508-233-5700FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

88 - 89

6. REQUISITION/PURCHASE NO.5. DATE ISSUED4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W911QY20R0037

Section A - Solicitation/Contract Form

SUPPLEMENTAL INFORMATION

A.1. The Army Contracting Command - Aberdeen Proving Ground, Natick Contracting Division (ACC-APG NCD), has a requirement for the production of Expeditionary TRICON Systems.

A.2. The Government intends to award a Firm-Fixed-Price (FFP) single award Indefinite Delivery/Indefinite Quantity (IDIQ) contract consisting of a five (5) year ordering period for production.

A.3. Award will be made to the offeror whose proposal representhes the best value to the Government considering a tradeoff of price and non-price factors. However, at its discretion the Government reserves the right not to award a contract.

A.4. This acquisition is a 100% total small business set aside. The North American Industry Classification System NAICS Code is 332439, and the size standard is 500 employees.

A.5. This requirement is subject to the availability funds and funds will be obligated for quantities ordered upon issuance of delivery orders and not off the base contract.

A.6. Proposals shall be valid for 100 days after the closing date of the solicitation. Contractors shall clearly indicate the period of validity.

A.7. Contractors will not be reimbursed for any proposal preparation costs.

A.8. Proposals are due 3:00 PM EST, XX XXXX 2020.

A.9. Offerors shall access http://www.assistdocs.com for all Mil-STDs referenced in this document for complete up-to-date information.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 1 Each Latrine FAT Test System

FFP

The contractor shall build one (1) Latrine First Article Test (FAT) System in accordance with (IAW) the Statement of Work (SOW).

Contractor's unit price shall reflect the cost for one (1) production system.

FOB: Destination

PSC CD: 5410

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Each

Latrine FAT Test Plan

FFP

The contractor shall prepare and submit the First Article Test (FAT) Test Plan IAW the SOW.

FOB: Destination

PSC CD: 5410

NET AMT

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0003 1 Each Latrine FAT Test Report

FFP

The contractor shall prepare and submit the latrine First Article Test (FAT) Test Report IAW the SOW.

FOB: Destination

PSC CD: 5410

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0004 1 Each Shower FAT Test System

FFP

The contractor shall build one (1) Shower First Article Test (FAT) System IAW the SOW.

Contractor's unit price shall reflect the cost for one (1) production system.

FOB: Destination

PSC CD: 5410

MAX

UNIT UNIT PRICE MAX AMOUNT

0005 1 Each Shower FAT Test Plan

FFP

The contractor shall prepare and submit the Shower First Article Test (FAT) Plan IAW the SOW.

FOB: Destination

PSC CD: 5410

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0006 1 Each Shower FAT Test Report

FFP

The contractor shall prepare and submit the Shower First Article Test (FAT) Test Report IAW the SOW.

FOB: Destination

PSC CD: 5410

MAX

UNIT UNIT PRICE MAX AMOUNT

0007 1 Each Kitchen FAT Test System

FFP

The contractor shall build one (1) Kitchen First Article Test (FAT) System IAW the SOW.

Contractor's unit price shall reflect the cost for one (1) production system.

FOB: Destination

PSC CD: 5410

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0008 1 Each Kitchen FAT Test Plan

FFP

The contractor shall prepare and submit the Kitchen First Article Test (FAT) Test Plan IAW the SOW.

FOB: Destination

PSC CD: 5410

MAX

UNIT UNIT PRICE MAX AMOUNT

0009 1 Each Kitchen FAT Test Report

FFP

The contractor shall prepare and submit the Kitchen First Article Test (FAT) Test Report IAW SOW.

FOB: Destination

PSC CD: 5410

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0010 1 Each Food Sanitation Center FAT Test System

FFP

The contractor shall build one (1) Food Sanitation Center System First Article Test (FAT) System IAW the SOW.

Contractor's unit price shall reflect the cost for one (1) production system.

FOB: Destination

PSC CD: 5410

MAX

UNIT UNIT PRICE MAX AMOUNT

0011 1 Each Food Sanitation Center FAT Test Plan

FFP

The contractor shall prepare and submit the Food Sanitation Center First Article Test (FAT) Test Plan IAW the SOW.

FOB: Destination

PSC CD: 5410

MAX

UNIT UNIT PRICE MAX AMOUNT

0012 1 Each Food Sanitation Center FAT Test Report

FFP

The contractor shall prepare and submit the Food Sanitation First Article Test (FAT) Test Report IAW the SOW.

UNIT UNIT PRICE MAX AMOUNT

0013 UNDEFINED Each Expeditionary TRICON Latrine-Green

FFP

The contractor shall produce the Expeditionary TRICON Latrine Systems in Green. Pricing shall be IAW the contractor's stepladder pricing in Section B.

UNIT UNIT PRICE MAX AMOUNT

0014 UNDEFINED Each Expeditionary TRICON Latrine-Tan

FFP

The contractor shall produce the Expeditionary TRICON Latrine Systems in Tan.

Pricing shall be IAW the contractor's stepladder pricing in Section B.

UNIT UNIT PRICE MAX AMOUNT

0015 UNDEFINED Job Expeditionary TRICON Latrine IPS

FFP

The contractor shall provide Expeditionary TRICON Latrine Integrated Product Support (IPS). Offerors shall propose their fully burdened labor stepladder pricing for this CLIN in Section B of the solicitation.

Individual requirements will be defined and negotiated at the order level based upon the level of effort and the fully burdened labor rates listed in Section B.

UNIT UNIT PRICE MAX AMOUNT

0016 UNDEFINED Each Expeditionary TRICON Kitchen-Green

FFP

The contractor shall produce the Expeditionary TRICON Kitchen Systems in Green. Pricing shall be IAW the contractor's stepladder pricing in Section B.

UNIT UNIT PRICE MAX AMOUNT

0017 UNDEFINED Each Expeditionary TRICON Kitchen-Tan

FFP

The contractor shall produce the Expeditionary TRICON Kitchen Systems in Tan.

Pricing shall be IAW the contractor's stepladder pricing in Section B.

UNIT UNIT PRICE MAX AMOUNT

0018 UNDEFINED Job Expeditionary TRICON Kitchen IPS

FFP

The contractor shall provide Expeditionary TRICON Kitchen Integrated Product Support (IPS). Offerors shall propose their fully burdened labor stepladder pricing for this CLIN in Section B of the solicitation.

Individual requirements will be defined and negotiated at the order level based upon the level of effort and the fully burdened labor rates listged in Section B.

UNIT UNIT PRICE MAX AMOUNT

0019 UNDEFINED Each Expeditionary TRICON Shower-Green

FFP

The contractor shall produce the Expeditionary TRICON Shower Systems in Green. Pricing shall be IAW the contractor's stepladder pricing in Section B.

UNIT UNIT PRICE MAX AMOUNT

0020 UNDEFINED Each Expeditionary TRICON Shower-Tan

FFP

The contractor shall produce the Expeditionary TRICON Shower Systems in Tan.

Pricing shall be IAW the contractor's stepladder pricing in Section B.

UNIT UNIT PRICE MAX AMOUNT

0021 UNDEFINED Job Expeditionary TRICON Shower IPS

FFP

The contractor shall provide Expeditionary TRICON Shower Integrated Product Support (IPS). Offerors shall propose their fully burdened labor stepladder pricing for this CLIN in Section B of the solicitation.

Individual requirements will be defined and negotiated at the order level based upon the level of effort and the fully burdened labor rates listged in Section B.

UNIT UNIT PRICE MAX AMOUNT

0022 UNDEFINED Each Expeditionary TRICON FSC-Tan

FFP

The contractor shall produce the Expeditionary TRICON Food Sanitation Center Systems in Tan. Pricing shall be IAW the contractor's stepladder pricing in Section B.

UNIT UNIT PRICE MAX AMOUNT

0023 UNDEFINED Each Expeditionary TRICON FSC-Green

FFP

The contractor shall produce the Expeditionary TRICON Food Sanitation Center Systems in Green. Pricing shall be IAW the contractor's stepladder pricing in Section B.

UNIT UNIT PRICE MAX AMOUNT

0024 UNDEFINED Each Latrine Monthly TM Status Report

FFP

The contractor shall submit monthly status reports IAW the SOW and CDRL A001: Latrine Monthly TM Status Report.

This CLIN shall be Not Separately Priced (NSP) and offerors shall not submit pricing for this CLIN.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0025 1 Each Latrine Configuration Audit

FFP

The contractor shall complete the Latrine Configuration Audit IAW the SOW and CDRL A002: ETS Latrine Configuration Audit.

0026 1 Each Latrine QA PLAN

FFP

The contractor shall complete the Latrine QA PLAN IAW the SOW and CDRL A003: ETS Latrine QA Plan.

UNIT UNIT PRICE MAX AMOUNT

0027 1 Each ETS Latrine FMECA

FFP

The contractor shall complete the FMECA IAW the SOW and CDRL A004: ETS Latrine FMECA.

UNIT UNIT PRICE MAX AMOUNT

0028 1 Each ETS Latrine FTA

FFP

The contractor shall complete the FTA IAW the SOW and CDRL A005: ETS Latrine FTA.

UNIT UNIT PRICE MAX AMOUNT

0029 1 Each ETS Latrine MTA

FFP

The contractor shall complete the MTA IAW the SOW and CDRL A006: ETS Latrine MTA.

UNIT UNIT PRICE MAX AMOUNT

0030 1 Each ETS Latrine LORA

FFP

The contractor shall complete the LORA IAW the SOW and CDRL A007: ETS Latrine LORA.

UNIT UNIT PRICE MAX AMOUNT

0031 1 Each ETS Latrine MAC

FFP

The contractor shall complete the MAC IAW the SOW and CDRL A008: ETS Latrine MAC.

UNIT UNIT PRICE MAX AMOUNT

0032 1 Each ETS Latrine -13&P TM

FFP

The contractor shall complete the 13&P TM IAW the SOW and CDRL A009:

ETS Latrine -13&P TM.

UNIT UNIT PRICE MAX AMOUNT

0033 1 Each ETS Latrine VAL Plan and Report

FFP

The contractor shall complete the VAL Plan and Report IAW the SOW and CDRL A010: ETS Latrine VAL Plan and Report.

UNIT UNIT PRICE MAX AMOUNT

0034 1 Each ETS Latrine PPL

FFP

The contractor shall complete the PPL IAW the SOW and CDRL A0011: ETS Latrine PPL.

UNIT UNIT PRICE MAX AMOUNT

0035 1 Each ETS Latrine EDFP

FFP

The contractor shall complete the EDFP IAW the SOW and CDRL A0012: ETS Latrine EDFP.

UNIT UNIT PRICE MAX AMOUNT

0036 1 Each ETS Latrine SPI PKG

FFP

The contractor shall complete the ETS Latrine SPI PKG IAW the SOW and CDRL A0013: ETS Latrine SPI PKG.

UNIT UNIT PRICE MAX AMOUNT

0037 1 Each ETS Latrine LMI PKG

FFP

The contractor shall complete the LMI PKG IAW the SOW and CDRL A0014:

ETS Latrine LMI PKG.

UNIT UNIT PRICE MAX AMOUNT

0038 1 Each ETS Latrine NMWR w RPSTL

FFP

The contractor shall complete the NMWR w RPSTL IAW the SOW and CDRL A0015: NMWR w RPSTL.

UNIT UNIT PRICE MAX AMOUNT

0039 1 Each ETS Latrine NMWR VAL Plan and Report

FFP

The contractor shall complete the Latrine NMWR VAL Plan and Report IAW the SOW and CDRL A0016: ETS Latrine NMWR VAL Plan and Report.

UNIT UNIT PRICE MAX AMOUNT

0040 1 Each ETS Latrine NMWR PPL

FFP

The contractor shall complete the ETS Latrine NMWR PPL IAW the SOW and CDRL A017: ETS Latrine NMWR PPL

UNIT UNIT PRICE MAX AMOUNT

0041 1 Each ETS Latrine NMWR EDFP

FFP

The contractor shall complete the NMWR EDFP IAW the SOW and CDRL A0018: ETS Latrine NMWR EDFP.

UNIT UNIT PRICE MAX AMOUNT

0042 1 Each ETS Latrine IMI DVD

FFP

The contractor shall complete the ETS Latrine IMI DVD IAW the SOW and CDRL A0019: ETS Latrine IMI DVD.

UNIT UNIT PRICE MAX AMOUNT

0043 1 Each ETS Latrine PSPL

FFP

The contractor shall complete the ETS Latrine PSPL IAW the SOW and CDRL A0020: ETS Latrine PSPL.

UNIT UNIT PRICE MAX AMOUNT

0044 UNDEFINED Each ETS Shower Monthly TM Status Report

FFP

The contractor shall complete the ETS Shower Monthly TM Status Reports IAW the SOW and CDRL B001: ETS Shower Monthly TM Status Report.

This CLIN shall be Not Separately Priced (NSP) and offerors shall not submit pricing for this CLIN.

0045 1 Each ETS Shower Configuration Audit

FFP

The contractor shall complete the Shower Configuration Audit IAW the SOW and CDRL B002: ETS Shower Configuration Audit.

UNIT UNIT PRICE MAX AMOUNT

0046 1 Each ETS Shower QA Plan

FFP

The contractor shall complete the Shower QA Plan IAW the SOW and CDRL B003: ETS Shower QA Plan.

UNIT UNIT PRICE MAX AMOUNT

0047 1 Each ETS Shower FMECA

FFP

The contractor shall complete the Shower FMECA IAW the SOW and CDRL B004: ETS Shower FMECA.

UNIT UNIT PRICE MAX AMOUNT

0048 1 Each ETS Shower FTA

FFP

The contractor shall complete the Shower FTA IAW the SOW and CDRL B005:

ETS Shower FTA.

UNIT UNIT PRICE MAX AMOUNT

0049 1 Each ETS Shower MTA

FFP

The contractor shall complete the Shower MTA IAW the SOW and CDRL B006:

ETS Shower MTA.

UNIT UNIT PRICE MAX AMOUNT

0050 1 Each ETS Shower LORA

FFP

The contractor shall complete the Shower LORA IAW the SOW and CDRL B007: ETS Shower LORA.

UNIT UNIT PRICE MAX AMOUNT

0051 1 Each ETS Shower MAC

FFP

The contractor shall complete the Shower MAC IAW the SOW and CDRL B008:

ETS Shower MAC.

UNIT UNIT PRICE MAX AMOUNT

0052 1 Each ETS Shower 13&P TM

FFP

The contractor shall complete the Shower 13&P M IAW the SOW and CDRL B009: ETS Shower 13&P TM.

UNIT UNIT PRICE MAX AMOUNT

0053 1 Each ETS Shower VAL Plan and Report

FFP

The contractor shall complete the Shower VAL Plan and Report IAW the SOW and CDRL B010: ETS Shower VAL Plan and Report.

UNIT UNIT PRICE MAX AMOUNT

0054 1 Each ETS Shower PPL

FFP

The contractor shall complete the Shower PPL IAW the SOW and CDRL B011:

ETS Shower PPL.

UNIT UNIT PRICE MAX AMOUNT

0055 1 Each ETS Shower EDFP

FFP

The contractor shall complete the Shower EDFP IAW the SOW and CDRL B012:

ETS Shower EDFP.

UNIT UNIT PRICE MAX AMOUNT

0056 1 Each ETS Shower SPI PKG

FFP

The contractor shall complete the Shower SPI PKG IAW the SOW and CDRL B013: ETS Shower SPI PKG.

UNIT UNIT PRICE MAX AMOUNT

0057 1 Each ETS Shower LMI PKG

FFP

The contractor shall complete the Shower LMI PKG IAW the SOW and CDRL B014: ETS Shower LMI PKG.

FOB: Destination

PSC CD: 5410

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0058 1 Each ETS Shower NMWR w RPSTL

FFP

The contractor shall complete the Shower NMWR w RPSTL IAW the SOW and CDRL B015: ETS Shower NMWR w RPSTL.

FOB: Destination

PSC CD: 5410

MAX

UNIT UNIT PRICE MAX AMOUNT

0059 1 Each ETS Shower NMWR VAL Plan and Report

FFP

The contractor shall complete the Shower NMWR VAL Plan and Report IAW the SOW and CDRL B016: ETS Shower NMWR VAL Plan and Report.

FOB: Destination

PSC CD: 5410

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0060 1 Each ETS Shower NMWR PPL

FFP

The contractor shall complete the Shower NMWR PPL IAW the SOW and CDRL B017: ETS Shower NMWR PPL.

FOB: Destination

PSC CD: 5410

MAX

UNIT UNIT PRICE MAX AMOUNT

0061 1 Each ETS Shower NMWR EDFP

FFP

The contractor shall complete the Shower NMWR EDFP IAW the SOW and CDRL B018: ETS Shower NMWR EDFP.

FOB: Destination

PSC CD: 5410

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0062 1 Each ETS Shower IMI DVD

FFP

The contractor shall complete the Shower IMI DVD IAW the SOW and CDRL B019: ETS Shower IMI DVD.

FOB: Destination

PSC CD: 5410

MAX

UNIT UNIT PRICE MAX AMOUNT

0063 1 Each ETS Shower PSPL

FFP

The contractor shall complete the Shower PSPL IAW the SOW and CDRL B020:

ETS Shower PSPL.

FOB: Destination

PSC CD: 5410

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0064 UNDEFINED Each ETS Kitchen Monthly TM Status Report

FFP

The contractor shall complete the Kitchen Monthly TM Status Report IAW the SOW and CDRL C001: ETS Kitchen Monthly TM Status Report.

This CLIN shall be Not Separately Priced (NSP) and offerors shall not submit pricing for this CLIN.

FOB: Destination

PSC CD: 5410

MAX

UNIT UNIT PRICE MAX AMOUNT

0065 1 Each ETS Kitchen Configuration Audit

FFP

The contractor shall complete the Kitchen Configuration Audit IAW the SOW and CDRL C002: ETS Kitchen Configuration Audit.

FOB: Destination

PSC CD: 5410

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0066 1 Each ETS Kitchen QA Plan

FFP

The contractor shall complete the Kitchen QA Plan IAW the SOW and CDRL C003: ETS Kitchen QA Plan.

FOB: Destination

PSC CD: 5410

MAX

UNIT UNIT PRICE MAX AMOUNT

0067 1 Each ETS Kitchen FMECA

FFP

The contractor shall complete the Kitchen FMECA IAW the SOW and CDRL C004: ETS Kitchen FMECA.

FOB: Destination

PSC CD: 5410

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0068 1 Each ETS Kitchen FTA

FFP

The contractor shall complete the Kitchen FTA IAW the SOW and CDRL C005:

ETS Kitchen FTA.

FOB: Destination

PSC CD: 5410

MAX

UNIT UNIT PRICE MAX AMOUNT

0069 1 Each ETS Kitchen MTA

FFP

The contractor shall complete the Kitchen MTA IAW the SOW and CDRL C006:

ETS Kitchen MTA.

FOB: Destination

PSC CD: 5410

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0070 1 Each ETS Kitchen MAC

FFP

The contractor shall complete the Kitchen MAC IAW the SOW and CDRL C008:

ETS Kitchen MAC.

FOB: Destination

PSC CD: 5410

MAX

UNIT UNIT PRICE MAX AMOUNT

0071 1 Each ETS Kitchen 10 TM

FFP

The contractor shall complete the Kitchen 10 TM IAW the SOW and CDRL C009: ETS Kitchen 10 TM.

FOB: Destination

PSC CD: 5410

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0072 1 Each ETS Kitchen 13&P TM

FFP

The contractor shall complete the Kitchen 13&P TM IAW the SOW and CDRL C010: ETS Kitchen 13&P TM.

FOB: Destination

PSC CD: 5410

MAX

UNIT UNIT PRICE MAX AMOUNT

0073 1 Each ETS Kitchen VAL Plan and Report

FFP

The contractor shall complete the Kitchen VAL Plan and Report IAW the SOW and CDRL C011: ETS Kitchen VAL Plan and Report.

FOB: Destination

PSC CD: 5410

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0074 1 Each ETS Kitchen PPL

FFP

The contractor shall complete the Kitchen PPL IAW the SOW and CDRL C012:

ETS Kitchen PPL.

FOB: Destination

PSC CD: 5410

MAX

UNIT UNIT PRICE MAX AMOUNT

0075 1 Each ETS Kitchen EDFP

FFP

The contractor shall complete the Kitchen EDFP IAW the SOW and CDRL C013:

ETS Kitchen EDFP.

FOB: Destination

PSC CD: 5410

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0076 1 Each ETS Kitchen SPI PKG

FFP

The contractor shall complete the Kitchen SPI PKG IAW the SOW and CDRL C014: ETS Kitchen SPI PKG.

FOB: Destination

PSC CD: 5410

MAX

UNIT UNIT PRICE MAX AMOUNT

0077 1 Each ETS Kitchen LMI PKG

FFP

The contractor shall complete the Kitchen LMI PKG IAW the SOW and CDRL C015: ETS Kitchen LMI PKG.

FOB: Destination

PSC CD: 5410

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0078 1 Each ETS Kitchen NMWR w RPSTL

FFP

The contractor shall complete the Kitchen NMWR w RPSTL IAW the SOW and CDRL C016: ETS Kitchen NMWR w RPSTL.

FOB: Destination

PSC CD: 5410

MAX

UNIT UNIT PRICE MAX AMOUNT

0079 1 Each ETS Kitchen NMWR VAL Plan and Report

FFP

The contractor shall complete the Kitchen NMWR VAL Plan and Report IAW the SOW and CDRL C017: ETS Kitchen NMWR VAL Plan and Report.

FOB: Destination

PSC CD: 5410

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0080 1 Each ETS Kitchen NMWR PPL

FFP

The contractor shall complete the Kitchen NMWR PPL IAW the SOW and CDRL C018: ETS Kitchen NMWR PPL.

FOB: Destination

PSC CD: 5410

MAX

UNIT UNIT PRICE MAX AMOUNT

0081 1 Each ETS Kitchen NMWR EDFP

FFP

The contractor shall complete the Kitchen NMWR EDFP IAW the SOW and CDRL C019: ETS Kitchen NMWR EDFP.

FOB: Destination

PSC CD: 5410

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0082 1 Each ETS Kitchen IMI DVD

FFP

The contractor shall complete the Kitchen IMI DVD IAW the SOW and CDRL C020: ETS Kitchen IMI DVD.

FOB: Destination

PSC CD: 5410

MAX

UNIT UNIT PRICE MAX AMOUNT

0083 1 Each ETS Kitchen PSPL

FFP

The contractor shall complete the Kitchen PSPL IAW the SOW and CDRL C021:

ETS Kitchen PSPL.

UNIT UNIT PRICE MAX AMOUNT

0084 UNDEFINED Job Shipping

FFP

Shipping will be required during the performance of this requirement. The price for this CLIN will be negotiated at the individual order level when shipping destinations are determined. The contractor shall be reimbursed for actual actual shipping expenses only.

UNIT UNIT PRICE MAX AMOUNT

0085 UNDEFINED Job Engineering Change Proposals

FFP

Offerors shall propose their fully burdened labor rates for this CLIN in Section B Contractor Pricing Support section of the solicitation.

Individual requirements will be defined and negotiated at the order level based upon the level of effort and the fully burdened labor rates listed in Section B.

UNIT UNIT PRICE MAX AMOUNT

0086 UNDEFINED Job Travel

FFP

Travel is anticipated during the performance of this requirement. These expenses cannot be accurately forecast at this time and are therefore awarded on a reimbursable basis. Travel expenses shall be limited to the constraints of FAR 31.205-46 and the Joint Travel Regulations and no fee shall be applied.

All requests for travel must be submitted to the Contracting Officer's Representative (COR) for approval at least five (5) days prior to incurring expenses.

ADDITIONAL PRICING

B.2. Production Units Stepladder Pricing

CLINS 0013, 0014, 0016, 0017, 0019, 0020, 0022 and 0023

ETS Latrine Systems

CLINS 0013 and 0014 (Years 1-5)

Year 1

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0013 Green 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0014 Tan 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

Year 2

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0013 Green 1.00 20.00 ___________

21.00 40.00 ____________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

Year 3

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0013 Green 1.00 20.00 ___________

21.00 40.00 ____________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________ Year 4

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0013 Green 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0014 Tan 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

Year 5

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0013 Green 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0014 Tan 1.00 20.00 ___________

21.00 40.00 ____________

ETS Kitchen Systems

CLINS 0016 and 0017 (Years 1-5)

Year 1

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0016 Green 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0017 Tan 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

Year 2

0016 Green 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0017 Tan 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________ Year 3

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0016 Green 1.00 20.00 ___________

21.00 40.00 ____________

0017 Tan 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

Year 4

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0016 Green 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0017 Tan 1.00 20.00 ___________

21.00 40.00 ____________

Year 5

0016 Green 1.00 20.00 ___________

0017 Tan 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

ETS Shower Systems

CLINS 0019 and 0020 (Years 1-5)

Year 1

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0019 Green 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0020 Tan 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

Year 2

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0019 Green 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0020 Tan 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

Year 3

0019 Green 1.00 20.00 ___________

0020 Tan 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

Year 4

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0019 Green 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0020 Tan 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

Year 5

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0019 Green 1.00 20.00 ___________

21.00 40.00 ____________

0020 Tan 1.00 20.00 ___________

21.00 40.00 ____________

ETS Food Sanitation Center Systems

CLINS 0022 and 0023 (Years 1-5)

Year 1

0022 Green 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0023 Tan 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

Year 2

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0022 Green 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0023 Tan 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________ Year 3

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0022 Green 1.00 20.00 ___________

21.00 40.00 ____________

0023 Tan 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

Year 4

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0022 Green 1.00 20.00 ___________

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0023 Tan 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

Year 5

CLIN DESCRIPTION FROM QUANTITY TO QUANTITY UNIT PRICE

0022 Green 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

0023 Tan 1.00 20.00 ___________

21.00 40.00 ____________

41.00 80.00 ____________

81.00 120.00 ____________

B.3. Contractor’s Fully Burdened Rates CLINS

0015, 0018, 0021, 0084, 0085 and 0086

Year 1

Labor Categories Fully Burdened Hourly Rates

Year 2

Year 3

Labor Categories Fully Burdened Hourly Rates

Year 4

Year 5

Labor Categories Fully Burdened Hourly Rates

Section C - Descriptions and Specifications

STATEMENT OF WORK (SOW)

FOR THE PRODUCTION AND INTEGRATION

OF EXPEDITIONARY TRICON SYSTEMS (ETS)

C.1 BACKGROUND

C.1.1. The United States Army is modernizing their containerized life support systems associated with the Force Provider (FP) program. FP is a containerized system with the objective to provide a stand-alone base camp capability for a broad array of Combat Service Support and Homeland Defense missions. Force Provider was originally Type Classified Standard in May of 1994 as a 550-personnel module capable of being complexed/combined to support a brigade sized force of 3300 personnel. Over time Force Provider Containerized Systems have evolved from 20’ ISO containers supporting 600 personnel to smaller more mobile and expeditionary Expandable TRICON shelters supporting 150 personnel each. This configuration is referred to as Force Provider Expeditionary TRICON System (ETS). Each Force Provider base camp (module) contains two Expeditionary Shower Systems (ESS), two Expeditionary Latrine Systems (ELS), one Expeditionary TRICON Kitchen System (ETKS), and one Food Sanitation Center (FSC).

C.1.2. Additionally, there is a Joint Services requirement for the ETS Systems associated with this Statement of Work (SOW) in support of other services deployable base-camp systems. By introducing standardized assets to the Joint Services community, FPE LSM can improve its maintenance repair supportability. The commonality of repair parts can be used to assist other services in maintaining overall operational readiness.

C.2 GENERAL SCOPE

C.2.1. The effort described in this SOW pertains to the production of the ETS Systems.

C.2.2. The ETS Systems described in this SOW are integrated into expandable shipping Triple Containers (TRICON) which measure 8’x 8’ x 6’6” in shipping configuration and expands on two sides. The ETS Systems shall be built in accordance with the Government’s specifications, supplied Technical Drawing Package and supporting documentation. The ETS Systems shall be packed for shipment per the supplied ETS Equipment packing plan (Attachments 0002, 0004, 0006, 0008). Pack-out components is defined in each ETS TDP. The ETS Systems have been developed, tested, and certified based on this supplied information.

C.2.3. The Contractor shall furnish all personnel, labor, engineering, services, equipment (except that expressly stated herein to be furnished by the Government), materials, supplies, and facilities necessary to fabricate, integrate and manufacture the ETS Systems and provide all support hardware and software as indicated in this SOW. The work and services to be performed by the Contractor are detailed in this SOW. The Contractor shall not initiate any task without written direction by the Contracting Officer.

C.2.4. Each system requires updated logistical support documentation as described in this SOW and the associated Contract Data Requirements Lists (CDRLs) listed in Section J of the solicitation. Each ETS system includes upgrades over the previous version and will require complete ILS documentation as described in the ETS Integrated Product Support SOW (Attachment 0016).

C.2.5. The intent of this contract is to produce the ETS Systems via a five (5) year Indefinite Delivery/Indefinite Quantity (IDIQ), Firm-Fixed-Price (FFP) contract vehicle until either the Army Acquisition Objective is achieved and/or all Joint Service requirements are met, whichever comes first. The U.S. Army intends to buy at least one of each ETS System and as many as 210 per year subject to availability of funds.

C.2.6. If the requirements of this SOW, subsidiary specifications, standards, drawings, or publications are in conflict, the Contractor shall refer the area of conflict to the Contracting Officer or the designated Contracting Officer's Representative for resolution.

C.2.7. The Government anticipates awarding one contract on a Best Value basis to a vendor demonstrating the ability to produce each ETS System to the technical specifications drawing packages provided.

C.3 CONTRACT REQUIREMENTS

C.3.1. Contractor shall produce each ETS System in accordance with the paragraphs below. Contractor(s) may substitute parts specified in the drawing package(s) with “equivalent” items. Equivalent items shall meet form, fit and function of the original item. Contractors offering “equivalent” items shall include technical, performance, and or test data verifying “equivalency”. Contractor(s) shall propose requisite test cost and schedule as part of their proposal(s) associated with their “or equivalent” submission(s) in order to meet or exceed the requirements in the technical specifications, salient characteristics, and the performance characteristics specified in the following paragraphs. Any proposed changes shall be proposed and completely documented in an Engineering Change Proposal (ECP) per paragraph C.13.2.

C.3.2. Contractor shall produce each ETS System in accordance with their respective Drawing Packages (Attachments 0001, 0003, 0005, 0007). Each ETS is housed in an 8' x 8' x 6’6” Convention for Safe Container (CSC) and International Standard for Organization (ISO) certified TRICON container which is modified to include two expandable wing section on opposing sides. The wings are expanded for operation providing approximately three times the floor space of a basic, non-expandable TRICON.

C.3.3. Contractor shall produce the Expeditionary Shower System (ESS) in accordance with Drawing Package 9-2- 6710 in accordance with Attachment 0001 & 0002 of Section J. The ESS is housed in an 8' x 8' x 6'6" TRICON container which is modified to include an expandable section at each end. The wings are expanded for operation providing approximately three times the floor space of a basic, non-expandable TRICON. Each ESS shall provide a 10-minute hot shower (target temperature of 105 degrees F based on 40 degree F supply water) and support the showering and shaving needs of 75 personnel.

C.3.3.1. The salient points associated with the ESS design are:

C.3.3.1.1. Four (4) individual shower stalls

C.3.3.1.2. Four (4) sinks with hot and cold 0.5 gallon per minute faucets and mirror-finished reflective surfaces (adequate for shaving)

C.3.3.1.3. Environmental control and ventilation maintaining internal temperatures of 60 – 90 degrees F with exterior temps of 33 – 120 degrees F

C.3.3.1.4. Power and water connections to accommodate interface to the Force Provider Base Camp

C.3.3.1.5. As built in accordance with the drawing package, the shower shall pack-out in the expandable TRICON in accordance with the Shower Equipment Packing Plan in Attachment 0002 of Section J. The Packing Plan may be in draft form at the time of award. It will be validated during production of the FAT.

C.3.4. Contractor(s) shall produce the Expeditionary Latrine System (ELS) in accordance with Drawing Package 9- 2-6709 in accordance with Attachment 0003 & 0004 in Section J. The ELS is housed in an 8' x 8' x 6’6” TRICON container which is modified to include an expandable wing section at each end. The wings are expanded for operation providing approximately three times the floor space of a basic, non-expandable TRICON. Each ELS shall provide sinks, urinals and commodes to support 75 personnel.

C.3.4.1. The salient points associated with the ELS design are:

C.3.4.1.1. Four (4) individual commode stalls with low-water use (less than 1.5 gallons per flush) commode.

C.3.4.1.2. Two (2) trough urinals with manual flush

C.3.4.1.3. Two (2) sinks with cold (ambient) 0.5 gallon per minute faucets.

C.3.2.1.4. Environmental control and ventilation maintaining internal temperatures of 60 – 90F with exterior temps of 33 – 120F

C.3.4.1.5. Power and water connections to accommodate interface to the Force Provider Base Camp

C.3.4.1.6. As built in accordance with the drawing package, the latrine shall pack-out in the expandable TRICON in accordance with the Latrine Equipment Packing Plan in Attachment 0004 of Section J. The Packing Plan may be in draft form at the time of award. It will be validated during production of the FAT.

C.3.5. Contractor(s) shall produce the Expeditionary TRICON Kitchen System (ETKS) in accordance with Drawing Package 9-2-6799 Attachments 0005 and 0006 of Section J. The ETKS is housed in an 8’ x 8' x 6’6” TRICON container which is modified to include an expandable wing section at each end. The wings are expanded for operation providing approximately three times the floor space of a basic, non-expandable TRICON. Each ETKS will provide the capability of preparing, cooking, and serving 150 Meals three times per day.

C.3.5.1. The salient points associated with the Expeditionary TRICON Kitchen System (ETKS) design are:

C.3.5.1.1. Meet requirements and conditions of the National Sanitation Foundation (NSF) at http://www.nsf.org/

C.3.5.1.2. One convection oven suitable for Unitized Group Ration A located at https://www.dla.mil/TroopSupport/Subsistence/Operational-rations/ugra/.

C.3.5.1.3. One 2-1/2 gallon capacity steam jacketed kettle

C.3.5.1.4. One under-counter 20 cubic foot refrigerator

C.3.5.1.5. One 3-well sanitation center meeting National Sanitation Foundation (NSF) requirements at http://www.nsf.org.

C.3.5.1.6. Two 412 square-inch electric griddles

C.3.5.1.7. Six Pan Capacity Boiler less Steamer.

C.3.5.1.8. Environmental control and ventilation with grease filtration maintaining internal temperatures of 60 – 90F with exterior temps of 33 – 120F.

C.3.5.1.9. Be capable of feeding 150 personnel per meal using Unitized Group Ration A meals plus supplements and enhancements. Additional capabilities and menus are inherent in the design.

C.3.5.1.10. Power and water connections to accommodate interface to the Force Provider Base Camp

C.3.5.1.11. As built in accordance with the drawing package, the kitchen shall pack-out in the expandable TRICON in accordance with the Kitchen Equipment Packing Plan in attachment 0006 of Section J. The Packing Plan may be in draft form at the time of award. It will be validated during production of the FAT.

C.3.6. Contractor(s) shall produce the Expeditionary TRICON Food Sanitation Center (FSC) in accordance with Drawing Package 9-2-1121 Attachments 0007 and 0008 of Section J. The FSC is housed in an 8’ x 8' x 6’6” TRICON container which is modified to include an expandable wing section at each end. The wings are expanded for operation providing approximately three times the floor space of a basic, non-expandable TRICON. Each FSC will provide the capability of sanitation functions related to the preparation and service of 150 meals three times a day.

C.3.6.1. The salient points associated with the Expeditionary TRICON Food Sanitation System (FSC) design are:

C.3.6.1.1. Meet requirements and conditions of the National Sanitation Foundation (NSF) at http://www.nsf.org/

C.3.6.1.2. Three sink basins heater tanks with 20 gallon capacity each. Sink basin shall be thermostatically controlled, shall heat 20 gallons of water a 110F delta in 45 minutes or less, and shall be removable.

C.3.6.1.3. One grease interceptor which shall process the three sink basins water with no restriction and fit under the left hand side drain table next to the waste water tank without protruding to the work area

C.3.6.1.4. One waste water tank that shall hold the water coming out of the grease interceptor without restriction, shall contain a discharge pump to move the waste water from the waste water tank to the waste water bag, and shall fit under the left hand side drain table next to the grease interceptor without protruding to the work area

C.3.6.1.5. Two drain tables that shall be able to lock in place and drain into the sinks without modifying the sinks basins or the container

C.3.6.1.6. One drying rack

C.3.6.1.7. Lights that shall illuminate the work area with blackout capability

C.3.6.1.8. Environmental control and ventilation maintaining internal temperatures of 60 – 90F with exterior temps of 33 – 120F.

C.3.6.1.9. Two 3000 gallons water bags; One Source Water and One Waste Water

C.3.6.1.10. Power and water connections to accommodate interface to the Force Provider Base Camp

C.3.6.1.11. As built in accordance with the drawing package, the FSC shall pack-out in the expandable TRICON in accordance with the FSC Equipment Packing Plan in attachment 0008 of Section J. The Packing Plan may be in draft form at the time of award. It will be validated during production of the FAT.

C.4 PERFORMANCE REQUIREMENTS

C.4.1. The ETS Systems are designed to meet the performance requirements and constraints listed below. Any substitutions submitted by the contractor(s) shall meet the specifications below in addition to the descriptions above.

C.4.2. Constraints: There are four (4) major design constraints associated with the ETS Systems. These constraints do not represent a complete list. Other constraints are inherent to the as-built design and performance specifications described in subsequent sections of this document and or in the drawing packages. These constraints are not prioritized. The systems depicted in the drawing packages have undergone iterations of design modifications and testing in order to achieve full function across the performance requirements spectrum. Any recommended changes or modifications to the technical specifications and drawing package may require testing.

C.4.3. The containers shall meet ISO standards for inter-modal shipping and have CSC certifications for stacking nine containers high in shipping configuration. Containers shall accommodate interface with power inputs and outputs, water connections, ventilation, etc. and otherwise completely integrate with the specific equipment associated with each ETS System it supports.

C.4.4. Each completed and packed-out asset shall not exceed 9,500 pounds. Each system packs out within its container in accordance with the packing plan associated with each system.

C.4.5. The electrical system shall be compatible with 208VAC, 3 PH; The primary source of electric power is the 60 kW tactical quiet generator (supplied in the field), commercial power (60 kW, 208 VAC, 3PH, 50/60 Hz).

C.4.6. The ETS Systems are completely electric powered.

C.5 GENERAL REQUIREMENTS

C.5.1. Each system shall be capable of being set-up and put into operation by a crew of five personnel (MOS non-specific) within 90 minutes of being placed on level ground (not to exceed 5% slope). Set-up includes making all power connections, water supply connections, waste water connection, pre-operational checks and services, and any other activity necessary. Set-up shall not include establishing the 60 kW generator (grounding, fueling, etc.) or obtaining fuel or water. The system, once set-up and in operation, shall require no more than one personnel for operations. Once system operations are complete, the system shall be capable of being reduced to the transport configuration within 90 minutes by five operator personnel (MOS non-specific). The five personnel shall be responsible for reversing all activities associated with set-up in addition to any other activity necessary to achieve the transport configuration. The above constraints apply to all types of climate and weather conditions between 33°F and 90°F. Setup and strike times associated with temperatures above and below this range may be adjusted. The system shall be capable of being set-up as specified above, operated, maintained, and resupplied by personnel wearing the Level III Chemical / Biological protective ensemble (Mission Oriented Protective Posture (MOPP) Gear (e.g., suit, boots and gloves, no mask)) and cold weather clothing. The system shall be capable of being disassembled (struck) and prepared for movement by personnel wearing Level IV Chemical / Biological protective ensemble (MOPP Gear (e.g., suit, boots, gloves, and mask)) and cold weather clothing.

C.5.2 The containers must meet International Organization for Standardization (ISO) for inter-modal shipping, have International Convention for Safe Container (CSC), and be capable of / certified for stacking nine containers high.

Containers shall accommodate interface with power inputs and outputs, water connections, ventilation, etc and otherwise completely integrate with the specific equipment associated with the ETS it supports.

C.5.3. Lighting. Lighting associated with each system shall meet tactical field requirements. Blackout lighting shall be incorporated.

C.5.4. The system-specific equipment shall be packed in accordance with the ETS equipment packing plan Attachments 0002, 0004, 0006, and 0008. The system shall operate from the ground-deployed position.

C.5.5. All material, equipment, and packout components, should be marked in accordance with MIL-STD-129.

C.5.6. The contractor shall mark all ETS Systems with Unique Item Identification (UID) as described in Attachment 0009, Statement of Work, Major End Item Data Plate, Unique Identification and IAW MIL-STD-130L.

C.6 ETS INTERFACE

C.6.1. The system shall operate on 120/208 volts, 3 phase, 50/60 hertz electricity supplied by a 60 kW Tactical Quiet Generator (supplied in the field). The system shall be compatible with tactical power as the primary source of electricity. The system shall be capable of operating on commercial electric power (120/208 volts, 3 phase, 50/60 hertz).

C.6.2. Water connections shall be Cam-Lock type in association with A-A-59326. Hot water supply shall be 1.0” cam-lock style male connector. Source water supply shall be 1.5” cam-lock style male connector. Waste water connection shall be 2.0” cam-lock style male connector.

C.6.3. Electrical connections shall be Military “Class L” type.

C.7 ETS ENVIRONMENT

C.7.1. The systems shall be capable of maintaining internal temperatures of 60F to 90F in ambient external temperatures ranging from -15F to 120F.

C.7.2. The system design and construction shall be such that the equipment is capable of withstanding the extremely hard usage encountered in Military Service. Examples of hard usage are as follows: Cross-country transportation, operation in extreme environments and at high altitudes, operation and storage in the open air, and exposure to the elements for extended periods of time. Materials and treatments shall be selected to provide effective resistance to wear, abuse, rust, decay, and corrosion under such conditions as specified below.

C.7.3. Paint, Color, Decontamination Survivability: The exterior surfaces of the system(s) shall be painted with Chemical Agent Resistant Coating (CARC). The specification for the primer and topcoat is under 20.24 of MIL- STD-171. The primer is MIL-DTL-53022 and the top coat is MIL-DTL-53039. Finish per 4.4 plus 5.2 followed by

20.24 of MIL-STD-171. Apply and test per MIL-DTL-53072. Test 336 hours of ASTM-B-117. The Contractor may refer to FED-STD-595 for green #383 or tan #380. Paint shall have a five-year warranty.

C.7.4. Effective Corrosion Prevention and Control Program (CPCP) The contractor will develop and maintain an informal CPCP to manage their internal design and manufacturing with respect to corrosion prevention. The Manufacturer’s CPCP is considered a working document and will be continually updated as needed.

Major responsibilities for the CPCP include:

• Review and ensure adequate corrosion prevention and control techniques are established, implemented, and maintained.

• Ensure the implementation of corrosion prevention and control is documented.

• Maintain a log of problems and solutions/actions covered.

• Ensure periodic reviews are made of all facilities to evaluate the adequacy of corrosion prevention and control measures.

• Review internal training programs to ensure the required corrosion prevention and control techniques are properly addressed.

• Review and recommend approval of cleaning materials, solutions, and chemicals not covered by approved specifications for use on the system, parts, and components.

• Findings/solutions that effect system configuration or pack out configuration shall be documented in an ECP.

Functional areas that will be represented by the CPCP include:

• Materials Engineering

• Design Engineering

• Reliability, Maintainability, Supportability and Integration

• Logistics Engineering

• Manufacturing Engineering

• Production Operations

• Quality Assurance

To ensure coordination of efforts, the contractor shall notify PM FSS of all corrosion preventative related topics, issues, and decisions.

C.8 MAINTAINABILITY

C.8.1. The system(s) shall not introduce any unique requirements for maintenance support. No special maintenance facilities, tools, or Test, Measurement, and Diagnostic Equipment (TMDE) shall be required.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .