W911QY-17-R-0023_ULCANS_Draft_Solicitation.pdf

PDF 826 KB Posted

Attached to
Ultra Lightweight Camouflage Net System (ULCANS)
Solicitation number
W911QY-17-R-0023
Issued by

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until local time

X

A X B X C X D

EX

X

G F 82 - 89

90 - 104 X H 105 - 112

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 111

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W911QY 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2 3 - 37

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

38 - 51 52 - 53

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

54 - 55 56 - 59

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 60 - 62 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 63 - 67 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

68 - 79

PART II - CONTRACT CLAUSES

W6QK ACC-APG NATICK

CONTRACTING DIVISION

BLDG 1 GENERAL GREENE AVENUE

NATICK MA 01760-5011

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

80 - 81

6. REQUISITION/PURCHASE NO.5. DATE ISSUED4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W911QY-17-R-0023

Section A - Solicitation/Contract Form

SUPPLEMENTAL INFORMATION

A.1. The Army Contracting Command – Aberdeen Proving Ground (ACC-APG), Natick Contracting Division has a requirement for Ultra-Lightweight Camouflage Net System (ULCANS), Increment I.

A.1.1. The Government anticipates this solicitation will result in the initial award of three Indefinite Delivery Indefinite Quantity (IDIQ), Firm Fixed Price (FFP) type contracts for the development and production of the ULCANS Increment I. Upon completion of the competitive prototyping (CP) testing, the government will conduct a comparative evaluation to down select to one vendor who will move forward into the developmental test phase. The contract is anticipated to be a FFP IDIQ contract, with a ceiling value of $480M over a 10-year ordering period. The minimum contract value will be $240,000.00 and the maximum contract value will be $480,000,000.00. An award will be made to the offeror whose proposal represents the best value to the government considering a tradeoff of price and non-price factors.

A.1.2. This requirement is subject to the availability funds.

A.1.3. Proposals shall be valid for 180 days after the closing date of the solicitation. Contractors shall clearly indicate the period of validity.

A.1.4. Contractors will not be reimbursed for any proposal preparation costs.

A.1.5. Proposals are due NLT 1:00pm EDT, 11 August 2017

A.2. The government anticipates awarding multiple FFP IDIQ contracts as a result of this solicitation;

however the government reserves the right to award one or no contracts at the governments discretion. Funds will be obligated for quantities ordered upon issuance of delivery orders and not by the basic contract.

A.3. This acquisition is full and open competition. The North American Industry Classification System NAICS Code is 314910, and the size standard is 500 employees.

A.6. The solicitation including Amendments, Exhibits and Attachments listed in Section J, may be downloaded from the Natick Contracting Division website: http://www3.natick.army.mil/team/ULCANS.aspx.

A.7. Proposals shall be addressed to the following:

Army Contracting Command – Aberdeen Proving Ground Natick Contracting Division (CCAP-SCN) Milford B Branch ATTN: Nicole Bernier Subject: W911QY-17-R-0023 15 General Greene Avenue, Bldg 1, 3rd Floor Natick, MA 01760

A.7.1. Prior to hand delivering proposals offerors shall coordinate the delivery with Nicole Bernier via email at nicole.e.bernier.civ@mail.mil.

A.8. Offerors shall access http://www.assistdocs.com herein for all Mil-STD’s referenced in this document for complete up to date information.

A.9. Any changes in the agreed upon arrangements are to be submitted to the Contracting Officer in advance for approval. In the event of any conflict or ambiguity between the Contractor's Technical Proposal and the Government's Performance Specification, the Government's Performance Specification takes precedence.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 UNDEFINED Each Integrated Master Schedule (IMS)

FFP

IAW CDRL A001 and SOW Section C.1.6.

FOB: Destination

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

0002 UNDEFINED Each Safety Assessment Report (SAR)

FFP

IAW CDRL A002 and SOW Section C.2.1.

UNIT UNIT PRICE MAX AMOUNT

0003 UNDEFINED Each Manufacturing and Surge Plan

FFP

IAW CDRL A003 and SOW Section C.2.2.

UNIT UNIT PRICE MAX AMOUNT

0004 UNDEFINED Each Failure Analysis / TIRs

FFP

IAW CDRL A004 and SOW Section C.2.

UNIT UNIT PRICE MAX AMOUNT

0005 UNDEFINED Each Level of Repair Analysis (LORA)

FFP

IAW CDRL A005, SOW Section C.5.1. and Attachment C-1.

UNIT UNIT PRICE MAX AMOUNT

0006 UNDEFINED Each Maintenance Task Analysis (MTA)

FFP

IAW CDRL A006, SOW Section C.5.2., & Attachments C-2 and C-3.

UNIT UNIT PRICE MAX AMOUNT

0007 UNDEFINED Each

FMECA

FFP

Failure Modes Effects and Criticality Analysis (FMECA). IAW CDRL A007, SOW Section C.5.3. and Attachment C-4.

UNIT UNIT PRICE MAX AMOUNT

0008 UNDEFINED Each System Support Package Hardware

FFP

IAW CDRL A008 and SOW Section C.2.13.

UNIT UNIT PRICE MAX AMOUNT

0009 UNDEFINED Each Technical Manual (TM) - 10

FFP

IAW CDRL A009, SOW Section C.5.4. and Attachment C-5.

UNIT UNIT PRICE MAX AMOUNT

0010 UNDEFINED Each Engineering Data for Provisioning (EDFP)

FFP

IAW CDRL A010 and SOW Section C.5.5.

UNIT UNIT PRICE MAX AMOUNT

0011 UNDEFINED Each Provisioning Parts List (PPL)

FFP

IAW CDRL A011 and SOW Section C.5.6.

UNIT UNIT PRICE MAX AMOUNT

0012 UNDEFINED Each Technical Manual (TM) Validation Plan

FFP

IAW CDRL A012, SOW Section C.5.7. and Attachment C-5.

UNIT UNIT PRICE MAX AMOUNT

0013 UNDEFINED Each Technical Manual (TM) Validation Report

FFP

IAW CDRL A013, SOW Section C.5.8. and Attachment C-5.

UNIT UNIT PRICE MAX AMOUNT

0014 UNDEFINED Each Special Packaging Instructions (SPI)

FFP

IAW CDRL A014, SOW Section C.5.9. and C-6.

UNIT UNIT PRICE MAX AMOUNT

0015 UNDEFINED Each Quick Reference Guide

FFP

IAW CDRL A015, SOW Section C.5.10 and Attachment C-7.

UNIT UNIT PRICE MAX AMOUNT

0016 UNDEFINED Each Care of Supplies in Storage (COSIS)

FFP

IAW CDRL A016, SOW Section C.5.11 and Attachment C-9.

UNIT UNIT PRICE MAX AMOUNT

0017 UNDEFINED Each OPTION Contractor Developmental Test (DT) Plan

FFP

Woodland PPT. IAW CDRL A017 and SOW Section C.2.10.1.

UNIT UNIT PRICE MAX AMOUNT

0018 UNDEFINED Each OPTION Contractor Developmental Test Report

FFP

Woodland PPT. IAW CDRL A018 and SOW Sections C.2.10.3. & C.2.10.4.

UNIT UNIT PRICE MAX AMOUNT

0019 UNDEFINED Each OPTION Contractor Developmental Test (DT) Plan

FFP

Class 3 Snow/Alpine PPT. IAW CDRL A019 and SOW Section C.2.10.1.

UNIT UNIT PRICE MAX AMOUNT

0020 UNDEFINED Each OPTION Contractor Developmental Test Report

FFP

Class 3 Snow/Alpine PPT. IAW CDRL A020 and SOW Sections C.2.10.3. & C.2.10.4.

UNIT UNIT PRICE MAX AMOUNT

0021 UNDEFINED Each OPTION Contractor Developmental Test (DT) Plan

FFP

Desert PPT. IAW CDRL A021 and SOW C.2.10.1.

UNIT UNIT PRICE MAX AMOUNT

0022 UNDEFINED Each OPTION Contractor Developmental Test Report

FFP

Desert PPT. IAW CDRL A022 and SOW Sections C.2.10.3. & C.2.10.4.

UNIT UNIT PRICE MAX AMOUNT

0023 UNDEFINED Each OPTION Contractor Developmental Test (DT) Plan

FFP

Woodland PQT. IAW CDRL A023 and SOW Section C.2.12.1.

UNIT UNIT PRICE MAX AMOUNT

0024 UNDEFINED Each OPTION Contractor Developmental Test Report

FFP

Woodland PQT. IAW CDRL A024 and SOW Sections C.2.12.3. & C.2.12.4.

UNIT UNIT PRICE MAX AMOUNT

0025 UNDEFINED Each OPTION Contractor Developmental Test (DT) Plan

FFP

Class 3 Snow/Alpine PQT. IAW CDRL A025 and SOW Section C.2.12.1.

UNIT UNIT PRICE MAX AMOUNT

0026 UNDEFINED Each OPTION Contractor Developmental Test Report

FFP

Class 3 Snow/Alpine PQT. IAW CDRL A026 and SOW Section C.2.12.3. & C.2.12.4.

UNIT UNIT PRICE MAX AMOUNT

0027 UNDEFINED Each OPTION Contractor Developmental Test (DT) Plan

FFP

Desert PQT. IAW CDRL A027 and SOW Section C.2.12.1.

UNIT UNIT PRICE MAX AMOUNT

0028 UNDEFINED Each OPTION Contractor Developmental Test Report

FFP

Desert PQT. IAW CDRL A028 and SOW Sections C.2.12.3. & C.2.12.4.

UNIT UNIT PRICE MAX AMOUNT

0029 UNDEFINED Each OPTION LRIP Status Report

FFP

Low Rate Initial Production (LRIP) Status Report. IAW CDRL A029 and SOW Section C.3.2.

UNIT UNIT PRICE MAX AMOUNT

0030 UNDEFINED Each OPTION Full Rate Production (FRP) Plan

FFP

IAW CDRL A030 and SOW Section C.3.5.

UNIT UNIT PRICE MAX AMOUNT

0031 UNDEFINED Each OPTION Full Rate Production (FRP) Report

FFP

IAW CDRL A031 and SOW Section C.3.5.

UNIT UNIT PRICE MAX AMOUNT

0032 UNDEFINED Each OPTION Contractor Support

FFP

Contractor Support for Development and Operational Testing. IAW SOW Section C.2.12.4.

UNIT UNIT PRICE MAX AMOUNT

0033 UNDEFINED Each OPTION Prototype Units – All Variants

FFP

IAW SOW Section C.1.3.4, Section B5 Prototype Pricing and Section J Attachment 0006 ULCANS Increment I - Section B Tables.

FOB: Origin (Shipping Point)

UNIT UNIT PRICE MAX AMOUNT

0034 UNDEFINED Each OPTION LRIP Units– All Variants

FFP

Low-Rate Initial Production Units – All Variants. IAW SOW Section C.3.2, B2 Production Pricing and Section J Attachment 0006 ULCANS Increment I - Section B Tables.

UNIT UNIT PRICE MAX AMOUNT

0035 UNDEFINED Each OPTION Research & Development to Support ECPs

FFP

IAW SOW Section C.1.10.

UNIT UNIT PRICE MAX AMOUNT

0036 UNDEFINED Job OPTION Shipping

FFP

IAW SOW Section C.2.15.

UNIT UNIT PRICE MAX AMOUNT

0037 UNDEFINED Each OPTION Spare and Repair Parts

FFP

IAW SOW Section C.1.3.6.

UNIT UNIT PRICE MAX AMOUNT

0038 UNDEFINED

Small Business Participation Report

FFP

IAW CDRL A033.

UNIT UNIT PRICE MAX AMOUNT

1001 UNDEFINED Each OPTION Full-Rate Production (FRP) Status Report

FFP

IAW SOW Section C.3.5.

UNIT UNIT PRICE MAX AMOUNT

1002 UNDEFINED Each OPTION Full Rate Production (FRP) Plan

FFP

UNIT UNIT PRICE MAX AMOUNT

1003 UNDEFINED Each OPTION Full Rate Production (FRP) Report

FFP

UNIT UNIT PRICE MAX AMOUNT

1004 UNDEFINED Each OPTION Production Units – All Variants

FFP

IAW SOW Section C.3.5, B2 Production Pricing and Section J Attachment 0006 ULCANS Increment I - Section B Tables.

UNIT UNIT PRICE MAX AMOUNT

1005 UNDEFINED Each OPTION Development

FFP

Battlefield Specific/Tailored Units (Development). IAW CDRL A032 and SOW Section C.3.6.

UNIT UNIT PRICE MAX AMOUNT

1006 UNDEFINED Each OPTION Production

FFP

Battlefield Specific/Tailored Units. IAW SOW Section C.3.7, B6 Battlefield Specific Production Pricing and Section J Attachment 0006 ULCANS Increment I

- Section B Tables.

UNIT UNIT PRICE MAX AMOUNT

1007 UNDEFINED Each OPTION Research & Development to Support ECP

FFP

Engineering Change Proposal (ECP). IAW SOW Section C.1.10.

UNIT UNIT PRICE MAX AMOUNT

1008 UNDEFINED Each OPTION Production Surge Capability

FFP

Production Surge Capability up to 5,000 units/month (12 month duration). IAW SOW Section C.2.2.

UNIT UNIT PRICE MAX AMOUNT

1009 UNDEFINED Each OPTION Production Surge Capability

FFP

Production Surge Capability up to 10,000 units/month (12 month duration). IAW

UNIT UNIT PRICE MAX AMOUNT

1010 UNDEFINED Job OPTION Shipping

FFP

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

1011 UNDEFINED Each OPTION Spare and Repair Parts

FFP

IAW SOW Section C.1.3.6.

UNIT UNIT PRICE MAX AMOUNT

2001 UNDEFINED Each OPTION Full-Rate Production (FRP) Status Report

FFP

IAW SOW Section C.3.5.

UNIT UNIT PRICE MAX AMOUNT

2002 UNDEFINED Each OPTION Full Rate Production (FRP) Plan

FFP

UNIT UNIT PRICE MAX AMOUNT

2003 UNDEFINED Each OPTION Full Rate Production (FRP) Report

FFP

UNIT UNIT PRICE MAX AMOUNT

2004 UNDEFINED Each OPTION Production Units – All Variants

FFP

IAW SOW Section C.3.5, B2 Production Pricing and Section J Attachment 0006 ULCANS Increment I - Section B Tables.

UNIT UNIT PRICE MAX AMOUNT

2005 UNDEFINED Each OPTION Development

FFP

Battlefield Specific/Tailored Units (Development). IAW CDRL A032 and SOW Section C.3.6.

UNIT UNIT PRICE MAX AMOUNT

2006 UNDEFINED Each OPTION Production

FFP

Battlefield Specific/Tailored Units (Production). IAW SOW Section C.3.7, B6 Battlefield Specific Production Pricing and Section J Attachment 0006 ULCANS Increment I - Section B Tables.

UNIT UNIT PRICE MAX AMOUNT

2007 UNDEFINED Each OPTION Research & Development to Support ECOs

FFP

IAW SOW Section C.1.10.

UNIT UNIT PRICE MAX AMOUNT

2008 UNDEFINED Each OPTION Production Surge Capability

FFP

Production Surge Capability up to 5,000 units/month (12 month duration). IAW

UNIT UNIT PRICE MAX AMOUNT

2009 UNDEFINED Each OPTION Production Surge Capability

FFP

Production Surge Capability up to 10,000 units/month (12 month duration). IAW

UNIT UNIT PRICE MAX AMOUNT

2010 UNDEFINED Job OPTION Shipping

FFP

UNIT UNIT PRICE MAX AMOUNT

2011 UNDEFINED Each OPTION Spare and Repair Parts

FFP

IAW SOW Section C.1.3.6

B.2 ADDITIONAL PRICING

B2. Production Pricing.

Offerors shall provide production pricing for camouflage type and quantities listed throughout Section B.2 Additional Pricing per contract year, IAW Attachment 0006 ULCANS Increment I - Section B Tables of the solicitation.

Order quantities from 2,501-5,000 shall be preceded by the execution of CLIN 1008 or 2008. Order quantities from 5,001-10,000+ shall be preceded by the execution of CLIN 1009 or 2009.

Combination - Nominally an order of equal quantity of each variant.

Camouflage Class

(Type I or II) Quantity Year

Woodland 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 2 Woodland 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 3 Woodland 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 4 Woodland 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 5 Woodland 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 6 Woodland 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 7 Woodland 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 8 Woodland 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 9 Woodland 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 10

Class 2 Desert/Urb 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 2 Class 2 Desert/Urb 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 3 Class 2 Desert/Urb 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 4 Class 2 Desert/Urb 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 5 Class 2 Desert/Urb 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 6 Class 2 Desert/Urb 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 7 Class 2 Desert/Urb 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 8 Class 2 Desert/Urb 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 9 Class 2 Desert/Urb 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 10 Class 3 Snow/Alp 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 2 Class 3 Snow/Alp 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 3 Class 3 Snow/Alp 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 4 Class 3 Snow/Alp 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 5 Class 3 Snow/Alp 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 6 Class 3 Snow/Alp 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 7 Class 3 Snow/Alp 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 8 Class 3 Snow/Alp 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 9 Class 3 Snow/Alp 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 10

Combination 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 2 Combination 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 3 Combination 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 4 Combination 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 5 Combination 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 6 Combination 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 7 Combination 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 8 Combination 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 9 Combination 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 10

B3. Spare and Repair Part Pricing

Part Quantity Year Woodland Type I Hexagon 1-25 26-50 51-75 76-100 101-200 201-300 2-10 Woodland Type I Diamond 1-25 26-50 51-75 76-100 101-200 201-300 2-10 Woodland Type I Repair Kit 1-25 26-50 51-75 76-100 101-200 201-300 2-10 Woodland Type I Screen Kit 1-25 26-50 51-75 76-100 101-200 201-300 2-10 Woodland Type II Hexagon 1-25 26-50 51-75 76-100 101-200 201-300 2-10 Woodland Type II Diamond 1-25 26-50 51-75 76-100 101-200 201-300 2-10 Woodland Type II Repair Kit 1-25 26-50 51-75 76-100 101-200 201-300 2-10 Woodland Type II Screen Kit 1-25 26-50 51-75 76-100 101-200 201-300 2-10 Class 2 Desert/Urban Type I Hexagon

1-25 26-50 51-75 76-100 101-200 201-300 2-10

Class 2 Desert/Urban Type I Diamond

1-25 26-50 51-75 76-100 101-200 201-300 2-10

Class 2 Desert/Urban Type I Repair Kit

1-25 26-50 51-75 76-100 101-200 201-300 2-10

Class 2 Desert/Urban Type I Screen Kit

1-25 26-50 51-75 76-100 101-200 201-300 2-10

Class 2 Desert/Urban Type II Hexagon

1-25 26-50 51-75 76-100 101-200 201-300 2-10

Class 2 Desert/Urban Type II Diamond

1-25 26-50 51-75 76-100 101-200 201-300 2-10

Class 2 Desert/Urban Type II Repair Kit

1-25 26-50 51-75 76-100 101-200 201-300 2-10

Des Class 2 Desert/Urban ert Type II Screen Kit

1-25 26-50 51-75 76-100 101-200 201-300 2-10

Class 3 Snow/Alpine Type I Hexagon

1-25 26-50 51-75 76-100 101-200 201-300 2-10

Class 3 Snow/Alpine Type I Diamond

1-25 26-50 51-75 76-100 101-200 201-300 2-10

Class 3 Snow/Alpine Type I Repair Kit

1-25 26-50 51-75 76-100 101-200 201-300 2-10

Class 3 Snow/Alpine Type I Screen Kit

1-25 26-50 51-75 76-100 101-200 201-300 2-10

Class 3 Snow/Alpine Type II Hexagon

1-25 26-50 51-75 76-100 101-200 201-300 2-10

Class 3 Snow/Alpine Type II Diamond

1-25 26-50 51-75 76-100 101-200 201-300 2-10

Class 3 Snow/Alpine Type II Repair Kit

1-25 26-50 51-75 76-100 101-200 201-300 2-10

Class 3 Snow/Alpine Type II Screen Kit

1-25 26-50 51-75 76-100 101-200 201-300 2-10

Support System Kit 1-25 26-50 51-75 76-100 101-200 201-300 2-10 8’ Support Pole 1-25 26-50 51-75 76-100 101-200 201-300 2-10 4’ Support Pole 1-25 26-50 51-75 76-100 101-200 201-300 2-10 Shape Disrupter 1-25 26-50 51-75 76-100 101-200 201-300 2-10 Pole Connector 1-25 26-50 51-75 76-100 101-200 201-300 2-10 Stake (24ea) 1-25 26-50 51-75 76-100 101-200 201-300 2-10 Carry Case, Screens 1-25 26-50 51-75 76-100 101-200 201-300 2-10 Carry Case, Support System 1-25 26-50 51-75 76-100 101-200 201-300 2-10

B4. Support Personnel Pricing

Offerors shall provide pricing for support personnel to witness and assist in the execution of government test events.

Personnel Type Duration Year Engineering Support Weekly Monthly 1 Equipment Specialist Weekly Monthly 1 Engineering Support Weekly Monthly 2 Equipment Specialist Weekly Monthly 2 Engineering Support Weekly Monthly 3 Equipment Specialist Weekly Monthly 3 Engineering Support Weekly Monthly 4 Equipment Specialist Weekly Monthly 4 Engineering Support Weekly Monthly 5 Equipment Specialist Weekly Monthly 5

B5. Prototype Pricing

Combination - Nominally an order of equal quantity of each variant.

Camouflage Class (Type I or II)

Quantity Year

Woodland 1-3 4-10 11-15 16+ 1 Woodland 1-3 4-10 11-15 16+ 2 Woodland 1-3 4-10 11-15 16+ 3 Woodland 1-3 4-10 11-15 16+ 4 Woodland 1-3 4-10 11-15 16+ 5

Class 2 Desert/Urban 1-3 4-10 11-15 16+ 1 Class 2 Desert/Urban 1-3 4-10 11-15 16+ 2 Class 2 Desert/Urban 1-3 4-10 11-15 16+ 3 Class 2 Desert/Urban 1-3 4-10 11-15 16+ 4 Class 2 Desert/Urban 1-3 4-10 11-15 16+ 5 Class 3 Snow/Alpine 1-3 4-10 11-15 16+ 1 Class 3 Snow/Alpine 1-3 4-10 11-15 16+ 2 Class 3 Snow/Alpine 1-3 4-10 11-15 16+ 3 Class 3 Snow/Alpine 1-3 4-10 11-15 16+ 4 Class 3 Snow/Alpine 1-3 4-10 11-15 16+ 5

Combination 1-3 4-10 11-15 16+ 1 Combination 1-3 4-10 11-15 16+ 2 Combination 1-3 4-10 11-15 16+ 3 Combination 1-3 4-10 11-15 16+ 4 Combination 1-3 4-10 11-15 16+ 5

B6. Battlefield Specific Production Pricing

Order quantities from 2,501-5,000 shall be preceded by the execution of CLIN 1008 or 2008. Order quantities from 5,001-10,000+ shall be preceded by the execution of CLIN 1009 or 2009.

Note: Combination - Nominally an order of equal quantity of each variant.

Camouflage Base Class

(Type I or II) Quantity Year

Woodland 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 2 Woodland 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 3 Woodland 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 4 Woodland 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 5 Woodland 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 6 Woodland 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 7 Woodland 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 8 Woodland 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 9 Woodland 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 10

Desert/Urban 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 2 Desert/Urban 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 3 Desert/Urban 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 4 Desert/Urban 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 5 Desert/Urban 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 6 Desert/Urban 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 7 Desert/Urban 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 8 Desert/Urban 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 9 Desert/Urban 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 10 Snow/Alpine 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 2 Snow/Alpine 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 3 Snow/Alpine 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 4 Snow/Alpine 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 5 Snow/Alpine 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 6 Snow/Alpine 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 7 Snow/Alpine 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 8 Snow/Alpine 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 9 Snow/Alpine 0-250 251-500 501-1000 1001-2500 2501-5000 5001-7500 7501-10000 10

Section C - Descriptions and Specifications

STATEMENT OF WORK

C. DESCRIPTIONS AND SPECIFICATIONS for ULCANS – Increment I

C.1. GENERAL REQUIREMENTS

C.1.1. Scope: This Statement of Work (SOW) describes the design, test, fabrication, schedule, performance requirements, and deliverables required for the ULCANS Increment I effort.

C.1.2. Technical: The ULCANS Increment I is being developed as a replacement to the legacy ULCANS camouflage system. ULCANS Increment I is a multi-spectral camouflage system that is quickly and easily erected and disassembled by dismounted personnel to conceal stationary vehicles, weapons systems, and equipment.

ULCANS Increment I is applied to all vehicles and systems in the operational force and conceals them from detection by the enemy. ULCANS Increment I is employed throughout entire operational themes from peacetime military engagement to major combat operations, and provides U.S. forces the ability to quickly employ camouflage, rapidly respond to changing tactical situations, and reduce battlefield signatures. Military forces operating in all types of environments and terrain, across the full spectrum of military operations (i.e., operations at the operational and tactical levels including offensive/defensive operations before, during and after hostilities) require capabilities to camouflage equipment and critical fixed facilities for force protection that enhance assault and tactical flexibility.

The complete technical performance requirements and specifications for the ULCANS Increment I system are located in Attachment B-1, PRF 32575.

C.1.3. Contract Outline and Sequence of Events: The contractor will be provided with non-proprietary data and hardware resulting from the developmental work accomplished to date by the government. This may include solid models, drawings, test reports, prototype screens, support system, and packaging. See Section H for specifics of Government Furnished Equipment (GFE) and Government Furnished Information (GFI). This provides the contractor with the preliminary system designs, but ultimately, the contractor shall be responsible for designing and fabricating ULCANS Increment I systems that meet all of the requirements of this contract and the performance specification (Attachment B-1, PRF 32575).

C.1.3.1 For the purposes of this contract, the ULCANS – Increment I System will be defined as all the parts and pieces that make up a fully functional ULCANS Increment I with all Components of the End Item (COEI) and Basic Issue Items (BII). The ULCANS Increment I System will include Screens, Support System (e.g. poles, stakes, shape disrupters, adapters), Screen Bag, Pole Bag, Stake Bag, and Repair Kit.

C.1.3.2. This overall developmental effort will consist of two phases. The first phase will be the completion of the design of the three sub-systems: 1) Screens, 2) Support System, and 3) Packaging. All three subsystems will be interoperable even if provided by different subcontractors. After successful completion of the Preliminary Design Review (PDR) (C.4.2.1), the contractor will be given approval to proceed with fabrication of the prototypes. Once government approval is granted, the contractor shall proceed to fabricate the Prototype ULCANS Increment I Systems as specified in the Delivery Order (DO).

C.1.3.3. The ULCANS variants to be covered by this contract shall be of the following types and classes as specified:

Type I – General Purpose, Radar Scattering Class 1 Light Woodland and Dark Woodland Reversible;

Class 2 Desert and Urban Reversible;

Class 3 Snow and Alpine Reversible;

Type II – General Purpose, Radar Transparent Class 1 Light Woodland and Dark Woodland Reversible;

Class 2 Desert and Urban Reversible;

Class 3 Snow and A

C.1.3.4. The contractor shall design and competitive prototyping phase. Additio prices specified in the DO. The contrac deliver them to the government for eval Testing will be held at a government ru systems to ensure system level perform may be returned to the contractor for fa shall be corrected by the contractor prio completion of CDT, the contractor shal for the Production Prove-Out Test (PPT quantities and prices specified in the DO determine the conformance of the ULC Feedback from the PPT will be used to portion of this contract. After completio for failure analysis. Deficiencies identif round of CDT. Following successful co Low Rate Initial Production (LRIP) qua prototypes will be evaluated in governm Production decision will be made.

Figure C-1

C.1.3.5. LRIP production approval will Developmental Testing (CDT) and inco LRIP production approval will be follow testing. The successful completion of th

C.1.3.6. During each government perfo parts as well as on-site technical suppor

C.1.4. Contractor Responsibilities: The supplies, and facilities necessary to des provide all support hardware and softw

W

Alpine Reversible;

d fabricate up to 24 prototypes (across all types and classe onal developmental prototypes, if ordered, will be ordered tor shall complete the ULCANS developmental prototype luation in the Competitive Prototyping Phase. The Compe un test facility and will allow for rapid, iterative developm mance is achieved. After completion of government testing ailure analysis. Deficiencies identified during Competitive or to initial Contractor Developmental Testing (CDT). Fo ll deliver up to 72 prototypes (across all types and classes) T). Additional developmental prototypes, if ordered, will b O. The PPT will be a government run test at a governmen

CANS to the requirements of Attachment B-1, PRF 32575 finalize the design of the ULCANS System and complete on of government testing, test prototypes may be returned fied during the PPT shall be corrected by the contractor pr ompletion of CDT, the contractor shall deliver up to 700 U antities to the government that are fully compliant with PR ment administered PQT. Upon successful completion of P

1. Proposed ULCANS Increment I Test Schedule.

l be based on the successful completion of the follow-on c orporation of necessary design changes to correct remainin wed by fabrication of PQT units. These units will be subj his test will support the decision for Full Rate Production ormed test, the contractor shall provide support in the form rt as required.

contractor shall furnish all personnel, labor, engineering, ign, develop, manufacture, and test the ULCANS Increme ware as indicated in this Statement of Work (SOW). The w

es) for the at quantities and e systems and etitive Prototype ment of prototype g, test prototypes e Prototype Testing llowing successful ) to the government be ordered at nt facility to and this contract.

e the developmental d to the contractor rior to a second

ULCANS systems at RF 32575. These

PQT, a Full Rate contractor ng deficiencies.

ected to PQT

(FRP).

m of spare and repair services, materials, ent I system and work and services to be performed by the contractor are detailed in this SOW and will be authorized by issuance of DO(s). The contractor shall not initiate any work that is not authorized by a DO or modification without written direction by the Contracting Officer.

C.1.5. Program Management: The contractor shall designate an individual as the Contractor’s Program Manager (PM). The PM shall serve as the primary Point of Contact (POC) between the government and contractor, and shall be responsible for the coordination of all contractor activities related to the contract. The PM shall have the authority to commit the contractor to specific courses of action and accept direction from the Contracting Officer. The PM shall be responsible for coordinating all meetings between the government and the contractor. The PM shall be responsible for bringing to the Contracting Officer’s attention any conflicts in the contractor’s interpretation of the contract requirements (first by telephone and followed in writing) or problems that could adversely affect the contractor’s ability to meet the stated quality, cost, or production/delivery schedule.

C.1.6 Integrated Master Schedule: The contractor shall develop and maintain a detailed Integrated Master Schedule (IMS) for the Program in Microsoft Project (using the Gantt chart format) that outlines all of the tasks required to execute the program. A baseline schedule shall be established during the contract preparation phase and tracked from contract award. The schedule shall show in detail the path the contractor will follow to meet the required delivery dates of all items awarded on the contract. The schedule shall provide a comprehensive list of all program related events (i.e. design reviews, engineering, design, integration, fabrication, Developmental Testing, Production, CDRL deliverables, etc.) and the relationship to other tests, events, and CDRLs. The schedule shall track all tasks, baseline and actual schedule progress, and include percentages complete. The contractor is expected to keep the IMS up to date and track program progress using the schedule. Updates to the schedule shall be supplied to the government per CDRL A001. The contractor shall submit the up to date IMS along with weekly teleconference meeting minutes.

C.1.7. Configuration Management: The contractor shall implement and maintain an internal Configuration Management (CM) program for the ULCANS – Increment I throughout the life of the contract. EIA649, ‘National Consensus Standard for Configuration Management’, may be used as a guide for the contractor’s configuration management program. Copies of this document may be purchased at http://www.sae.org/. At any time the government shall observe the contractor’s CM processes to ensure quality product performance and minimize impacts to the schedule of production DO for the ULCANS Increment I.

C.1.8. Physical Configuration Baseline (PCBL): The contractor shall create and control the PCBL using the change control and engineering release processes. The PCBL, which shall be in the contractor’s own format, is the product performance requirement for replacement assemblies and spare/repair parts, engineering drawings, parts lists, process specifications and computer software configuration items. The PCBL shall support interchangeability and interoperability to a replaceable part level.

C.1.9. Configuration Control: The contractor shall use configuration control to manage all proposed changes after the Physical Configuration is baselined (See C.1.8). Configuration control shall be used to document the impact of proposed changes and to update configuration documentation. Following acceptance of the system, the contractor shall not alter the design in form, fit, or function without prior approval from the government Contracting Officer

(KO).

C.1.10. Engineering Change Proposal (ECP): An ECP shall be prepared for any proposed changes. ECPs shall only be integrated into the system if it approved by the government KO. At a minimum, the ECP shall include the following:

C.1.10.1. Date Prepared C.1.10.2. ECP Number C.1.10.3. Justification and Priority Code C.1.10.4. System Designation (i.e. Cage Code, nomenclature, model, P/N) C.1.10.5. Name of Part (or Lowest Assembly) Affected C.1.10.6. Baselines Affected C.1.10.7. Title of Change

C.1.10.8. Description of Change C.1.10.9. Need for Change C.1.10.10. Effect on Interfaces (i.e. Integrated Logistics Support (ILS), Interchangeability and Interoperability) C.1.10.11. Total Cost/Savings C.1.10.12. Retrofit Information (if applicable) C.1.10.13. Technical data describing the change to include any changes or additions to the drawings and EDFP.

C.1.10.14. Applicable testing performed and evaluation of the test results.

C.1.10.15. Applicable updates to TM and training

C.1.11.Warranty Performance: The contractor shall provide a warranty covering workmanship, materials, design, and compliance with the Physical Configuration Baseline and this SOW, and recommend a cost effective warranty coverage period for the system.

C.1.12. Contractor Test Authorization: The contractor is authorized to receive DoD test rates at a Major Range Test Facility Base (MRTFB).

C.2. DEVELOPMENTAL PHASE TASKS

C.2.1. Safety Assessment Report (SAR): The contractor shall conduct a Safety Assessment of the ULCANS Increment I system In Accordance With (IAW) CDRL A002. The SAR is a comprehensive evaluation of the safety risks to the operator, user, and maintainer and equipment prior to test or operation of the system. The Safety Assessment shall identify, analyze and document all safety features of the system design and potential hazards that may be present and specific procedural controls that should be followed to prevent or minimize hazard exposure.

C.2.2. Manufacturing and Surge Plans:

C.2.2.1. Manufacturing Plan. The vendor shall provide a description of the current manufacturing capability, including but not limited to manufacturing facility size, equipment, personnel, Berry Amendment compliance, U.S. production, supply chain, limitations (minimum purchase/yardage, etc.), and other pertinent information. PM (O5) FSS desires information on current production capacity as well as projected future production capacity. The Manufacturing and Surge Plan shall be developed IAW CDRL A003.

C.2.2.2. Surge Plan. The vendor shall provide a description of the manufacturing capability to accommodate a surge in production to support wartime demand.

C.2.2.2.1. The vendor shall have the ability to transition production from a minimum sustaining rate to a “surge” status where up to 10,000 units per month would be required. The following details, as well as any other pertinent information, should be considered:

Production facility size Equipment required Personnel required Time required to achieve increased production rates Raw materials and lead times for those materials

C.2.2.2.2. The vendor shall provide manufacturing capability and capacity, listing the path forward, timeline, and resources that would be required for the firm to be able to scale up to the following quantities per month in the event of a conflict:

Up to 1000 systems/month sustained production From 1001 to 2500 systems/month surge capability for 6 months duration From 2501 to 5000 systems/month surge capability for 6 months duration From 5001 to 10,000 systems/month surge capability for 12 months duration

C.2.3. Design Support System: The contractor shall design the Support System to meet the requirements of the Attachment

B-1, PRF 32575.

C.2.4. Fabrication of Support System: The contractor shall not proceed with this task without approval of the KO.

Approval shall be based on the acceptance of the design presented in the Preliminary Design Review (PDR) (C.4.2.1). The contractor shall fabricate Support System IAW the approved design in quantities sufficient to meet the delivery requirements of the developmental ULCANS Increment I Systems.

C.2.5. Design Packaging: The contractor shall design the components of the packaging to meet the requirements of

Attachment B-1, PRF 32575. Only those components required for the ULCANS Increment I shall be addressed.

C.2.6. Fabricate Packaging: The contractor shall not proceed with this task without approval of the KO. Approval shall be based on the acceptance of the design presented in the PDR (C.4.2.1). The contractor shall fabricate packaging IAW the approved design in quantities sufficient to meet the requirements of delivery of the developmental

ULCANS.

C.2.7. Design Screens: The contractor shall design the Screens to meet the requirements of Attachment B-1, PRF 32575.

C.2.8. Fabricate Screens: The contractor shall not proceed with this task without approval of the KO. Approval shall be based on the acceptance of the design presented in the PDR (C.4.2.1). The contractor shall fabricate screens IAW the approved design in quantities sufficient to meet the requirements of delivery of the developmental ULCANS.

C.2.9. Fabricate and Deliver ULCANS Increment I Systems for Competitive Prototype Phase: The contractor shall fabricate and deliver complete Developmental ULCANS Increment I Systems to the government to support the Competitive Prototyping Phase. The contractor shall fabricate and deliver complete Developmental ULCANS Increment I Systems to the government IAW quantities specified in the delivery order. These systems will be subjected to government testing. Each ULCANS Increment I System shall integrate the Screens, Support System, and Packaging designed and fabricated under (C.2.4), (C.2.6) and (C.2.8). Any changes, to include improvements, shall only be made with the prior approval of the government. The Developmental Prototype ULCANS Increment I System shall contain all COEI and BII required to provide the ULCANS Increment I System with complete functionality. The ULCANS Increment I System as delivered shall be fully functional and meet all requirements of the contract.

C.2.10. Initial Contractor Developmental Test: The contractor shall be responsible for all actions necessary to complete the Contractor DT including transportation of equipment and test items to and from test sites. The contractor shall administer and perform an initial Contractor DT at the completion of the Competitive Prototyping phase and prior to the initiation of government PPT IAW the Attachment B-1, PRF 32575, and the government approved test plan.

The Contractor DT is designed to verify the conformance of ULCANS Increment I Production Units to this Statement of Work and the requirements and verifications of the Attachment B-1, PRF 32575 contained in Attachment B-1. The contractor shall conduct all of the verifications specified in Attachment B-1, PRF 32575 for the ULCANS Increment I System including Screens, Support System, and Packaging. The contractor shall provide all technical support to the Contractor DT, to include repairing any damage or problems that occur during testing and having personnel and parts available to service systems as required. Failed components shall be replaced by the Contractor at no additional charge to the government. The contractor shall perform all maintenance and repairs during testing at no additional cost to the government. Maintenance shall be conducted IAW the procedures outlined in the contractor supplied technical publications and technical manuals. During the Contractor DT, the contractor’s personnel shall perform all unit and direct support level maintenance as required.

C.2.10.1. Initial Contractor Developmental Test Plan: The Contractor shall develop and provide Developmental Test Plans

IAW CDRLs A017, A019, and A021. The Developmental Test Plans shall outline any remaining testing required to demonstrate that the developmental units meet the stated performance requirements. The Developmental Test Plans shall include a comprehensive test schedule that outlines the locations, dates, durations, and identifies all testing resources required.

C.2.10.2. Initial Contractor Developmental Test Units: The contractor shall fabricate complete ULCANS Increment I systems for Contractor Developmental Test IAW the finalized frozen configuration following the CDR. These units shall be evaluated in the Contractor Developmental Test IAW the DT Plan developed under C.2.10. The Developmental units shall be representative of production units including, but not limited to, design, manufacturing processes, sources of supply, and quality assurance processes. Changes to the Developmental units resulting from material deficiencies or inadequate design shall be incorporated into the design through the ECP process to include updating the Developmental units.

C.2.10.3. Initial Contractor Developmental Testing: The contractor may utilize all Developmental units as needed to complete all verifications within the required schedule. The contractor shall be responsible for coordinating and scheduling all Contractor Developmental Testing and for the utilization of the appropriate facilities, equipment, personnel, and procedures. The contractor may use government test facilities, on a non-interference basis, for performance of some or all of the required Contractor Developmental Test. If utilized, the contractor shall provide reimbursement directly to the government testing activity (e.g., Aberdeen Test Center) for all direct and indirect costs incurred related to the test conduct. Throughout Contractor Developmental Test execution, the government requires immediate and electronic access (e.g., VISION Digital Library at Aberdeen Test Center or other means) to test-related information, including the test plans, test schedule, test results, and each Test Incident Report (TIR).

The government has the right to attend any portion or all of the Contractor Developmental Test. The contractor, at no additional cost to the government, shall correct all issues to include non-conformances to requirements or specifications that are identified as a result of the conduct of the Contractor Developmental Test. If adequately demonstrated in prior testing, the government reserves the right to waive portions of the Contractor Developmental Test. Any testing waived by the government shall result in a direct reduction in the Contractor Developmental Test cost. The contractor shall report on the Contractor Developmental Test results, analyze any failures, repair any damage, provide corrective action for failures, submit ECPs as part of the configuration control as required, and retain one Developmental unit as manufacturing samples during execution of ULCANS Increment I PPT.

C.2.10.4. Initial Contractor Developmental Test Report: The contractor is required to develop and submit comprehensive

Contractor Developmental Test Reports for all of the tests that were conducted during the Contractor Developmental Tests IAW CDRLs A018, A020, and A022.

C.2.11. Fabricate and Deliver ULCANS Increment I Systems for PPT: The contractor shall fabricate and deliver complete

Developmental ULCANS Increment I Systems to the government to support PPT. The contractor shall fabricate and deliver complete Developmental ULCANS Increment I Systems to the government IAW quantities specified in the delivery order. These Systems will be subjected to government Testing. These systems shall be manufactured IAW the finalized configuration following the CDR. The PPT units shall be representative of production units including, but not limited to, design, manufacturing processes, sources of supply, and quality assurance processes.

Production of PPT units shall include all the non-recurring tasks associated with design and initiation of production. Non-recurring tasks to initiate ULCANS Increment I production shall include developing manufacturing processes and instructions; developing quality assurance processes and documents; establishing viable suppliers; set up of equipment, tools, and fixtures; personnel training; and all other tasks required to establish a production line that delivers compliant systems. Changes to the PPT units resulting from material deficiencies or inadequate design shall be incorporated into the design through the ECP process to include updating the PPT units.

C.2.12. Follow-on Contractor Developmental Test: The contractor shall be responsible for all actions necessary to complete the Contractor DT including transportation of equipment and test items to and from test sites. The contractor shall administer and perform an initial Contractor DT at the completion PPT and prior to the initiation of Government PQT IAW the Attachment B-1, PRF 32575, and the government approved test plan. The Contractor DT is designed to verify the conformance of ULCANS Increment I Production Units to this Statement of Work and the requirements and verifications of the PRF 32575 contained in Attachment B-1. The contractor shall conduct all of the verifications specified in Attachment B-1, PRF 32575 for the ULCANS Increment I System including Screens, Support System, and Packaging. The contractor shall provide all technical support to the Contractor DT, to include repairing any damage or problems that occur during testing and having personnel and parts available to service systems as required. Failed components shall be replaced by the contractor at no additional charge to the government. The contractor shall perform all maintenance and repairs during testing at no additional cost to the government. Maintenance shall be conducted IAW the procedures outlined in the contractor supplied technical publications and technical manuals. During the Contractor DT, the contractor’s personnel shall perform all unit and direct support level maintenance as required.

C.2.12.1. Follow-on Contractor Developmental Test Plan: The contractor shall develop and provide Developmental Test

Plans IAW CDRLs A023, A025, and A027. The Developmental Test Plans shall outline any remaining testing required to demonstrate that the developmental units meet the stated performance requirements. The Developmental Test Plans shall include a comprehensive test schedule that outlines the locations, dates, durations, and identifies all testing resources required.

C.2.12.2. Follow-on Contractor Developmental Test Units: The contractor shall fabricate complete ULCANS Increment I systems for Contractor…

This is the start of the file's text. The full file is on GovTribe.