SUAS_Proucts_II_CDRLs_12152016_post.pdf
PDF 861 KB Posted
- Solicitation number
- W911QY17R0017
About this file
Contract Data Requirements List
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RESPONSES_to_draft_Questions_wALL_answers_4-24-17.docx | DOCX document | |
| SUAS_Products_II_SOW_1_19_17_post.pdf | ||
| SUAS_Products_II_DSL__3-30-17_post.pdf | ||
| draft_RFP_3-31-17_(final_-post).pdf | ||
| SUAS_Products_II_DID_List_3-30-17_post.pdf | ||
| Past_Performance_Questionnaire_post.pdf | ||
| SUAS_Products_II_Non_Disclosure_post.pdf | ||
| Attachment_1_LRRS_Salient_Characteristics_post.docx | DOCX document | |
| Attachment_2_MRM_Salient_Characterisitcs_post.docx | DOCX document | |
| PRICEBOOK_IDIQ_3-31-17_post.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SAFT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
SUAS Systems and Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A001 System Safety Hazard Analysis Report (SSHAR)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SAFT-80101C SOW para 3.2.7 SFAE-AV-UAS-TU
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT SEE 16 SEE 16 b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
A N/A SEE 16
Reg
Repro
16. REMARKS:
BLK 8: The Government will approve or disapprove each submittal within 30 calendar days of receipt. The contractor shall resubmit, unless otherwise directed, disapproved submittals no later than 30 calendar days after receipt of the Government’s disposition. The contractor shall address all of the Government’s comments in their resubmission.
Block 9: Distribution Statement C: Distribution authorized to US Govt agencies and their contractors; Administrative or Operational Use, 3 Oct 16; other request shall be referred to:
SUAS Product Manager
SFAE-AV-UAS-TU
PEO Aviation Redstone Arsenal, AL 35898-7459
Export Control Act Warning – Required
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violation of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.
Destroy by any method that will prevent disclosure of contents or reconstruction of the document in accordance with the National Industrial Security Program Operating Manual (NISPOM).
BLKs 10, 12 & 13: Deliver within 60 calendar days after award of each applicable Delivery Order. Submit within 14 days of each revision.
BLK 14: Delivery notification shall be made by email in Microsoft Office format.
Emails shall be addressed to:
Usarmy.redstone.peo-avn.list.uas-tuas-cm@mail.mil
Deliverables shall be uploaded to:
https://topvue.peoavn.army.mil/Topvue-UAS
SFAE-AV-UAS-TU 1 0 1
15. TOTAL 1 0 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, 1 Jun 90
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SAFT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
SUAS Systems and Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A002 Safety Assessment Report (SAR)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SAFT-80102C SOW para. 3.2.7.1 SFAE-AV-UAS-TU
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT SEE 16 SEE 16 b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
Contractor format is acceptable
Block 8: The Government will approve/disapprove within 14 calendar days of receipt. If disapproved, contractor shall resubmit with Government comments incorporated within 14 calendar days after receipt.
Block 9: Distribution Statement C: Distribution authorized to US Govt agencies and their contractors; Administrative or Operational Use, 3 Oct 16; other request shall be referred to:
SUAS Product Manager
SFAE-AV-UAS-TU
PEO Aviation Redstone Arsenal, AL 35898-7459
Export Control Act Warning – Required
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violation of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.
Destroy by any method that will prevent disclosure of contents or reconstruction of the document in accordance with the National Industrial Security Program Operating Manual (NISPOM).
BLKs 10, 12 & 13: Deliver within 60 calendar days after award of each applicable Delivery Order. Submit within 14 days of each revision.
NOTE: Updated Hazardous Tracking Log shall be submitted 3 calendar days prior to each System Safety Working Group Meeting.
Block 14: Delivery notification shall be made by email in Microsoft Office format.
Emails shall be addressed to:
Usarmy.redstone.peo-avn.list.uas-tuas-cm@mail.mil
Deliverables shall be uploaded to:
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SAFT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
SUAS Systems and Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A003 Health Hazard Assessment Report (HHAR)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SAFT-80106C SOW para. 3.2.7.3 SFAE-AV-UAS-TU
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT SEE 16 SEE 16 b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
BLK 8: The Government will approve or disapprove each submittal within 30 calendar days of receipt. The contractor shall resubmit, unless otherwise directed, disapproved submittals no later than 30 calendar days after receipt of the Government’s disposition. The contractor shall address all of the Government’s comments in their resubmission.
Block 9: Distribution Statement C: Distribution authorized to US Govt agencies and their contractors; Administrative or Operational Use, 3 Oct 16; other request shall be referred to:
SUAS Product Manager
SFAE-AV-UAS-TU
PEO Aviation Redstone Arsenal, AL 35898-7459
Export Control Act Warning – Required
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violation of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.
Destroy by any method that will prevent disclosure of contents or reconstruction of the document in accordance with the National Industrial Security Program Operating Manual (NISPOM).
BLKs 10, 12 & 13: Deliver within 60 calendar days after award of each applicable Delivery Order. Submit within 14 calendar days of each revision.
BLK 14: Delivery notification shall be made by email in Microsoft Office format.
Emails shall be addressed to:
Usarmy.redstone.peo-avn.list.uas-tuas-cm@mail.mil
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER: MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
SUAS Systems and Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A004 Status Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-80368A SOW para. 3.2.3 SFAE-AV-UAS-TU
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT SEE 16 SEE 16 b. COPIES
8. APP CODE B 11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
N/A N/A SEE 16
Block 9: Distribution Statement B: Distribution authorized to US Government Agencies Only; Administrative or Operational Use, 3 Oct 16; other requests shall be referred to:
SUAS Product Manager
SFAE-AV-UAS-TU
PEO Aviation Redstone Arsenal, AL 35898-7459
Export Control Act Warning – Required
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violation of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.
Destroy by any method that will prevent disclosure of contents or reconstruction of the document in accordance with the National Industrial Security Program Operating Manual (NISPOM).
Blocks 10, 12 & 13: Submit within 30 days after award of each applicable Delivery Order. Submit on the 5th calendar day of each month thereafter, for each applicable Delivery Order.
Block 14: Delivery notification shall be made by email in Microsoft Office format.
Emails shall be addressed to:
Usarmy.redstone.peo-avn.list.uas-tuas-cm@mail.mil
SFAE-AV-UAS-TU 0 0 1
15. TOTAL 0 0 1
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
SUAS Systems and Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A005 Technical Report - Study/Services Trip Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B SOW para. 4.1 SFAE-AV-UAS-TU
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ASREQ SEE 16 b. COPIES
8. APP CODE 11. AS OF DATE
a. ADDRESSEE
Draft Final
N/A C N/A SEE 16
Block 9: Distribution Statement C: Distribution authorized to US Govt agencies and their contractors; Administrative or Operational Use, 3 Oct 16; other request shall be referred to:
SUAS Product Manager
SFAE-AV-UAS-TU
PEO Aviation Redstone Arsenal, AL 35898-7459
Export Control Act Warning – Required
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violation of these export laws are subject to severe criminal penalties.
Disseminate in accordance with the provisions of DoD Directive 5230.25.
Destroy by any method that will prevent disclosure of contents or reconstruction of the document in accordance with the National Industrial Security Program Operating Manual (NISPOM).
Blocks 10, 12 & 13: Submit within 7 days of completion of each Government approved trip.
Block 14: Delivery notification shall be made by email in Microsoft Office format. Emails shall be addressed to:
Usarmy.redstone.peo-avn.list.uas-tuas-cm@mail.mil
Deliverables shall be uploaded to:
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
SUAS Systems and Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A006 Technical Report - Study/Services Supporting Documentation
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B SOW para. 3.2.2, 3.4.9.6 SFAE-AV-UAS-TU
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT SEE 16 SEE 16 b. COPIES
8. APP CODE 11. AS OF DATE
a. ADDRESSEE
Draft Final
A C N/A SEE 16
BLK 8: The Government will approve or disapprove each submittal within 14 calendar days of receipt. The contractor shall resubmit, unless otherwise directed, disapproved submittals no later than 7 calendar days after receipt of the Government’s disposition. The contractor shall address all of the Government’s comments in their resubmission.
Block 9: Distribution Statement C: Distribution authorized to US Govt agencies and their contractors; Administrative or Operational Use, 3 Oct 16; other request shall be referred to:
SUAS Product Manager
SFAE-AV-UAS-TU
PEO Aviation Redstone Arsenal, AL 35898-7459
Export Control Act Warning – Required
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violation of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.
Destroy by any method that will prevent disclosure of contents or reconstruction of the document in accordance with the National Industrial Security Program Operating Manual (NISPOM).
Blocks 10, 12 & 13: Submit as defined within each applicable Delivery Order.
Block 14: Delivery notification shall be made by email in Microsoft Office format.
Emails shall be addressed to:
Usarmy.redstone.peo-avn.list.uas-tuas-cm@mail.mil
G. PREPARED BY
H. DATE I. APPROVED BY J. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER: QCIC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
SUAS Systems and Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A007 Acceptance Test Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-80553A SOW para. 3.3.3.2, 3.3.4 SFAE-AV-UAS-TU
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT SEE 16 SEE 16 b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
Block 8: The Government will approve/disapprove within 14 calendar days. If disapproved, the contractor shall resubmit within 14 calendar days with Government comments incorporated.
Block 9: Distribution Statement C: Distribution authorized to US Govt agencies and their contractors; Administrative or Operational Use, 3 Oct 16; other request shall be referred to:
SUAS Product Manager
SFAE-AV-UAS-TU
PEO Aviation Redstone Arsenal, AL 35898-7459
Export Control Act Warning – Required
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violation of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.
Destroy by any method that will prevent disclosure of contents or reconstruction of the document in accordance with the National Industrial Security Program Operating Manual (NISPOM).
Blocks 10, 12 & 13: Submit in accordance with the SOW of each applicable Delivery Order award. Revise as required and submit revisions within 14 calendar days of each revision.
Block 14: Deliv Delivery notification shall be made by email in Microsoft Office format. Emails shall be addressed to:
Usarmy.redstone.peo-avn.list.uas-tuas-cm@mail.mil Juanita.Clarke@dcma.mil, Richard.Niner@dcma.mil
DCMA 1 0 1
15. TOTAL 2 0 2
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
SUAS Systems and Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A008 Engineering Change Proposal (ECP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80639D SOW para. 3.4.4 SFAE-AV-UAS-TU
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ASREQ ASREQ b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
A N/A ASREQ
Block 8: The Government will approve/disapprove within 14 calendar days of receipt. If disapproved, contractor shall resubmit within 14 calendar days with Government comments incorporated.
Block 9: Distribution Statement C: Distribution authorized to US Govt agencies and their contractors; Administrative or Operational Use, 3 Oct 16; other request shall be referred to:
SUAS Product Manager
SFAE-AV-UAS-TU
PEO Aviation Redstone Arsenal, AL 35898-7459
Export Control Act Warning – Required
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violation of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25. Destroy by any method that will prevent disclosure of contents or reconstruction of the document in accordance with the National Industrial Security Program Operating Manual (NISPOM).
Block 14: Delivery notification shall be made by email in Microsoft Office format.
Emails shall be addressed to:
Usarmy.redstone.peo-avn.list.uas-tuas-cm@mail.mil Juanita.Clarke@dcma.mil, Richard.Niner@dcma.mil mailto:Kris.Lizaso@dcma.mil
Form Approved
OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER TMSS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
SUAS Systems and Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A009 Commercial Off-the-Shelf (COTS) Manual and Associated Supplemental Data
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-TMSS-80527C SOW para. 3.4.9.3 SFAE-AV-UAS-TU
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION
LT 1TIME SEE 16 b. COPIES
8. APP CODE A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION a. ADDRESSEE
Draft
Final
A N/A N/A
Block 8: The Government will approve/disapprove within 14 calendar days of receipt. If disapproved, contractor shall resubmit within 14 calendar days with Government comments incorporated.
Block 9: Distribution Statement A: Distribution authorized for public release; distribution is unlimited.
Export Control Act Warning – Required
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violation of these export laws are subject to severe criminal penalties.
Disseminate in accordance with the provisions of DoD Directive 5230.25.
Destroy by any method that will prevent disclosure of contents or reconstruction of the document in accordance with the National Industrial Security Program Operating Manual (NISPOM).
Blocks 12: Submit 30 days after Delivery Order award, unless otherwise specified in the Delivery Order SOW.
Block 14: Delivery notification shall be made by email in Microsoft Office format.
Emails shall be addressed to:
Usarmy.redstone.peo-avn.list.uas-tuas-cm@mail.mil
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
SUAS Systems and Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A010 Frequency Allocation Data
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-81174 SOW para. 3.4.9.2 SFAE-AV-UAS-TU
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT SEE 16 SEE 16 b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
A N/A ASREV
Contractor format is acceptable.
Block 8: The Government will approve or disapprove each submittal within 30 calendar days of receipt. If disapproved, the contractor shall resubmit within 30 calendar days with Government comments incorporated.
Block 9: Distribution Statement C: Distribution authorized to US Govt agencies and their contractors; Administrative or Operational Use, 3 Oct 16; other request shall be referred to:
SUAS Product Manager
SFAE-AV-UAS-TU
PEO Aviation Redstone Arsenal, AL 35898-7459
Export Control Act Warning – Required
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violation of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.
Destroy by any method that will prevent disclosure of contents or reconstruction of the document in accordance with the National Industrial Security Program Operating Manual (NISPOM).
Blocks 10, 12 & 13: Submit 30 days after Delivery Order award, unless otherwise specified in the Delivery Order SOW. Resubmit within 10 calendar days of each revision.
Block 14: Delivery notification shall be made by email in Microsoft Office format.
Emails shall be addressed to:
Usarmy.redstone.peo-avn.list.uas-tuas-cm@mail.mil
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
SUAS Systems and Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A011 Baseline Description Document
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-81121A SOW para. 3.4.1 SFAE-AV-UAS-TU
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ASREV SEE 16 b. COPIES
8. APP CODE C 11. AS OF DATE
a. ADDRESSEE
Draft Final
Block 8: Government will approve/disapprove within 14 calendar days of receipt. If disapproved, correct and resubmit within 14 calendar days.
Block 9: Distribution Statement C: Distribution authorized to US Govt agencies and their contractors; Administrative or Operational Use, 3 Oct 16; other request shall be referred to:
SUAS Product Manager
SFAE-AV-UAS-TU
PEO Aviation Redstone Arsenal, AL 35898-7459
Export Control Act Warning – Required
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violation of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.
Destroy by any method that will prevent disclosure of contents or reconstruction of the document in accordance with the National Industrial Security Program Operating Manual (NISPOM).
Blocks 10, 12 & 13: Submit within 90 days of each applicable Delivery Order award, unless otherwise specified in the Delivery Order SOW. Submit within 14 calendar days of each revision.
Block 14: Delivery notification shall be made by email in Microsoft Office format.
Emails shall be addressed to:
Usarmy.redstone.peo-avn.list.uas-tuas-cm@mail.mil Juanita.Clarke@dcma.mil, Richard.Niner@dcma.mil
DCMA 0 0 1
15. TOTAL 0 0 2
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
SUAS Systems and Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A012 Interface Control Document (ICD)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-81248B SOW para. 3.4.9.1 SFAE-AV-UAS-TU
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT SEE 16 SEE 16 b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
A N/A ASREV
Block 8: The Government will approve/disapprove within 14 calendar days. If disapproved, the contractor shall resubmit within 14 calendar days with Government comments incorporated.
Block 9: Distribution Statement C: Distribution authorized to US Govt agencies and their contractors; Administrative or Operational Use, 3 Oct 16; other request shall be referred to:
SUAS Product Manager
SFAE-AV-UAS-TU
PEO Aviation Redstone Arsenal, AL 35898-7459
Export Control Act Warning – Required
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violation of these export laws are subject to severe criminal penalties.
Disseminate in accordance with the provisions of DoD Directive 5230.25.
Destroy by any method that will prevent disclosure of contents or reconstruction of the document in accordance with the National Industrial Security Program Operating Manual (NISPOM).
Blocks 10 and 12: Submit 30 days after Delivery Order award, unless otherwise specified in the Delivery Order SOW. Submit within 10 calendar days of each revision.
Block 14: Delivery notification shall be made by email in Microsoft Office format.
Emails shall be addressed to:
Usarmy.redstone.peo-avn.list.uas-tuas-cm@mail.mil
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
SUAS Systems and Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A013 Hazardous Materials Management Program (HMMP) Report
DI-MISC-81397C SOW para. 3.2.7.4 SFAE-AV-UAS-TU
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ASREV SEE 16 b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
Contractor format is acceptable
Block 8: The Government will approve/disapprove within 14 calendar days of receipt.
If disapproved, contractor shall resubmit with Government comments/changes incorporated within 7 calendar days.
Block 9: Distribution Statement C: Distribution authorized to US Govt agencies and their contractors; Administrative or Operational Use, 3 Oct 16; other request shall be referred to:
SUAS Product Manager
SFAE-AV-UAS-TU
PEO Aviation Redstone Arsenal, AL 35898-7459
Export Control Act Warning – Required
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violation of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.
Destroy by any method that will prevent disclosure of contents or reconstruction of the document in accordance with the National Industrial Security Program Operating Manual (NISPOM).
Block 12 and 13: Submit 45 days after Delivery Order award, unless otherwise specified in the Delivery Order SOW. Subsequent submissions shall be submitted on the first working day of each fiscal year. Submit within 14 days of each revision.
Block 14: Delivery notification shall be made by email in Microsoft Office format.
Emails shall be addressed to:
Usarmy.redstone.peo-avn.list.uas-tuas-cm@mail.mil
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
SUAS Systems and Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A014 Hazardous Material Management Program (HMMP) Plan
DI-MGMT-81398C SOW para. 3.2.7.4 SFAE-AV-UAS-TU
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ASREV SEE 16 b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
Contractor format is acceptable
Block 8: The Government will approve/disapprove within 14 calendar days of receipt. If disapproved, contractor shall resubmit with Government comments/changes incorporated within 7 calendar days.
Block 9: Distribution Statement C: Distribution authorized to US Govt agencies and their contractors; Administrative or Operational Use, 3 Oct 16; other request shall be referred to:
SUAS Product Manager
SFAE-AV-UAS-TU
PEO Aviation Redstone Arsenal, AL 35898-7459
Export Control Act Warning – Required
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violation of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.
Destroy by any method that will prevent disclosure of contents or reconstruction of the document in accordance with the National Industrial Security Program Operating Manual (NISPOM).
Blocks 12 and 13: Submit 30 days after Delivery Order award, unless otherwise specified in the Delivery Order SOW. Submit within 14 days of each revision.
Block 14: Delivery notification shall be made by email in Microsoft Office format.
Emails shall be addressed to:
Usarmy.redstone.peo-avn.list.uas-tuas-cm@mail.mil
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER IPSC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
SUAS Systems and Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A015 Software Development Plan (SDP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-IPSC-81427A SOW para. 3.3.10 SFAE-AV-UAS-TU
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ASREV SEE 16 b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
Block 8: The Government will approve/disapprove within 14 calendar days. If disapproved, the contractor shall resubmit within 14 calendar days with Government comments incorporated.
Block 9: Distribution Statement C: Distribution authorized to US Govt agencies and their contractors; Administrative or Operational Use, 3 Oct 16; other request shall be referred to:
SUAS Product Manager
SFAE-AV-UAS-TU
PEO Aviation Redstone Arsenal, AL 35898-7459
Export Control Act Warning – Required
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violation of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.
Destroy by any method that will prevent disclosure of contents or reconstruction of the document in accordance with the National Industrial Security Program Operating Manual (NISPOM).
Blocks 12 & 13: Submit within 30 calendar days after each applicable Delivery Order award, unless otherwise specified in the Delivery Order SOW. Submit within 14 calendar days of each revision.
Block 14: Delivery notification shall be made by email in Microsoft Office format.
Emails shall be addressed to:
Usarmy.redstone.peo-avn.list.uas-tuas-cm@mail.mil
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
SUAS Systems and Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A016 Failure Analysis and Corrective Action Report
(FACAR)
DI-SESS-81315B SOW para. 3.3.4.2 SFAE-AV-UAS-TU
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ASREQ SEE 16 b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
Contractor format is acceptable
Block 8: The Government will approve/disapprove within 14 calendar days of receipt.
If disapproved, contractor shall resubmit with Government comments/changes incorporated within 7 calendar days.
Block 9: Distribution Statement C: Distribution authorized to US Govt agencies and their contractors; Administrative or Operational Use, 3 Oct 16; other request shall be referred to:
SUAS Product Manager
SFAE-AV-UAS-TU
PEO Aviation Redstone Arsenal, AL 35898-7459
Export Control Act Warning – Required
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violation of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.
Destroy by any method that will prevent disclosure of contents or reconstruction of the document in accordance with the National Industrial Security Program Operating Manual (NISPOM).
Blocks 10, 12 & 13: Submit within 15 calendar days of each failure occurrence.
Block 14: Delivery notification shall be made by email in Microsoft Office format.
Emails shall be addressed to:
Usarmy.redstone.peo-avn.list.uas-tuas-cm@mail.mil Kris.Lizaso@dcma.mil
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
SUAS Systems and Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A017 Failure Mode Effects, and Criticality Analysis Report
DI-SESS-81495A SOW para. 3.3.5 SFAE-AV-UAS-TU
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ONE/R SEE 16 b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
Block 8: The Government will approve/disapprove within 30 calendar days of receipt. If disapproved, resubmit with Government comments incorporated within 30 calendar days.
Block 9: Distribution Statement C: Distribution authorized to US Govt agencies and their contractors; Administrative or Operational Use, 3 Oct 16; other request shall be referred to:
SUAS Product Manager
SFAE-AV-UAS-TU
PEO Aviation Redstone Arsenal, AL 35898-7459
Export Control Act Warning – Required
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violation of these export laws are subject to severe criminal penalties.
Disseminate in accordance with the provisions of DoD Directive 5230.25.
Destroy by any method that will prevent disclosure of contents or reconstruction of the document in accordance with the National Industrial Security Program Operating Manual (NISPOM).
Blocks 10, 12 & 13: Submit 30 days after Delivery Order award, unless otherwise specified in the Delivery Order SOW. Submit within 30 days of approval of each Class I ECP that affects the performance, reliability, availability or maintainability of the SUAS system.
Block 14: Delivery notification shall be made by email in Microsoft Office format. Emails shall be addressed to:
Usarmy.redstone.peo-avn.list.uas-tuas-cm@mail.mil
Deliverables shall be uploaded to:
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
SUAS Systems and Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A018 Failure Summary and Analysis Report
4.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .