W911QY-17-R-0017 draft RFP – Government’s response to industry questions/comments
| Question # |
| Location |
| Industry Question/Concern |
| Government Response |
| 1 |
| SOW |
List of attachments on pg.4 1.1(3), pg.6
3.3 pg.17
| Cannot locate Attachments 3 and 4 to SOW as listed. |
| Salient characteristics of RQ-11B and RQ-20A (Attachments 1 and 2) will be used (3 and 4 will be deleted). |
| 2 |
| Draft RFP |
| Can we provide a white paper for a new product versus sustainment /upgrades to FoSUAS platforms? |
| For the draft RFP purposes, white paper is acceptable. For the solicitation, proposal must be submitted. |
| 3 |
| Form 1449, Page 1, Block 10. Block 10 |
| “This Acquisition is set aside 75% for Small Business”. Please define which domains will be included in this set aside. |
| The acquisition will be a Partial Small Business Set-Aside, by Domain. Actual percentage is unknown at this point. |
CLIN 0101-01XX (up to 0199) - SYSTEM DOMAIN Small Business Set-Aside. Alternate systems/ Unmanned Aircraft are to meet or exceed the Salient Characteristics as provided
CLIN 0201-02XX (up to 0299) - FLIGHT CONTROL SYSTEM DOMAIN Full and Open competition.
CLIN 0301-03XX (up to 0399) - TOGA DOMAIN Small Business Set-Aside. PdO TUAS will have the complete TDP available for build-to-print procurement.
CLIN 0401-04XX (up to 0499) OTHER MAJOR COMPONENTS DOMAIN Small Business Set-Aside.
CLIN 0501-05XX (up to 0599) - SPARE AND REPAIR PARTS FOR RQ-11B and RQ-20A DOMAIN Small Business Set-Aside. Proposals for the spare and repair parts in this domain must contain pricing for all requested items. Responders are encouraged to describe their capabilities should the offeror have the ability to provide ANY of the listed items or a form-fit-and-function equivalent. The Government reserves the right to move such an item to the Other Major Component domain (and award the contract) if it is in the best interest of the Government.
CLIN 0601-06XX (up to 0699) - MISCELLANEOUS DOMAIN This domain will be awarded to all successful offerors
| 4 |
| Section B, CLIN 0201 |
| FLIGHT CONTROL SYSTEM FOR RQ-11B PN TBD. Please confirm that this CLIN includes the airborne and ground-based radios for the RQ-11B. |
| The FCS will be procured with the airborne radio integrated, and the ground radio will be procured on a separate CLIN to be added to Section B. |
| 5 |
| Section B, CLIN 0203 |
| FLIGHT CONTROL SYSTEM FOR RQ-20A PN TBD. Please confirm that this CLIN includes the airborne and ground-based radios for the RQ-20A |
| Same as # 4. |
| 6 |
| Section B, CLIN 0205 |
| FLIGHT CONTROL SYSTEM RADIO FOR RQ-11B & RQ-20A PN TBD. Please clarify if this CLIN is for the airborne radio, ground-based radio, or both. |
A new CLIN will be added to Section B for the ground based radios. Although the ground-based radios would not be considered “FCS”, this is the logical domain to include those components as counterparts to the airborne radios.
| 7 |
| Section L.2.1 VOLUME I – ADMINISTRATIVE, Page 181. |
| Statement is “The Subcontracting goal (if applicable) established for this effort is 48% with the following socio-economic sub goals: Small Disadvantaged Business: 13%; Woman-Owned Small Business: 7%; Historically Underutilized Business Zone (HUB Zone) Small Business: 11%; Veteran Owned Small Business: 6% and Service Disabled Veteran Owned Small Business: 6%.” Please define when the Subcontracting goal is applicable. |
Subcontracting plans are NOT required for small business concerns
| 8 |
| L 2.2 VOLUME II - FACTOR 1: TECHNICAL, Page 184. |
| Please confirm that an offeror can propose an unmanned aerial vehicle that is not an RQ-11B or an RQ-20A for the LRRS or MRM systems. |
Offerors can propose their own MRM and LRRS systems and Unmanned Aircraft in the Systems Domain, as listed under CLINs 0126-0131
| 9 |
| Section L 2.4 VOLUME IV - FACTOR 3: SMALL BUSINESS PARTICIPATION PLAN, Page 189 |
| Text reads: “The offeror proposes a small business goal of at least 23%”. Please clarify if 23% is a requirement or provided as an example. |
The total of 23% is the Small Business Goal. Not an example.
| 12 |
| Section L 2.4 VOLUME IV - FACTOR 3: SMALL BUSINESS PARTICIPATION PLAN, Page 189 |
| Text reads: “Of that 23% goal 5% must be attributed to contributions from Small Disadvantaged Business, 5% must be attributed to Woman- Owned Small Business, 3% must be attributed to Historically Underutilized Business Zone (HUB Zone) Small Business, 5% attributed to Veteran owned Small Business and 3% attributed to Service Disabled Veteran Owned Business.” Total of the percentages listed equals 21% which does not align with the 23% goal. Please confirm that the percentages are listed as intended. |
The total goal sought is 23% Small Business Participation. The listed percentages are minimum goals for the key subcategories that have their own individual minimum goals.
| 13 |
| L 2.5 VOLUME V - FACTOR 4: PRICE, Page 190. |
| Text reads: Section I - Price Workbook: Offeror shall provide a completed Price Workbook and Schedule B IAW the Price Workbook directions provided in the RFP Section J, Attachment H. Please confirm that offeror does not need to complete the entire workbook to be compliant. The offeror can elect to provide pricing for specific elements of the Workbook. |
Yes, offeror can complete pricing for ANY one proposed ITEM in ANY tab/domain. Exception are the RQ-20A and RQ-11B Spare and Repair parts tabs, which the Government requests to be completed/proposed in its entirety. However, if an offeror can only propose a limited number of items within this domain, the Government reserves the right to move such an item to the Other Major Component domain (and award the contract) if it is in the best interest of the Government.
| 14 |
| Pricebook |
| The part numbers listed in the attachment PRICEBOOK_IDIQ_3-31-17_post.xlsx under the RQ-20A and RQ-11B Parts tabs are either incomplete or vendor unique numbers. The nomenclature of these items appears to be well within the capabilities of our company to source, procure, and provide traceability but without a complete part number, we have no way of determining this potential or reviewing the historical repair data. We would request that the manufacturers part numbers or National Stock Numbers (NSNs) be provided because without them industry cannot determine the potential of this effort and competition will be reduced. |
Manufacturer’s part numbers are provided. National Stock Numbers for both RQ-11B, RQ-20A will be provided (if available) with the RFP.
Under the “RQ-11B and RQ-20A Spare and Repair Parts” domain how will the process of Task Order issuance to delivery of material be managed? Will large quantities of material need to be held by the contractor until delivery is requested?
Delivery orders quantities will be managed by PdM TUAS and will be based on Government requirements. Delivery schedule will vary, in general it is expected to be in 90-180 DARO.
| 16 |
| SOW, page 18 |
| What Government Obsolescence Working Group is being referred to on Page 18 of the SOW? |
Internal to PdM TUAS, in conjunction with other Government agencies and existing vendors, the Government Obsolescence Working Group evaluates the impending obsolescence of components and plan for mitigations.
Will any assembly be required under the “RQ-11B and RQ-20A Spare and Repair Parts” domain?
There should not be an assembly requirements on any DO for Spares and Repair Parts.
How will the Task Order structure support obsolescence monitoring? In other words, will the contracting office be willing to make fast acquisitions in the event that a part is nearing total obsolescence?
Delivery orders will be issued based on requirement at the time of the order.
Will the security requirements be the same across all domains and more specifically, will the SECRET clearance be required for contractors that are only bidding on the Spares and Repairs domain? Why is compliance with OPSEC required when there is no OPSEC deliverable?
Compliance with OPSEC is a default requirement for vendors providing items integral to DoD systems, and covers the use of distribution limited (C, D, export controlled) documents.
The proper level of clearance will depend on the components being proposed, and on the likelihood that a vendor might propose improved components based on “threats or weaknesses” of the existing system, which are classified.
We recommend that counterfeit mitigation requirements also be added to the Quality Control Program requirement.
This recommendation will be considered for the RFP, as well as denoting how it is addressed within the cyber-security plan.
The contractor is responsible for but at present there are no specifications linked to the parts. Will these standards be provided at time of solicitation?
Any testing requirements and standards will apply only when applicable to a requirement for a specific delivery order.
| General LRRS |
| Does the Government intend to provide the detailed radio requirements sufficient to submit a comprehensive proposal, similar to Appendix A (Digital Data Link Radio Performance Parameters), included with the FCS/DDL Radio Upgrade RFP? |
Detailed performance requirements for the radio will be provided prior to any delivery order requesting radios. The requirements and interfaces for the radio are still under review.
| 23 |
| range |
| Requirement for range below 500 ft. altitude makes meeting 15 Km very difficult. Can we meet this requirement with a 2MHz mode? |
The radio range measurement assumes a 500 ft altitude and clear line of sight, and full bandwidth is required at this distance.
| 24 |
| Page 8 |
| This requirement is inconsistent with vendor understanding of frequency range requirement and with text in the SOW. Will this requirement be updated to the new frequency range? |
If the question is referring to page 6) The determination is still being made of whether or not the OCONUS and CONUS frequencies can be covered by one radio, and still allow for competition. The expected frequency ranges, as well as designation of threshold versus objective, will be clearly stated within the final RFP.
| 25 |
| Page 9 |
| Will the OSRVT be provided as GFE for interoperability evaluation and validation? Does the OSRVT impose additional DDL radio requirements beyond what is otherwise specified for this program? Please provide access to the OSRVT specification and associated GFE. |
The OSRVT will not be provided as GFE, however PdM TUAS will offer interoperability testing with the OSRVT to support this requirement. The requirements are driven by the UAS Data Link Interoperability Profile.
| 26 |
| SOW 3.3.4.1 |
| “PVT (including 810G, EMC/EMI, HERO/HERF/HERP, …) shall be conducted at Government-approved facilities.” What are these Government-approved facilities? Can offerors gain Government approval? Please list all Government -approved facilities and/or state how to become one. |
Government facilities for environmental testing are located at RTC on Redstone Arsenal, AL. Vendors providing products to the Government can be approved on a case-by-case basis for specific tests if the RTC/ATEC test leads agree that the use of the vendor’s test facility will fulfill the test needs.
| 27 |
| 3.4.8 Page 26, para1 |
| Provide a waiver or exception of provision of anything other than form, fit, and function information for offered commercial products and services. |
Will consider for inclusion in the RFP.
| 28 |
| RFP L1.1 |
| It appears as though proposal due date and award are scheduled for September 2017. Please verify/modify the proposal due date and the award date as appropriate. |
Proposal due date will be established in the RFP. Contract award projected for SEP 2017.
| 29 |
| RFP L2.2 |
| Section 1: Which versions of the following specifications will be used for this procurement and associated compliance? |
· RQ-11B Radio Subsystem Specification
· UAS Datalink Interoperability Profile
· Waveform Specification for SUAS DDL
Final answers may change with the RFP, however current versions are as follows:
RQ-11B Radio Subsystem Specification is 51978G-06-143 Rev B UAS Data Link IOP Version 3.0.3, 15 September 2014 Waveform Specification v1.7, 03 July 2012
| 30 |
| SOW 3.3 |
| Can DDL radios be provided outside of the specified domains as a major Lowest Replaceable Unit (LRU)? |
See #6. Radios will be added as standalone components within the FCS/Radios domain.
LRU is Line Replaceable Unit vice Lowest Replaceable Unit
| 31 |
| SOW GENERAL |
| What are the DDL radio security requirements for this program? Define specific radio requirements, especially for FIPS and Type 1 security. If not required at time of award, please provide anticipated programmatic requirement dates. |
| FIPS 140-2 will be required. Other options can be proposed and may be evaluated on a best value basis when determining delivery order awards. |
| 32 |
| RFP L2.2 PAR 2 |
| Will RQ‐20A components be included in the Major |
Components (LRUs)?
Some RQ-11B and RQ-20A components are included in the Major Components and other domains.
| 33 |
| NDA 2 & 8 |
| Should the Shadow RQ‐7Bv2 be "RQ‐11B" and "RQ‐20A"? |
| NDA form will be updated |
| 34 |
| RFP M FIG4 |
| The color code shows yellow as acceptable and green as marginal. Should these colors be reversed? |
| Corrected |
| 35 |
| SOW 3.2.4 |
| Security Requirements, Page 10 first paragraph: Is a TEMPEST Countermeasures Review expected and necessary? |
| Yes. For unclassified programs, the TEMPEST requirements are de-scoped to an appropriate level, however the review will still be required. |
| 36 |
| SOW/CDRLS |
| Will all offerors be required to bid the Miscellaneous domain? If so what would be the basis for submission as there are no initial or sample task orders and some items appear proprietary in nature? |
| Offerors are asked to price all CLINs to include pricing sheets in the Price Workbook and schedule B, unless plug in numbers are provided. |
| 37 |
| SOW ATTACHMENTS |
| The SOW lists five attachments, numbered 1 through 5. Only four of the attachments are contained in the DRFP package (Attachment 2, “Parts List," is missing), but none are numbered according to the SOW and some are not numbered at all. For example, Attachment 1 (filename) is labeled Attachment 3 in the document, and Attachment 2 (filename) is labeled Attachment 4 in the document |
| All the attachments will be updated for the RFP |
| 38 |
| GENERAL |
| Will there be Objective requirements? |
Add Objective requirements by which offerors can differentiate themselves.
Objective requirements will be considered, however, the primary purpose is procure form/fit/function parts for the existing RQ-11 and RQ-20 fleet.
| 39 |
| GENERAL |
| When will the first Delivery Order RFP be released? |
| After the award of the IDIQ, when requirement arises. |
| 40 |
| SOW 1.1 |
| Section 1.1 refers to 1,017 LRRS and 2,870 MRMs, which total 3,887. Is 3,887 the total number of SYSTEMS or AIR FRAMES? If it is the number of SYSTEMS, what is the total number of AIR FRAMES of RQ‐11B and RQ‐20A? |
| 3,887 is the total number of airframes. System configuration will vary. |
| 41 |
| SOW 1.1 |
| Is the number of 385 LRRS to be procured included in the 1,017 previously identified, or in addition to the 1,017 quantity? |
| The 385 is additional to the 1017 which have already been procured. |
| 42 |
| SOW 1.1 (3) |
| What quantity of spares should vendors assume? What is the percentage (as a percentage of total AIR FRAMES) of spare radios that have been procured under the existing contract? |
| Historical procurement data will be attached to the RFP. |
| 43 |
| SOW 1.1.(5) |
| Is the Government interested in a radio embedded in a TOGA? Would you consider a roadmap that shows a radio embedded in the PORTOGA? Make these Objective requirements and/or add an ECP CLIN if desired. |
| TOGA is designed to allow a radio module to be attached to the back, which can be easily changed depending on mission requirements. |
| 44 |
| SOW 3.2.7.5 |
| Is the Government interested in an extended product warranty beyond the 18 months required in Section |
3.2.7.5 of the SOW?
The Government seeks the 18 month warranty term. Offerors can propose longer terms, as long as it is at no additional cost to the Government.
| SOW 3.3 |
| Recommend including a radio-only domain. This would allow the Government greater flexibility to integrate or test different radio and FCS combinations and help streamline logistics and price for long term sustainment and support activities. |
Radios will be added as stand-alone CLINs, however will remain within the existing domain structure.
| 46 |
| SOW 3.3 |
| Please provide clarity in the RFP document (as opposed to only the FBO posting) on how the Government intends to implement and enforce a 75% small business set-aside. Clarity on the specific domains affected by these government procedures will affect offerors’ ability to respond. |
Answered on # 3 above
| 47 |
| NA |
| Include an LRIP order for each contract awardee for evaluation purposes to reduce technical risk and better evaluate proposed pricing. |
No, the Government will not routinely award DOs for evaluation purposes. Historical data will be provided to assist offerors with proposed pricing.
| 48 |
| GENERAL |
| Regarding the FCS/Radio Subsystem, how many units will be required under an LRIP award? |
| Current planning allocates 25 MRM and 25 LRRS FCS/Radio subsystems for the LRIP delivery order. Subject to change. |
| 49 |
| GENERAL |
| Regarding the FCS/Radio Subsystem, how many units will be required for the first FRP Delivery Order? |
| New FCS/Radio Subsystems are expected to replace current Avionics/Radio Systems for complete LRRS and MRM fleet over a 3 year period. |
| 50 |
| Form 1449, Page 1, Block 10. Block 10 |
| Will the Government apply the "Rule of Two" (restricting the award of task orders to only small businesses if the Government determines there are at least two small business that are qualified to receive a task order) for any domains and task orders awarded under this IDIQ contract? Please define which domains will be subject to the "Rule of Two". |
| The Government will evaluate all the Order proposals IAW all the order evaluation criteria and all the laws and regulations. The majority of domains are established as a Small Business Set-Aside. The FCS domain is Full and Open and the Government intends to compete delivery orders among all offerors that receive an award for this domain. |
Workbook
Does the Gov't have anticipated Qtys for each of the CLINs?
The Government requests the pricing to be for EACH with applicable quantity discounts filled in on schedule B
| 52 |
| Page 65 |
| Is there an intention to have a minimum quantity? |
| There is no minimum quantity anticipated, only minimum and maximum IDIQ award values. |
Para will be updated for RFP.
| 53 |
| RFP page 1 |
| Which Domain (CLINs) is not able to be 100% Small Business Set-Aside? |
| Answered on #3 |
| 54 |
| CDRLs Pricebook pg 61 |
| Draft RFP states 'CDRLs - Offeror shall price each individual CDRL as listed in CDRLs Price list attachment. When applicable, CDRLs will be a Line item for delivery orders.', Price workbook states "Pricing for CDRLs that are not priced at this time will be negotiated at the DO level and will not be included in the offerors' price" , Please provide clarification as to which CDRLs need to be priced at time of submission. |
| CDRLs will be a separate CLIN using Plug-in number for the IDIQ purposes. Individual CDRL prices will be negotiated on DOs as applicable. |
The price workbook will not be used.
| 55 |
| RFP Clause |
| Does the Government intend to include the FAR clause, 52.219-14 Limitation on Subcontracting on the Set-Aside portion of the contract? |
| Yes. |
| 56 |
| SOW 3.3.4 page 19 |
| What level of operational maturity is required prior to proposing new components or systems? What level of manufacturing maturity and capacity is required? |
| For the large majority of DO’s, components will need to be completely developed and ready for test prior to delivery. |
| Please confirm industry will be paying for all PVT events? PVT - Section 3.3.4.1 - Page-20/As applicable by Delivery Order:The PVT shall be conducted at Government approved facilities. The contractor shall coordinate with the Government to provide all necessary equipment and manpower necessary to facilitate the conduct of testing. For specific tests within the PVT for which the contractor wishes to execute, the contractor shall prepare and deliver detailed test plans and procedures IAW DI-SESS-81704 to demonstrate performance requirements. The contractor shall prepare and submit Test/Inspection Reports IAW DI-NDTI-80809. |
| The approach may differ for different DO’s, however typically industry will provide the components to be tested and fund any personnel that they wish to have support those test. The Government will fund the test range, facilities, and test support personnel required to execute the testing and write the test report. |
| 58 |
| SOW 3.3.2 obsolescence |
| Is it the intent of the Government to have baseline control on commercial parts? Which Domains would this be applicable to? The contractor shall assume full responsibility for Parts Obsolescence issues, resolutions, and implementation for the term of the contract. Through the ordering period of the contract, the contractor shall receive Government approval via the ECP process to:(1) identify alternate sources, replacement parts, or optional part numbers for parts and materials that become obsolete or damaged and need repair, and(2) revise applicable engineering drawings, schematics, and specifications to incorporate the new information. The parts obsolescence program and procedures shall be made available for review by Government Obsolescence Working Group. |
| The Government will maintain the documented baseline of what parts are approved for purchase and inclusion in the fielded system. When a vendor updates a part due to obsolescence, the Government must be notified of the change and be provided with updated information regarding design and specifications. The level of testing will be determined, and the testing will be performed against the part prior to the Government updating the “system/subsystem” baseline to include that part as a form/fit/function replacement to the previous part. This is to verify all requirements, safety, and flight worthiness continue to be met throughout the lifecycle of the system, with various components from various vendors. |