UNCLASSIFIED
UAS-00004
Shadow RQ-7B Tactical Unmanned Air System (TUAS)
ACAT Level IC
Production and Deployment
System Engineering Plan (SEP), R1 (ASA(AL&T) Coordination Draft)
Supporting the Operations, and Sustainment Program
TBD November 2015
SEP DECISION APPROVAL:
Hon. Heidi Shyu DATE
ASA(AL&T)
DISTRIBUTION STATEMENT D. Distribution Authorized to Department of Defense and U.S. DoD Contractors only; IAW U.S. Army Shadow 200 Tactical Unmanned Aircraft System (UAS) Security Classification Guide, 17 May 11. Other requests shall be referred to the UAVS Project Office, ATTN: SFAE-AV-UAV, Redstone, AL 35898 ii
(This page intentionally left blank) iii
SYSTEM ENGINEERING PLAN (SEP), R1
FOR THE
SHADOW RQ-7B PRODUCTION PROGRAM
TBD 2015
SUBMITTED BY:
JASON P. LUCAS DATE JAMES T. BURGESS DATE
Chief Engineer, Shadow Lieutenant Colonel, AV Shadow TUAS Program Manager Ground Maneuver
CONCURRENCE:
MR. LARS ERICSSON DATE COURTNEY P. COTE DATE
Chief Colonel, AV Tech Management Division, UAS Project Manager, UAS
MR. RAY K. SELLERS DATE BG ROBERT L. MARION DATE
Assistant PEO for Engineering and Technology Program Executive Officer PEO Aviation PEO Aviation iv v
TABLE OF CONTENTS:
1 INTRODUCTION 1
1.1 Program Description & Applicable Documents 1
1.2 Applicable Documents 2
1.3 PROGRAM BACKGROUND 3
2 PROGRAM TECHNICAL REQUIREMENTS 7
2.1 Architectures and Interface Control 7
2.1.1 Architectures 7
2.1.2 Interface Control 10
2.2 Technical Certifications 12
3 ENGINEERING RESOURCES AND MANAGEMENT 13
3.1 TECHNICAL SCHEDULE AND SCHEDULE RISK ASSESSMENT 13
3.2 ENGINEERING RESOURCES AND COST/SCHEDULE REPORTING 15
3.3 ENGINEERING AND INTEGRATION RISK MANAGEMENT 15
3.4 TECHNICAL ORGANIZATION 17
3.4.1 Government Program Office Organization 17
3.4.2 Program Office Technical Staffing Levels 18
3.4.3 Contractor Program Office Organization 18
3.4.4 Engineering Team Organization and Staffing 19
3.5 RELATIONSHIPS WITH EXTERNAL TECHNICAL ORGANIZATIONS 23
3.6 TECHNICAL PERFORMANCE MEASURES AND METRICS 23
4 TECHNICAL ACTIVITIES AND PRODUCTS 27
4.1 PREVIOUS PHASE SYSTEM ENGINEERING ACTIVITIES 27
4.2 NEXT PHASE SYSTEM ENGINEERING ACTIVITIES 27
4.3 REQUIREMENTS DEVELOPMENT AND CHANGE PROCESS 28
4.3.1 Analysis and Decomposition 29
4.3.2 Requirements Management and Change Process 33
4.4 TECHNICAL REVIEWS 38
4.5 CONFIGURATION AND CHANGE MANAGEMENT PROCESS 40
4.6 DESIGN CONSIDERATIONS 42
4.7 ENGINEERING TOOLS 43
vi
ANNEX A - ACRONYMS 45
Appendix A - Work Breakdown Structure 51 Appendix B - Technical Readiness Review Products and Criteria 57 vii
Mandated Tables and Figures
Tables Table 1.1-1 SEP Update Record 1 Table 1.1-2 Applicable Documents 2 Table 2.1-1 Required Interface Memoranda of Agreement 3 Table 2.2-1 Technical Certifications 12 Table 3.4.4-1 Engineering Team Details 19 Table 3.4.4-2 IPT Team Details 21 Table 3.6-1 Technical Performance Measures and Metrics 25 Table 4.3-1 JCCB Baseline Controls 30 Table 4.4-1 Technical Review Details 39 Table 4.6-1 Design Considerations 42 Table 4.6-2 R&M Activity Planning and Timing 42 Table 4.7-1 Engineering Tools 43
Figure 1.1 Program Background 4 Figure 1.2 System Description 5 Figure 2.1-1 Functional Architecture 8 Figure 2.1-2 UGCS/UGDT Physical Architecture 9 Figure 2.1-3 PGCS/PGDT Physical Architecture 10 Figure 2.1.2-1 External Interfaces 11 Figure 2.1.2-2 Subsystem Interfaces 12 Figure 3.1-1 System Technical Schedule 13 Figure 3.1-2 Example Engineering Release Schedule 14 Figure 3.3-1 Risk Management Process Diagram 16 Figure 3.3-2 Risk Cube 16 Figure 3.4.1-1 Product Office Organization 17 Figure 3.4.3-1 Contractor Functional Organization 18 Figure 3.4.4-1 IPT/WG Team Hierarchy 19 Figure 4.3.1 Cybersecurity and Systems Engineering Integration 29 Figure 4.3.1-1 Requirements Decomposition and Control 31 Figure 4.3.1-2A RQ-7B Specification Tree 32 Figure 4.3.1-2B RQ-7BV2 Specification Tree 32 Figure 4.3.2A IJCCB Process 34 Figure 4.3.2B System Engineering Process 36 Figure 4.3.2C Development and Verification Process Relationship 37 Figure 4.5-1 Configuration Management Process Diagram 41 viii
1 Introduction
1.1 Program Description
The prior approved System Engineering Plan (SEP) dated 23 February 2007 supported the final production phase. This System Engineering Plan (SEP) continues the overall technical approach to manage system engineering activities for the Shadow RQ-7B Tactical Unmanned Air System (TUAS) Program. The program is post Milestone C and in its sustainment phase. There are no future milestones that this SEP supports. The Army placed the last of its authorized 102 systems under contract during 2009. This SEP focuses on operations, sustainment, and the modifications program documented in the approved Acquisition Strategy dated 20 February 2013. The overall technical approach is primarily driven by applying these systems engineering principles via engineering service contracts to achieve incremental performance improvements and to maintain interoperability and cybersecurity.
This SEP revision has three goals:
First, this SEP supports the approved Acquisition Strategy.
Second, this SEP is the blueprint to conduct, manage, and control the technical aspects of the acquisition program.
Third, this SEP provides the guidelines for the contractors and the Joint Systems
Integration Laboratory (JSIL) to use when developing and implementing the supporting System Engineering Management Plans (SEMPs).
This SEP will be updated, as needed, to reflect acquisition policy changes, decision memoranda, and to ensure compliance with the latest policy and regulatory changes.
Table 1.1-1 SEP Update Record
Revision Date Change Log and Reason
Approved By
Basic 5 March 2007 Implement OSD and DA policy
PEO Aviation
(ACAT II
Milestone Authority)
1.0 TBD November
Support 7BV2 material release and align with new acquisition strategy.
PEO Aviation
1.2 Applicable Documents
This SEP is used in conjunction with the following technical documents:
Table 1.1-2 Applicable Documents (Specifications per JCCB ECP approval baseline.)
Document Document Number Date TUAV Operational Requirements Document (ORD)
N/A 29 August 2003
TUAV Performance Specification
R38431-00003G March 2009
TCDL (RQ-7BV2) Performance Specification
R39489-00064A October 2012
IRS External Interfaces for the TCDL Tactical Unmanned Aerial Vehicle
R39489-00065A November 2012
IRS Subsystem Interfaces for the TCDL Tactical Unmanned Aerial Vehicle
R39489-00066B April 2014
Performance Specification for the TCDL Air Vehicle (AV) Subsystem
R39489-00115C April 2014
Performance Specification for the TCDL Portable Ground Control Station (PGCS) Subsystem
R39489-00116C June 2014
Performance Specification for the TCDL Portable Ground Data Terminal (PGDT) Subsystem
R39489-10001G June 2014
Performance Specification for the Universal Ground Control Station (UGCS)
R39593-00036E February 2011
Performance Specification for the Universal Ground Data Terminal (UGDT) Subsystem
R39278-30003C April 2010
Performance Specification for the TCDL Launcher (LAU) Recovery (REC) Subsystem
R39489-00434B May 2014
Overarching IOP Version 1.5.5 October 2008 Common Data Link (CDL) IOP Version 2.0 October 2010 Performance Specifications for the Standard Common Data Link (Std-CDL) Waveform
PRF 7681990G Nov 2007
TUAS Acquisition Strategy Report
N/A February 2013
UAS IJCCB Charter UAS-MISC-001C April 2014 JCCB Charter UAS-GM-001 December 2012
1.3 Program Background
The Tactical Unmanned Aircraft Systems Product Office within the Unmanned Aircraft Systems (UAS) Project Office (PO) is responsible all RQ-7B system acquisition, systems engineering, and sustainment.
The RQ-7B Tactical Unmanned Aircraft System (TUAS) provides superior situational awareness, wide-area target acquisition, and high value target (HVT) tracking to conduct both shaping and decisive operations. A complete TUAS consists of Ground Control Stations, Ground Data Terminals, Aircraft, Launch/Recovery Equipment and Mobile Maintenance Facilities. The RQ-7B provides near real-time responsive Reconnaissance, Surveillance, and Target Acquisition (RSTA) capability against defended areas in close proximity to friendly forces.
The original acquisition strategy, consistent with guidance at the time, emphasized Commercial-off-the-Shelf (COTS) technology and a rapid fielding at a minimum cost.
This strategy resulted in successful fielding three years after system selection with a successful Systems Capability Demonstration in November 1999 and Initial Operating Capability in October 2002. The Joint Requirements Oversight Council (JROC) approved the Brigade/Unit of Action Tactical Unmanned Aircraft Vehicle (TUAS) Operational Requirements Document (ORD) in June 2003. The ORD specified a blocking concept with Thresholds required for Production and Objective requirements for three Block Upgrades, (1) Tactical Common Data Link (TCDL) Modifications, (2) Payload Modifications, and (3) System Modifications.
The Army deployed Shadow systems in support of Operation Iraqi Freedom (OIF) beginning in March 2003. Shadow systems also supported Operation Enduring Freedom (OEF) with over twenty systems deployed in Afghanistan. During these operations, the Product Office focused on Engineering Change Proposals designed to meet Urgent Operational Requirements as well as software and hardware fault resolution. The result is a robust system that has flown over 900,000 hours – 90% in combat.
In 2009, the Product Office placed the last of the authorized 104 systems on contract, ending the Production phase of the acquisition. In 2010, the Army G8 established a RQ- 7B UAS MODS Aircraft Procurement Exhibit approving several modifications for development and production. These modifications will be incrementally integrated, tested, and fielded in accordance with the technology readiness and funding profile. The major modifications are grouped as follows: (1) v2 Modifications (include TCDL and Encryption), (2) Payload Modifications, and (3) System Modifications.
The original RQ-7A system completed Initial Operational Test and Evaluation (IOT&E) during May 2002, supporting a full-rate production (FRP) decision in September 2002.
The baseline RQ-7B system provides 12 hours of continuous operations on station within a 24-hour period, with a capability to operate any 12 hours (non-continuous) within a 24-hour period if required by the commander. The system has the capability of surge operations for 18 hours within a 24-hour period for three consecutive days, with the following day being limited to eight hours of operations. Rapid set-up and tear-down times and transfer of air vehicle control between ground stations supports ground maneuver brigade movement and fire support during movement.
A limited customer or user test conducted by ATEC during May 2004 evaluated target location error improvements. A Limited User Test (LUT) during June 2010 evaluated laser designator, range finder, and communications relay improvements.
The system was re-qualified and then evaluated during a May 2014 Follow-On Operational Test (FOT) to assess Tactical Common Data Link (TCDL), Universal Ground Control Station (UGCS), Universal Ground Data Terminal (UGDT), larger wing, and electronic fuel injection engine improvements. These improvements are being fielded as part of a retrofit program.
The 7BV2 system and aircraft increases endurance to 7 hours on station at 50 km and increases the maximum take-off weight when configured with the 20.2 foot wing. It also provides Ku Band Type 1 command/control and payload video encryption and implements the Tactical Common Data Link (TCDL) messaging and waveform.
The program background and timeline is summarized in Figure 1.1 below.
Figure 1.1 Program Background
The system is depicted in Figure 1.2.
Figure 1.2 System Description
The Ground Maneuver Product Office also acquires products through the JSIL. The following products are developed, produced, and sustained as described in this SEP:
1) Universal Mission Simulator (UMS). Simulates the physical and functional Universal Ground Control System (UGCS) characteristics to enable operator flight currency proficiency training.
2) Commander’s Work Station (CWS). Implements a network based open architecture approach to enable applications to access a ground control station and securely distribute aircraft and payload operator information and payload products.
3) Multiple Unified Simulation Environment (MUSE). Stimulates tactical software to enable UAV flight in a simulation environment for training purposes.
4) Shadow Interactive Multimedia Instruction Suite (SIMIS). High fidelity graphic and virtual environment training application that runs on multiple operating systems including Windows, MAC, Web, Android, and iOS devices.
5) Data Acquisition System (DAS). The DAS is a mobile test monitoring, data acquisition, archival, and reporting system that captures Shadow aircraft operator and payload operator displays, payload video, message traffic, and meteorological data.
6) Open Architecture for Telemetry and Instrumentation Systems (OATIS).
Aircraft instrumentation capturing digital and analog flight test data.
7) Hardware in the Loop Simulator (HILSIM). The HILSIM provides a high fidelity 6 degree freedom (6-DOF) aircraft aeronautical model and enables system interconnections to evaluate tactical hardware and software in a ground test environment.
8) Post Production Software Support (PPSS). PPSS programs helps sustain fielded tactical software by addressing obsolescence, information assurance, and corrections necessary for continued fleet operations.
2 Program Technical Requirements The TUAV System provides Reconnaissance, Surveillance, and Target Acquisition (RSTA) support to the ground maneuver commander. The system additionally provides cooperative engagement, remote designation, and communications relay mission support.
The primary mission of near real time (NRT) intelligence support includes the following tasks:
Named Area of Interest (NAI) and Targeted Area of Interest (TAI) surveillance
Route, area, and zone reconnaissance support
Intelligence Preparation of the Battlefield (IPB) support
Situational development support
Target acquisition support
Indirect fire, Close Air Support (CAS), and close-in fire support
Rear area security support
Combat search and rescue support
Battle Damage Assessment (BDA) support.
2.1 Architectures and Interface Control
The following charts and narrative describe our RQ-7Bv2 architecture. This subject is divided into functional, physical, and external interface discussion.
2.1.1 Architecture.
The system functional architecture is depicted in Figure 2.1-1 below. The former RQ-7A and RQ-7B legacy functional architecture is largely the same, but the RQ-7Bv2 system features digital communications for aircraft command and control. The launch and recovery subsystem, the weather station, and the external pilot box (engineering special test equipment) are unchanged and require an analog to digital communications conversion to communicate with the Universal Ground Control Station (UGCS) and new Portable Ground Control Station (PGCS). The aircraft uses a primary and secondary data link for two-way communications with the ground. The primary data link utilizes the Mini-C and Mini-T modems for Ku band communications with messages in STANAG 4586 format. The Ultra High Frequency (UHF) secondary data link, used as a backup for primary link loss and for launch and recovery operations, uses the same UHF modem utilized by legacy AVs. The data is in the legacy 52-byte format for the Command and Control (C2) messages.
Figure 2.1-1: System Functional Architecture
Figure 2.1-2 depicts the UGCS/UGDT physical architecture. The Shadow v2 Vehicle Specific Module (VSM) architecture splits into two separate VSMs: the Ground VSM (GVSM) and the Air vehicle VSM (AVSM). The GVSM is a software module that resides on the ground and interfaces with the:
Common User Control System (CUCS)
Display VSM
Tactical Automatic Landing System (TALS)
Pilot Box
Weather Station
UGDT (Primary Data Link)
Shadow 200 UHF Modem (Secondary Data Link)
The AVSM is a software module that resides in the ASIM on the Shadow 200 AV and interfaces with the:
Airborne Computer Equipment (ACE) Mission Processor
Mini-C Airborne Data Terminal (ADT) (Video Encoder)
Mini-T ADT (Primary Data Link)
The AV ACE box consists of a Payload Processor, Mission Processor, and Flight Processor. The diagrams below show the architecture of the RQ-7Bv2 system.
Figure 2.1-2: UGCS/UGDT Physical Architecture
Figure 2.1-3: PGCS/PGDT Physical Architecture
2.1.2 Interface Control.
External interfaces are under configuration control through the External Interfaces Specification R39489-00065 and are depicted in Figure 2.1.2-1. UAS Inter-Operability Profiles (IOP) are also implemented as coordinated with the Integrating Joint Configuration Control Board (IJCCB). These are represented as “EI-15” in Figure 2.1.2- 1.
Figure 2.1.2-1 External Interfaces
Internal interfaces are under configuration control through the Subsystem Interfaces Specification R39489-00066 and are depicted in Figure 2.1.2-2.
Figure 2.1.2-2 Subsystem Interfaces
2.2 Technical Certifications
Certification requirements are summarized in Table 2.1 below.
Table 2.2-1 Technical Certifications Certification POC Certification
Authority Certification
Date Clinger-Cohen PMO IASO CIO G-6
18 Dec 2014 Army Interoperability
PMO C4I POC
CIO G-6
Spectrum Supportability
PMO Spectrum Manager
ASMO
Multiple:
correlates to RFE
RMF/Information Assurance
PMO IASO
CIO G-6
Multiple: varies by accreditation boundary Future Airborne
Capability Environment
(FACE)
PMO P3I POC
TBD
None: future intent
3 Engineering Resources and Management
3.1 Technical Schedule and Schedule Risk Assessment
The Product Management Integrated Product Team (PM IPT) performs schedule planning, resourcing, and execution. Strategic tasks trace to approved strategy, acquisition, and funding documentation. Functional tasks are carried out by functional IPTs – the System Engineering IPT is one of five. The other IPTs cover logistics, contracts, production, system safety, and test. Section 3.4 discusses the organization and IPTs that participate in SEP implementation.
Program planning and integrated schedule management is implemented by the PM IPT.
Critical path analysis techniques are used to manage predecessor and successor events to completion based on resource prioritization and management attention.
Figure 3.1-1 presents the over-arching technical schedule. In general, legacy and 7BV2 common subsystems (the engine is an example) will both benefit from capability improvements. Additionally, the legacy system will address obsolescence and interoperability improvements to ensure its continued mission effectiveness and sustainment until it is retired. Problems identified via field surveillance will also be addressed. New payloads and unique capability improvements will be integrated into the 7BV2 system using system engineering practices as documented in this plan.
Figure 3.1-1 System Technical Schedule (as of Feb 2015)
PREDECISIONAL – FOR OFFICIAL USE ONLY – Exemption 5
POM 16-20
Shadow RQ-7B 30-Year Plan
UNCLASSIFIED / FOUO
FY15 – FY24
A
Decision Points
Milestones
New Start
Production to Sustainment Transition Point
Divestment (Div)
System Acquisition Framework
Shadow v1 Legacy
DEMIL
Legacy Sustainment (20yr Life)
Legacy Reliability Improvements
Begins FY22, Ends FY28
DEMIL
OSGCS,PGCS,GDT, Generators
Capabilities
• Reduced acoustic signature
Shadow v2 Modifications
Begins FY32, Ends FY40
DEMIL
Shadow v2 Sustainment (20yr Life)
Shadow v2 Modifications
Engine Fielding
SOF AV Mod SOF Fielding
Army AV Mod Army Fielding
Capabilities
• Increased Automation (reduced manpower)
• Increased Survivability
• Improved payloads
Future Group III
UAS
FY 28 FY 32 FY 40
Future UAS Sustainment Future UAS Dev
Future UAS Proc
Material Solution Analysis
Technology Development
Engineering and Manufacturing Development
Production and Deployment
A B C
IOC
FOC
Operation and
Support
Capabilities
• Increased autonomy
• Increased endurance
• Dual payload capability
FY25 – FY34 FY35 – FY45PROGRAM
As stated earlier in SEP section 1.1: the overall technical approach is primarily driven by applying systems engineering principles via engineering service contracts. The product office averages twelve (12) to (14) engineering projects covering improvements, corrections, obsolescence, and information assurance/C4I updates per year. It isn't practical to incrementally depict the applicable engineering milestones within this SEP.
Figure 3.1-2 represents an example schedule. We block these separate projects into an aggregate configuration. This "blocking" strategy minimizes disruption to field units and aligns our training, technical manual, and logistics support. The “V2 Release 4” schedule is an example of this “blocking” strategy. It is dynamic: if an individual effort can’t complete on schedule (including requisite qualifications and logistics support elements) then it gets moved to the next scheduled release block.
Note that multiple contractors or government agencies might be involved in this process.
Each contractor or government agency participant that develops and qualifies a change will implement this SEP through an approved System Engineering Management Plan (SEMP) to ensure conformity with SEP requirements and to ensure all participants engage in a common methodology using the same criteria, tools, and procedures.
Figure 3.1-2 Example Engineering Release Schedule (as of Aug 2015)
3.2 Engineering Resources and Cost/Schedule Reporting
Engineering activities are included in each of the three contract types subject to this system engineering plan: production, engineering services, and performance based logistics. An overarching Integrated Master Schedule is maintained via the PM IPT.
However, each contract also has engineering resources aligned to a common Work Break-down Structure (WBS) and cost/schedule reporting criteria are implemented by each contract. The systems engineering contract, in particular, applies these criteria to each project or product improvement documented as a sub-engineering services memorandum.
Each product, reliability, obsolescence, or sustainment improvement implements an IMS to identify tasks and resources. Each schedule is based on a WBS following the MIL- STD-881, Appendix H (Unmanned Aircraft Vehicle) guidelines. It is provided as Appendix A to this plan. Each contractor or government agency that produces a configuration change – as discussed in Section 3.1, above – will adhere to Appendix A of this SEP.
Each contractor or government agency participating in systems engineering development activities under this SEP will tailor a common WBS at level 4 and below to meet Earned Value Management System (EVMS) requirements. This level of decomposition enables work package status tracking and cost and schedule performance reporting.
As depicted in the WBS at Appendix A, integrated product teams are included and subject to control system criteria as they manage their work and budgets.
Product office responsible engineers assess these reports and brief the product manager monthly to address issues, risks, and receive guidance.
3.3 Engineering and Integration Risk Management
The Program Manager, Unmanned Aircraft System process is based on the “DoD Guide to Risk Management” and is levied on each of the product teams. This SEP implements this policy as documented in Figure 3.3-1. Responsible engineers brief the product manager monthly to adjudicate new risk findings, approve and track mitigation plans, and receive additional program management guidance.
Figure 3.3-1 Risk Management Process
Figure 3.3-2 Risk Cube
Low Likelihood (21-40%)
Likely (41- 60%)
Highly Likely (61-80%)
Near Certainty (81-100%)
Likelihood Rating
Low Likelihood
(21-40%)
Likely (41-60%)
Highly Likely (61-80%)
Near Certainty (81-100%)
Likelihood Rating
Minimum impact.
Minimum oversight needed to ensure risk remains low.
Low
Some disruption.
Different approach may be required. Additional management attention may be needed.
Moderate
Unacceptable. Major disruption likely.
Different approach required. Priority management attention required.
High
Assessment
Minimum impact.
Minimum oversight needed to ensure risk remains low.
Low
Some disruption.
Different approach may be required. Additional management attention may be needed.
Moderate
Unacceptable. Major disruption likely.
Different approach required. Priority management attention required.
High
Assessment
Minimum impact. Consequences unimportant.Slight change w/schedule slack.< $50K1
Minor impact. Reduced performance margin.Slip <1 month. Slight program impact.$50K- $250K2
Minimum system impact. No performance margin but meets capability.
Slip 1-3 month. Slight MS impact. Possible program impact.
$250K - $1M3
Significantly degrades system performance. Does not meet capability requirements.
Slip >3 months. Moderate MS impact.$1M - $5M4
Does not meet KPP.Large slip. Significant MS / program impact.> $5M5
PerformanceScheduleCost
ConsequenceRating
Minimum impact. Consequences unimportant.Minimal or no impact.< $50K1
Minor impact. Reduced performance margin.Able to meet key dates. $50K-$250K2
Minimum system impact. No performance margin but meets capability.$250K - $1M3
Significantly degrades system performance. Does not meet capability requirements.Program critical path affected.$1M - $5M 4
Does not meet KPP.Cannot meet key program milestones.> $5M5
PerformanceScheduleCost
ConsequenceRating
Not Likely
(0-20%)
Risk Assessment Process
Minor schedule slip. Able to meet key milestones with no schedule float.
3.4 Technical Organization
The product office organization is depicted in Figure 3.4.1-1. The organization is augmented via part-time subject matter expertise support from the PM UAS Technical Management Division and the Navy’s PMA-263 project office as required.
3.4.1 Government Program Office Organization
Figure 3.4.1-1 Product Office Organization
‐ General Logistician (Maintenan
‐ Logistics Specialist (Reset/Prese
Training and Tech Pubs Team
‐ Lead Logistician (Training)
‐ General Logistician (BIT/NET)
‐ General Logistician (BIT/NET)
‐ General Logistician (BIT/NET)
‐ General Logistician (BIT/NET)
‐ Lead Logistician (Fielding)
Material Fielding & Integration
‐ Lead Logistician (Fielding)
‐ Logistics Specialist (GFP)
‐ Logistics Specialist (Fielding)
‐ General Logistician
‐ Logistics Specialist (PBL)
‐ Logistics Specialist (LMI/LORA)
Acquisition and Contracting
‐ Lead Logistician (PBL)
‐ Logistics Specialist (PBL)
‐ Logistics Specialist (PBL)
‐ Logistics Specialist (TCDL)
‐ Logistics Specialist (ILS)
‐ Logistics Specialist (LMI/LORA)
Operations & Sustainment Spt
‐ Lead Logistician (O&S)
‐ Logistics Specialist (USMC)
‐ General Engineer (Software)
‐ General Engineer (Radios)
‐ General Engineer (Propulsion)
‐ General Engineer (Weapons)
‐ General Engineer (Payload)
Logistics Branch
‐ Fleet Manager
‐ Lead Logistician
ILS Plans and Product Dev
‐ Lead Logistician
‐ Lead Engineer
‐ General Engineer
Product Engineering
‐ Lead Engineer (TCDL)
‐ General Engineer (AV)
‐ General Engineer (Ground Sys)
‐ Lead Engineer (Production)
‐ General Engineer (Quality)
‐ General Engineer (CM)
‐ General Engineer (Production)
‐ General Engineer (RAM)
Test Engineering
‐ Procurement Analyst
‐ Procurement Analyst
‐ Procurement Analyst Engineering Branch
‐ Branch Chief
Systems Engineering
Business Branch
‐ USMC Program Integrator
‐ Program Analyst/Scheduler
‐ Program Analyst
‐ Cost Analyst
‐ Program Analyst
‐ National Guard Liaison
‐ Safety and Standards Officer
‐ Operations Analyst
‐ Senior Operations Analyst
‐ Senior Operations Analyst
‐ Safety Manager
Headquarters
‐ Product Manager
‐ Deputy Product Manager
‐ Assistant Product Manager
‐ Assistant Product Manager
3.4.2 Program Office Technical Staffing Levels
This SEP is aligned with the acquisition strategy and Cost Analysis Requirements Document (CARD) to ensure staffing, resources, and funding alignment. As discussed in Section 1.1, above, this project is in the sustainment phase. Unlike SEPs that document major acquisition programs between Milestones A and C – this SEP documents a post milestone C sustainment program. Traditional programs have fixed engineering milestones and activities (design reviews, etc.). Engineering workload for a traditional program ramps up or down consistent with their schedule.
TUAS technical staff manning is essentially “flat”. If the future “Group III UAS depicted in Figure 3.1-1 comes to fruition then a SEP revision will be required along with all the other requisite acquisition documentation. For the purposes of this SEP: our systems engineering staffing is consistent with the SEP Section 3.1 narrative and as illustrated in Table 3.4.4-1.
3.4.3 Contractor Program Office Organization
The prime contractor organization is functionally represented in Figure 3.4.3-1. Staffing and management change to match engineering demand and project complexity. The prime contractor may not be the recipient of all the engineering work represented by our SEP Section 3.1 narrative. As a result, for those individual projects awarded to competing contractor or government agencies the prime contractor will adjust their management levels to ensure profitability. It is not practical to depict each “contractor” (or government agency) functional organization within this SEP. However, they will be required to produce a TUAS approved SEMP and execute their systems engineering accordingly.
Figure 3.4.3-1 Contractor Functional Organization
3.4.4 Engineering Team Organization and Staffing
The product office core engineering team is depicted in Table 3.4.4-1 and the functional team hierarchy is depicted in Figure 3.4.4-1. Table 3.4.4-2 describes the IPTs, membership, roles, and products in more detail. There is no over-arching IPT as is often true for major developments between Milestone A and C. This SEP documents Post- Milestone C sustainment activities that do not require recurring executive level engagement through an over-arching IPT.
Table 3.4.4-1 Engineering Team Details
Figure 3.4.4-1 IPT/WG Team Hierarchy
‐ General Engineer (Ground Sys)
‐ General Engineer (Software)
‐ General Engineer (Radios)
‐ General Engineer (Propulsion)
‐ General Engineer (Weapons)
‐ General Engineer (Payload)
Product Engineering
‐ Branch Chief
Engineering Branch
‐ General Engineer (Production)
‐ General Engineer (CM)
‐ General Engineer (Production)
‐ Lead Engineer
‐ General Engineer
‐ Lead Engineering (TCDL)
‐ General Engineer (AV)
Systems Engineering
‐ Lead Engineer (Production)
Test Engineering
‐ General Engineer (RAM)
PM IPT
SE IPT
IA
I P T
R is k
IP
T T&E
Working IPT
A vi o n ic s
IP
T
P ro p u ls io n I P T
C I
IP
T
So ft w ar e
IP
T
C o n tr o l E q u ip m en t
IP
T
Production IPT
Supportability IPT
System Safety Working Group
Fa ilu re R ev ie w B o ar d
Mishap IPT
Obsolescence IPT
Q u al it y
IP
T
Su p p o rt E q u ip m en t
IP
T
This page deliberately blank.
Team Name Chairperson Team Membership Role & Responsibility Products and Metrics
Headquarters Products:
‐ Deputy Pdm ‐ Acqusition Strategy
‐ Assistant PMs
‐ Cost Analysis
Requirements Document
‐ Operations Analysts ‐ ILS Plan
‐ Safety Manager
Integrated Master
Schedule
Business Branch Lead Metrics:
Engineering Lead ‐ Cost
Logistics Branch Lead ‐ Performance
Prime Contractor ‐ Schedule
Role: identify, document, track, and monitor risks through mitigation and closure.
Risk management plan
Schedule: meets monthly. Mitigation status
IASO
Coordinate issues, status, and solution plans.
Metrics: minutes, action items.
Contractor Leads Schedule: meets weekly.
PM
TCM UAS
AED
AMCOM Safety
PEO
Metrics: mishap trend analysis, hazard closure rate
Program Office Mishap Rates
Engineering Trend Analysis
Logistics Causal Analysis
Prime Contractor Action Items
Program Office
Engineering
Logistics
PEO Avn POC
TCM UAS
ATEC AEC
ATEC OTC
DUSA‐TE POC
DOT&E POC
ASA(AL&T) T&E POC
SE POC Production deliveries
Production POC Cost/Schedule metrics
DCMA POC Schedule: meets weekly. Performance
Product Tech Lead
Engr Branch Lead
Fleet Mgt POC
PBL Lead
AMRDEC Obsolescence
Team
System Engr Leads
System Engr Leads
‐ Avionics
‐ Propulsion
‐ C4I
‐ Software
‐ Control Equipment
‐ Support Equipment
‐ Reliability
‐ Test
‐ Production
‐ Obsolescence
‐ Quality
Contractor Engr Leads
Logistics POC
Table 3.4.4‐2 IPT Team Details (Page 1 of 2)
Safety Mgr
Role: review mishap data.
Schedule: meets weekly.
Pdm GM Same as PM IPT
IA Lead
Pdm GM &
Safety Mgr
Role: implement AR 385‐16 via closed loop hazard tracking system and analysis coordination
Schedule: meets quarterly.
Products: hazard tracking logs, risk acceptance documents
Role: track production issues and provide production activity oversight/guidance.
Products: TEMP and derivative plans and reports.
Role: implements AR 73‐1 via test strategy integration and advising
PdM GM.
Production IPT
Obsolescence IPT
SE IPT
SE Lead
SE Lead
Mishap IPT
Metrics: critical technical parameter & measure of effectiveness identification/tracking.
Schedule: meets semi‐annually or as needed.
T&E WIPT
Pdm GM &
Test Lead
PM IPT Pdm GM
Role: provides oversight, guidance, stategic integration.
Schedule: meets weekly.
Risk IPT
IA IPT
SSWG
Shadow
Obsolescence
Lead
Role: assess obsolescence impacts, trends, and status resolution plans.
Schedule: meets weekly.
Products: acquisition strategy, cost analysis, sustainment plan inputs;
trend analysis, action
Metrics: system health analysis reports, issue resolution metrics.
Products: problem change report (PCR) tracking & disposition, issue/action item tracking, use case and technical performance measure approval.
Metrics: critical technical parameters, PCR burn‐ down/schedule.
Role: provide product and functional system engineering integration and oversight.
Schedule: meets weekly.
Team Name Chairperson Team Membership Role & Responsibility Products and Metrics
Avionics POC
Quality POC
Contractor POCs Schedule: meets weekly.
Metrics: FRB top 5 solution completion status.
Avionics POC
Quality POC
Contractor POCs Schedule: meets weekly.
Metrics: FRB top 5 solution completion status.
Logistics POC
Quality POC
Navy POC
Propulsion POC
Logistics POC
Role: Review status of Shadow V1 and V2 SEIT SW PCRs, PPSS, JSIL, IA, AIC, and scheduled SW Release efforts.
Navy POC Schedule: meets weekly on Tuesdays at 1000 CDT/CST.
Control Equip POC
Quality POC
Reliability POC
System Engr POC
Support Equip POC
Quality POC
System Engr POC
Contractor POCs
Avionics POC
Propulsion POC
C4I POC
Software POC
Control Equip POC
Support Equip POC
Production POC
Quality POC
Logistics POC
QM POC
DCMA POC
Supply Support Lead
Maintenance Lead
Readiness Lead
Training Lead
Fielding Lead
ILS Lead Metrics:
PBL Lead
Marine Corps Logistician
FMS Specialist ‐ Depot Mean Down
Time
Maintenance Specialist ‐ MWO Status
COLTS/UAS‐I Specialist ‐ Supply Chain Status
Item Manager ‐ Availability
Prime Contractor POCs
Aircraft IPT AV Lead
Role: coordinate issues and status solution plans.
Products: minutes, action items, PCR Status
Propulsion IPT Propulsion
Lead
Role: coordinate issues and status solution plans.
Products: minutes, action items, PCR Status
Schedule: meets bi‐weekly on
Tuesdays at 0900 CDT/CST.
Metrics: FRB top 5 solution completion
C4I IPT Not currently active
Software IPT PdM TUAS
Software Lead
Metrics: Minutes, Action
Items
Control
Equipment IPT
Control
Equipment
Lead
Role: coordinate issues and status solution plans.
Metrics: Minutes, Action
Items, Problem Change
Report (PCR) Status Schedule: monthly on Thursdays at
1000 CST.
Ground Support
Equipment IPT
Support
Equipment
Lead
Role: coordinate issues and status solution plans.
Metrics: Minutes, Action
Items, Problem Change
Report (PCR) Status Schedule: monthly on Wednesdays at 1000 CST.
Failure Review
Board
Reliability
Lead
Purpose: assess new failures, trends, and corrective action plans.
Products: minutes, action items, metrics, trend and cost analysis.
Schedule: meets monthly.
Metrics: failure cost, quantity, rate per 100,000 flight hours
Quality IPT Quality POC Purpose: review open PQDRs, assess open general quality issues including
Metrics: Quality
Improvement Process
Supportability IPT
Logistics
Sustainment
Lead
Role: manage and monitor requirements compliance.
Products: sustainment plan, action item tracking, trend analysis.
Schedule: meets weekly.
‐ System Status
Readiness
Table 3.4.4‐2 IPT Team Details (Page 2 of 2)
AV Lead
Role: coordinate issues and status solution plans.
Products: minutes, action items, PCR Status
Avionics IPT
3.5 Relationships with External Technical Organizations
The TRADOC Configuration Manger (TCM) – Unmanned Aircraft Systems (UAS) is the principle external organization participating in our IPTs. Contractor quarterly management reviews, T&E IPTs, and system safety working groups involve active TCM UAS participation. The System Safety Working Group charter and the Test and Evaluation Master Plan (TEMP) discuss other agency participation and roles.
Pre-planned product improvement (P3I) and other design reviews during this operations and support phase include TCM-UAS involvement. The TEMP documents the methodology by which we ensure Army Test and Evaluation Command independent evaluation for efforts during this phase.
The Joint System Integration Laboratory (JSIL) provides training simulators, special test equipment, and post-production software change support. SEP methodology and processes crosswalk from this plan into JSIL system engineering and configuration control plans.
3.6 Technical Performance Measures and Metrics
Each new engineering effort produces tailored performance measures and metrics based on the capability improvement or obsolescence issue it addresses. However, an overarching minimum set of technical performance measures are presented in Table 3.6- 1.
Shadow is a mature acquisition program and completed its approved production quantity objectives. A reliability growth model was not used for this program. A reliability growth curve is not provided for this reason. Shadow uses a systematic reliability monitoring program as described below and in Table 4.6-2 R&M Activity Planning and Timing.
A failure reporting and correction system and field surveillance produce problem change requests (PCRs) that are presented to the SE IPT. PCRs are prioritized and introduced into improvement programs. Each of these programs follows system engineering processes, including metrics and appropriate verifications, which conclude with engineering change documentation approved by a Joint Configuration Control Board
(JCCB).
Table 3.6-1 Technical Performance Measures and Metrics
TPM Name Responsible IPT KPP (K) or CTP (C)
Correlation
Theshold
Value
Range (C) 125 Km
Endurance (C) 7 Hours
TLE (C) < 50 m
Probability of Recognition given Detection (P(R/D))
(K) and (C)
8000 ft
AGL, 7000
ft standoff
(day);
6000 ft standoff
(night)
MTBSA (C) 20 Hours
CPU Usage No < 50 %
Memory Usage No < 50 %
Network Utilization and Speed No Varies by project
Throughput (reserve) No >= 50 %
Disk Utilization No < 50 %
Unit and Life Cycle Cost
PM IPT,
Supportability IPT, SE IPT
No None
Supportability IPT
Production IPT
Avionics IPT
Propulsion IPT
Emplace, Displace Time (C) 180, 60
Minutes
Transportability and
Deployability (C)
Varies by project
Weight No
Varies by project
Launch and Recovery (C) Soccer
Field Area
Technical Performance Measures
(Each P3I or capability upgrade augments with additional TPMs correlating to
Performance Attribute)
SE IPT
SW IPT
Control
Equipment IPT
Mean Time to Repair (Field)
Space, Weight, and Power
(SWAP)
Varies by project No
(C) 2 hours
4 Technical Activities and Products
4.1 Previous Phase System Engineering Activities
The prior SEP dated 23 February 2007 discussed the “Production Program” engineering activities. The product office placed the last of the authorized 102 Army systems on contract during 2009. The prior SEP also discussed engineering activities and processes leading to the development and fielding of the Laser Range Finder/Designator payload and the communications relay subsystem. The prior SEP also provided the methodology and processes supporting the RQ-7BV2 development which provides Ku Band Type 1 command/control and payload video encryption and implements the Tactical Common Data Link (TCDL) messaging and waveform.
4.2 Next Phase System Engineering Activities
This SEP supports the P3I program as well as continued system operations and sustainment. Prior methodology and processes continue to apply, but are both tailored and described in more detail within this SEP.
This SEP also introduces methodology and processes tailored to support foreign material sales. For example, SEP Section 4.4 discusses uses cases. These are additionally tailored to address Australian unique configuration and practices. Engineering milestone reviews then include an assessment of change impacts on the Australian configuration. This assessment, coupled with peer review, ensures designs and supporting analyses address Australian impacts. Australia has two systems at this time. Its configuration baseline and logistics support are separately maintained.
This SEP also introduces the Integrating Joint Configuration Control Board (I-JCCB) as documented later in SEP Section 4.3.2. IJCCB structure and responsibilities are more fully described in UAS-MISC-001C. It is different from the Joint Configuration Control Board described in the prior approved SEP and in UAS-GM-001. The primary mission of the I-JCCB is to ensure that interoperability is achieved among the Universal Products and to maximize commonality among the Universal Product hardware and software configuration baselines. Section 4.3.2 provides additional I-JCCB detail. The JCCB, however, remains the single control authority for all Shadow system configuration baselines. Section 4.5 provides additional JCCB detail.
4.3 Requirements Development and Change Process
The PM and SE IPTs provide horizontal integration between multiple contract change sources: engineering services, production, post-production software support, performance based logistics, and foreign military sales programs. Horizontal integration occurs within weekly IPTs and quarterly reviews and as part of the SEP Section 3.1 narrative discussing our “blocking” or “release” methodology prior to fielding.
The SE IPT is the overarching engineering IPT. System Change Requests (SCRs) and Problem Change Reports (PCRs) are assessed within the SE IPT process and aligned with either existing contract scope or prioritized for new funding and scope within a contract.
The SE IPT maintains technical authority over the approved production baseline and is responsible for merging new capability and/or improvements (configuration changes) into the production baseline using SEP methodology, processes, and procedures.
The chief engineer exercises configuration control through the JCCB and is also responsible for developmental test configuration control and risk acceptance through a Test Flight Authorization (TFA) process. The TFA process provides test configuration control and PM level risk assessment and acceptance in accordance with AR 95-20 (Contractor’s Ground and Flight Operations) and the DFARS clauses 252.228-7001 and/or -7002.
System engineering processes implement cybersecurity test strategy and planning to obtain relevant data from all available sources, including information security assessments, inspections, component-and subsystem-level tests, system-of-system tests, and testing in an operational environment with systems and networks operated by representative end users. System engineering processes identify and assess network architecture, external network connections, intended operational environment, and the anticipated cyber threat requirements to influence the design and subsequently to assess test adequacy. Figure 4.3-1 illustrates our methodology.
Figure 4.3.1 Cybersecurity and Systems Engineering Integration
4.3.1 Analysis and Decomposition
The project office and prime contractor rely on the IBM Dynamic Object Oriented Requirements System (DOORS) tool to perform requirements analysis and management activities. The requirements schema facilitates the requirements development process through a hierarchy that maintains links from system level requirements down to allocated item level requirements. Cybersecurity is also integrated into the evaluation structure. Figure 4.3-1 depicts this schema, showing the relationships between the requirements modules maintained in DOORS, verification documentation, and product baseline documentation. The Figure 4.3-1 generic references to “Subsystem 1”, as an example, maps to “TUAV Air Vehicle Performance Specification R38561-00098” in Figure 4.3.1-2A.
The prior approved SEP documented product office functional baseline control. This SEP describes both functional and allocated baseline control to correct prior process shortfalls. Table 4.3-1 summarizes the new controls.
Table 4.3-1 JCCB Baseline Controls
Milestone Review Specification Exit Criteria Approval Authority Preliminary Design Review
Functional (System or Prime Item and Interface Specification Paragraph Changes) Baseline Impact Documentation
JCCB to receive and approve preliminary ECP.
Critical Design Review Allocated (Configuration Item and supporting analyses) Baseline Documentation
JCCB to receive and approve Preliminary ECP revision.
Functional and allocated requirements are illustrated in two specification trees. Figure 4.3.1-2A documents the RQ-7B specification tree. Figure 4.3.1-2B documents the RQ- 7BV2 specification tree. The specification tree as tailored for the Australian baseline is not depicted. Training simulator and/or special test equipment specification trees maintained by the Joint System Integration Laboratory (JSIL) are also not depicted.
Figure 4.3.1-1 Requirements Decomposition and Control
Validated Baseline
TUAV
ORD
CONOPS
Program
SOW
Program
TRD
System Functional Requirements Baseline
Subsystem Interface Requirement Specification
External Interface Requirement Specification
System Performance Specification
System Functional
Module
Verification Documentation
Allocated Subsystem Baseline
System Verification, Test Cases, ATP, DT&E
Subsystem 1
Subsystem 2
Subsystem 3
Subsystem 4
Subsystem n
Subsystem Specification
Subsystem Functional
Module
Subsystem Interface
Specification
Allocated Item Baseline
Software
Hardware
Subcontract
Subsystem Verification, Test Cases
SW Item Test
HW Item Test
SC Item Test
Product Baseline
Design Description Documents
Design Decision
Documents
Parts Lists
Drawings
Code
Technical Manuals
Training Materials
Validation Documentation
OT&E
Figure 4.3.1-2A RQ-7B Specification Tree
Figure 4.3.1-2B RQ-7BV2 Specification Tree
R38431-00097 Interface Requirement
Specification, Subsystem Interfaces for the
Tactical Unmanned Aerial Vehicle
R38431-00096 Interface Requirement
Specification, External Interfaces for the
Tactical Unmanned Aerial Vehicle
R38431-00003 Performance Specification for the Tactical Unmanned Aerial
Vehicle
R38561-00098 Performance
Specification for the TUAV Air
Vehicle
R38561-00100 Performance
Specification for the TUAV
Portable Ground Control Station
R38561-00102 Performance
Specification for the TUAV
Recovery System
R38561-00104 Performance
Specification for the TUAV Air
Vehicle Transport
R38561-00106 Performance
Specification for the TUAV Maintenance
Section Multi- Functional
R38561-00099 Performance
Specification for the TUAV Ground Control System
R38776-00037 Performance
Specification for the TUAV One
System ® Remote Video Terminal
R38561-00103 Performance
Specification for the TUAV Launcher
R38561-00105 Performance
Specification for the TUAV Mobile
Maintenance Facility
R39489-00066 Interface Requirement
Specification Subsystem Interfaces for the TCDL Tactical
Unmanned Aerial Vehicle
R39489-00065 Interface Requirement
Specification External Interfaces for the TCDL Tactical Unmanned
Aerial Vehicle
R39489-00064 Performance Specification for the TCDL Tactical Unmanned Aerial Vehicle
R39489-00116 Performance Specification for the TCDL Portable Ground Control Station
(PGCS) Subsystem
R39489-00434 Performance Specification for the TCDL Launcher (LAU) Recovery (REC)
Subsystem
R39489-00115 Performance Specification for the TCDL Air Vehicle
(AV) Subsystem
R39278-30003 Performance Specification for the Universal Ground
Data Terminal
R39489-10001 Performance Specification for the TCDL Portable Ground Data Terminal
(PGDT) Subsystem
R39593-00036 Performance Specification for the Universal Ground Control Station (UGCS)
4.3.2 Requirements Management and Change Process
The Defense Acquisition Guidebook defines eight (8) technical management processes that are implemented by the Shadow system engineering organization. The IPTs execute these processes and the SEMPs that crosswalk to this SEP discuss the details for each organization contributing to the change methodology discussed in SEP Section 3.1. The SEIT IPT addresses “Technical Planning”, “Technical Assessment”, “Decision Analysis”, and “Risk Management”. The remaining four technical management processes (“Requirements Management”, “Configuration Management”, “Interface Management”, and “Data Management”) involve control methodology implemented within the production contract.
There are two requirement change processes. These are illustrated by three flow charts.
The first flow chart (Figure 4.3.2A) documents the I-JCCB process which controls common requirements between multiple unmanned aircraft platforms. The second flow chart (Figure 4.3.2B) documents both the Shadow engineering process leading to JCCB change approval followed by production and acceptance. Section 4.5 (Configuration Management and Change Process) includes a complimentary third flow chart (Figure 4.5-
2) illustrating the JCCB and ECP process.
The primary mission of the I-JCCB is to ensure that interoperability is achieved among the Universal Products and to maximize commonality among the Universal Product hardware and software configuration baselines.
Figure 4.3.2A IJCCB Process
Multiple prime contractor contract change sources all share a common system engineering change process documented in this SEP. JSIL change sources also crosswalk to SEP processes documented herein. This SEP introduces an additional JSIL training simulator/special test equipment functional, allocated, and product baseline controlled through the JCCB.
The prior approved SEP focused on functional baseline management. OSD Configuration Management Guidance (MIL-HDBK-61A) defines a functional baseline as the approved configuration documentation describing a…