PWS - ARL Shop Machine Tool MX.doc

DOC document 197 KB Posted

Attached to
Sources Sought for Shop Machine Maintenance
Solicitation number
W911QX-25-Q-0057
Issued by

About this file

This Performance Work Statement (PWS) outlines requirements for preventive maintenance and repair services for machine tools and equipment at Army Research Laboratory (ARL) facilities at Aberdeen Proving Ground, MD. The contractor must provide all labor, tools, supplies, repair parts, and materials to perform scheduled preventive maintenance and unscheduled repairs on various equipment including mills, lathes, air compressors, temperature chambers, and hydraulic systems listed in Equipment Lists A and B.

Key requirements include 24-hour response time to service requests, completion of repairs within 5 days when parts are needed (2 days without parts), monthly inspection reports, and compliance with environmental protection regulations. The contractor must provide factory-trained personnel with minimum 3 years experience. Work is to be performed during normal government hours (0700-1600 Monday-Friday). The related sources sought notice (W911QX-25-Q-0057) indicates this will be a one base year plus two option years contract under NAICS 811310 with a $12.5M size standard. Responses to the sources sought are due within 5 days of posting, with particular interest in small business participation including 8(a), HUBZone, SDVOSB, WOSB, and EDWOSB firms.

View the file

Other files

File Type Posted
Equipment List.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS)

Shop Machine Maintenance C.1 General

The Contractor will furnish all labor, tools, supplies, repair parts, oil, grease, filters, etc., to perform effective preventive maintenance (PM), and service calls for repair service when required, for the equipment described in lists A and B below. The equipment is located in various Army Research Laboratory (ARL) Experimental Facilities located throughout the Aberdeen Proving Ground (APG), MD 21005.

C.2 Scope

C.2.1 The Contractor shall perform all unscheduled service repairs and scheduled Preventive Maintenance (PM) services: annual, semi-annual, to include lift tests and Occupational Safety and Health Administration (OSHA) inspections for the machine tools in accordance with all applicable documents and manufacturer’s procedures and recommendations to include testing of equipment and repair or replacement of defective parts and components. The Contractor shall be required to comply with all applicable environmental protection regulations. (See paragraph C.14)

C.2.2 The Contractor shall provide the Contracting Officer’s Representative (COR) with a designated point(s) of contact that shall respond to all notifications within 24 hours of initial contact. The Contractor shall also provide secondary points of contact in the event that the primary points of contact are not available.

C.2.3 The Contractor shall make available to the COR the status of any or all repair work in progress upon request. All repairs shall require estimates to be provided to COR for approval prior to commencing any work or ordering of parts. Approval in the form of electronic mail (e-mail) is acceptable. Approval by telephone is not acceptable.

C.3 Acronyms/Definitions

CLIN - Contract Line Item Number

Contract Line Item Number (CLIN) - The numerical number assigned to a controlled account.

Contracting Officer Representative (COR) - The COR will act as the daily Government POC for the Contractor to obtain authorizations for repairs, moving of equipment, and so forth. No overtime to be billed, flat rate labor cost only. The COR is not authorized to modify or terminate the contract nor obligate the Government.

Preventive Maintenance (PM) - The routine checking of hardware that is performed by a field engineer/mechanic/technician/electrician on a specific scheduled basis. PMs include visual and operational inspection of all operational components and any repair of adjustment necessary to ensure proper operation in accordance with Original Equipment Manufacturer specifications. This includes, but is not limited to: lubrication of forklifts and cranes, brake repair, check and fill if necessary, proper levels of brake fluid, engine oil: lubricants and grease, check hydraulic lines, fittings and fluid levels: check radiator, cap, core, gasket and hoses for leakage: change anti-freeze on annual basis, ensure equipment is kept in safe operation and meets all OSHA guidelines. Preventative maintenance schedule should be disclosed by the Contractor and agreed to by the Government.

On-Site - Location of equipment’s utilization, i.e. experimental facilities.

Repair Service Call- A repair service call that is required due to a malfunction of the equipment.

Repair-To accomplish the operations that are authorized to restore a vehicle to serviceable condition.

C.4 Authorization, Acceptance, Correction of Work

C.4.1 Prior to performance of any repair work, the Contractor shall provide to the COR for approval an estimated cost to complete repair. Cost estimates shall include estimated hours by category of labor, repair parts and any other anticipated costs including an up to date published price list for all the parts required as well as a published price list of labor required.

C.4.2 The cost estimate shall be provided to the COR within 24 hours (weekends and Federal holidays excluded), from notification by the COR that repair work is required. Actual repair work shall begin once the parts are received from the supplier and work is to be completed within five (5) days. The COR will have authority to approve all orders below the $10,000.00 micro-purchase threshold subject to the limitation of funding available on each respective CLIN. Orders above the micro-purchase threshold require approval from the KO and any quote shall be accompanied by the contractor published price to include loaded labor rates, materials, and equipment for completion of the effort

C.4.3 Upon COR approval of the estimated repair cost, the Contractor shall accomplish repairs within five (5) days (weekends and Federal holidays excluded) when it is necessary to order parts. If repairs cannot be accomplished within this period of time, Contractor shall supply rental units at fair market rates or otherwise identify and present a solution to mitigate the Government’s downtime while equipment is under repair.

C.4.4 Upon COR approval of the estimated repair cost, the Contractor shall accomplish repairs within two (2) days (weekend and Federal holidays excluded), when it is not necessary to order parts.

C.4.5 If contact, at any time, cannot be made by COR within 30 minutes using office or cellular phones after initial attempt and a message is left, the Contractor shall contact the COR by return call within two (2)-hours or by close of business (COB).

C.4.6 Should the Contractor’s personnel be unable to determine the cause of equipment failure within 48 hours (weekends and Federal holidays excluded), and cannot make equipment operational, the Contractor shall be required to obtain additional technician support, either in the form of “specialists,” Contractor personnel, or authorized manufacturer personnel for resolution of the problem. Equipment shall be made operable to the original equipment manufacturer (OEM) manual.

C.4.7 If performance is found to be unsatisfactory and not in accordance with the requirements of this contract, the Contractor shall begin correcting unsatisfactory work as soon as possible but not later than the first three (3) hours of the following regularly scheduled Government workday. Rework or corrective work shall be performed at the expense of the Contractor.

C.4.8 Downtime for each item failure shall be measured by those intervals between the time the Government makes an attempt to contact the Contractor’s representative at the prearranged contact point and the time that the item is returned to good operating condition. Travel time shall be included in the calculation of downtime.

C.5 Scheduled Preventive Maintenance (PM)

C.5.1 The Contractor shall perform all PM services on-site to minimize equipment downtime. PM is the routine checking of hardware that is performed by a field engineer/mechanic/technician/electrician on a specific scheduled basis as proposed by the Contractor and agreed to by the Government. PM includes but is not limited to visual and operational inspections, lubrication of axles and fittings, repairs, changes (fuel filters, air filters, oil filters), checking of hydraulic lines, adjustments and replacements that are necessary to maintain operational equipment. The Contractor shall be responsible for the correct mixture of anti-freeze to prevent freezing during cold weather. All PM to include those items that have been received under warranty shall be performed in accordance with the OEM specifications and appropriate manufacturers manuals. The costs of the following items shall be included in the cost for preventive maintenance: oil, grease/lubricants, fluids, anti-freeze, oil filters, air filters, fuel filters and fittings. The cost of repair parts will be reimbursed on a monthly basis in accordance with the parts CLINs.

C.6 Repair Service Calls

C.6.1 For any repair service call that is required due to a malfunction of the equipment, the hourly rate for repair services shall begin upon the arrival at the work site. Repair service calls include but are not limited to: repairs to replace or overhaul un-serviceable components, assemblies, sub-assemblies, and electrical components to keep the equipment fully operational. Repairs shall have a maximum forty-eight (48) hour turnaround time after notification by the CO excluding federal holidays and weekends. If parts or supplies are not readily available to fulfill the forty-eight (48) hour repair criteria, the contractor shall be required to provide to the COR the estimated delivery date of the parts or supplies along with a completion schedule of the repair work.

C.7. Parts and Materials

C.7.1 The parts and materials used by the contractor in performance of this contract shall be new and conform to the OEM’s or re-manufacturer’s specifications unless approved by the COR. Rebuilt assemblies shall only be used with prior approval of the COR when it is a standard industry practice and the rebuilt assembly or subassembly carries the same manufacturer’s or re-manufacturer’s warranty as a new assembly or subassembly. Any part removed is Government property and shall be returned upon request of the COR unless the replacement part is predicated upon an exchange basis with the part being replaced, or unless given to the Contractor to dispose of said part. The Contractor shall provide all repair parts and supplies necessary for PM and repair of equipment and will be reimbursed by the Government for actual cost on a monthly basis.

C.7.2 Any or all parts or components damaged by the Contractor shall be repaired or replaced at the expense of the Contractor, to the satisfaction of the COR.

C.8 Major Component Repairs

C.8.1 Major component repairs such as engine overhaul, power train repair, etc. shall require the Contractor to perform a technical inspection and provide a written report with the name of the major component, cause of component breakdown, cost to repair and estimated time for repair prior to proceeding with the repair. The Contractor shall submit a cost estimate as soon as possible but not later than five (5) working days after notification from the COR. The Contractor must receive written approval from the Government POC prior to proceeding with repair(s).

C.9 Uneconomical Repairs

C.9.1 If determined during a repair service call that it is not cost effective to repair a particular piece of equipment, the COR may request the contractor to perform an inspection to determine the equipment’s overall condition and service ability. These inspections include effort such as: a thorough inspection of the equipment such as engine, transmission, other major components, controls, mast, cables, chains, hoses, electrical, air, and boom hydraulic systems to determined disposition of the equipment. The Contractor shall include an estimated cost for labor and materials required to return the equipment to an operating condition. The Contractor shall complete this cost estimate within forty-eight (48) hours after the service call date.

C.10 Cost and Funding limitations

C.10.1 An amount of funding for the payment of parts or services that is not to exceed the ceiling price (total amount) will be indicated in the contract. A Not to Exceed (NTE) value may be adjusted upward or downward depending on the number of repair parts purchased. The Contractor shall not exceed this price unless notified by the Contracting Officer through a modification to the contract that the ceiling price has been increased and has specified in the notice a revised ceiling price for performance under this contract/CLIN. The Government shall not be obligated to pay the contractor any amount in excess of the price in the Schedule, and the contractor shall not be obligated to continue performance if to do so would exceed the ceiling price or funding set forth in the contract unless and until the Contracting Officer has notified the Contractor in writing that the ceiling price and funding have been increased.

C.11 PM and repair schedule

C.11.1 The Contractor shall contact the COR and schedule the inspections a minimum of one (1) week in advance in order to allow the COR to work around range operations. Repair service calls shall be performed as required but within twenty-four (24) hours of telephonic or e-mail notification by the COR for repair service calls.

C.11.2 Unscheduled Repair - Only work authorized by the COR may be performed under these line items, and work may only be authorized if there is sufficient funding on the appropriate line item. The Contractor shall notify the COR of a requirement for work under these line items, or the Government may initiate a request. The Contractor shall provide the COR with a written estimate of the effort, and shall certify that all labor and materials are being proposed at most favored customer prices. Line item is for unscheduled repair of items included on the equipment list, which may be authorized by the COR.

C.12 Adjustments to Equipment Inventory requiring PM and repairs

C.12.1 The COR shall have the right to make increases or decreases to the list of equipment as new and/or replacement equipment is received or is deleted from the schedule and the Contractor may submit requests for equitable adjustments to the contract as appropriate. Unless and until the contract is modified to incorporate costs associated with any PM to be performed on the revised list, the Contractor shall only provide PM for the equipment covered by the contract price. New equipment that is added to the list shall be repaired and maintained in accordance with the applicable warranty.

C.13 Employee Qualifications

C.13.1 All effort provided under this contract shall be conducted by factory trained personnel with knowledge in the areas of preventative maintenance and service call repairs of commercial industrial equipment as specified on the attached list. All personnel shall have not less than three (3) years of experience or have current certification of appropriate training. Any maintenance performed by apprentices shall be under the direct supervision of the journeyman contract personnel.

C.13.2 A background investigation of each employee requiring installation facility access shall be required consisting of a National Agency Check (NAC). This will allow for employees to have unescorted access to restricted areas to maintenance and repair equipment. The requirements under this PWS are not deemed classified and employees shall not be exposed to classified material. A security clearance is not required to have access to the work areas under the contract. Escorts will not be provided beyond the first forty-five (45) days of contract performance: therefore Contractor personnel must be capable of qualifying for access badges at time of contract award.

C.14 Environmental Protection

C.14.1 Environmental Laws and Regulations: In order to provide for environmental abatement and control and to prevent environmental pollution arising from the services of the Contractor in the performance of this contract, the Contractor shall comply with applicable federal, state and local laws and regulations concerning environmental pollution abatement and control currently in effect.

C.14.2 License and Certification Requirements: Contractor shall obtain all licenses and certification required by Federal, State, and Local environmental laws and regulations necessary to adhere to the specifications of this contract. The Contractor shall submit all plans, notifications, reports, submittal documents, and fees required by Federal, State, and Local environmental laws and regulations to the appropriate Federal, State, and Local authority and/or agency as necessary to adhere to the specification of this contract. All required licenses and certifications required by Federal, State, and Local environmental laws and/or regulations shall be considered a contract deliverable upon award.

C.14.3 Notification of Federal and State Regulators: Contractor shall immediately notify the Designated Government Representative (DGR) and COR of the arrival on site of any Federal, State, and/or DoD environmental regulator or enforcement agent and/or the receipt of any correspondence from a Federal or State environmental agency.

C.14.4 Inspections of Work Sites: Contractor shall submit to potential Federal, State, Army and installation work site environmental regulatory inspections and/or investigations into noncompliance, and fully cooperate with such inspections/investigations by providing the appropriate records and documentation. Environmental regulatory agencies are authorized by law to inspect any work site for environmental compliance with regulatory requirements. If an inspection is conducted, it will not stop or disrupt ongoing contract activities. The inspection will only require the work site environmental officer, or supervisor/manager to answer questions and/or escort the inspector to specific work site areas with the potential to affect environmental quality.

C.14.5 Generation of Solid Waste: Contractor shall remove from the installation and dispose of all solid waste generated, which cannot be recycled to an approved and permitted off-post disposal facility.

C.14.5.1 Contractor shall make every effort to divert construction, demolition debris, and all other solid waste to comply with the Army Integrated Solid Waste Management Policy.

C.14.5.2 Prior to removing any waste from the installation for disposal, the Contractor shall coordinate with the installation Qualified Recycling Program (QRP) Manager, DGR, and COR to arrange for recyclable materials to be removed and diverted from the waste stream.

C.14.5.3 Submit in writing the quantities of waste removed and recycled to the DGR and/or COR on a monthly basis. The submittal shall include the date of disposal/recycling, the disposal/recycling facility, the types of material disposed/recycled and the quantities of materials disposed/recycled by weight.

C.14.5.4 The Contractor shall establish a program to promote cost-effective waste reduction in all operations and facilities covered by the contract. This includes collection, separation, and processing products or other materials recovered from solid waste streams for use in the form of raw materials.

C.14.5.5 The Contractor shall make maximum effort to reduce and prevent waste.

C.14.6 Generation of Hazardous Waste: Contractor shall assign all hazardous waste management responsibilities to the appointed Environmental Compliance Designee (ECD). Contractor shall contact the DGR and/or COR to obtain technical assistance from the Environmental Office for assisting the ECD with achieving and maintaining compliance with hazardous waste storage and disposal requirements. Contractor shall properly profile all waste generated as part of this contract to determine if any waste is hazardous waste as defined by 40 CFR. Contractor shall accumulate hazardous waste prior to disposal shipment in a satellite accumulation point at or near the point of generation or in a less-than-90-day site, in accordance with Federal, State, Army, and installation regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement or Status- of-Forces Agreement. The Contractor shall properly package the hazardous waste and complete the hazardous waste manifest, then take the manifest to DGR for approval and signature prior to removing any hazardous waste from the installation. Contractor shall contact DGR to obtain the installation’s hazardous waste EPA ID number for the hazardous waste manifest. The Contractor shall notify the DGR 24 hours prior to removing any hazardous waste from the installation. The contractor shall remove and dispose of manifested hazardous waste generated by contract activities from the installation, to an approved off-post permitted hazardous waste disposal facility. The DGR shall assist contractors with profiling their waste upon request.

C.14.7 Protection of Work Site Resources: Contractor shall confine all activities to areas defined by the COR. Prior to the beginning of any work, the Contractor shall identify any land resources to be preserved within the work area. The Contractor shall not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and landforms. The Contractor shall provide effective protection for land and vegetative resources at all times.

C.15 Clean-up of Premises

C.15.1 Upon completion of services provided, the contractor is required to clean up work space and remove and dispose of any parts or debris resulting from the contractor’s performance. This is required after each day of on-site performance.

C.15.2 Spill Responsibility. The Contractor is responsible for reporting any and all spills or leaks during the performance of this contract, which occurs as a result of, or is contributed to by the actions of its agents, employees, of subcontractors to the APG EOC, 911, with a follow-up contact to the ARL Risk Management Office.

C.16 Equipment Availability and Release

C.16.1 The Government shall make available to the Contractor, equipment for maintenance or repairs in accordance with the provisions of the contract. The contractor upon receipt of any Government equipment shall assume the risk of and shall be responsible for any loss or damage thereto. Any equipment described herein to be moved from the activity shall have the prior written approval of the COR.

C.16.2 All PM activities shall be performed at Aberdeen Proving Ground (APG), MD. Repairs performed by the Contractor off-site of APG are not authorized without the prior written approval of the COR.

C.16.3 The Contractor shall not exchange equipment without written consent of the COR. The Contracting Officer shall be notified when this service would affect a change in the serial number.

C.16.4 Before termination or expiration of this contract or removal of equipment covered under this contract, the equipment may be subject to an inspection by the COR or COR’s appointed representative. If the equipment is not in operating condition in accordance OEM specifications/standards upon inspection, the Contractor agrees to return the equipment to operating condition. Upon termination of contract, if equipment is non-operational, the Contractor shall reimburse the Government for any changes including, but not limited to, travel, parts and labor required to place the equipment in operating condition.

C.17 Government Facilities/Equipment/

C17.1 Equipment is located at various ARL Experimental Test Facilities throughout the Aberdeen Proving Ground, (APG) MD 21005.

C.17.2 Equipment List - See attached equipment list A & B below

C.18 Duty Time

C.18.1 The service and repairs to be performed under this contract shall be performed during normal Government working days, Monday through Friday except for Federal Holidays, between the hours of 0700 to 1600 local time. If services are scheduled by the Contractor to be performed on a regular federal holiday (see below), or one designated by Presidential proclamation, rescheduling shall be at the discretion of the COR and requires written approval.

New Year’s Day January 1*

Martin Luther King’s Birthday 3rd Monday in January

Presidents Day 3rd Monday in February

Memorial Day Last Monday in May

Juneteenth

June 19th

Independence Day 4 July*

Labor Day 1st Monday in September

Columbus Day 2nd Monday in October

Veterans Day 11 November*

Thanksgiving Day 4th Thursday in November

Christmas Day 25 December*

*The holiday is observed on the preceding Friday or the following Monday when the holiday occurs on Saturday or Sunday, respectively.

C.19 Warranties

The Contractor agrees that the materials and services furnished under this contract shall be covered by the most favorable commercial warranties the Contractor provides to customers for such materials and services, but if not otherwise specified, not less than a minimum of ninety (90) days warranty. The Contractor agrees that the rights and remedies provided herein are in addition to and do not limit any rights afforded to the Government by any other clause of this contract. New equipment received by the Government under manufacturer’s warranty shall not be repaired without prior written approval of the COR. The COR may request the contractor to inspect the equipment to determine if the provisions of the manufacturer’s warranty are applicable.

C.20 Antiterrorism and OPSEC

Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

C.21 Service Request

The Contractor shall furnish to the COR the information below for authorization of work performed and time expended upon completion of each repair.

The service request shall include, as a minimum:

a. Date/time of service request

b. Name of Government personnel requesting service

c. Identify if a PM or Remedial Service Request

d. Date/time of response (sign-in)

e. Date/time of service completed

f. Equipment identification number, model number, serial number of the malfunctioning equipment

g. Description of equipment malfunction

h. Repair affected

i. Replacement part nomenclature, model number and serial number

j. The cost of each part replaced

k. Number of hour(s) incurred when remedial maintenance services are provided

l. Name of the technical representative performing the PM or remedial services

m. Printed Name, Signature and Date of the Government POC accepting the Completed services

C.22. Documentation

C.22.1 Department of the Army Technical Bulletin Safety Inspection and Testing of Lifting devices, TB 43-0142

C.22.2 All applicable Occupational Safety and Health Administration (OSHA) regulations.

C.22.3 APG Regulation 750-3 Maintenance of Supplies and Equipment Inspection, Testing and Maintenance of Lifting Devices.

C.22.4 The Contractor shall provide monthly inspection and acceptance reports that include status of necessary repairs. The information on any preventative maintenance performed should be contained in the monthly inspection/acceptance/status reports.

C.22.5 The Contractor shall prepare and maintain complete records on all equipment maintained under the contract. These records shall be available for review by the Government during the contract period. A service report shall be prepared by a contractor representative for each maintenance action. This report shall include as a minimum:

(1) Date

(2) Model, serial number and local identification of equipment

(3) Description of malfunction

(4) Status prior to maintenance and status after maintenance

(5) Problems detected, problems corrected, and problems identified but cause not isolated

(6) Non-problem maintenance performed (e.g. cleaning)

(7) Dates and time of notification, arrival of repairmen, and repairs completed

(8) Signature of contractor representative and (9) signature of COR/ACOR

Report shall be provided to the COR after signatures are obtained. These reports shall be Government property at the end of contract period.

C.23 Distribution Statements

All Contracts submission documents shall be distributed in accordance with the following:

Distribution Statement C

Distribution authorized to U.S. Government Agencies and their contractor due to the sensitivity of the materials and information of the equipment being serviced as determined on 08 October 2024. Other reasons for this document shall be referred to the Contracting Officer’s Representative (COR), Mr. John Zajicek (FCDD-RLA-WE).

EQUIPMENT LIST:

A (Terminal Effects Division)

Item: 45054

Mill, Sharpe, 2003

Model: 1440F

Serial#: 23905/OBDN71440P

PM’s/Year 1

POC: Dave Schall

Location: EF14/B1150G Shop

Item: 45051

Air Compressor, Mfg: Ingersoll-Rand, 2002

Model: SSR-HP7.5

Serial# LX4906U02253

PM’s/Year 2

Location EF14/B1150C

Item: 45077

Air Compressor, Mfg: Ingersoll Rand

Model: 2475

Serial#: 1014635

Item: 45078

Temperature Control Chamber, Mfg: Cincinnati Sub Zero

Model: Z32

Serial#: ZP1135876

Item: 45098 DV Systems

Model: JAT-5063-41XL

Serial#:

93191 PM’s/Year: 1

POC: Dave Schall

Location: EF14

Item: 45042

Lathe, Monarch

Model: 60

Serial#:36752

PM’s/Year: one (1) POC: Dave Schall

Location: EF14/B1150A

Item: 45045 Mill, Mfg: Sharpe, 2001 Model: QMV-8 Serial#:800345 PM’s/Year: 2 POC: Dave Schall Location: EF14 Item: 45052 Mill, Lagun, 2003 Model: Millmatic 3 Serial#:45570 PM’s/Year: 1 POC: Dave Schall Location: EF14/B1150A Item: 45039 Helical Screw Compressor, 40 HP, Manufacturer: Quincy, 1985 Model: QST40 Serial#: QST40ANA3T132362 PM’s/Year: 1 POC: Jack Koontz Location: EF9 Item: 45090 Lincoln Eagle Welder w/trailer Model: 10,000+/K2343-3 Serial#:11400607133 PM’s/Year: 1 POC: James Perrella Location: EF7A/1143A Item: 45058 Air Compressor, Mfg: Speed, 50Gal Tank, 2-Cyl, Single Stage, 2003 Model: 3JR76 Serial#: L1-904-0041 PM’s/Year: 2 POC: James Perrella Location: EF7A/1143A Item: 46003 Mill, Manufacturer: Bridgeport, 1992 Model: Series I - Standard Serial#: BR261140 PM’s/Year: 1 POC: Jeff Ball Location: 1116A Item: 46004

MILLING MACHINE, VERTICAL 42 INCH TABLE, MFG: BRISGEPORT, 1981

Model: 12BRJ Serial#: J242000 PM’s/Year: 2 POC: Jeff Ball Location: 1116A Item: 46005

LATHE, 17 INCH, MFG: LEBLOND, 1966

Model: 17ES Serial#:5E321 PM’s/Year: 1 POC: Jeff Ball Location: 1116A Item: 46006 Lathe, 15" x 54", MN REGAL, Manufacturer: LeBlond, 1991 Model: REGAL Serial#:15C-601 PM’s/Year: 1 POC: Jeff Ball Location: 1116A Item: 46015 Compressor, Vertical Tank, Mfg: Campbell Hausfeld, 1997 Model: VT559501 Serial#:030691L-654162 PM’s/Year: 2 POC: Jeff Ball Location: 1116A Item: 45084 Lathe, Mfg: Sharp Industries, 2001 Model: 1440F Serial#:23877 PM’s/Year: 2 POC: John Hogan Location: Bldg. 309 R106 Item: 45091 Ingersol-Rand Compressor Model: Type30 #57T-D Serial#:239613 PM’s/Year: 1 POC: John Hogan Location: Bldg. 309 R110 Item: 45029

LATHE, 10 INCH, FLOOR, MFG: MONARCH, 1954

Model: EE Serial#:38038 PM’s/Year: 1 POC: John Hogan Location: Bldg. 309 R110 Item: 45093 DV Systems Air Compressor Model: C-15TD, 15HP Rotary Serial#:36944 PM’s/Year: 1 POC: Ken Dudeck Location: Bldg.1100E Item: 45094 Kaeser Air Compressor Model: SFC 8T Rotary Serial#:1001 PM’s/Year: 2 POC: Ken Dudeck Location: Bldg.1103A Item: 45095 DV Systems Air Compressor Model: VAV-5062-45XL Twin Piston Serial#:1100F PM’s/Year: 2 POC: Ken Dudeck Location: Bldg.1100F Item: 45044 Mill, Southwest Industries Model: Trak-K3 Serial#:00-0730 PM’s/Year: 2 POC: Ken Dudeck Location: Bldg.1100F Item: 45067 Hydraulic Shear, Adira, 2006 Model: Unknown Serial#: 496611792D PM’s/Year: 1 POC: Ken Dudeck Location: Bldg.1100F Item: 45068 Lathe, Southwestern, 2003 Model: 1745 Serial#:011BX10918 PM’s/Year: 2 POC: Ken Dudeck Location: Bldg.1100F Item: 45086 HTE Shears Model: 375-10A Serial#:879T1697 PM’s/Year: 1 POC: Ken Dudeck Location: Bldg.1100F Item: 45089 Southwestern Lathe Model: 1745 Serial#:00-7529 PM’s/Year: 2 POC: Ken Dudeck Location: Bldg.1100F Item: 45046 Mill, Bridgeport Vertical Head, J-Head Model: SERIES I Serial#:2J1146902 PM’s/Year: 2 POC: Ken Dudeck Location: Bldg.1100F Item: 46027 Bridgeport Mill Model: 248F Serial#:35557 PM’s/Year: 1 POC: Dave Ayers Location: 1188A, R16 Item: 46028

American Lathe Model: 248F Serial#:13408051798 PM’s/Year: 1 POC: Dave Ayers Location: 1188A, R16 Item: 45092 TRAK Lathe Model: TRL 1630SX Serial#:172CH374 PM’s/Year: 1 POC: Dave Ayers Location: 1188A, R16

Item: 46022

Lathe, Floor, 15”, Mfg. Clausing

Model: 8044CS TRIUMPH V/S

Serial#: VT1817

PM’s/Year: 1

POC: Dave Ayers Location: 1188A, R16

Item: 46023

PPI diaphragm compressor

Model: U652

Serial#:2L-058039

PM’s/Year: 1

POC: Dave Ayers Location: 1188A, R16

Item: 46024

PPI diaphragm compressor

Model: U650

Serial#:4X068

PM’s/Year: 1

POC: Dave Ayers Location: 1188A, R16

Item: 46025

Air Compressor, Ingersoll Rand Model: SSR-UP6-30-125 Serial#: PX8248U07008 PM’s/Year: 2 POC: Dave Ayers Location: 1188A, R16 B (Weapons Sciences Division) Item: 44021

LATHE, ENGINE FLOOR 10 INCH, 1951

Model: EE Serial#:33813 PM’s/Year: 1 POC: Eric Miller Location: 740B, TEF Item: 44002 11" Tool Room Lathe, Vectrax

Model: 89975486 Serial#: 109031650 PM’s/Year: 2 POC: Joe Colburn Location: Bldg.390/R164 Item: 44034 Lathe, 16" Engine, Mfg: Standard Modern, 2003 Model: 16 x 40Engine Lathe Serial#:12512 PM’s/Year: 2 POC: Joe Colburn Location: Bldg.390/164 Item: 44039

Milling Machine, Bridgeport/Harding, 2006 Model: Series I

Serial#: HJ317853 PM’s/Year: 2 POC: Joe Colburn Location: Bldg.390/164 Item: 44041 Precision Mathews Lathe Model: PM-1228VF-LB Serial#:60003 PM’s/Year: 2 POC: Joe Colburn Location: Bldg.390/159A Item: 44016

LATHE, ENGINE, 10 INCH, 1966

Model: 187RN Serial#:128137 PM’s/Year: 1 POC: Kenneth Paxton

Location: Bldg. 328/Aero

Item: 44046 Temptronic Temperature Chamber Model: TP04300B-3x32-4 Serial#:4080496 PM’s/Year: 1 POC: Douglas Petrick Location: Bldg. 453/R16 Item: 44047 Lathe, Weiler Model: PRAKTIKANT VC Plus Serial#:60106/OA 02 PM’s/Year: 2 POC: Douglas Petrick Location: Bldg. 453 Item: 44029

Milling Machine, MFG: Bridgeport, 1998 Model: EX-TRAK-DX-II

Serial#: EZ2CH740 PM’s/Year: 2 POC: Douglas Petrick Location: Bldg. 453 Item: 44031

Mill, Mfg: Haas, 2005 Model: TM-1 Serial#:43213 PM’s/Year: 2 POC: Douglas Petrick Location: Bldg. 453

Item: 44036 Lathe, CNC Turning, Cabinet Type, Mfg: Haas Model: TL-1 Serial#:3074085

PM’s/Year: 2 POC: Douglas Petrick Location: Bldg. 453 Item: 44040

2016, INGERSOL-RAND AIR COMPRESSOR

Model: CBV419797 Serial#: UP6-15CTAS-150W/D PM’s/Year: 2 POC: Douglas Petrick Location: Bldg. 453 Item: 44042 Ingersoll-Rand compressor model 2475 Model: UP6-15CTAS-150W/D Serial#: NAR10110858 PM’s/Year: 2 POC: Douglas Petrick Location: Bldg. 517 Contracting Officer: