A07_-_Evaluation_Criteria_(LPTA).docx

DOCX document 21 KB Posted

Attached to
Kohler Generators Federal contract opportunity
Solicitation number
W911QX-18-T-0070
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

Evaluation Criteria (LPTA)

View the file

Other files for this federal contract opportunity

Other files attached to Kohler Generators, newest first.
File Type Posted
C01_-_Synopsis_of_Award.docx DOCX document
A01_-_Salient_Characteristics.docx DOCX document
A03_-_Redacted_Brand_Name_Simplified_Acquisition_Sole_Source.pdf PDF
A02_-_Combination_Synopsis-Solicitation_for_Commercial_Purchases.docx DOCX document
A02_-_Provisions_and_Clauses_Full-Text_Attachment_(for_Combo_Synopsis-Solicitation).doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Evaluation Criteria (Lowest Price Technically Acceptable)

The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforms to the solicitation and has the lowest evaluated price of all offers meeting or exceeding the acceptability standards for non-cost factors.

The technical acceptability element of the evaluation will be a determination as to whether the proposed product meets the performance characteristics and specifications in the solicitation. The Technical element of the evaluation shall be based solely on information furnished by the vendor. The Government is not responsible for locating or securing any information, which is not identified in the proposal. To ensure sufficient information is available, vendors must furnish as part of their proposal all descriptive material (such as cuts, illustrations, drawings, or other information) necessary for the Government to determine whether the product meets the performance characteristics and specifications of the requirement. If the offeror proposes to modify a product so as to conform to the requirement of this solicitation, the offeror shall include a clear description of such proposed modifications and clearly mark any descriptive materials to show modifications.

The Contracting Officer determines that past performance need not be evaluated because the supplies being purchased are of a low complexity that past performance information would not make a substantial difference.

Price will be evaluated based on the total proposed price, including options, (if any).

Template last updated 8/22/2017

File details come from the government source that posted it.