Performance Work Statement (PWS) Shop Machine Maintenance 11 June 2018

C.1 General

The Contractor shall furnish all labor, tools, supplies, repair parts, oil, grease, filters, etc., to perform effective preventive maintenance (PM), and service calls for repair service when required, for the equipment described in lists A and B below. The equipment is located on various Army Research Laboratory (ARL) Experimental Facilities located throughout the Aberdeen Proving Ground (APG), MD 21005.

C.2 Scope

C.2.1 The Contractor shall perform all unscheduled repairs and scheduled Preventive Maintenance (PM) services: annual, semi-annual, to include lift tests and OSHA inspections for the machine tools in accordance with all applicable documents and manufacturer’s procedures and recommendations to include testing of equipment and repair or replacement of defective parts and components. The Contractor shall be required to comply with all applicable environmental protection regulations. (See paragraph C.14)

C.2.2 The Contractor shall provide the COR with a designated point(s) of contact and make arrangements to enable its maintenance representative to receive such notification or provide an answering service or other continuous telephone coverage to permit the COR to make such contact. The Contractor shall also provide secondary points of contact in the event that the primary points of contact are not available.

C.2.3 The Contractor shall make available to the COR the status of any or all repair work in progress upon request. All repairs shall require estimates to be provided to COR for approval prior to commencing any work or ordering of parts. Approval in the form of electronic mail (e-mail) is acceptable. Approval by telephone is not acceptable.

C.3 Acronyms/Definitions

CLIN - Contract Line Item Number

Contract Line Item Number (CLIN) - The numerical number assigned to a controlled account.

Contracting Officer Representative (COR) - The COR will act as the daily Government POC for the Contractor to obtain authorizations for repairs, moving of equipment, and so forth. No overtime to be billed, flat rate labor cost only. The COR is not authorized to modify or terminate the contract nor obligate the Government.

Preventive Maintenance (PM) - The routine checking of hardware that is performed by a field engineer/mechanic/technician/electrician on a specific scheduled basis. PMs include visual and operational inspection of all operational components and any repair of adjustment necessary to ensure proper operation in accordance with Original Equipment Manufacturer specifications. This includes, but is not limited to: lubrication of forklifts and cranes, brake repair, check and fill if necessary, proper levels of brake fluid, engine oil: lubricants and grease, check hydraulic lines, fittings and fluid levels: check radiator, cap, core, gasket and hoses for leakage: change anti-freeze on annual basis, ensure equipment is kept in safe operation and meets all OSHA guidelines. Preventative maintenance schedule should be disclosed by the Contractor and agreed to by the Government.

On-Site - Location of equipment’s utilization, i.e. experimental facilities.

Repair Service Call- A repair service call that is required due to a malfunction of the equipment.

Repair-To accomplish the operations that are authorized to restore a vehicle to serviceable condition.

C.4 Authorization/Acceptance/Correction of Work

C.4.1 Prior to performance of any repair work, the Contractor shall provide to the COR for approval an estimated cost to complete repair. Cost estimates shall include estimated hours by category of labor, repair parts and any other anticipated costs including an up to date published price list for all the parts required as well as a published price list of labor required.

C.4.2 The cost estimate shall be provided to the COR within 24 hours (weekends and Federal holidays excluded), from notification by the COR that repair work is required. Actual repair work shall begin once the parts are received from the supplier and work is to be completed within five (5) days. The COR will have authority to approve all orders below the $10,000.00 micro-purchase threshold subject to the limitation of funding available on each respective CLIN. Orders above the micro-purchase threshold require approval from the KO and any quote shall be accompanied by the contractor published price to include loaded labor rates, materials, and equipment for completion of the effort

C.4.3 Upon COR approval of the estimated repair cost, the Contractor shall accomplish repairs within five (5) days (weekends and Federal holidays excluded) when it is necessary to order parts. If repairs cannot be accomplished within this period of time, Contractor shall supply rental units at fair market rates or otherwise identify and present a solution to mitigate the Government’s downtime while equipment is under repair.

C.4.4 Upon COR approval of the estimated repair cost, the Contractor shall accomplish repairs within two (2) days (weekend and Federal holidays excluded), when it is not necessary to order parts.

C.4.5 If contact cannot be made by COR within 30 minutes using office or cellular phones after initial attempt and a message is left, the Contractor shall contact the COR by return call within two (2)-hours or by close of business (COB).

C.4.6 Should the Contractor’s personnel be unable to determine the cause of equipment failure within 48 hours (weekends and Federal holidays excluded), and cannot make equipment operational, the Contractor shall be required to obtain additional technician support, either in the form of “specialists,” Contractor personnel or authorized manufacturer personnel for resolution of the problem. Equipment shall be made operable to the original equipment manufacturer (OEM) manual.

C.4.7 If performance is found to be unsatisfactory and not in accordance with the requirements of this contract, the Contractor shall begin correcting unsatisfactory work as soon as possible but not later than the first three (3) hours of the following regularly scheduled Government workday. Rework or corrective work shall be performed at the expense of the Contractor.

C.4.8 Downtime for each item failure shall be measured by those intervals between the time the Government makes an attempt to contact the Contractor’s representative at the prearranged contact point and the time that the item is returned to good operating condition. Travel time shall be included in the calculation of downtime.

C.5 Scheduled Preventive Maintenance (PM)

C.5.1 The Contractor shall perform all PM services on-site to minimize equipment downtime. Preventive Maintenance is the routine checking of hardware that is performed by a field engineer/mechanic/technician/electrician on a specific scheduled basis as proposed by the Contractor. PMs include but are not limited to visual and operational inspections, lubrication of axles and fittings, repairs, changes (fuel filters, air filters, oil filters), checking of hydraulic lines, adjustments and replacements that are necessary to maintain operational equipment. The Contractor shall be responsible for the correct mixture of anti-freeze to prevent freezing during cold weather. All PMs to include those items that have been received under warranty must be performed in accordance with the original equipment manufacturers specifications and appropriate manufacturers manuals. The costs of the following items shall be included in the cost for preventive maintenance: oil, grease/lubricants, fluids, anti-freeze, oil filters, air filters, fuel filters and fittings. The cost of repair parts will be reimbursed on a monthly basis in accordance with the parts CLINs.

C.6 Repair Service Calls

C.6.1 A repair service call that is required due a malfunction of the equipment. The hourly rate for repair services shall begin upon the arrival at the work site. Repair service calls include but are not limited to repairs on an as required basis to replace or overhaul un-serviceable components, assemblies, sub-assemblies, and electrical components to keep the equipment fully operational. Repairs shall have a maximum forty-eight (48) hour turnaround time after notification by the CO excluding federal holidays and weekends. If parts/supplies are not readily available to fulfill the forty-eight (48) hour repair criteria, the contractor shall be required to provide to the COR the estimated delivery date of the parts/supplies or tires along with a completion schedule of the repair work.

C.7. Parts and Materials

C.7.1 Parts and Materials used by the contractor in performance of this contract shall be new and conform to the original equipment manufacturer’s or re-manufacturer’s specifications unless approved by the COR. Rebuilt assemblies shall only be used with prior approval of the COR when it is a standard industry practice and the rebuilt assembly or subassembly carries the same manufacturer’s or re-manufacturer’s warranty as a new assembly or subassembly. Any part removed is Government property and shall be returned upon request of the COR unless the replacement part is predicated upon an exchange basis with the part being replaced or unless given to the Contractor to dispose of said part. The Contractor shall provide all repair parts and supplies necessary for preventive maintenance and repair of requirement and will be reimbursed by the Government for actual cost on a monthly basis.

C.7.2 Parts or components damaged by the Contractor shall be repaired or replaced at the expense of the Contractor to the satisfaction of the COR.

C.8 Major Component Repairs

C8.1 Major component repairs such as engine overhaul, power train repair, etc. shall require the Contractor to perform a technical inspection and provide a written report with the name of the major component, cause of component breakdown, cost to repair and estimated time for repair prior to proceeding with the repair. The Contractor shall submit a cost estimate as soon as possible but not later than five (5) working days after notification from the COR. The Contractor must receive written approval from the Government POC prior to proceeding with repair(s).

C.9 Uneconomical Repairs

C.9.1 If determined during a repair service call that it is not cost effective to repair a particular piece of equipment, the COR may request the contractor to perform an inspection to determine the equipment’s overall condition and service ability. These inspections include effort such as: a thorough inspection of the equipment such as engine, transmission, other major components, controls, mast, cables, chains, hoses, electrical, air, and boom hydraulic systems to determined disposition of the equipment. The Contractor shall include an estimated cost for labor and materials required to return the equipment to an operating condition. The Contractor shall complete this cost estimate within forty-eight (48) hours after the service call date.

C.10 Cost and Funding limitations

C.10.1 An amount of funding for the payment of parts or services that is not to exceed the ceiling price (total amount) will be indicated in the contract. A Not to Exceed (NTE) value may be adjusted upward or downward depending on the number of repair parts purchased. The Contractor shall not exceed this price unless notified by the Contracting Officer through a modification to the contract that the ceiling price has been increased and has specified in the notice a revised ceiling price for performance under this contract/CLIN. The Government shall not be obligated to pay the contractor any amount in excess of the price in the Schedule, and the contractor shall not be obligated to continue performance if to do so would exceed the ceiling price or funding set forth in the contract unless and until the Contracting Officer has notified the Contractor in writing that the ceiling price and funding have been increased.

C.11 PM and repair schedule

C.11.1. The Contractor shall contact the COR and schedule the inspections a minimum of one (1) week in advance in order to allow the COR to work around range operations. Repair service calls shall be performed as required but within twenty-four (24) hours of telephonic or e-mail notification by the COR for repair service calls.

C.11.2 Unscheduled Repair ~ Only work authorized by the technical POC may be performed under these line items, and work may only be authorized if there is sufficient funding on the appropriate line item. The Contractor shall notify the technical POC of a requirement for work under these line items, or the Government may initiate a request. The Contractor shall provide the technical POC with a written estimate of the effort, and shall certify that all labor and materials are being proposed at most favored customer prices. Line item is for unscheduled repair of items included on (the) equipment list, which may be authorized by the COR. The Government reserves the right to obligate additional funds on these line items during performance as necessary.

C.12 Adjustments to Equipment Inventory requiring PM and repairs

C.12.1 The COR shall have the right to make increases or decreases to the list of equipment as new and/or replacement equipment is received or is deleted from the schedule and the Contractor may submit requests for equitable adjustments to the contract as appropriate. Unless and until the contract is modified to incorporate costs associated with any PM to be performed on the revised list, the Contractor shall only provide PM for the equipment covered by the contract price. New equipment that is added to the list shall be repaired and maintained in accordance with the applicable warranty.

.13 Employee Qualifications

C.13.1 All effort provided under this contract shall be conducted by factory trained personnel with knowledge in the areas of preventative maintenance and service call repairs of commercial industrial equipment as specified on the attached list. All personnel shall have not less than three (3) years of experience or have current certification of appropriate training. Any maintenance performed by apprentices shall be under the direct supervision of the journeyman contract personnel.

C.13.2 A background investigation of each employee requiring installation facility access shall be required consisting of a National Agency Check (NAC). This will allow for employees to have unescorted access to restricted areas to maintenance and repair equipment. The requirements under this PWS are not deemed classified and employees shall not be exposed to classified material. A security clearance is not required to have access to the work areas under the contract. Escorts will not be provided beyond the first forty-five (45) days of contract performance: therefore Contractor personnel must be capable of qualifying for access badges at time of contract award.

C.14 Environmental Protection

C.14.1 In order to provide for environmental abatement and control and to prevent environmental pollution arising from the services of the Contractor in the performance of this contract, the Contractor shall comply with applicable federal, state and local laws and regulations concerning environmental pollution abatement and control currently in effect.

C.15 Clean-up of Premises

C.15.1 Upon completion of services provided, the contractor is required to clean up work space and remove and dispose of any parts or debris resulting from the contractor’s performance. This is required after each day of on-site performance.

C.15.2 Spill Responsibility. The Contractor is responsible for reporting any and all spills or leaks during the performance of this contract, which occurs as a result of, or is contributed to by the actions of its agents, employees, of subcontractors to the APG EOC, 911, with a follow-up contact to the ARL Risk Management Office.

C.16 Equipment Availability and Release

C.16.1 The Government shall make available to the Contractor, equipment for maintenance or repairs in accordance with the provisions of the contract. The contractor upon receipt of any Government equipment shall assume the risk of and shall be responsible for any loss or damage thereto. Any equipment described herein to be moved from the activity shall have the prior written approval of the COR.

C.16.2 All preventive maintenance activities shall be performed at Aberdeen Proving Ground (APG), MD. Repairs performed by the Contractor off-site of APG are not authorized without the prior written approval of the COR.

C.16.3 The Contractor shall not exchange equipment without written consent of the COR. The Contracting Officer shall be notified when this service would affect a change in the serial number.

C.16.4 Before termination or expiration of this contract or removal of equipment contract, the equipment may be subject to an inspection by the COR or COR’s appointed representative. If the equipment is not in operating condition in accordance OEM specifications/standards upon inspection, the Contractor agrees to return the equipment to operating condition. Upon termination of contract, if equipment is non-operational, the Contractor shall reimburse the Government for any changes including, but not limited to, travel, parts and labor required to place the equipment in operating condition.

C.17 Government Furnished Facilities/Equipment/Services

C17.1 Equipment is located at various ARL Experimental Test Facilities throughout the Aberdeen Proving Ground, (APG) MD 21005.

C.17.2 Equipment List - See attached equipment list A & B below

C.18 Duty Time

C.18.1 The service and repairs to be performed under this contract shall be performed during normal Government working days, Monday through Friday except for Federal Holidays, between the hours of 0700 to 1600 local time. If services are scheduled by the Contractor to be performed on a regular federal holiday (see below), or one designated by Presidential proclamation, rescheduling shall be at the discretion of the COR and requires written approval.

New Years Day January 1* Martin Luther King’s Birthday 3rd Monday in January Presidents Day 3rd Monday in February Memorial Day Last Monday in May Independence Day 4 July* Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veterans Day 11 November* Thanksgiving Day 4th Thursday in November Christmas Day 25 December*

*The holiday is observed on the preceding Friday or the following Monday when the holiday occurs on Saturday or Sunday, respectively.

C.19 Warranties

The Contractor agrees that the materials and services furnished under this contract shall be covered by the most favorable commercial warranties the Contractor provides to customers for such materials and services, but if not otherwise specified, not less than a minimum of ninety (90) days warranty. The Contractor agrees that the rights and remedies provided herein are in addition to and do not limit any rights afforded to the Government by any other clause of this contract. New equipment received by the Government under manufacturer’s warranty shall not be repaired without prior written approval of the COR. The COR may request the contractor to inspect the equipment to determine if the provisions of the manufacturer’s warranty are applicable.

C.20 Antiterrorism and OPSEC

Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

C.21 Service Request

The Contractor shall furnish to the COR the information below for authorization of work performed and time expended upon completion of each repair.

The service request shall include, as a minimum:

a. Date/time of service request

b. Name of Government personnel requesting service

c. Identify if a PM or Remedial Service Request

d. Date/time of response (sign-in)

e. Date/time of service completed

f. Equipment identification number, model number, serial number of the malfunctioning equipment

g. Description of equipment malfunction

h. Repair affected

i. Replacement part nomenclature, model number and serial number

j. The cost of each part replaced

k. Number of hour(s) incurred when remedial maintenance services are provided

l. Name of the technical representative performing the PM or remedial services

m. Printed Name, Signature and Date of the Government POC accepting the Completed services

C.22. Documentation

C.22.1 Department of the Army Technical Bulletin Safety Inspection and Testing of Lifting devices, TB 43-0142

C.22.2 All applicable Occupational Safety and Health Administration (OSHA) regulations.

C.22.3 APG Regulation 750-3 Maintenance of Supplies and Equipment Inspection, Testing and Maintenance of Lifting Devices.

C.22.4 The Contractor shall provide monthly inspection and acceptance reports that include status of necessary repairs. The information on any preventative maintenance performed should be contained in the monthly inspection/acceptance/status reports.

C.22.5 The Contractor shall prepare and maintain complete records on all equipment maintained under the contract. These records shall be available for review by the Government during the contract period. A service report shall be prepared by a contractor representative for each maintenance action. This report shall include as a minimum:

(1) date

(2) model, serial number and local identification of equipment

(3) description of malfunction

(4) status prior to maintenance and status after maintenance

(5) problems detected, problems corrected, and problems identified but cause not isolated

(6) non-problem maintenance performed (e.g. cleaning)

(7) dates and time of notification, arrival of repairmen, and repairs completed

(8) signature of contractor representative and (9) signature of COR/ACOR

Report shall be provided to the COR after signatures are obtained. These reports shall be Government property at the end of contract period.

EQUIPMENT LIST:

Equipment List A (Protection Division)

Building R7A Item # 45091 Lincoln Eagle Welder, Model: 10,000+/K2343-3 S/N: 011400607133 ARL Barcode: 7343K PM's Per year: 2

Item # 45015 Lathe, Bench Type, 8 inch, MFG: Emco, 1984

MN: EMCOCOMPS

SN: 8110018

BC: 1057J

PMs/YR - 2

Item # 45063 Drill Press, Mfg: Wilton, 2001

VSG-20,

MN: 2015

SN: 30864

BC: 8477J

PMs/YR -2

Item # 45064 Band Saw, Horizontal, Mfg: Grizzly, 1992

MN: GG-1758

SN: 272178

BC: 1102J

PMs/YR -2

Item# - 45073 Unisaw 50 inch/Table Saw, SN: 2368436869

MN:

BC: 1203J

Item# - 45074 Compressor

MN: VT6196004J

SN: 10494VT6196004J,

BC: 1220J

Building # 1143 Item # 45056 DoAll Saw, 2003

MN: 2013V,

SN: 500-032920

BC: 4521J

PMs/YR

Item # 45058 Air Compressor, Mfg: Speed, 50Gal Tank, 2-Cyl, Single Stage, 2003

MN: 3JR76

SN: L1-904-0041

BC: 4799J

PM's/YR -2

Building R7 Item # 45026 Saw, Circular Table, Mfg: Delta, 1986

MN: 34-763F,

SN: 86135879

BC: 66683,

PMs/YR

Item # 45027 Band Saw, 20 INCH, Mfg: Delta, 1987

MN: 28-662

SN: 87E26201

BC: 3930F

PMs/YR

Building # R9

[REDACTED]

Item # 45017

SAW, TABLE, MFG: DELTA, 1986

MN: 34-763F

SN: 86C05703

BC: 2338H,

PMs/YR -2

Item # 45018

SAW, BAND, MFG: DELTA, 1986

MN: 28-653,

SN: 86E12877,

BC: 4063F

PMs/YR -2

Item # 45019

SAW, BAND HORIZONTAL, MFG: GREENLEE, 1986

MN: 1357

SN: VW3500263

BC: 4623F

PMs/YR -2

Building # 1179 Item # 45039 Helical Screw Compressor, 40 HP, Manufacturer: Quincy, 1985

MN: QST40,

SN: QST40ANA3T132362,

BC:

PMs/YR

Building # R12A Item # 45004

SAW, CIRCULAR TABLE, MFG: DELTA, 1987

MN: 34-410

SN: 87A01316

BC: 3801H

PMs/YR -2

Item # 45005

BAND SAW, VERTICAL, MFG: DELTA, 1987

MN: 20,

SN: 20373,

BC: 23275

PMs/YR -2

Item # 45060 Drill Press, Mfg - RF, 1999

MN: 00458315

SN: 936124

BC # 4326H

PM/yr -2

Building # R14 Various locations Item # 45041 Band Saw, Horizontal, Do-All

MN: C-305A

SN: 534-00296

BC: 5046H

PMs/YR

Item # 45054 Mill, Sharpe, 2003

MN: 1440F

SN: 23905/OBDN71440P,

BC: NONE,

PMs/YR -4 Loc: B1150G shop

Item # 45051 Air Compressor, Mfg: Ingersol-Rand, 2002

MN: SSR-HP7.5

SN: LX4906U02253,

BC: 1757J

PMs/YR -4 Loc: B1150C

Item # 45061 Drill Press, Mfg: Wilton VSG-20, 2003

MN: 2015

SN: 3114

BC: 8058J

PMs/YR-4 Loc: B1150K

Item# 45062 DoAll Band Saw, 2003

MN: 3613-1

SN: 440-01865

PMs/YR-4 Loc: B1150G shop

Item# 45075 Saw, Circular, Table, Mfg: Delta

MN: 36-L300

SN: 09E-10497-2009-20-PC

PMs/YR-4 Loc: B1150G shop

Item# 45076 Saw, Radial Arm, Mfg: Original Saw Company MN: 3536-01-Type 4

SN: 20100802391

PMs/YR-4 Loc: B1150G shop

Item# 45077 Air Compressor, Mfg: Ingersoll Rand

MN: 2475

SN: 1014635

PMs/YR-4 Loc: B1150G shop

Item# 45078 Temperature Control Chamber, Mfg: Cincinnati Sub Zero

MN: Z32

SN: ZP1135876

BC: 4639K

PMs/YR-4 Loc: B1150C

Item# 45079 Band Saw, Vertical, Mfg: Rigid

MN: BS14002

SN: AM045234919

PMs/YR-4 Loc: 14B shop

Item# 45080 Saw, Circular, Table, Mfg: Rigid

MN: TS3650

SN: PO63014441

PMs/YR-4 Loc: 14B shop

Item# 45081 Band Saw, Horizontal, Mfg: MSC

MN: 09518895

SN: 9728296

PMs/YR-4 Loc: B1150A

Building R-14 # 1150 Item # 45003 Hydraulic Press, Dake, 150 Ton, 1979

MN: 45-157

SN: 177200

BC: 75763

PMs/YR -1 Loc: Bld1150A

Item # 45030 Air Compressor, MFG: Ingersol-Rand, 1990

MN: U10H-5

SN: KA989U90F

BC: 3535F

PMs/YR -4 Loc: Bld1150A

Item # 45031 Saw, Band, Mfg. Do-All, 1983

MN: 2613-1H3

SN: 362-90213

BC: 16964

PMs/YR -4 Loc: Bld1150A

Item # 45032 Saw, Circular, Table, 12Inch, Mfg: SCMI, 1985

MN: S115F

SN: AB2650

BC: 66486

PMs/YR -4 Loc: Bld1150A

Item # 45042 Lathe, Monarch, MN: 60, SN: 36752

BC: 0075C

PMs/YR -4 Loc: Bld1150A

Item # 45045 Mill, Mfg: Sharpe, 2001

MN: QMV-8,

SN: 00800345,

BC: 8299H

PMs/YR -4

Item # 45052 Mill, Lagun, 2003 MN: Millmatic 3

SN: 45570

BC: 4262J

PMs/YR -4 Loc: Bld1150A

Item # 45053 SAND BLASTER, Clemco, MN: 900R6DC

SN: 52087-5/03

BC:

PMs/YR -4 Loc: Bld1150A

Item # 45055 Surface Grinder, Mfg: Chevalier, 2003

MN: FSG-3A1224

SN: P3932001

BC: 4399J

PMs/Yr -4 Loc: Bld1150A

Item # 45082 Drill Press, Mfg: Wilton 25”, 2001

MN: 24513

SN: 350442

BC: 0308J

PMs/YR -4 Loc: Bld1150A

Building # 309 Rm106 Item # 45083 DoAll Band Saw, 2010

MN: 2013V

SN: 57110731

BC: 1205K

PMs/YR -4

Item # 45084 Lathe, Mfg: Sharp Industries, 2001

MN: 1440F

SN: 23877

BC: 8106H

PMs/YR -4

Item # 45085 Drill Press, Mfg: Delta, 1987

MN: 20

SN: 87C70001

BC: 6727K

PMs/YR -4

Building # 309 Room #110 Item # 45091 Ingersol-Rand Compressor Model: Type30 #57T-D S/N: 239613 ARL Barcode: N/A PM's Per year: 1

Item # 45028

BAND SAW, MASTER TAPE LOADING, 12 INCH, MFG: DOALL, 1951

MN: ML

SN: 458786

BC: 68481

PMs/YR -6

Item # 45029

LATHE, 10 INCH, FLOOR, MFG: MONARCH, 1954

MN: EE

SN: 38038,

BC: 68449

PMs/YR -6

Building # 1100E /1100F Item #44043 Flow Water Jet S/N: 434994

MN: 016670-3

PM’s/YR-4

Item # 45008

LAB PRESS HYDRAULIC, 30 TON, 1998

SN: 268-16

MN: 2698

BC: 23090

PMs/YR -2

Item # 45009

BAND SAW, VERTICAL, MFG: JET, 1987

MN: VBS-900

SN: 901537

BC: 4515F

PMs/YR -2

Item # 45011

DRILL PRESS, GEAR HEAD, MFG: JET, 1987

MN: GHD-125

SN: 870021

BC: 11604

PMs/YR -2

Item # 45043 Band Saw, Horizontal, Do-All, MN: C-305M

SN: 516-96109

BC: 1587M

PMs/YR

Item # 45044 Mill, Southwest Industries MN: Trak-K3, SN: 00-0730, BC: 4286H

PMs/YR

Item # 45047 Do-All Band Saw, MN: - 2612-1H3, SN: - 362-83169, BC: 255530

PMs/YR -2

Item # 45048 Rigid Threading Machine, 2002

MN: 1224

SN - EB22453G02

BC: 9892H

PMs/YR -2

Item # 45049 Jet Drill Press, 2002

MN: JRD-750

SN: 02017514

BC: 1517J

Item # 45050 Chevalier Precision Hydraulic Machinery Grinder, 2002

MN: FSG3A818,

SN: M3911002,

BC: 9850H

PMs/YR -4

Item # 45065 Mill, Lagun, 2005

MN: KMC717

SN: 43150,

BC:

PMs/YR -2

Item # 45066 Machine, Abrasive, Cut-off, Mfg. Scotchman, 2002

MN: CFO

SN: 1546MF0102,

BC:

PMs/YR -4

Item # 45067 Hydraulic Shear, Adira, 2006

MN:

SN: 496611792D

BC: 76491,

PMs/YR -2

Item # 45068 Lathe, Southwestern, 2003

MN: 1745

SN: 011BX10918

BC:

PMs/YR -4

Item # 45070 Punch & Notcher, Geka, 2003

MN: HYD110

SN: 19121

BC:

PMs/YR -4

Item # 45072 Belt Sander, Mfg: Rand Bright, MN: S-36-75, SN: 187-4192

BC:

PMs/YR – 4

Item# - 45086 HTE Shears

MN: 375-10A

SN: 879T1697

BC: 6725K

PMs/Yr

Item# - 45087 Wilton Drill Press

MN: 1280R

SN: 0810190

BC: 0476K

PMs/Yr

Item #45089 Southwestern Lathe

MN: 1745

SN: 00-7529

BC0999D

PMs/YR - 2

Building # 1122 Item # 45020 Bridgeport Milling Machine, MN: 248F

SN: 35557

BC: 75900

PMs/YR

Item # 45040 DoAll Saw, 1995

MN: 2013V

SN: 500-961308,

BC: 8158C

PMs/YR

Item # 45046 Mill, Bridgeport Vertical Head, J-Head

MN: SERIES I,

SN: 2J1146902

BC: 8529H

PMs/YR

Item# - 45088 American Turn Master Lathe

SN: 1308051798

BC: 0126k PMs/YR- 08

MN: AT-1340G

Building 4600 Room 132 Item # 46012 Lathe, Mill, Drill Press Combo, Maxi-Mat Super 11, Mfg: Emco Manufacturing MN: Super 11, SN: 8607010

BC: 2558F

BLDG: 390 / Room 138 PMs/YR -4

Building 4600 Room L1193 Item # 46019 Vacuum Pump, Kinney

MN: 400,

SN: 296466 1302

BC:

PMs/YR -4

Item # 46020 Leybold Vacuum US vacuum pump

MN: D8B

SN: 912551-30000790215

BC: 5463J

PMs/YR -4

Item # 46021 Leybold Vacuum US vacuum pump

MN: D16B

SN: 170221-30000058650

BC: 5490J

PMs/YR -4

Item # 46022 Lathe, Floor, 15”, Mfg: Clausing

MN: 8044CS TRIUMPH V/S

SN: VT1817

BC: 6967J

BLDG: 4600 / Room L1193

Building # 1188A

Item # 46023 PPI diaphragm compressor

MN: U652

SN: 2L-058039

BC:

PMs/YR -4

Item # 46024 PPI diaphragm compressor

MN: U650

SN: 4X068

BC:

PMs/YR -4

Item # 46025 Air Compressor, Ingersoll Rand

MN: SSR-UP6-30-125

SN: PX8248U07008

BC: 6836J

PMs/YR -4

Item # 46026 Band saw

MN: 09518895

SN: 9528009

Building # 1185 Item # 45001

DRILL PRESS, FLOOR MODEL, MFG: JET, 1985

MN: GHD-125

SN: 850512

BC: 24492, BLDG: 1185

PM/YR -1

Item # 45002

BAND SAW, VERTICAL, MFG: JET, 1986

MN: VBS-900

SN: 901488

BC: 24588

PM/YR -1

Item # 45013

LATHE, MONARCH EE, 1954

MN:

SN: 38043

BC: 23563

PMs/YR -2

Building # 1193 Item # 45007

LATHE, 10 INCH, BENCH, MFG: MONARCH, 1953

MN: EE

SN: 38029

Building # 1116A Item # 46002

BAND SAW, VERTICAL, MFG: DOALL, 1952

MN: MD

SN: 5216645

BC: 38422

PMs/YR -4

Item # 46003 Mill, Manufacturer: Bridgeport, 1992 MN: Series I - Standard, SN: BR261140

BC: 49299

PMs/YR

Item # 46004

MILLING MACHINE, VERTICAL 42 INCH TABLE, MFG: BRISGEPORT, 1981

MN: 12BRJ

SN: J242000

BC: 38374

PMs/YR -4

Item # 46005

LATHE, 17 INCH, MFG: LEBLOND, 1966

MN: 17ES

SN: 5E321

BC: 3836

PMs/YR -4

Item # 46006 Lathe, 15" x 54", MN REGAL, Manufacturer: LeBlond, 1991

MN: REGAL

SN: 15C-601

BC: 71674

PMs/YR -4

Item # 46007

BAND SAW, CUT-OFF MACHINE, MFG: WELLS, 1985

MN: 8W

SN: 33757

BC: 38317

PMs/YR -4

Item # 46014 Panel Saw, 7", Mfg: SSC, 1998

MN:

SN: 773A497420038,

BC:

PMs/YR -4

Item # 46015 Compressor, Vertical Tank, Mfg: Campbell Hausfeld, 1997

MN: VT559501

SN: 030691L-654162

BC: 72148

PMs/YR -4

Item # 46016 Radial Arm Saw, Type 1, The Original, Mfg: Lancaster Machine Co, 1990

MN 3536

SN 89390001

BC: NONE

PMs/YR -4

Item # 46017 Jointer/Planer, DJ20, Mfg: Delta, 1990

MN 37350

SN 5744

BC:

PMs/YR -4

Item # 46018 Bandsaw, Mfg: Do-All, 2009

MN: 2013V3,

SN: 572-09311

BC: 0658K,

PMs/YR -4

Equipment List B (Lethality Division) Building # 390 Item # 44001 Drilling Machine, Mfg: High Speed Hammer

MN: R53,

SN: 129077,

BC: 43566,

Bldg. /Room: 390/155 PMs/YR -1

Item # 44002 LATHE, BENCH 10 INCH, MFG: Sheldon

MN: EXL-568,

SN: TXE-16378T

BC: 43580

Bldg./Room:390/155, PMs/YR -2

Item # 44003 Lathe, Mfg: Sears, 1970

MN 99K2140N

SN: 53748

BC: 43581

Bldg./Room:390/159, PMs/YR -4

Item # 44004 Belt Sander, MFG: Sears, MN: L1322541

SN: A3148

BC: 43646

Bldg./Room:390/155 PMs/YR -2

Item # 44005 SAW, FILING BAND, MFG: DoAll, 1958 Model: ML

SN: 5216535

BC: 43648

Bldg. /Room: 390/155

Item # 44006 Drilling Machine, MFG: Atlas Press

MN: 1800

SN: 000721

BC: 43568

Bldg. /Room: 390/155 PMs/YR -4

Item # 44007 Drilling Machine, Mfg: High Speed Hammer

MN: R53

SN: 1D29327

BC: 43567

Bldg. /Room: 390/155, PMs/YR -4

Bldg. 328/Aero Item # 44016

LATHE, ENGINE, 10 INCH, 1966

MN: 187RN

SN: 128137

BC: 65731,

Bldg.: 328/Aero

Bldg. 740B / 740F Item # 44017 BAND SAW, 26 INCH VERTICAL, MFG: Do All, 1951

MN: V26

SN: 26512341

BC: 40454

Bldg.: 740B PMs/YR -4

Item # 44019

DRILL PRESS, BENCH. 3/8 INCH, 1947

MN: 1LMS

SN: 3017

BC: 40455,

Bldg.: 740B PMs/YR -4

Item # 44021

LATHE, ENGINE FLOOR 10 INCH, 1951

MN: EE

SN: 33813

BC: 2327H

Bldg.: 740B PMs/YR -4

Item # 44032 Cutoff Saw, Mfg: Grizzly #7, 2005

MN: G0561

SN: 571880

BC:

Bldg. /Room: 740F

Bldg. 453-16 Item # 44022 Lathe, 10 inch, MFG: Monarch, 1969

MN: EE,

SN: 38039

BC: 3553

Bldg.: 453-16 PMs/YR -2

Item # 44028 Drill Press, MFG: Rockwell, 1978

MN:

SN: 135181715-000,

BC: 39425

Bldg. /Room: 453-16 PMs/YR -2

Item # 44029 Milling Machine, MFG: Bridgeport, 1998 Model EX-TRAK-DX-II

SN: EZ2CH740

BC: 6569H

Bldg. /Room: 453-16 PMs/YR -2

Item # 44030 Drill Press, Mfg: Delta, 2005

MN: 17-925

SN: 011572 W3090

BC: 8311J

Bldg. /Room: 453-16

Item # 44031 Mill, Mfg: Haas, 2005

MN: TM-1

SN: 43213

BC:

Bldg. /Room: 453-16 PMs/YR -12

Item # 44036 Lathe, CNC Turning, Cabinet Type, Mfg: Haas, MN: TL-1, SN: 3074085, BC:

Bldg.: 453-16 PMs/YR -12

Bldg. 390 Item # 44033

DRILLING MACHINE, WITH CABINET, MFG: ENCO, 1987

MN: 105-1120

SN: 2252

BC:

Bldg. /Room: 390 Room162F PMs/YR -4

Item # 44034 Lathe, 16" Engine, Mfg: Standard Modern, 2003 MN: 16 x 40Engine Lathe

SN: 12512

BC: 6672J

Bldg.: 390, Room 162F PMs/yr -4

Item# 44039 Milling Machine:

Bridgeport/Harding, 2006 Series I SN: HJ317853 BC: N/A PM's/YR: 4.

PMs/yr -4

Item# - 44038 Band Saw, Horizontal, Mfg: JET, 2007

MN: KOTIN-03-06

SN: 003811,

BC: NA,

Bldg. /Room: B390, Room 162F, PMs/YR-2

Item # 44041 Precision Mathews Lathe

MN: PM-1228VF-LB

S/N: 60003 ARL Barcode: ARL-180001973 Bldg. /Room: B390, Room 162F PMs/Year - 4

Bldg. R17

ITEM #45016

1984, WILKE BAND SAW, VERTICAL

S/N # 8487056 M/N: 87

BC: 23057

BLDG: R17

2 PMs/YR

Bldg.: 453

ITEM #44040

2016, INGERSOL-RAND AIR COMPRESSOR

S/N: CBV419797

M/N: UP6-15CTAS-150W/D

BC: ARL18001467

BLDG: 453

POC: DAVE GRZYBOWSKI

12 PMs/YR

Bldg.: 517 Item # 44042 Ingersoll-Rand compressor model 2475, SN. NAR10110858, Ingersoll Rand dryer model D41ECA100, SN. 555000

POC: Rex A. Hall PM's: 4/ year