Performance Work Statement (PWS) Shop Machine Maintenance 01 August 2018
C.1 General
The Contractor shall furnish all labor, tools, supplies, repair parts, oil, grease, filters, etc., to perform effective preventive maintenance (PM), and service calls for repair service when required, for the equipment described in the list A and B below. The equipment is located on various Army Research Laboratory (ARL) Experimental Facilities located throughout the Aberdeen Proving Ground (APG), MD 21005.
C.2 Scope
C.2.1 The Contractor shall perform all unscheduled repairs and scheduled Preventive Maintenance (PM) services: annual, semi-annual, to include lift tests and OSHA inspections for the machine tools in accordance with all applicable documents and manufacturer’s procedures and recommendations to include testing of equipment and repair or replacement of defective parts and components. The Contractor shall be required to comply with all applicable environmental protection regulations. (See paragraph C.14)
C.2.2 The Contractor shall provide the COR with a designated point(s) of contact and make arrangements to enable its maintenance representative to receive such notification or provide an answering service or other continuous telephone coverage to permit the COR to make such contact. The Contractor shall also provide secondary points of contact in the event that the primary points of contact are not available.
C.2.3 The Contractor shall make available to the COR the status of any or all repair work in progress upon request. All repairs shall require estimates to be provided to COR for approval prior to commencing any work or ordering of parts. Approval in the form of electronic mail (e-mail) is acceptable. Approval by telephone is not acceptable.
C.3 Acronyms/Definitions
CLIN - Contract Line Item Number
Contract Line Item Number (CLIN) - The numerical number assigned to a controlled account.
Contracting Officer Representative (COR) - The COR will act as the daily Government POC for the Contractor to obtain authorizations for repairs, moving of equipment, and so forth. No overtime to be billed, flat rate labor cost only. The COR is not authorized to modify or terminate the contract nor obligate the Government.
Preventive Maintenance (PM) - The routine checking of hardware that is performed by a field engineer/mechanic/technician/electrician on a specific scheduled basis. PMs include visual and operational inspection of all operational components and any repair of adjustment necessary to ensure proper operation in accordance with Original Equipment Manufacturer specifications. This includes, but is not limited to: lubrication of forklifts and cranes, brake repair, check and fill if necessary, proper levels of brake fluid, engine oil: lubricants and grease, check hydraulic lines, fittings and fluid levels: check radiator, cap, core, gasket and hoses for leakage: change anti-freeze on annual basis, ensure equipment is kept in safe operation and meets all OSHA guidelines. Preventative maintenance schedule should be disclosed by the Contractor and agreed to by the Government.
On-Site - Location of equipment’s utilization, i.e. experimental facilities.
Repair Service Call- A repair service call that is required due to a malfunction of the equipment.
Repair-To accomplish the operations that are authorized to restore a vehicle to serviceable condition.
C.4 Authorization/Acceptance/Correction of Work
C.4.1 Prior to performance of any repair work, the Contractor shall provide to the COR for approval an estimated cost to complete repair. Cost estimates shall include estimated hours by category of labor, repair parts and any other anticipated costs including an up to date published price list for all the parts required as well as a published price list of labor required.
C.4.2 The cost estimate shall be provided to the COR within 24 hours (weekends and Federal holidays excluded), from notification by the COR that repair work is required. Actual repair work shall begin once the parts are received from the supplier and work is to be completed within five (5) days. The COR will approve all orders below the $3,000 micro-purchase threshold. The COR will approve any orders over the micro-purchase threshold when the Contractor provides a published price list for parts and labor at the time of repair and funding is available for all costs as well as receiving a Contracting Officer (KO) approval for the record.
C.4.3 Upon COR approval of the estimated repair cost, the Contractor shall accomplish repairs within five (5) days (weekends and Federal holidays excluded) when it is necessary to order parts. If repairs cannot be accomplished within this period of time, Contractor shall supply rental units at fair market rates.
C.4.4 Upon COR approval of the estimated repair cost, the Contractor shall accomplish repairs within two (2) days (weekend and Federal holidays excluded), when it is not necessary to order parts.
C.4.5 If contact cannot be made by COR within 30 minutes using office or cellular phones after initial attempt and a message is left, the Contractor shall contact the COR by return call within two (2)-hours or by close of business.
C.4.6 Should the Contractor’s personnel be unable to determine the cause of equipment failure within 48 hours (weekends and Federal holidays excluded), and cannot make equipment operational, the Contractor shall be required to obtain additional assistance, either in the form of “specialists” Contractor personnel or authorized manufacturer personnel for resolution of the problem. Equipment should be made operable to the original equipment manufacturer manual.
C.4.7 If performance is found to be unsatisfactory and not in accordance with the requirements of this contract, the Contractor shall begin correcting unsatisfactory work as soon as possible but not later than the first three (3) hours of the following regularly scheduled Government workday. Rework or corrective work shall be performed at the expense of the Contractor.
C.4.8 Downtime for each item failure shall be measured by those intervals between the time the Government makes an attempt to contact the Contractor’s representative at the prearranged contact point and the time that the item is returned to good operating condition. Travel time shall be included in the calculation of downtime.
C.5 Scheduled Preventive Maintenance (PM)
C.5.1 The Contractor shall perform all PM services on-site to minimize equipment downtime. Preventive Maintenance is the routine checking of hardware that is performed by a field engineer/mechanic/technician/electrician on a specific scheduled basis as proposed by the Contractor. PMs include but are not limited to visual and operational inspections, lubrication of axles and fittings, repairs, changes (fuel filters, air filters, oil filters), checking of hydraulic lines, adjustments and replacements that are necessary to maintain operational equipment. The Contractor shall be responsible for the correct mixture of anti-freeze to prevent freezing during cold weather. All PMs to include those items that have been received under warranty must be performed in accordance with the original equipment manufacturers specifications and appropriate manufacturers manuals. The costs of the following items shall be included in the cost for preventive maintenance: oil, grease/lubricants, fluids, anti-freeze, oil filters, air filters, fuel filters and fittings. The cost of repair parts will be reimbursed on a monthly basis in accordance with the parts CLINs.
C.6 Repair Service Calls
C.6.1 A repair service call that is required due a malfunction of the equipment. The hourly rate for repair services shall begin upon the arrival at the work site. Repair service calls include but are not limited to repairs on an as required basis to replace or overhaul unserviceable components, assemblies, sub-assemblies, and electrical components to keep the equipment fully operational. Repairs shall have a maximum forty-eight (48) hour turnaround time after notification by the CO excluding federal holidays and weekends. If parts/supplies are not readily available to meet the forty-eight (48) hour repair criteria, the contractor shall be required to provide to the COR the estimated delivery date of the parts/supplies or tires along with a completion schedule of the repair work.
C.7. Parts and Materials
C.7.1 Parts and Materials used by the contractor in performance of this contract shall be new and conform to the original equipment manufacturer’s or re-manufacturer’s specifications unless approved by the COR. Rebuilt assemblies may only be used with prior approval of the COR when it is a standard industry practice and the rebuilt assembly or subassembly carries the same manufacturer’s or re-manufacturer’s warranty as a new assembly or subassembly. Any part removed is Government property and shall be returned upon request of the COR unless the replacement part is predicated upon an exchange basis with the part being replaced or unless given to the Contractor to dispose of said part. The Contractor shall provide all repair parts and supplies necessary for preventive maintenance and repair of requirement and will be reimbursed by the Government for actual cost on a monthly basis.
C.7.2 Parts or components damaged by the Contractor shall be repaired or replaced at the expense of the Contractor to the satisfaction of the COR.
C.8 Major Component Repairs
C8.1 Major component repairs such as engine overhaul, power train repair, etc. shall require the Contractor to perform a technical inspection and provide a report with the name of the major component, cause of component breakdown, cost to repair and estimated time for repair prior to proceeding with the repair. The Contractor shall submit a cost estimate as soon as possible but not later than five (5) working days after notification from the COR. The Contractor must receive written approval from the Government POC prior to proceeding with repair(s).
C.9 Uneconomical Repairs
C.9.1 If determined during a repair service call that it is not cost effective to repair a particular piece of equipment, the COR may request the contractor to perform an inspection to determine the equipment’s overall condition and service ability. These inspections include effort such as: a thorough inspection of the equipment such as engine, transmission, other major components, controls, mast, cables, chains, hoses, electrical, air, and boom hydraulic systems to determined disposition of the equipment. The Contractor shall include an estimated cost for labor and materials required to return the equipment to an operating condition. The Contractor shall complete this cost estimate within forty-eight (48) hours after the service call date.
C.10 Cost and Funding limitations
C.10.1 An amount of funding set aside for the payment of parts or services that is not to exceed the ceiling price (total amount) shown in the contract. A Not to Exceed (NTE) value may be adjusted upward or downward depending on the number of repair parts purchased. The Contractor is to not exceed this price unless notified by the Contracting Officer through a modification to the contract that the ceiling price has been increased and has specified in the notice a revised ceiling price for performance under this contract/CLIN. The Government shall not be obligated to pay the contractor any amount in excess of the price in the Schedule, and the contractor shall not be obligated to continue performance if to do so would exceed the ceiling price set forth in the contract unless and until the Contracting Officer has notified the Contractor in writing that the ceiling price has been increased and shall have specified in the notice a revised ceiling that shall constitute the ceiling price for performance under this contract.
C.11 PM and repair schedule
C.11.1. The Contractor shall contact the Contracting Officer’s COR and schedule the inspections a minimum of one (1) week in advance in order to allow the COR to work around range operations. Repair service calls shall be performed as required but within twenty-four (24) hours of telephonic or e-mail notification by the COR for repair service calls.
C.11.2 Unscheduled Repair ~ Only work authorized by the technical POC may be performed under these line items, and work may only be authorized if there is sufficient funding already in place on the appropriate line item. The Contractor may notify the technical POC of a requirement for work under these line items, or the Government may initiate a request. The Contractor shall provide the technical POC with a written estimate of the effort, and would certify that all labor and materials are being proposed at most favored customer prices. Line item is for unscheduled repair of items included on (the) equipment list, which may be authorized by the COR. The Government reserves the right to obligate additional funds on these line items during performance as necessary.
C.12 Adjustments to Equipment Inventory requiring PM and repairs
C.12.1 The COR shall have the right to make increases or decreases to the list of equipment as new and/or replacement equipment is received or is deleted from the schedule and the Contractor may submit requests for equitable adjustments to the contract as appropriate. Unless and until the contract is modified to incorporate costs associated with any PM to be performed on the revised list, the Contractor shall only provide PM for the equipment covered by the contract price. New equipment that is added to the list shall be repaired and maintained in accordance with the applicable warranty.
C.13 Employee Qualifications
C.13.1 All effort provided under this contract shall be conducted by factory trained personnel with knowledge in the areas of preventative maintenance and service call repairs of commercial industrial equipment as specified on the attached list. All personnel shall have not less than three (3) years of experience or have current certification of appropriate training. Any maintenance performed by apprentices shall be under the direct supervision of the journeyman personnel.
C.13.2 A background investigation of each employee requiring installation facility access shall be required consisting of a National Agency Check (NAC). This will allow for employees to have unescorted access to restricted areas to maintenance and repair equipment. The requirements under this PWS are not deemed classified and employees shall not be exposed to classified material. A security clearance is not required to have access to the work areas under the contract. Escorts will not be provided beyond the first forty-five (45) days of contract performance: therefore Contractor personnel must be capable of qualifying for access badges at time of contract award.
C.14 Environmental Protection
C.14.1 In order to provide for environmental abatement and control and to prevent environmental pollution arising from the services of the Contractor in the performance of this contract, the Contractor shall comply with applicable federal, state and local laws and regulations concerning environmental pollution abatement and control currently in effect.
C.15 Clean-up of Premises
C.15.1 Upon completion of services provided, the contractor is required to clean up work space and remove and dispose of any parts or debris resulting from the contractor’s performance. This is required after each day of on-site performance.
C.15.2 Spill Responsibility. The Contractor is responsible for reporting any and all spills or leaks during the performance of this contract, which occurs as a result of, or is contributed to by the actions of its agents, employees, of subcontractors to the APG EOC, 911, with a follow-up contact to the ARL Risk Management Office.
C.16 Equipment Availability and Release
C.16.1 The Government shall make available to the Contractor, equipment for maintenance or repairs in accordance with the provisions of the contract. The contractor upon receipt of any Government equipment shall assume the risk of and shall be responsible for any loss or damage thereto. Any equipment described herein to be moved from the activity shall have the prior approval of the COR.
C.16.2 All preventive maintenance activities shall be performed at Aberdeen Proving Ground (APG), MD. Repairs performed by the Contractor off-site of APG are not authorized without the written approval of the COR.
C.16.3 The Contractor shall not exchange equipment without written consent of the COR. The Contracting Officer shall be notified when this service would affect a change in the serial number.
C.16.4 Before termination or expiration of this contract or removal of equipment contract, the equipment may be subject to an inspection by the COR or COR’s appointed representative. If the equipment is not in operating condition in accordance OEM specifications/standards upon inspection, the Contractor agrees to return the equipment to operating condition. Upon termination of contract, if equipment is non-operational, the Contractor shall reimburse the Government for any changes including, but not limited to, travel, parts and labor required to place the equipment in operating condition.
C.17 Government Furnished Facilities/Equipment/Services
C17.1 Equipment is located at various ARL Experimental Test Facilities throughout the Aberdeen Proving Ground, (APG) MD 21005.
C.17.2 Equipment List - See attached equipment list A & B below
C.18 Time of Performance
C.18.1 The service and repairs to be performed under this contract shall be performed during normal Government working days, Monday through Friday except for Federal Holidays, between the hours of 0700 to 1600 local time. If services are scheduled by the Contractor to be performed on a regular federal holiday (see below), or one designated by Presidential proclamation, rescheduling shall be at the discretion of the COR.
New Year’s Day January 1* Martin Luther King’s Birthday 3rd Monday in January Presidents Day 3rd Monday in February Memorial Day Last Monday in May Independence Day 4 July* Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veterans Day 11 November* Thanksgiving Day 4th Thursday in November Christmas Day 25 December*
*The holiday is observed on the preceding Friday or the following Monday when the holiday occurs on Saturday or Sunday, respectively.
C.19 Warranties
The Contractor agrees that the materials and services furnished under this contract shall be covered by the most favorable commercial warranties the Contractor provides to customers for such materials and services, but if not otherwise specified, not less than a minimum of ninety (90) days warranty. The Contractor agrees that the rights and remedies provided herein are in addition to and do not limit any rights afforded to the Government by any other clause of this contract. New equipment received by the Government under manufacturer’s warranty shall not be repaired without prior approval of the COR. The COR may request the contractor to inspect the equipment to determine if the provisions of the manufacturer’s warranty are applicable
C.20 Service Request
The Contractor shall furnish to the COR the information below for authorization of work performed and time expended upon completion of each repair.
The service request shall include, as a minimum:
a. Date/time of service request
b. Name of Government personnel requesting service
c. Identify if a PM or Remedial Service Request
d. Date/time of response (sign-in)
e. Date/time of service completed
f. Equipment identification number, model number, serial number of the malfunctioning equipment
g. Description of equipment malfunction
h. Repair affected
i. Replacement part nomenclature, model number and serial number
j. The cost of each part replaced
k. Number of hour(s) incurred when remedial maintenance services are provided
l. Name of the technical representative performing the PM or remedial services
m. Printed Name, Signature and Date of the Government POC accepting the Completed services
C.21. Documentation
C.21.1 Department of the Army Technical Bulletin Safety Inspection and Testing of Lifting devices, TB 43-0142
C.21.2 All applicable Occupational Safety and Health Administration (OSHA) regulations.
C.21.3 APG Regulation 750-3 Maintenance of Supplies and Equipment Inspection, Testing and Maintenance of Lifting Devices.
C.21.4 The Contractor shall provide monthly inspection and acceptance reports that include status of necessary repairs. The information on any preventative maintenance performed should be contained in the monthly inspection/acceptance/status reports.
C.21.5 The Contractor shall prepare and maintain complete records on all equipment maintained under the contract. These records shall be available for review by the Government during the contract period. A service report shall be prepared by a contractor representative for each maintenance action. This report shall include as a minimum:
(1) date
(2) model, serial number and local identification of equipment
(3) description of malfunction
(4) status prior to maintenance and status after maintenance
(5) problems detected, problems corrected, and problems identified but cause not isolated
(6) non-problem maintenance performed (e.g. cleaning)
(7) dates and time of notification, arrival of repairmen, and repairs completed
(8) signature of contractor representative and (9) signature of COR/ACOR
Report shall be provided to the COR after signatures are obtained. These reports shall be Government property at the end of contract period.
EQUIPMENT LIST:
Equipment List A (Protection Division)
Building R7A Item # 45090 Lincoln Eagle Welder w/trailer, Model: 10,000+/K2343-3 S/N: 011400607133 ARL Barcode: 7343K PM's Per year: 2
Item # 45015 Lathe, Bench Type, 8 inch, MFG: Emco, 1984
MN: EMCOCOMPS
SN: 8110018
BC: 1057J
PMs/YR - 2
Item # 45063 Drill Press, Mfg: Wilton, 2001
VSG-20,
MN: 2015
SN: 30864
BC: 8477J
PMs/YR -2
Item # 45064 Band Saw, Horizontal, Mfg: Grizzly, 1992
MN: GG-1758
SN: 272178
BC: 1102J
PMs/YR -2
Item# - 45073 Unisaw 50 inch/Table Saw, SN: 2368436869
MN:
BC: 1203J
Item# - 45074 Compressor
MN: VT6196004J
SN: 10494VT6196004J,
BC: 1220J
Building # 1143 Item # 45056 DoAll Saw, 2003
MN: 2013V,
SN: 500-032920
BC: 4521J
PMs/YR
Item # 45058 Air Compressor, Mfg: Speed, 50Gal Tank, 2-Cyl, Single Stage, 2003
MN: 3JR76
SN: L1-904-0041
BC: 4799J
PM's/YR -2
Building R7 Item # 45026 Saw, Circular Table, Mfg: Delta, 1986
MN: 34-763F,
SN: 86135879
BC: 66683,
PMs/YR
Item # 45027 Band Saw, 20 INCH, Mfg: Delta, 1987
MN: 28-662
SN: 87E26201
BC: 3930F
PMs/YR
Building # R9
[REDACTED]
Item # 45017
SAW, TABLE, MFG: DELTA, 1986
MN: 34-763F
SN: 86C05703
BC: 2338H,
PMs/YR -2
Item # 45018
SAW, BAND, MFG: DELTA, 1986
MN: 28-653,
SN: 86E12877,
BC: 4063F
PMs/YR -2
Item # 45019
SAW, BAND HORIZONTAL, MFG: GREENLEE, 1986
MN: 1357
SN: VW3500263
BC: 4623F
PMs/YR -2
Building # 1179 Item # 45039 Helical Screw Compressor, 40 HP, Manufacturer: Quincy, 1985
MN:QST40,
SN:QST40ANA3T132362,
BC:
PMs/YR
Building # R12A Item # 45004
SAW, CIRCULAR TABLE, MFG: DELTA, 1987
MN: 34-410
SN: 87A01316
BC: 3801H
PMs/YR -2
Item # 45005
BAND SAW, VERTICAL, MFG: DELTA, 1987
MN: 20,
SN: 20373,
BC: 23275
PMs/YR -2
Item # 45060 Drill Press, Mfg - RF, 1999
MN: 00458315
SN: 936124
BC # 4326H
PM/yr -2
Building # R14 Various locations Item # 45041 Band Saw, Horizontal, Do-All
MN: C-305A
SN: 534-00296
BC: 5046H
PMs/YR
Item # 45054 Mill, Sharpe, 2003
MN: 1440F
SN: 23905/OBDN71440P,
BC: NONE,
PMs/YR -4 Loc: B1150G shop
Item # 45051 Air Compressor, Mfg: Ingersol-Rand, 2002
MN: SSR-HP7.5
SN: LX4906U02253,
BC: 1757J
PMs/YR -4 Loc: B1150C
Item # 45061 Drill Press, Mfg: Wilton VSG-20, 2003
MN: 2015
SN: 3114
BC: 8058J
PMs/YR-4 Loc: B1150K
Item# 45062 DoAll Band Saw, 2003
MN: 3613-1
SN: 440-01865
PMs/YR-4 Loc: B1150G shop
Item# 45075 Saw, Circular, Table, Mfg: Delta
MN: 36-L300
SN: 09E-10497-2009-20-PC
PMs/YR-4 Loc: B1150G shop
Item# 45076 Saw, Radial Arm, Mfg: Original Saw Company MN: 3536-01-Type 4
SN: 20100802391
PMs/YR-4 Loc: B1150G shop
Item# 45077 Air Compressor, Mfg: Ingersoll Rand
MN: 2475
SN: 1014635
PMs/YR-4 Loc: B1150G shop
Item# 45078 Temperature Control Chamber, Mfg: Cincinnati Sub Zero
MN: Z32
SN: ZP1135876
BC: 4639K
PMs/YR-4 Loc: B1150C
Item# 45079 Band Saw, Vertical, Mfg: Rigid
MN: BS14002
SN: AM045234919
PMs/YR-4 Loc: 14B shop
Item# 45080 Saw, Circular, Table, Mfg: Rigid
MN: TS3650
SN: PO63014441
PMs/YR-4 Loc: 14B shop
Item# 45081 Band Saw, Horizontal, Mfg: MSC
MN: 09518895
SN: 9728296
PMs/YR-4 Loc: B1150A
Building R-14 # 1150 Item # 45003 Hydraulic Press, Dake, 150 Ton, 1979
MN: 45-157
SN: 177200
BC: 75763
PMs/YR -1 Loc: Bld1150A
Item # 45030 Air Compressor, MFG: Ingersol-Rand, 1990
MN: U10H-5
SN: KA989U90F
BC: 3535F
PMs/YR -4 Loc: Bld1150A
Item # 45031 Saw, Band, Mfg. Do-All, 1983
MN: 2613-1H3
SN: 362-90213
BC: 16964
PMs/YR -4 Loc: Bld1150A
Item # 45032 Saw, Circular, Table, 12Inch, Mfg: SCMI, 1985
MN: S115F
SN: AB2650
BC: 66486
PMs/YR -4 Loc: Bld1150A
Item # 45042 Lathe, Monarch, MN: 60, SN: 36752
BC: 0075C
PMs/YR -4 Loc: Bld1150A
Item # 45045 Mill, Mfg: Sharpe, 2001
MN: QMV-8,
SN: 00800345,
BC: 8299H
PMs/YR -4
Item # 45052 Mill, Lagun, 2003 MN: Millmatic 3
SN: 45570
BC: 4262J
PMs/YR -4 Loc: Bld1150A
Item # 45053 SAND BLASTER, Clemco, MN: 900R6DC
SN: 52087-5/03
BC:
PMs/YR -4 Loc: Bld1150A
Item # 45055 Surface Grinder, Mfg: Chevalier, 2003
MN: FSG-3A1224
SN: P3932001
BC: 4399J
PMs/Yr -4 Loc: Bld1150A
Item # 45082 Drill Press, Mfg: Wilton 25”, 2001
MN: 24513
SN: 350442
BC: 0308J
PMs/YR -4 Loc: Bld1150A
Building # 309 Rm106 Item # 45083 DoAll Band Saw, 2010
MN: 2013V
SN: 57110731
BC: 1205K
PMs/YR -4
Item # 45084 Lathe, Mfg: Sharp Industries, 2001
MN: 1440F
SN: 23877
BC: 8106H
PMs/YR -4
Item # 45085 Drill Press, Mfg: Delta, 1987
MN: 20
SN: 87C70001
BC: 6727K
PMs/YR -4
Building # 309 Room #110 Item # 45091 Ingersol-Rand Compressor Model: Type30 #57T-D S/N: 239613 ARL Barcode: N/A PM's Per year: 1
Item # 45028
BAND SAW, MASTER TAPE LOADING, 12 INCH, MFG: DOALL, 1951
MN: ML
SN: 458786
BC: 68481
PMs/YR -6
Item # 45029
LATHE, 10 INCH, FLOOR, MFG: MONARCH, 1954
MN: EE
SN: 38038,
BC: 68449
PMs/YR -6
Building # 1100E /1100F Item #44043 Flow Water Jet S/N: 434994
MN: 016670-3
PM’s/YR-4
Item # 45008
LAB PRESS HYDRAULIC, 30 TON, 1998
SN: 268-16
MN: 2698
BC: 23090
PMs/YR -2
Item # 45009
BAND SAW, VERTICAL, MFG: JET, 1987
MN: VBS-900
SN: 901537
BC: 4515F
PMs/YR -2
Item # 45011
DRILL PRESS, GEAR HEAD, MFG: JET, 1987
MN: GHD-125
SN: 870021
BC: 11604
PMs/YR -2
Item # 45043 Band Saw, Horizontal, Do-All, MN: C-305M
SN: 516-96109
BC: 1587M
PMs/YR
Item # 45044 Mill, Southwest Industries MN: Trak-K3, SN: 00-0730, BC: 4286H
PMs/YR
Item # 45047 Do-All Band Saw, MN: - 2612-1H3, SN: - 362-83169, BC: 255530
PMs/YR -2
Item # 45048 Rigid Threading Machine, 2002
MN: 1224
SN - EB22453G02
BC: 9892H
PMs/YR -2
Item # 45049 Jet Drill Press, 2002
MN: JRD-750
SN: 02017514
BC: 1517J
PMs/YR -4
Item # 45050 Chevalier Precision Hydraulic Machinery Grinder, 2002
MN: FSG3A818,
SN: M3911002,
BC: 9850H
PMs/YR -4
Item # 45065 Mill, Lagun, 2005
MN: KMC717
SN: 43150,
BC:
PMs/YR -2
Item # 45066 Machine, Abrasive, Cut-off, Mfg. Scotchman, 2002
MN: CFO
SN: 1546MF0102,
BC:
PMs/YR -4
Item # 45067 Hydraulic Shear, Adira, 2006
MN:
SN: 496611792D
BC: 76491,
PMs/YR -2
Item # 45068 Lathe, Southwestern, 2003
MN: 1745
SN: 011BX10918
BC:
PMs/YR -4
Item # 45070 Punch & Notcher, Geka, 2003
MN: HYD110
SN: 19121
BC:
PMs/YR -4
Item # 45072 Belt Sander, Mfg: Rand Bright, MN: S-36-75, SN: 187-4192
BC:
PMs/YR – 4
Item# - 45086 HTE Shears
MN: 375-10A
SN: 879T1697
BC: 6725K
PMs/Yr
Item# - 45087 Wilton Drill Press
MN: 1280R
SN: 0810190
BC: 0476K
PMs/Yr
Item #45089 Southwestern Lathe
MN: 1745
SN: 00-7529
BC0999D
PMs/YR - 2
Building # 1122 Item # 45020 Bridgeport Milling Machine, MN: 248F
SN: 35557
BC: 75900
PMs/YR
Item # 45040 DoAll Saw, 1995
MN: 2013V
SN: 500-961308,
BC: 8158C
PMs/YR
Item # 45046 Mill, Bridgeport Vertical Head, J-Head
MN: SERIES I,
SN: 2J1146902
BC: 8529H
PMs/YR
Item# - 45088 American Turn Master Lathe
SN: 1308051798
BC: 0126k PMs/YR- 08
MN: AT-1340G
Building 4600 Room 132 Item # 46012 Lathe, Mill, Drill Press Combo, Maxi-Mat Super 11, Mfg: Emco Manufacturing MN: Super 11, SN: 8607010
BC: 2558F
BLDG: 390 / Room 138 PMs/YR -4
Building 4600 Room L1193 Item # 46019 Vacuum Pump, Kinney
MN: 400,
SN: 296466 1302
BC:
PMs/YR -4
Item # 46020 Leybold Vacuum US vacuum pump
MN: D8B
SN: 912551-30000790215
BC: 5463J
PMs/YR -4
Item # 46021 Leybold Vacuum US vacuum pump
MN: D16B
SN: 170221-30000058650
BC: 5490J
PMs/YR -4
Item # 46022 Lathe, Floor, 15”, Mfg: Clausing
MN: 8044CS TRIUMPH V/S
SN: VT1817
BC: 6967J
BLDG: 4600 / Room L1193
Building # 1188A Item # 46023 PPI diaphragm compressor
MN: U652
SN: 2L-058039
BC:
PMs/YR -4
Item # 46024 PPI diaphragm compressor
MN: U650
SN: 4X068
BC:
PMs/YR -4
Item # 46025 Air Compressor, Ingersoll Rand
MN: SSR-UP6-30-125
SN: PX8248U07008
BC: 6836J
PMs/YR -4
Item # 46026 Band saw
MN: 09518895
SN: 9528009
Building # 1185 Item # 45001
DRILL PRESS, FLOOR MODEL, MFG: JET, 1985
MN: GHD-125
SN: 850512
BC: 24492, BLDG: 1185
PM/YR -1
Item # 45002
BAND SAW, VERTICAL, MFG: JET, 1986
MN: VBS-900
SN: 901488
BC: 24588
PM/YR -1
Item # 45013
LATHE, MONARCH EE, 1954
MN:
SN: 38043
BC: 23563
PMs/YR -2
Building # 1193 Item # 45007
LATHE, 10 INCH, BENCH, MFG: MONARCH, 1953
MN: EE
SN: 38029
Building # 1116A Item # 46002
BAND SAW, VERTICAL, MFG: DOALL, 1952
MN: MD
SN: 5216645
BC: 38422
PMs/YR -4
Item # 46003 Mill, Manufacturer: Bridgeport, 1992 MN: Series I - Standard, SN: BR261140
BC: 49299
PMs/YR
Item # 46004
MILLING MACHINE, VERTICAL 42 INCH TABLE, MFG: BRISGEPORT, 1981
MN: 12BRJ
SN: J242000
BC: 38374
PMs/YR -4
Item # 46005
LATHE, 17 INCH, MFG: LEBLOND, 1966
MN: 17ES
SN: 5E321
BC: 3836
PMs/YR -4
Item # 46006 Lathe, 15" x 54", MN REGAL, Manufacturer: LeBlond, 1991
MN: REGAL
SN: 15C-601
BC: 71674
PMs/YR -4
Item # 46007
BAND SAW, CUT-OFF MACHINE, MFG: WELLS, 1985
MN: 8W
SN: 33757
BC: 38317
PMs/YR -4
Item # 46014 Panel Saw, 7", Mfg: SSC, 1998
MN:
SN: 773A497420038,
BC:
PMs/YR -4
Item # 46015 Compressor, Vertical Tank, Mfg: Campbell Hausfeld, 1997
MN: VT559501
SN: 030691L-654162
BC: 72148
PMs/YR -4
Item # 46016 Radial Arm Saw, Type 1, The Original, Mfg: Lancaster Machine Co, 1990
MN 3536
SN 89390001
BC: NONE
PMs/YR -4
Item # 46017 Jointer/Planer, DJ20, Mfg: Delta, 1990
MN 37350
SN 5744
BC:
PMs/YR -4
Item # 46018 Bandsaw, Mfg: Do-All, 2009
MN: 2013V3,
SN: 572-09311
BC: 0658K,
PMs/YR -4
Equipment List B (Lethality Division) Building # 390 Item # 44001 Drilling Machine, Mfg: High Speed Hammer
MN: R53,
SN: 129077,
BC: 43566,
Bldg./Room: 390/155 PMs/YR -1
Item # 44002 LATHE, BENCH 10 INCH, MFG: Sheldon
MN: EXL-568,
SN: TXE-16378T
BC: 43580
Bldg./Room:390/155, PMs/YR -2
Item # 44003 Lathe, Mfg: Sears, 1970
MN 99K2140N
SN: 53748
BC: 43581
Bldg./Room:390/159, PMs/YR -4
Item # 44004 Belt Sander, MFG: Sears, MN: L1322541
SN: A3148
BC: 43646
Bldg./Room:390/155 PMs/YR -2
Item # 44005 SAW, FILING BAND, MFG: DoAll, 1958 Model: ML
SN: 5216535
BC: 43648
Bldg./Room: 390/155 PMs/YR -2
Item # 44006 Drilling Machine, MFG: Atlas Press
MN: 1800
SN: 000721
BC: 43568
Bldg. /Room: 390/155 PMs/YR -4
Item # 44007 Drilling Machine, Mfg: High Speed Hammer
MN: R53
SN: 1D29327
BC: 43567
Bldg. /Room: 390/155, PMs/YR -4
Bldg. 328/Aero Item # 44016
LATHE, ENGINE, 10 INCH, 1966
MN: 187RN
SN: 128137
BC: 65731,
Bldg.: 328/Aero
Bldg. 740B / 740F Item # 44017 BAND SAW, 26 INCH VERTICAL, MFG: Do All, 1951
MN: V26
SN: 26512341
BC: 40454
Bldg.: 740B PMs/YR -4
Item # 44019
DRILL PRESS, BENCH. 3/8 INCH, 1947
MN: 1LMS
SN: 3017
BC: 40455,
Bldg.: 740B PMs/YR -4
Item # 44021
LATHE, ENGINE FLOOR 10 INCH, 1951
MN: EE
SN: 33813
BC: 2327H
Bldg.: 740B PMs/YR -4
Item # 44032 Cutoff Saw, Mfg: Grizzly #7, 2005
MN: G0561
SN: 571880
BC:
Bldg./Room: 740F
Bldg. 453-16 Item # 44022 Lathe, 10 inch, MFG: Monarch, 1969
MN: EE,
SN: 38039
BC: 3553
Bldg.: 453-16 PMs/YR -2
Item # 44028 Drill Press, MFG: Rockwell, 1978
MN:
SN: 135181715-000,
BC: 39425
Bldg./Room: 453-16 PMs/YR -2
Item # 44029 Milling Machine, MFG: Bridgeport, 1998 Model EX-TRAK-DX-II
SN: EZ2CH740
BC: 6569H
Bldg./Room:453-16 PMs/YR -2
Item # 44030 Drill Press, Mfg: Delta, 2005
MN: 17-925
SN: 011572 W3090
BC: 8311J
Bldg./Room: 453-16 PMs/YR -2
Item # 44031 Mill, Mfg: Haas, 2005
MN: TM-1
SN: 43213
BC:
Bldg./Room: 453-16 PMs/YR -12
Item # 44036 Lathe, CNC Turning, Cabinet Type, Mfg: Haas, MN: TL-1, SN: 3074085, BC:
Bldg.: 453-16 PMs/YR -12
Bldg. 390 Item # 44033
DRILLING MACHINE, WITH CABINET, MFG: ENCO, 1987
MN: 105-1120
SN: 2252
Bldg. /Room: 390 Room162F PMs/YR -4
Item # 44034 Lathe, 16" Engine, Mfg: Standard Modern, 2003 MN: 16 x 40Engine Lathe
SN: 12512
BC: 6672J
Bldg.: 390, Room 162F PMs/yr -4
Item# 44039 Milling Machine:
Bridgeport/Hardinge, 2006 Series I SN: HJ317853 BC: N/A PM's/YR: 4.
PMs/yr -4
Item# - 44038 Band Saw, Horizontal, Mfg: JET, 2007
MN: KOTIN-03-06
SN: 003811,
BC: NA,
Bldg. /Room: B390, Room 162F, PMs/YR-2
Item # 44041 Precision Mathews Lathe
MN: PM-1228VF-LB
S/N: 60003 ARL Barcode: ARL-180001973 Bldg. /Room: B390, Room 162F PMs/Year - 4
Bldg. R17
ITEM #45016
1984, WILKE BAND SAW, VERTICAL
S/N # 8487056 M/N: 87
BC: 23057
BLDG: R17
2 PMs/YR
Bldg.: 453
ITEM #44040
2016, INGERSOL-RAND AIR COMPRESSOR
S/N: CBV419797
M/N: UP6-15CTAS-150W/D
BC: ARL18001467
BLDG: 453
POC: DAVE GRZYBOWSKI
12 PMs/YR
Bldg.: 517 Item # 44042 Ingersoll-Rand compressor model 2475, SN. NAR10110858, Ingersoll Rand dryer model D41ECA100, SN. 555000
POC: Rex A. Hall PM's: 4/ year