W911PT-26-Q-A122 Amd 0001.pdf
PDF 4 MB Posted
- Solicitation number
- W911PT-26-Q-A122
About this file
This is Amendment 0001 to Solicitation W911PT26QA122, issued by the U.S. Army Corps of Engineers on September 4, 2026, for nitrogen and argon piping installation and removal services at Watervliet Arsenal in New York. The response due date has been extended from September 8, 2026, to September 11, 2026. The solicitation requires contractors to remove existing piping above floor level and install new nitrogen and argon trunk lines with control manifolds, shut-off valves, and reconnections to machines in Building 35A Rooms 0010 and 0012. All new piping and fittings must be 316/316L stainless steel Swagelok components suitable for cryogenic use, installed according to ANSI B16, B31.3, and B31.12 standards with proper hangers and supports every 6 feet horizontally and 8 feet vertically.
The contractor must perform comprehensive pneumatic pressure testing at either operating pressure (for systems under 100 psig) or 150 psig (for systems over 100 psig) for a minimum two-hour duration, with test gauges accurate to +/- 1% and calibrated within one year. All materials, tools, equipment, and labor must be provided by the contractor, who must demonstrate a minimum 10-year history of successful cryogenic piping installations and submit at least three project references. Submittals required prior to work commencement include Safety Data Sheets, asbestos notification forms, Lockout/Tagout acknowledgment, project schedules, contractor safety plans, Swagelok tube fitting installation certificates, and material certifications. Electronic quote responses must be submitted to Contract Specialist Michael E. Gross at michael.e.gross28.civ@army.mil. The contractor must comply with Watervliet Arsenal security policies, OSHA Voluntary Protection Program requirements for applicable contractors exceeding 1,000 hours per quarter, and all local safety regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911PT-26-Q-A122.pdf | ||
| Attachment 0001 - Wage Determination NY20260002-02.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Response Due Date
08 Sep 2026 11 Sep 2026
Section C - Description/Specifications/Statement of Work
Miscellaneous text in this section has been modified to:
STATEMENT OF WORK (SOW)
SERVICE: Nitrogen and Argon Piping - Installation and Removal Preparer/Point of Contact (POC): Tom Gamache x4221
Date: 09/01/2026
General Requirements:
A. Contractor(s) will remove and dispose of all the existing piping above floor level.
B. Contractor will be responsible, IAW attached Memo, for the following:
W911PT26QA1220001
a. Install new Nitrogen trunk lines, North and South wall, in Bldg. 35A Room 0010. Connection to the required machines. Runs must extend the length of each wall with shutoffs at an interval determined by COR.
i. Contractor must replace singular 1/4" Nitrogen feed line to water control valve currently connected to the feed line in Room 0010.
ii. Contractor will install a control manifold inside Room 0010 on the east wall with a shut off on the main line prior to the manifold and one (1) shut off valve on each of the feed lines that will supply the North and South walls. COR must approve location of manifold prior to placement.
iii. Two (2) machines on the North wall and one (1) machine on South wall must be reconnected by contractor. The contractor must install shutoff valves within six (6) feet of each machine connection. COR must approve location prior to placement.
b. Replace current service lines (Nitrogen & Argon) to Room 0012.
i. Contractor must put shut-off loops in the hallway both Nitrogen and Argon, shut-offs must be no higher than six
(6) feet off the floor. COR must approve location of manifold prior to placement.
ii. Termination will be at the two collection tanks (Nitrogen and Argon) inside Room 0012. Replacement must be in kind with the diameter of piping that is existing.
iii. Contractor must replace singular 1/4" Nitrogen feed line to water control valve currently connected to the feed line just outside Room 0012.
c. Pressure Testing new installation.
C. All new fittings must be 316/316L Swagelok fittings and Swagelok full port 1/4 turn ball valves.
D. Hangers and supports must be used as needed:
a. Properly support the new piping every 6 feet horizontal, 8 feet vertical, 3 feet from the ends and no more than 1 foot from any change of direction.
b. Hangers used to support piping shall be fabricated to permit adequate adjustment after erection while still supporting the load. Pipe guides and anchors shall be installed to keep pipes in accurate alignment, to direct the expansion movement, and to prevent buckling, swaying, and undue strain.
c. Piping subjected to vertical movement when operating temperatures exceed ambient temperatures shall be supported by variable spring hangers and supports or by constant support hangers.
d. Attachment to buildings structural concrete and masonry shall be by cast-in concrete inserts, built-in anchors, or masonry anchor devices. Inserts and anchors shall be applied with a safety factor not less than 5.
e. Provide all structural work and equipment required to control expansion and contraction of piping. Verify that the anchors, guides, and expansion joints provided, adequately protect the piping systems.
f. Provide pipe supports conforming to the requirements of MSS SP-58.
Where pipe supports contact bare piping or in-line devices, provide supports of compatible material so that neither has a deteriorating action on the other.
E. All new piping and fittings must be 316/316L stainless steel.
a. Handle, transport, and store tubing and fittings carefully. Plug or cap pipe and fitting ends during transportation or storage to minimize dirt and moisture entry . Do not subject piping to abrasion or concentrated external loads. Discard any tubing segment and fittings that have been damaged.
b. All piping and fittings shall conform with and be installed in strict accordance with ANSI B16 (standards for pipes and fittings, B31.3 (process piping), and B31.12 (hydrogen piping and pipelines).
c. All piping and tubing shall be deburred, and clean of dirt, oil, or scale.
Tubing and fittings shall be clear and free of cutting burrs and defects in structure or threading and shall be thoroughly brushed and blown. Repair of defects in piping, tubing or fittings is not allowed; replace defective items when found.
d. Provide color code marking of piping conforming to the latest edition of ASME A13.1. Provide printed legends to identify contents of pipes and arrows to show direction of flow . Color code label backgrounds to signify levels of hazard. Make labels of plastic sheet with pressure-sensitive adhesive suitable for the intended application.
F. All materials used must be acceptable for cryogenic use. For example: pipe dope, tape, piping, fittings etc.
G. The Contractor shall perform all work in strict conformance with Watervliet Arsenal Instructions for Contractors (WAIC). The Contractor shall read and understand this document prior to submitting a proposal. The WAIC is publicly available at: https://wva.army.mil/docs /librariesprovider6/default-document-library/wvaic_0123.pdf
H. The Contractor is required to review the project site, obtain and/or verify all measurements and project data required to perform the project work. All dimensions shown as (+/-) are existing dimensions and shall be field verified by the Contractor.
I. The Contractor shall fully review all contract documents and provide written notice to the Contracting Officer's Representative (COR) of any discrepancies that are found prior to bid submission.
J. The Contractor shall submit with their bid, at least three (3) jobs with references where the Contractor has successfully completed similar cryogenic piping installations and testing. Contractor(s) shall be qualified with a 10-year (minimum) history of successful performance in the type of work required for this SOW.
K. The Contractor shall provide all materials, tools and equipment, qualified labor, transportation, and supervision as needed to complete the services that meet the technical requirements in this scope, and ensure work is completed safely and properly.
L. The Contractor shall not conduct any work that is beyond this scope and accompanying specifications unless directed in writing by the Contracting Office (KO) or the COR. Any work done by the Contractor beyond this scope and accompanying specifications without direction from the KO or Project COR will be at the Contractor's own risk and at no cost to the government.
M. All labor for the installation of material and equipment furnished under this Contract shall be done by experienced personnel. All workmanship shall meet professional industrial standards and must be in compliance with the latest version of applicable codes, industry standard and specific requirements of this scope.
N. The Contractor is responsible for safety and shall comply with all local labor laws, regulations, customs and practices pertaining to labor, safety and similar matters.
O. The Contractor shall be and remain liable in accordance with applicable law for all damages caused by the Contractor's negligent performance of any of the services furnished under this Contract.
P. The Contractor shall always keep the work area free from accumulation of waste materials. Upon completing construction, the Contractor shall remove all temporary facilities and leave the project site in a clean and orderly condition acceptable to the COR.
Q. The Contractor is required to provide the proper control of hazardous energy (lockout /tagout LOTO) per OSHA 29 CFR 1910.147.
R. The Contractor shall create a project schedule and submit for Government review and approval. Project schedule shall detail the phases of work and the overall timeline for the execution of the work. The Contractor shall include delivery dates, appropriate milestones, and shall clearly detail any requirements for work performed outside of regular hours of operation.
S. The Contractor shall be responsible for the professional quality, technical accuracy, and the coordination of all construction and other services furnished under this Contract.
Contractor shall, without additional compensation, correct or revise any errors or deficiencies in its construction and other services.
T. If any of the Contractor's services do not conform to the Contract requirements, the Project COR may require the Contractor to perform the services again in conformity with the contract requirements at no cost to the government.
Testing:
A. Prior to acceptance and initial operation, piping installation, shall be visually inspected and pressure-tested by the contractor to determine that the materials, design, fabrication, and installation practices are in accordance with the requirements.
B. Interruption of Exiting GN2 Service: DO NOT interrupt GN2 service to Facilities occupied by owner or others unless permitted under the following conditions.
a. Notify the COR no fewer than two business days in advance of proposed interruption of GN2 service in written communication.
b. Do not proceed with interruption of N2 services without the COR's written permission.
C. GN2 Leak Detectors - Ultrasonic Leak Detectors or 100% Isopropyl Alcohol
D. Testing equipment shall have a Schrader valve for owner to attach a gauge to check test pressure gauge accuracy.
a. Test pressure gauge accuracy shall be +/-1% and be calibrated within 1 year of test.
b. Test pressure gauge shall have sticker or calibration certificate.
c. Test equipment and installed piping shall be visually examined before pressure is applied to ensure connections are properly secured.
d. Prior to application of full test pressure, a preliminary test of not more than 10 psig shall be applied to reveal possible major leaks.
e. After preliminary test, pressure shall be raised in stages of not more than 25% up to full pneumatic test pressure allowing time for equalization of strains and detection of major leaks at each stage.
E. Pneumatic Test Duration shall be two (2) hours.
F. Pneumatic Pressure Test PSIG
a. For piping operating less than 100 psig it is permissible to conduct the leak test using operating pressure. Document pressure on test report.
b. For piping operating over 100 psig a pneumatic test pressure of 150 psig shall be used. Document pressure on test report.
c. If leaks are found, pressure shall be vented, appropriate repair or replacement shall be completed, and the pneumatic test repeated until no leakage is found.
Prepare and deliver test reports to the COR.
G. Inspection shall consist of visual examination during or after manufacture, fabrication, assembly, or pressure tests.
H. This inspection shall include nitrogen pressure test, at which time the gas piping shall stand a pressure of not less than 25% of the components rated operational pressure. If the low-pressure testing is successful, the pressure shall then be gradually increased to test if the system will maintain its integrity at higher pressure. Test pressures shall be held for a length of time satisfactory to the COR, but in no case less than 2 hours with no perceptible drop in pressure
I. The piping system shall withstand the test pressure specified without showing evidence of leakage or other defects. Reduction of test pressures as indicated by pressure gauges shall be deemed to indicate the presence of a leak unless such reduction is readily attributed to some other cause.
J. The leakage shall be located by means of an approved gas detector, a noncorrosive leak detection fluid, or other approved leak detection process. Methods that provide a source of ignition shall not be used.
K. Where repairs or additions are made following the pressure test, the affected piping shall be re-tested. Minor repairs and additions are not required to be pressure-tested provided that the work is inspected and connections are tested with a noncorrosive leak-detecting fluid or other leak-detecting methods approved by the COR.
APPENDIX A: Consolidated List of Submittals
Line Item Submitted Submittal Needed By Submittal Reviewed By (Office)
1 Safety Data Sheets for Hazardous Materials
(SDS)
NLT 7 Calendar Days After Award Safety Office
2 Signed Contractor Asbestos Notification Form
NLT 7 Calendar Days After Award Environmental Office
3 Signed Lockout/Tagout (LOTO) Notification Acknowledgement Record
NLT 7 Calendar Days After Award Safety Office
4 Project Schedule NLT 7 Calendar Days After Award COR
5 Contractor Safety Plan NLT 7 Calendar Days After Award COR
6 Solid Waste Reporting Log, Bills of Lading, Dump Slips for C&D Debris and Recycled Materials
NLT the 10th Day of the Following Month, and at Project Completion
Environmental Office
7 Swagelok Tube Fitting Installation Certificates
Prior to commencement of any work
COR
8 Piping - Material Certifications Prior to commencement of any work
COR
9 Parts - Material Certifications (valves, fittings, couplings etc.)
Prior to commencement of any work
COR
10 Pressure Testing Certification and CoC
Prior to Acceptance or initial operation
COR
C. REQUEST FOR QUOTE RESPONSES
ALL RESPONSES MUST BE ELECTRONIC. YOU MUST SUBMIT YOUR QUOTE RESPONSES USING THE
FOLLOWING METHODS:
(a) Email to: Contract Specialist: michael.e.gross28.civ@army.mil
(b) Request for Quotes must be filled out completely and sent in its entirety to be considered responsive.
C. Submission of Recordable Injuries and Illness Cases (Dec 2012)
Watervliet Arsenal is pursuing OSHA Voluntary Protection Program (VPP) recognition. The VPP impacts all contractors whose employees cumulatively work more than 1000 hours per quarter within a calendar year at Watervliet Arsenal (herein referred to as "applicable contractors"). It is the contractor's responsibility to ensure its employees and managers are in full compliance with OSHA requirements and have a general understanding of VPP. Detailed information on VPP is available on the OSHA website at http://www.osha.gov/dcsp/vpp/index.html.
All contractors, whether regularly involved in routine site operations or engaged in temporary projects such as construction or repair, must follow the safety and health rules of Watervliet Arsenal. Applicable contractors are required to annually submit to Watervliet Arsenal, ATTN: TAWV-XOS/ Safety Office, Bldg. 10, 1 Buffington Street, Watervliet, NY 12189-4050 or email: usarmy.watervliet.tacom.list.watesafety@army.mil the following documents (covering the previous calendar year quarters) by 15 January:
- Total Case Incidence Rate (TCIR)
- the number of recordable injuries and illness cases per 100 full-time employees that a site has experienced in a given time frame.
- Days Away, Restricted, and/or Transfer Case Incident Rate (DART)
-Number of recordable injuries and illness cases per 100 full-time employees resulting in days away from work, restricted work activity, and/or job transfer that a site has experienced in a given time frame.
- OSHA Form 300A
Applicable contractors may submit the above immediately following the completion of a quarter, if desired.
CS7520 - ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES
mailto:usarmy.watervliet.tacom.list.watesafety@army.mil
a. The contractor and all associated subcontractors' employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor must provide all information required to complete the required background check(s) to meet installation access requirements requested by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 "Personal Identity Verification of Contractor Personnel") as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
b. For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated Tier 1/T1 (formerly referred to as a National Agency Check with Inquiries/NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05, The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. An initial CAC may be issued on a favorable review of the FBI fingerprint check and a successfully scheduled T1 by the Centralized Suitability Service Center (CSSC).
c. For contractors that do not require CAC but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards, and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation /facility access and local security policies and procedures elsewhere in Section C titled as paragraph - Access to the Detroit Arsenal; Identifying Contractor Employees; Non-disclosure Statement; for OCONUS locations, refer to the Status of Forces Agreement and other theater regulations.
| IDCode: J |
| Page: 1 |
| Pages: 12 |
| AmendNo: 0001 |
| EffDate: 04 SEP 2026 |
| ReqNo: |
| ProjNo: W911PT26PTBD |
| IssCode: W911PT |
| AdmCode: |
| IssuedBy: W6QK ACC WVA |
ACC WATERVLIET ARSENAL, 1 BUFFINGTON ST
WATERVLIET, NY 12189-4000
UNITED STATES
MICHAEL GROSS, EMAIL: MICHAEL.E.GROSS28.CIV@ARMY.MIL TELEPHONE: 571-588-9116
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W911PT26QA122 |
| SolDate: 18 AUG 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The purpose of Amendment 0001 to Solicitation W911PT-26-Q-A122 is to incorporate revisions to the Statement of Work (SOW) and extend the closing/due date to 11 September 2026. |
| ContNameTitle: |
| CoNameTitle: |
| ContDate: |
| CODate: |