View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W911PT23Q0039 10-Feb-2023

b. TELEPHONE NUMBER

5182664738

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 17 Feb 2023

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W911PT9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

JOSEPH POKRENTOWSKI

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

SEE SCHEDULE

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

ARMY CONTRACTING COMMAND-WARREN (WVA)

ATTN: CCTA-HDW/BLDG 10

1 BUFFINGTON STREET

WATERVLIET NY 12189-4000

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W911PT 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

ARMY CONTRACTING COMMAND-WARREN (WVA)

SERVICES TEAM

ATTN: CCTA-HDW/BLDG 10

1 BUFFINGTON STREET

WATERVLIET NY 12189-4000

TEL: 518-266-4535 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$11,000,000

NAICS:

811310

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF71

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W911PT23Q0039

Section SF 30 - BLOCK 14 CONTINUATION PAGE

LOCAL NARRATIVES

A.__ NOTICE OF WATERVLIET ARSENAL INFORMATION/REQUIREMENTS

(a) IMPORTANT DELIVERY/QUALITY REQUIREMENTS:

(1) ALL OFFERORS MUST CAREFULLY REVIEW THE DELIVERY REQUIREMENT IN THE

REQUEST FOR QUOTE OR SOLICITATION. WHEN SUBMITTING AN OFFER/BID, PLEASE

ENSURE THAT YOU CAN MEET THE DELIVERY SCHEDULE.

(2) ON TIME DELIVERY IS VERY CRITICAL. THEREFORE, YOU MUST ADHERE TO THE

DELIVERY REQUIREMENTS INDICATED IN ANY RESULTANT AWARD. FAILURE TO

COMPLY WITH THE CONTRACTUAL DELIVERY SCHEDULE, MAY RESULT IN TERMINATION

OF THE ORDER OR REQUIRE CONSIDERATION IF THE GOVERNMENT ELECTS TO EXTEND

DELIVERY. (NOTE: Non-availability of raw materials, subcontractor issues, scheduling conflicts, should be considered at the time you are submitting your offer/bid. They are not acceptable excuses for failing to meet the delivery after award).

(3) PROVIDING QUALITY PRODUCTS THAT CONFORM TO THE CONTRACT ARE JUST AS

IMPORTANT AS MEETING THE REQUIRED DELIVERY. DELIVERY OF NON-CONFORMING

PRODUCTS RESULTS IN DELIVERY DELAYS AND INCREASED COSTS TO THE ARSENAL.

(4) PAST PERFORMANCE FOR QUALITY AND DELIVERY MAY BE A MAJOR

CONSIDERATION IN MAKING DETERMINATIONS FOR FUTURE CONTRACT AWARDS.

NOTICE: Throughout this document we may use the terms “we” and “you”, the term “we” means the government of the United States of America, and the term “you” means the contractor.

(b) WATERVLIET ARSENAL INFORMATION FOR CONTRACTORS:

“Watervliet Arsenal Information for Contractors” document is incorporated by reference in all solicitations and contracts. The full text version of the instructions is available at Internet address:

http://www.wva.army.mil/Documents/Contracting/WAIC.pdf Upon request, the contracting officer will make its full text available.”

POC - CONTRACT SPECIALIST/BUYER: Maria Decrescenzo

TELEPHONE NUMBER: 518-266-4641

E-MAIL ADDRESS: maria.d.decrescenzo.civ@army.mil

CONTRACTOR DUNS NUMBER/CAGE CODE/FAX NUMBER:

Please provide the following information for your company.

VENDOR NAME: ___________

VENDOR POC: ___________

POC PHONE: ___________

E-MAIL ADDRESS (see note below): ___________

DUNS NUMBER ___________

CAGE CODE (if known) ___________

TAX ID NUMBER ___________

VENDOR FAX NUMBER ___________

NOTE: Your e-mail address is required so that in the event you receive the resultant award, we can e-mail it to you.

If we experience difficulties with e-mail, it will be data faxed.

(c) AWCF BULK FUND _x__ DOES ____ DOES NOT APPLY

(d) POSTERS:

(1) Contracts for Material, Supplies, Articles and Equipment Exceeding $15,000/Service Contract Labor Standards. Orders subject to these Acts require contractors to post WH Publication 1313, “Employee Rights on Government Contracts”.

(2) Construction Orders. Orders for construction require contractors to post WH Publication 1321, “Employee Rights under the Davis Bacon” and the Office of Federal Contract Compliance poster on “Equal Employment Opportunity is the Law.”

(3) These posters can be accessed electronically at http://www.dol.gov .

(4) Hard copies of the posters will be made available upon request to the contracting officer.

(e) PAYMENTS:

Any vendor that receives an award (except those paid by credit card or accommodation check) can view invoice payments made by DFAS at https://wawf.eb.mil/ using the “my invoice” system. You will be required to register in order to view payments. Payment information is maintained for 120 days from invoice payment. Vendors can find out when invoices have been paid by Electronic Funds Transfer (EFT), etc. This website can save valuable time and frustration over billing questions and it is a free service.

(f) RELEASE OF INFORMATION:

The contractor shall not release or authorize release of DoD specifications; acceptance test results; information involving critical military technology; or any other information in which the DoD maintains proprietary rights, or is otherwise confidential or classified. This restriction includes any endorsement by the Department of Army of a contractor. Release of information under the circumstances referenced above requires the prior written approval of the Contracting Officer responsible for this contract. It is the contractor’s responsibility to be familiar with, and comply with the requirements of Chapter 5, page 22, paragraph 5-48, of AR 360-1 may be found at http://www.usapa.army.mil/pdffiles/r360_1.pdf

C._1_ Submission of Recordable Injuries and Illness Cases (Dec 2012) (ACC-Warren (WVA)) Watervliet Arsenal is pursuing OSHA Voluntary Protection Program (VPP) recognition. The VPP impacts all contractors whose employees cumulatively work more than 1000 hours per quarter within a calendar year at Watervliet Arsenal (herein referred to as “applicable contractors”).

It is the contractor’s responsibility to ensure its employees and managers are in full compliance with OSHA requirements and have a general understanding of VPP. Detailed information on VPP is available on the OSHA website at http://www.osha.gov/dcsp/vpp/index.html . All contractors, whether regularly involved in routine site operations or engaged in temporary projects such as construction or repair, must follow the safety and health rules of Watervliet Arsenal.

Applicable contractors are required to annually submit to Watervliet Arsenal, ATTN: TAWV-XO-S/Safety Office, Bldg. 10, 1 Buffington Street, Watervliet, NY 12189-4000 or email: usarmy.watervliet.tacom.list.wate-safety@mail.mil the following documents (covering the previous calendar year quarters) by 15 January:

- Total Case Incidence Rate (TCIR) - the number of recordable injuries and illness cases per 100 full-time employees that a site has experienced in a given time frame.

- Days Away, Restricted, and/or Transfer Case Incident Rate (DART) - Number of recordable injuries and illness cases per 100 full-time employees resulting in days away from work, restricted work activity, and/or job transfer that a site has experienced in a given time frame.

- OSHA Form 300A

Applicable contractors may submit the above immediately following the completion of a quarter, if desired.

H._1_ SERVICES/CONSTRUCTION REQUIREMENTS

(a) SCHEDULE UNIT OF MEASURE NOTE: When "LOT" is stated as a unit of measure it is the equivalent to

"JOB".

(b) WORK PERFORMED ON-SITE AT WATERVLIET ARSENAL:

The contractor agrees that each employee working at Watervliet Arsenal will sign the “Contractor Personnel Agreement on Non-Disclosure of Watervliet Arsenal Technology below. Signatures must be received by the Contract Administrator before work may begin and any resultant delay won’t be considered an excusable delay to contract performance as defined in the contract clause “Default”. Additional copies of this Non-Disclosure Statement can be found on the Internet at http://www.wva.army.mil/Documents/Contracting/nondis.pdf

(d) CONTRACTOR PERSONNEL AGREEMENT ON NON-DISCLOSURE

OF WATERVLIET ARSENAL TECHNOLOGY

(1) The Undersigned, as an employee of _________________________ (Name of Firm) agrees to the following terms and conditions.

(2) Any knowledge gained, as a result of my being permitted on Watervliet Arsenal’s premises, concerning cannon production technology (as defined below) or other technology on any defense item being manufactured or developed at Watervliet Arsenal, will not be released outside of _________________________ (Name of firm) and/or the United States of America (this prohibition includes, but is not limited to, the company’s domestic and foreign subsidiaries, affiliates, etc.), nor will such technology be used to manufacture or assist another in the manufacture of cannon (as described below) or other defense items being manufactured or developed at Watervliet Arsenal, without the written prior approval of Watervliet Arsenal.

(3) Definitions:

(a) CANNON: is defined as any and all components/parts of a complete assembly consisting of a tube, breech mechanism, tube attachments, muzzle appendages, firing mechanisms, and all integral components.

It may also be a component of a weapons system of 40mm Bore or over such as tank guns, towed and self-propelled howitzers, naval guns, mortars and recoilless guns.

(b) CANNON PRODUCTION TECHNOLOGY: is defined as the technical data package and manufacturing technology.

(1) TECHNICAL DATA PACKAGE: cannon engineering drawings, specifications and standards.

(2) MANUFACTURING TECHNOLOGY: technical knowledge, documentation, assistance and equipment and machines used and/or useful in the manufacturing of cannon.

(c) TECHNICAL KNOWLEDGE: the know how collected, trade secrets, production experience and special skills necessary for the production of cannon and the technical information and inventions necessary for the manufacture of cannon and relating to the manufacture of cannon.

(d) TECHNICAL DOCUMENTATION: manufacturing technical data comprised of drawings, specifications, schemes, composition, descriptions, methods of calculations, instructions and other information necessary for the manufacture of cannon.

(e) TECHNICAL ASSISTANCE: all assistance required to make practical and economical use of the technology required to manufacture cannon, such as delivery of documentation, training of personnel, instructions, consultations and acquainting of specialists with the most economical method of using this technology in the manufacture of cannon.

(f) EQUIPMENT AND MACHINES: production machines, machine accessories, apparatuses, spare parts and tooling used for cannon manufacture.

TYPED OR PRINTED NAME, SIGNATURE DATE

TYPED OR PRINTED NAME, SIGNATURE DATE

TYPED OR PRINTED NAME, SIGNATURE DATE

(e) JOB SITE AVAILABILITY:

The work site will be available for performance during normal business hours:

Monday through Thursday Business Hours: 7:00 a.m. EST to 3:00 p.m. EST

Friday Business Hours: Every other Friday from 7:00 a.m. EST to 2:00 p.m. EST

Fridays will be staggered with every other Friday being a closed business day. The first Friday of 2023 to be closed is January 13, 2023.

Based on the above, service contractors should call contract/purchase order administrator in advance if service is scheduled for a Friday to determine if the Arsenal will be open for business.

When a federal holiday is normally observed on Friday, the Arsenal may be closed on the preceding Thursday. In this case, contact the contract/purchase order administrator in advance if scheduling service to determine if the Arsenal will be open for business.

Work at other than the above hours won’t be allowed unless the contractor makes an application at least 48 hours in advance and gets written contracting officer approval. No guarantee is made that the job site will be made available other than as stated above.

(f) CONTROL OF FOREIGN VISITORS TO WATERVLIET ARSENAL:

Offerors are advised that any employee or representative of their company who is not a U.S. citizen, (or is representing a foreign company) and is a U.S. citizen), planning on visiting the Watervliet Arsenal for the purpose of attending: bid conferences, bid openings, site visits, engineering services, or any other visit related to this solicitation will be escorted at all times by an arsenal representative while on the installation grounds.

Therefore, offerors must notify the Contracting Officer in advance (a minimum of two [2] weeks) of any proposed visit by a non-U.S. citizen or U.S. citizen representing a foreign firm, to assure proper clearance for entry into the arsenal. Failure to comply, or disclose a foreign national visitor, may subject the Contractor to the penalties set forth in 18 U.S.C.A. Section 1001, Chapter 14.

Due to manpower constraints, Watervliet Arsenal is often unable to provide escort services during contract performance. Therefore, if the resulting contract requires performance on Watervliet Arsenal property, employees, individuals or subcontractors representing the successful offeror who are not U.S. citizens may not, depending on staffing levels and the availability of escorts, be allowed access to the Arsenal for purpose of contract performance.

Be further advised that the inability of the Arsenal to provide escorts resulting in denial of access to Watervliet Arsenal of the aforementioned personnel will not be considered an excusable delay to contract performance as defined in the contract clause “Default” contained in the contract. Therefore, offerors should consider the above contingencies during offer preparation.

(h) CONTRACTOR IDENTIFICATION:

Contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence, and when working in situations where their actions could be construed as official government acts.

A.__ Electronic Contracting Electronic Bids/Proposals/Commercial Offers Required in Response to this Solicitation (June 2020) ACC-WVA

(a) All Army Contracting Command – Watervliet Arsenal (WVA) solicitations will be publicized on the SAM.gov website (https://sam.gov /). Any additional attachments, including Technical Data Packages, when available electronically, will be separate attachments or links embedded in the solicitation.

(b) Bids/Proposals must be submitted in electronic media. When submitting your bid/proposal electronically, the bid/proposal and any supplemental information (such as spreadsheets, backup data, technical information), can be submitted using any of the following electronic formats:

(1) Microsoft* Office Products (Watervliet can read Microsoft* Office 2007 and lower); Word, Excel, or PowerPoint. Spreadsheets must be sent in a format that includes all formulate macro and format information. Print image is not acceptable.

(2) Files in Adobe PDF (Portable Document Format). Scanners should be set to 300 dots per inch.

(3) Files in HTML (Hypertext Markup Language). HTML documents must not contain active links to live Internet sites or pages. All linked information must be contained within your electronic bid/offer and be accessible offline.

(4) Other electronic formats are not acceptable.

(c) Please select only one medium by which to transmit each bid/proposal.

(d) Timely receipt of offers/proposals:

(1) Your attention is called to the solicitation closing date and time on the solicitation is local time for the Army Contracting Command – Watervliet Arsenal (WVA). Lateness rules for electronic submissions for bids are outlined in FAR 52.214-7, “Late Submissions, Modifications, and Withdrawal of Bids,” for proposals in FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition” or FAR 52.212-1, “Instructions to Offerors-Commercial Items.” Pay particular attention to the applicable clause as it relates to the timing of submissions.

(2) NOTE: There is no “expected” or “target” length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned to submit their proposals allowing adequate time for submission.

(3) Solicitations may remain posted on the SAM.gov website after the solicitation closes. Even though the system may allow you to submit a proposal after the closing date/time, your proposal will be considered late and may not be considered for award.

(e) Security Note: If you choose to password-protect access to your bid/offer, you must provide the password to Watervliet Arsenal at least ten days prior to the opening/closing date. Contact the buyer identified in “Watervliet

Arsenal Information/Requirements”. Passwords used only for the purpose of write protecting files need not be provided.

(f) Electronic bids/proposals must include, as minimum:

(1) E-mailed bids/proposals must include a signed SF 33 cover sheet, SF 1449 or SF 1442 (whichever is applicable) that can be scanned. If scanned, attach it to your e-mail offer (or first e-mail message if you are sending multiple e-mails due to length).

(2) All applicable fill-in provisions. For solicitations issued on an SF 33 or SF 1442, this would include Sections A, B, F, and K. For solicitations issued on an SF 1449, you must review the solicitation to ascertain where all of the required fill-ins are located since commercial acquisitions do not have designated sections.

(3) A statement of agreement to all the terms, conditions, and provisions of the solicitation.

(4) Any other information required by the solicitation.

(g) Please see FAR 14.406 for a description of the steps the Government shall take with regard to unreadable electronic bids received via the media described in paragraphs (b) above. See FAR 15.207(c) for a description of steps the government shall take with regard to unreadable proposals.

(h) Bidders/Offerors shall make every effort to ensure that their bid/proposal is virus-free. Bids/proposals (or portions thereof) submitted which DO reflect the presence of a virus, or which are otherwise rendered unreadable by damage in electronic transit, shall be treated as “unreadable” per paragraph (h) above. Use of any formats other than those listed above may result in the file being quarantined and will be considered by Watervliet Arsenal to be “unreadable” files.

Note (Macros): The virus scanning software used by our e-mail systems cannot always distinguish a macro from a virus. Therefore, sending a macro embedded in an email message or an email attachment may cause the email bid/offer to be quarantined. In that event paragraph (g) above applies.

*Registered trademark

C.__ REQUEST FOR QUOTE RESPONSES

ALL RESPONSES MUST BE ELECTRONIC. YOU MUST SUBMIT YOUR QUOTE RESPONSES USING

THE FOLLOWING METHODS:

(a) Email to: maria.d.decrescenzo.civ@army.mil

(b) Request for Quotes must be filled out completely and sent in its entirety to be considered responsive.

SOW CLINS 0001, 0003, 0005

STATEMENT OF WORK (SOW)

FOR

Fire Extinguisher Inspection, Testing and Maintenance (IT&M)

AT

Watervliet Arsenal Building #35, 111, 40-4, 44, 110, 114, 115, 119, 124, 125, 133, 144, 150, 152.

Project #: WO22PW030

Installation Management, Public Works Division` Facilities Engineering (TAWV-IMP-F)

PR# 80476774

PART 1 GENERAL

SUMMARY OF WORK

a. This Statement of Work (SOW) defines the effort required for Inspection, testing, maintenance, and replacement of fire extinguishers post-wide. Internal and external inspection, hydrostatic testing, recharging, and maintenance repairs in accordance with NFPA 10 and Army Regulations. Provide test result data and certification of testing.

1.1.2 Location of Work

a. The work is located at the Watervliet Arsenal, approximately as indicated. The exact location will be shown by the Contracting Officer.

1.1.3 Period of Performance

a. The contractor shall be required to (i) commence work under this contract within 7 calendar days after the date the contractor receives notice to proceed, (ii) prosecute the work diligently, and (iii) complete the entire work ready for use not later than [30] calendar days after notice to proceed was given. The time stated for completion shall include final cleanup of the premises.

1.1.4 Hours of Operation

a. Normal duty hours are 7:00 AM through 4:00 PM, Monday through Thursday, and 7:00 AM through 3:00 PM on Fridays. Federal holidays are non-work days. If a federal holiday falls on a Saturday or Sunday, the preceding Friday or following Monday is a work holiday.

SUBMITTALS

1.1.5 General Submittal Requirements

a. The contractor shall provide submittal documents via e-mail to the Contracting Officer for review and approval. Provide all physical (non-document) submittals (including but not limited to material swatches, samples, etc.) directly to the Contracting Officer for review and approval. All submittals require government approval unless otherwise explicitly stated.

b. The contractor shall reference APPENDIX A “Consolidated List of Submittals” for the complete list of required submittals.

1.1.6 Contractor Safety Plan

a. The contractor shall submit a safety plan which is specific to the work activity being performed under the scope of this project for Government review and approval.

1.1.7 Lockout / Tagout (LOTO) Acknowledgement

a. The Contractor shall sign and submit a “Lockout/Tagout (LOTO) Notification Acknowledgement Record” prior to working on or de-energizing any electrical equipment.

1.1.8 Asbestos Notification Acknowledgement Record

a. The contractor shall sign the “Asbestos Notification Acknowledgement Record” and submit this form to the Project COR prior to starting project work.

1.1.9 Project Schedule

a. The contractor shall create a project schedule and submit for Government review and approval.

b. The project schedule shall detail the phases of work and the overall timeline for the execution of the work. The contractor shall include delivery dates, appropriate milestones, and shall clearly detail any requirements for work performed outside of regular hours of operation.

GENERAL REQUIREMENTS

1.1.10 Watervliet Arsenal Information for Contractors (WAIC)

a. The contractor shall perform all work in strict conformance with Watervliet Arsenal Instructions for Contractors (WAIC). The contractor shall read and understand this document prior to submitting a proposal. The WAIC is publically available at:

<http://www.wva.army.mil/Documents/Contracting/WAIC.pdf>

1.1.11 Utility Outage Requests and Utility Connection Requests

a. Schedule work to minimize outages. For utility outages and connections required during the execution of work that affect existing systems, coordinate schedule with COR. Schedule utility outages and connections to minimize disruptions to the Government. No additional payment will be provided for utility outages and connections required to be performed outside the regular work hours.

b. The contractor shall notify the Contracting Specialist a minimum of two (2) business days before the contractor starts work. The contractor shall notify the COR a minimum of seven (7) business days before the shut-down of a utility or building service.

1.1.12 Safety Requirements

a. The contractor is required to provide the proper control of hazardous energy (lockout/tagout) per

OSHA 29 CFR 1910.147.

b. The contractor shall inspect the project work site prior to starting work, and shall request a copy of the asbestos building inspection records to verify the location and description of known asbestos-containing materials.

ON-SITE PERMITS

1.1.13 Excavation (Dig Permit)

a. The clearance of buried utilities will be performed by the Government in advance of the Contractor performing subsurface work, unless otherwise explicitly stated.

b. The Contractor shall obtain a copy of the completed Utility Clearance Permit (WVA Form 420-2-E) from the COR prior to performing subsurface work. Verify existing utility locations indicated on contract drawings, within area of work.

1.1.14 Hot Work and Confined Space

a. Obtain permit for welding, burning, use of flame, or entry into confined space from WVA Fire

Department by calling (518)266-5990 each day the permit is to be used.

APPLICABLE DOCUMENTS

1.1.15 Specifications

a. The following specifications accompany this Statement of Work and are a part thereof.

i. UFGS 10 44 16 Fire Extinguishers

1.1.16 References

a. The following references accompany this Statement of Work and are a part thereof.

i. Watervliet Arsenal Instructions for Contractors (WAIC).

ii. NFPA 10 Standard for Portable Fire Extinguishers.

iii. NFPA 10 Chapter 7 Inspection, Maintenance, and Recharging.

CONTRACTOR EQUIPMENT

1.1.17 Equipment Identification

a. The contractor shall create and affix a label to all large equipment, dumpsters, and other mobilized property, which is weather-resistant (laminated, or within a see-thru label hanger), securely affixed to the equipment or visible through a window, and which clearly displays the General Contractor’s:

i. Company Name, POC Name (first, last), POC phone number, Project Number.

1.1.18 Waste Dumpster

a. The contractor shall place any waste dumpsters in a manner that does not interfere with thru-traffic.

b. Place waste dumpsters with a minimum of 33’ clearance from any building. The final location shall be coordinated with, and approved by the COR before any dumpsters are mobilized.

c. Cover all waste dumpsters when not in use, and before the end of each work shift. The cover shall be weather-tight.

d. The Contractor shall submit all Bills of Lading and Weight Slips associated with the disposal of all construction and demolition (C&D) debris to the Contracting Officer on a monthly basis. The contractor shall provide this information within ten (10) days of disposal of the waste.

PART 2 PRODUCTS

GENERAL

All work shall be in strict accordance with product manufacturer’s instructions and specifications, including but not limited to manufacturer guidance for storage, staging, application, installation, and disposal of the product.

2.1.1 Hazardous Materials

a. The contractor shall submit Safety Data Sheets (SDS) for all hazardous materials to be used.

2.1.2 Asbestos, Mercury, Lead, PCB

a. Unless otherwise stated, all materials for this project shall be new. All products shall not contain any asbestos, mercury, chromium/lead paint, Class I Freon, and Polychlorinated Biphenyls (PCB), and shall state such on the manufacturer’s original packaging.

2.1.3 DoD Green Procurement Program

a. All construction materials shall meet the applicable requirements of the DoD Green Procurement

Program, specifically recycled content products, environmentally preferable products and services, biobased products, energy-and water-efficient products, alternate fuel vehicles and alternative fuels, products using renewable energy, and alternatives to hazardous or toxic chemicals as found at <http://www.acq.osd.mil/dpap/cpic/cp/docs/USA001967-08-DPAP.pdf>.

2.1.4 Paint

a. To meet the Affirmative Procurement Program (Federal Government’s Buy Recycled

Requirements) all paint used in the project shall adhere to the below listed requirements of the Comprehensive Procurement Guideline for recovered materials. This applies only to interior latex paint, only if available at the time of the project.

i. Reprocessed Latex Paint (White, Off-White, Pastel Colors) shall contain 20% Post consumer content.

ii. Reprocessed Latex Paint (Grey, Brown Earth tones, and Other Dark Colors) shall contain 50-99% Post consumer content.

iii. Consolidated Latex Paint shall contain 100% Post consumer content.

PRODUCTS

2.1.5 Fire Extinguishers – UL rating 10A:120B: C Sentry, Buckeye, Amerex ABC 20LB or equivalent.

PART 3 EXECUTION

ITEMS OF WORK

3.1.1 General Project Requirements

a. The contractor is required to review the project site, and obtain and/or verify all measurements and project data/information required to perform this project work. In addition, the contractor is required to review all contract documents, and provide written notice to Contracting Officer of any discrepancies that are found.

b. The contractor shall supply all tools, materials, supplies, equipment, labor, temporary utilities and supervision necessary for a complete and appropriate execution of the contract documents and requirements of this SOW.

c. The SOW and any Project Drawings and Specifications do not indicate each component, device, fastener, fixture, or similar incidental item necessary for the performance of the Work. The Contractor shall provide, furnish, and install all necessary and appropriate components, devices, fasteners, fixtures, or similar incidental items as necessary and required to provide complete, operable, and functional system to suit the intended purpose.

3.1.2 Execution

a. The contractor shall be responsible for all labor, testing, freight and cost associated with internal and external inspection, hydrostatic testing, recharge, and maintenance of Fire Extinguishers. There are approximately 76 each ABC 20lb Fire extinguishers.

i. Contractor will conduct Hydrostatic testing, recharging and maintenance in accordance with all applicable standards, regulations, and codes required by the most up to date NFPA 10 (Standard for Portable Fire Extinguisher’s), Federal, State, OSHA, and local authorities, fire extinguisher manufacturer’s service manual, for all fire extinguishers.

ii. Price for the hydrostatic testing and recharges will include any incidental repairs associated with the tests.

iii. Any incidental repairs such as hose replacement, hose retainer clip, pressure gauge and or any part of the fire extinguisher that has failed the testing or inspection will notify the contracting officer of the price if not covered under hydrostatic testing and recharge.

iv. For the fire extinguishers that have failed hydrostatic testing, the contractor will provide a price for a single 20lbs. Fire Extinguisher, new along with certification and standard 1-year commercial warranty.

b. The contractor shall come to a central location chosen by the project COR to pick up and transport the fire extinguishers to be tested.

i. This (IT&M) shall be accomplished in intervals, so there is no loss of protection.

ii. All serial tags and numbers identifying the Fire Extinguisher will remain intact, as to allow the government employees to reinstall the Fire Extinguishers when testing is complete.

c. Once tested, recharged and or repaired, the contractor will provide test results for each fire extinguisher to the project COR. Test results shall be in electronic PDF format and paper copy. Test results shall include, but is not limited to:

i. Certification of testing.

ii. Date of testing, signature of person(s) performing testing, serial number, and a pass or fail result.

d. Contractor shall transport, discharge, and recycle approximately 70 each 20LB ABC formerly hydrostatically tested, expired Fire Extinguishers.

i. Bill of Lading for recycled materials shall be provided to project COR.

e. The contractor shall maintain and update records and inventory of all Fire Extinguishers that have been tested and serviced to be able to provide records upon request.

CLOSEOUT REQUIREMENTS

3.1.3 Construction and Demolition Debris

a. The Contractor shall submit copies of all Bills of Lading and Weight Slips associated with the disposal of construction and demolition (C&D) debris and/or recycled materials, under this scope of work. Submit documentation per Appendix A, “Consolidated List of Submittals”.

3.1.4 Cleanup of Work Site

a. The contactor shall clean all work areas and remove all tools, equipment, debris, materials, and all waste from the premises.

b. The contractor shall remove all debris from any remote holding locations, to include any excavation and concrete equipment chute cleanout debris.

c. The contractor shall remove their equipment from Watervliet Arsenal premises within five (5) working days after completion of project work.

3.1.5 Restoration of Work Site

a. The contractor shall repair any items, building surfaces, equipment or miscellaneous items which were damaged during the execution of this SOW. Items that cannot be repaired to restore original function or aesthetics shall be replaced in kind by the Contractor at no additional charge to the Government.

b. Grass, trees, and other vegetation affected by project work shall be restored to same or better condition as existed prior to the start of project work. The Contractor shall prepare the affected areas to eliminate uneven areas and low spots. Remove foreign materials, weeds, and damaged soil. The Contractor shall scratch the area to a depth of three (3) inches where topsoil is to be placed. Spread topsoil to a uniform, compacted depth of less than five (5) inches over areas to be reseeded. Rake until smooth. The Contractor shall seed, fertilize, and water the area to establish grass.

3.1.6 Warranty

a. The contractor shall provide a [1] year warranty on repaired/hydro tested Fire Extinguishers.

b. The contractor shall provide a [1] year warranty on new Fire Extinguishers.

PART 4 APPENDICES

a. Consolidated List of Submittals

b. Quality Assurance Surveillance Plan (QASP)

APPENDIX A: Consolidated List of Submittals

Line Item Submitted Submittal Needed By

Submittal Reviewed By (Office)

1 Safety Data Sheets for Hazardous Materials

(SDS)

NLT 7 Calendar Days After Award

Safety Office

2 Signed Contractor Asbestos Notification Form

NLT 7 Calendar Days After Award

Environmental Office

3 Signed Lockout/Tagout (LOTO) Notification Acknowledgement Record

NLT 7 Calendar Days After Award

Safety Office

4 Project Schedule NLT 7 Calendar Days After Award

COR

5 Contractor Safety Plan NLT 7 Calendar Days After Award

COR

6 Solid Waste Reporting Log, Bills of Lading, Dump Slips for C&D Debris and Recycled Materials

NLT the 10th Day of the Following Month, and at Project Completion.

Environmental Office

7 Fire Extinguishers. 20 LB NLT 7 Calendar Days after Award

COR

8 Certificates of Testing NLT the 10th Day of the Following Month, and at Project Completion.

COR

9 Personnel Training Certificates NLT 7 Calendar Days After Award

COR

A. Price for the hydrostatic testing and recharges will include any incidental repairs associated with the tests. Price per hydrostatic testing and recharge of 20 Lbs. Fire Extinguishers $___. And Price per hydrostatic testing pressurized water extinguisher (no recharge) $ ____.

1. Price for replacement parts such as:

a. Hose Replacement $___

b. Hose Retainer Clip $___

c. Pressure gauge $___

d. Hose Retainer $___

e. Valve Assembly $___

2. For the fire extinguishers that have failed hydrostatic testing, the contractor will provide a price for a single 20lbs.Fire Extinguisher, new (not reclaimed) along with certification and standard 1 year commercial warranty.

a. For the units that fail hydrostatic testing the contractor will provide a price per new unit including mounting bracket. $____.

3. -Price for all units will be inclusive of freight and shipping back to the centralized location on the Watervliet Arsenal.

PWS CLINS 0002, 0004, 0006

PERFORMANCE WORK STATEMENT

FOR

Inspection/Testing of Fire Suppression Systems

AT

Watervliet Arsenal

1. General:

1.1:Description:

This Performance Work Statement (PWS) defines the tasks for the following required services contract for fixed fire suppression system inspections and repairs for one (1) base year, and two option years at Watervliet Arsenal, 1 Buffington Street, Watervliet, NY, 12189. Any work performed shall be subject to approval from the Watervliet Arsenal Firehouse. In summary, the required services include:

A. Bi-Annual Inspection/testing of fixed fire suppression systems on machines, and in various areas required per applicable NFPA codes. These are generally CO2 or equivalent “clean agent” systems (See Section 2.1).

B. Repairs to address deficiencies from previous NFPA inspection reports. (See Section 2.3) C. Updates/retrofits required to bring all machine tools at the Arsenal into compliance with NFPA and DOT codes, as well as updates (installation of discharge pressure switches, etc.) to enable machine tools to be connected to the Arsenal’s Simplex Truesight® Workstation at the Firehouse (See section 2.3).

D. Contractor shall work with SimplexGrinnell as required in order to facilitate connection to the Simplex modules/main panel as described in item C.

1.2:Hours of Operation.

1.2.1: Normal duty hours are 7:00 AM through 4:00 PM, Monday through Thursday, and 7:00 AM through 3:00 PM on select Fridays (the arsenal is closed every-other Friday). Federal holidays are non-work days. If a federal holiday falls on a Saturday or Sunday, the preceding Friday or following Monday is a work holiday.

1.3: General Requirements.

The contractor shall perform all work in strict conformance with Watervliet Arsenal Instructions for Contractors (WAIC). The contractor shall read and understand this document prior to submitting a proposal. The WAIC is publicly available at:

http://www.wva.army.mil/Documents/Contracting/WAIC.pdf 1.3.1: The contractor shall supply all tools, materials, supplies, equipment, labor, temporary utilities and supervision necessary for the complete execution of the requirements within the contract documents and requirements of this

PWS.

1.3.2: The contractor shall, prior to submitting a proposal, review (i) all contract documents, and (ii) the project work site, and shall provide written notice to Contracting Specialist detailing any discrepancies that are found between the contract documents and the project work site.

1.3.3: The contractor shall notify the Contracting Specialist a minimum of two (2) business days before the contractor starts work. The contractor shall notify the COR a minimum of seven (7) business days before the shut-down of a utility or building service.

1.3.4: The contactor shall clean all work areas, at the end of each work day, to remove all tools, equipment, debris, materials, and all waste from the work site.

2. Tasks:

2.1: NFPA Required Inspections, Description/Reporting/Deficiencies/Ad-Hoc Repairs:

2.1.1: Contractor shall conduct a function test of all components (valves, nozzles, tamper switches, discharge switches, alarms and manual activation systems, cylinder weights, hoses) of the system to ensure proper function for an actual discharge as per NFPA requirements bi-annually on the fire suppression systems specified in section 2.2.

Two inspections are required per NFPA code: one in January time frame and a second inspection in September time frame. Exact dates for inspections are to be mutually agreed upon by the requiring Activity Representative and the contractor.

*NFPA 12- Chapters 4 and 5 of Carbon Dioxide Extinguishing systems *NFPA 17- Chapter 11 of Dry Chemical Extinguishing system *NFPA 72- National Fire Alarm Code 2.1.2: Bi-Annual NFPA Inspection reports: Contractor shall provide an electronic copy to the process owner/POC of bi-annual inspection reports (in Adobe PDF or similar tamper resistant format) via email for electronic storage within the Arsenal’s electronic maintenance system, IAW CDRL 001.

2.1.3: Deficiencies: Any system that did not pass inspection: The Requiring Activity Representative will be notified as soon as possible in writing IAW CDRL 002. The contractor will provide a solution for evaluation within 24 hours, in an effort to repair the system back to operational state. Contractor shall provide separate written quote for evaluation to the requiring activity representative for any parts found to be not operational IAW CDRL 003.

2.1.4: Ad-Hoc Repairs: An additional dollar amount not including the price of inspections will be determined at time of award and will be used for general ad-hoc repairs such as:

-Hydro testing nozzle replacements -Hydro testing bottles -Detection/notification sensors -Pull station parts -Hose replacement

Any work or parts needed to repair the system back to operational state will be brought to the attention of the Requiring Activity Representative in writing; and worked on after evaluation and approval from the contracting office; within the limitations of the funds set aside for general repairs.

2.1.5: Hydrostatic Testing: Contractor shall compile a record of the current hydrostatic test (HST) dates, frequency of required HST and date of next HST test due for each component of each system requiring such test and a written copy will be issued to the owner for record purposes, IAW CDRL 004.

2.1.6: Additional Machines: IMPORTANT: Any additional machines that are installed during the course of the contract needing inspections due to the Watervliet Arsenal’s current modernization efforts will be reviewed annually, quotations will be provided by the contractor and incorporated via modification at time of exercise of option, if acceptable to the requiring activity.

2.2: Specific Systems to be Inspected:

2.2.1: Building Areas: Areas equipped with fire suppression systems: The contractor shall inspect and test the CO2

SYSTEMS in the following buildings per the applicable NFPA requirements:

‐ 35 Heat Treat Area ‐ 35 Minor Plating Area

‐ 135 Rotary Forge

- 110 Paint/Chemical Storage Area

2.2.2: Machine Tools: The CO2 /Dry Chemical Fire Suppression systems on the following 8 machine tools shall also be inspected and tested per the applicable NFPA requirements:

Building 25: WV12818, WV12819, WV12858 (Star Lathes)

Building 25-2: WV12920, WV12941, WV12779 (Tool and Cutter Grinders) Building 35: WV12810 (Ekin Broach Grinder), WV12951 (Corvus Broach Grinder).

2.2.3: Inspection Schedule: IAW CDRL 009, the contractor shall provide a schedule of the bi-annual inspections for each system within fifteen (15) days after the contract has been awarded for the first year, and each option year thereafter as applicable to the requiring activity representative.

2.3: Additional required repairs:

2.3.1: Building 35, Heat Treat Area Quench Tank-Replace defective discharge pressure switch 2.3.2: Building 135, Rotary Forge-Replace Broken CO2 discharge nozzles, add in NFPA 12 required signage for CO2 for activation stations/Carbon Dioxide.

2.3.3: Building 25, WV12779 (Holroyd Broach Grinder)-Perform a full replacement and conversion from current European designed 230 Volts AC Kidde® system to an NFPA compliant 120 Volts AC CO2 system. WVA representative will provide drawings/schematics of machine as required.

a. Replace Argonite tank/hoses with equivalent DOT compliant tank(s)

b. Replace control panel as required in order to make system testable,

c. Assist SimplexGrinnell to tie in IM module to main Firehouse Panel

d. Current configuration is:.1-89.6 kg Argonite tank, 230 volts, with protection volume inside machine of approximately 500-700 cubic feet.

e. Documentation of system test instructions, and applicable procedures shall be provided by the contractor

IAW CDRL 005 to the requiring activity representative for electronic storage.

f. The contractor shall provide an Operation and Maintenance Manual for the new fire suppression system to the requiring activity representative IAW CDRL 006.

2.3.4: Building 35-1, WV12810, Ekin Broach Grinder- This machine tool has a CO2 Fire Suppression system which is currently functional. However, it lacks a written procedure to perform functional tests of the system which is written in the English language. This system utilizes Ultraviolet Infrared Flame Detector(s), has 2-10 kg CO2 tanks, and has a protection volume of approximately 500- 700 cubic feet.

The contractor shall provide, in their solicitation, a line item for one of the following two alternatives as a solution to facilitate NFPA compliant testing, and connection to the Arsenal’s fire suppression network for this machine tool.

a. Develop and document, in the English language, a written test procedure for the current Kraft and Bauer System which will provide written instructions/procedures which will enable any qualified NYS Fire Protection Inspector to inspect the system bi-annually according to NFPA 12 requirements. If this alternative is selected, the vendor shall provide an electronic copy of the written test procedure to the requiring activity representative IAW CDRL 007.

This alternative is preferred over replacing the system as the system has been specifically designed by the Original Equipment Manufacturer and would avoid the need to reverse-engineer the currently installed system on the machine tool which utilizes Ultraviolet Infrared sensors for flame detection. Contractor would be required to contact OEM (Kraft and Bauer) for specific information regarding instructions for testing the system. If the contractor determines option (a) is the more feasible alternative for technical and safety reasons, the contractor shall install a discharge pressure switch on the current system and adjust quote accordingly.

b. In the event that the system cannot be tested, perform a full replacement of the CO2 system with a compatible domestic system which is readily testable by any qualified NYS Fire Protection Inspector. The replacement system’s control panel shall provide means for connection to the Arsenal’s fire suppression system via an addressable IM module to be installed by SimplexGrinnell. Documentation for testing this system shall be provided to the requiring activity representative IAW CDRL 005. Manufacturer’s operation and maintenance manual shall be provided to the requiring activity representative IAW CDRL 006.

2.3.5: For any newly installed systems, the contractor shall provide, upon completion of the installation, an initial certification and test report stating that the system functions in compliance with the manufacturer’s specifications and test parameters, IAW CDRL 008.

2.3.6: Install discharge pressure switches to facilitate interface with SimplexGrinnell Fire Suppression System network via addressable modules (modules to be installed by Simplex Grinnell at a later date).

Assist SimplexGrinnell to tie in the following machine tools to main firehouse panel at the point of connection to the addressable modules. SimplexGrinnell will install addressable IM modules at a later date once all machines have the required discharge pressure switches installed:

a. WV12818, Building 25-1, Star Lathe-Install Discharge Pressure Switch required on Firetrace system, tie in IM module with SimplexGrinnell.

b. WV12819, Building 25-1, Star Lathe-Install Discharge Pressure Switch required on Firetrace system, tie in IM module with SimplexGrinnell.

c. WV12858, Building 25-1, Star Lathe-Install Discharge Pressure Switch required on Firetrace system, tie in IM module with SimplexGrinnell.

2.3.7: Machines requiring contractor to assist SimplexGrinnell:

d. WV12920, Building 25-2, Walter Tool & Cutter Grinder-tie in IM module with SimplexGrinnell

e. WV12941, Building 25-2, Walter Tool & Cutter Grinder-tie in IM module with SimplexGrinnell

f. Corvus Broach Grinder, Building 35-1: -tie in IM module with SimplexGrinnell

CLAUSES INCORPORATED BY FULL TEXT

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .