Warranties.pdf
PDF 71 KB Posted
- Attached to
- Roofing Inspections & Repairs for a base and two option Years with Watervliet Arsenal, Watervliet, NY
- Solicitation number
- W911PT22Q0035
About this file
This document contains details on a federal contract opportunity for roofing inspections and repairs services. The solicitation seeks a contractor to perform semi-annual roof inspections and repairs of damage for buildings located at the Watervliet Arsenal in Watervliet, New York over a one year base period and two option years. The estimated period of performance is 1 June 2022 through 31 May 2023. The solicitation number is W911PT22Q0035 and will be set aside 100% for small business concerns. It will be posted on https://sam.gov/ on 28 March 2022 under the Army Contracting Command ACC-Warren. Offerors must have an active SAM registration including representations and certifications to be eligible for award. The project aims to follow applicable FAR sustainable acquisition principles.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001 22-Q-0035.pdf | ||
| UFGS 07 51 13 - Built-Up Asphalt Roofing.docx | DOCX document | |
| W911PT22Q0035.pdf | ||
| 07 WVA 01-2 - Membrane Roofing (TPO).doc | DOC document | |
| 07 WVA 01-3 - Membrane Roofing (EPDM).doc | DOC document | |
| 21PW046_SOW.docx | DOCX document | |
| Bid Items.pdf | ||
| Buildings.pdf | ||
| UFGS 07 32 14 - Clay Tile Roofing Replacement or Repair.docx | DOCX document | |
| UFGS 07 22 00 - Roof and Deck Insulation.docx | DOCX document | |
| UFGS 07 60 00 - Flashing and Sheet Metal.docx | DOCX document | |
| 07 WVA 01-1 - Metal Roofing.doc | DOC document | |
| UFGS 07 31 13 - Asphalt Shingles.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building Name SF Warranty Year of Install 10 Campbell Hall 23,480 X 2015 15 Motor Pool 23,818 16 South Gate House 411 20 Major Components Mfg. 92,583 21 O'Keefe Hall 16,574 X 2017 23 Supply Bldg, Crib 1, Pre-set 6,998 X 2009 25 Minor Components Mfg 63,455 29 Switch Gear Bldg 215 30 Sewage Bldg 156 35 Medium Caliber Tube Bldg 341,898
35A Medium Caliber Tube Bldg 36 Industrial Waste Treatment Plant 521 X 2011 43 Main Gatehouse 142 44 Dalliba Hall 30,019 X 2020
111 Gillespie Gatehouse 128 112 H.P. Gas Dynamics & Simulation Bldg 5,012 114 Research & Engineering Bldg 4,680 115 Maggs Research Center 31,648 X 2020 120 DPW Bldg 37,063 X 2011 121 Research, Engineering Lab 6,181 122 Research, Engineering Lab 2,215 123 Decreasing, Cleaning 11,803 125 Breech Comp, Weld Shop 127,152 X 2007 130 Storehouse, Supply Cribs 28,051 131 Propoane Storage 308 133 Storage 7,386 135 Miller Cannon Production 190,000 X 2020 136 Boiler Plant 13,462 X 2013 138 Acid Storage 829 139 Inert Gas Storage 816 140 Flammible Gas Storage 835 144 Electric Meter House 80 145 Warehouse 117,402
Total SF= 1,185,321
General Notes:
1) Information is based off of warranties in our files.
2) Not all of the warranties cover full roof replacement.
Warranties
File details come from the government source that posted it. Updated .