REPLACE 15kv CABLES, LOOP #3 SOUTH 3B1 - 3B2 @ WVA Federal contract opportunity
Solicitation number
W911PT-20-R-0010
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

This is an amendment to a federal solicitation modifying the terms of the contract. The amendment incorporates an additional line item for the replacement of wet underground cables between specified buildings on the installation. The new line item is a firm fixed price option that will cover the labor, materials, and equipment to replace the cables in accordance with existing specifications and applicable wage determinations. The estimated value of the work is between $500,000 and $1,000,000. The amendment provides additional details on acceptance criteria, delivery schedules, and contract clauses relating to the evaluation of options.

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE 15kv CABLES, LOOP #3 SOUTH 3B1 - 3B2 @ WVA, newest first.
File Type Posted
26 05 53 - Identification For Electrical Systems.pdf PDF
UFGS 33 71 02_Underground Electrical Distribution.pdf PDF
26 05 26 - Grounding And Bonding For Electrical Systems.pdf PDF
26 05 05 - General Provisions For Electrical Systems.pdf PDF
UFGS 26 05 19.10 10_Insulated Wire and Cable.pdf PDF
W911PT20R0010-0002.pdf PDF
26 05 13 - Medium Voltage Cables.pdf PDF
W911PT-20-R-0010-0001.pdf PDF
20PW013_SOW_R1_Replace 15kV Underground Electrical Cables, Loop.docx DOCX document
W911PT-20-R-0010.pdf PDF
WD DATED 2.7.2020.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16H1F002100NT

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is issued to incorporate Option Line Item 0002, for the Replacement of w et underground cables betw een Main-Substation to Emergency Sw itching Station & Main-Substation to 5B1-Substation, per Sketch "PN86414_SK-1_15kV Wet Cable Manhole Map.pdf" and existing Specifications incorporated to this solicitation.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Mar-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911PT20R0010

X 9B. DATED (SEE ITEM 11)

21-Feb-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Mar-2020

CODE

ARMY CONTRACTING COMMAND-WARREN (WVA)

ATTN: CCTA-HDW/BLDG 10

1 BUFFINGTON STREET

WATERVLIET NY 12189-4000

W911PT 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911PT20R0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0002 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Lot OPTION Replace 15kv Wet Underground Cables

FFP

To cover the cost of labor, material and equipment for the Replacement of wet underground cables between Main-Substation to Emergency Switching Station & Main-Substation to 5B1-Substation,. All work to be in accordance with existing applicable specifications per Sketch "PN86414_SK-1_15kV Wet Cable Manhole Map.pdf", which is attached and incorporated.

Wage Determination General Decision NY2 (Latest Revision) applies and is incorporated.

Magnitude of both projects is between $500,000 and $1,000,000.

Contracting Officer's Representative is Dave Fisher.

100% Payment and Performance Bonds are required.

FOB: Destination

PSC CD: Z2NZ

NET AMT

SECTION E - INSPECTION AND ACCEPTANCE

The following Acceptance/Inspection Schedule was added for CLIN 0002:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

Destination Government Destination Government

SECTION F - DELIVERIES OR PERFORMANCE

The following Delivery Schedule for CLIN 0002 has been added:

W911PT20R0010

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

01-NOV-2020 1 ARMY CONTRACTING COMMAND-

WARREN (WVA)

SERVICES TEAM

ATTN: CCTA-HDW/BLDG 10

1 BUFFINGTON STREET

WATERVLIET NY 12189-4000

518-266-4535 FOB: Destination

W911PT

SECTION I - CONTRACT CLAUSES

The following have been added by full text:

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 30. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of clause)

SECTION M - EVALUATION FACTORS FOR AWARD

The following have been added by full text:

52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).