QA_Tracker__1500_Ton_Press_22_JUN_18.pdf

PDF 70 KB Posted

Attached to
1500 Ton Straightening Press Federal contract opportunity
Solicitation number
w911pt18r0013
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to 1500 Ton Straightening Press, newest first.
File Type Posted
W911PT-18-R-0013_Amendment_002.pdf PDF
W911PT-18-R-0013_Amendment_001.pdf PDF
W911PT-18-R-0013.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question # Date Received Document Reference Question Government Response 1 6/1/2018 Solicitation What is the current make and model of the existing machine at Waterlviet Arsenal?

Our existing machine, WV12797, is an Empire model

SPCL285-CP.

2 6/20/2018 Solicitation Since encore tells us they can not ensure the level of accuracy, is the intention for us to introduce a second ID measurement device in order to obtain .001 " decimal place accuracy? If we are to add a second ID measurement device, what is the intention of motorizing a wire to automate the Encore Unit, when we need an ID measurement second device? Should we record signals from each?

Paragraph 3.2.12.2 ID Alignment - no longer states a tolerance that would require the Encore Electronics Bore Alignment Gauge to measure accuracies beyond its capabilities, however, paragraph 3.2.12 Bore Alignment Gauge states that measurement to three (3) decimal places is required for both ID and OD alignments.

Sheet1

File details come from the government source that posted it.