About this file

Amendment 0001 to W911PT-16-Q-0137.

View the file

Other files for this federal contract opportunity

Other files attached to Install OSHA Railing; Flooring, Lighting in B38, newest first.
File Type Posted
Amendment_16-Q-0137-0002.pdf PDF
SK-1_-_Revised_Layout.pdf PDF
5BL011_SOW_Install_OSHA_Railings_Rev2.docx DOCX document
Wage_Determination_NY160002_07-29-2016_NY2.txt TXT text file
Site_Visit_Announcement.doc DOC document
W911PT-16-Q-0137.pdf PDF
Drawing_Attachments.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16H1F605702EF

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Additional Information from the August 9, 2016, site visit is added per attached.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911PT-16-Q-0137

X 9B. DATED (SEE ITEM 11)

02-Aug-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Aug-2016

CODE

ARMY CONTRACTING COMMAND-WARREN (WVA)

ATTN: CCTA-HDW/BLDG 10

1 BUFFINGTON STREET

WATERVLIET NY 12189-4000

W911PT 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

ronald.a.ascher.civ@mail.milEMAIL:(518) 266-4643TEL:

RONALD ASCHER / CONTRACT SPECIALIST

W911PT-16-Q-0137

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been added by full text:

ADDENDUM TO SOW 5BL011

Clarifications based on the August 9th, 2016, site visit are as follows:

1) Coordination for moving items on/under mezzanine and in warehouse space will be handled by the Government.

2) The contractor shall furnish and install 1/2" plywood over the existing flooring surface on the east and west mezzanine. The plywood need only to be screwed down. Fasteners shall be sized appropriately and intended for such an application.

3) The breaker in the electrical panel is a General Electric TEY.

4) In order to comply with code, the new transformer will need to be placed under the northeast stairwell in lieu of the utility closet, Room 114 (see attached for new location). This is approximately 75 feet from the utility closet. An access hatch will also be required next to where the conduit passes through the wall.

5) The contractor shall submit shop drawings detailing all aspects of the lighting control system to include but not limited to fixture types, locations, control zones, wiring diagrams, etc. for review and approval prior to release for fabrication. Lighting control system drawings shall include electric riser diagrams and show circuiting to panels. Layout of fixtures shall take into account sprinklers and location of fire alarm components. To the best extent possible develop layouts that work around collisions.

6) The contractor shall NOT permanently affix luminaires to any part of the cast iron structure as it is considered historical. All fixtures shall be installed using mounting clamps or cable ties. Fixtures and Unistrut for upper mezzanine(s) may be clamped to the cast iron beam. Location and mounting method shall be marked on the shop drawings.

7) Wiring shall be installed in either MC or EMT conduit. Conduit shall be ¾" and strapped and supported per NEC code. Flexible wiring may be used for areas where conduit is not feasible.

8) The contractor shall install new 3 way switch circuits at the North and South double doors. Switches shall operate fixtures for the center bay, upper mezzanine, and lower mezzanine. Contractor shall also install switches at the fire door and office door on the upper mezzanine level. At least one fixture at each of the ingress/egress points shall operate via a motion or infrared detector for nighttime safety.

W911PT-16-Q-0137

9) It is acceptable to use handrail brackets instead of welded continuous handrails so long as the handrail design meets loads of OSHA.

10) The office on the west mezzanine shall remain, the walls on the east mezzanine shall be removed.