PP-63_-_Boldt_Machinery_-_Mori_Seiki_Steady_Rests_OEM.pdf

PDF 1 MB Posted

Attached to
Steady Rests per Spec. 6-16-3419
Solicitation number
W911PT-16-Q-0076
Issued by

About this file

Sole Source Justification

View the file

Other files

File Type Posted
W911PT-16-Q-0076.docx DOCX document
Sole_Source_Attachment_-_Boldt_Machinery_-_Copy.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUSTIFICATION FOR SOLE SOURCE

SMALL PURCHASE ACTION

1.

Competition not feasible and practicable for the following reasons:

Supply: Only known source to provide direct replacement parts that will interface and be compatible with existing equipment.

Service: Only known source with the schematics, drawings, and technical knowledge to repair equipment to its original functioning capacity.

Original Equipment Manufacturer:

This acquisition will be negotiated on a noncompetitive basis with

Restricted to one source by Source Controlled Drawing.

Contractor has proprietary rights to software/hardware. Only source to provide enhancements, upgrades, and technical support.

Complete drawings, specifications and technical data are not available.

The acquisition must be effected by this contractor's part number.

Other

By soliciting available distributors with an estimated cost of:

In compliance with FAR 13.106-1(b), I have reviewed the proposed acquisition of

By negotiating on a noncompetitive basis with

This acquisition will be on a brand name only basis (supporting documentation is attached).

The procurement will be accomplished:

2. On the basis of the facts above which are supported in the file, I have determined that it is impractical to obtain competition for this acquisition.

CONTRACTING OFFICER SIGNATURE DATE LEGAL REVIEW SIGNATURE (Waiver attached) pp-63 6 October 2015 gerard.mangione Typewritten Text See Sole Source Justification in PCF file.

gerard.mangione Typewritten Text

SF 4853 - Justification for Sole Source jacobsol

JUSTIFICATION FOR SOLE SOURCE SMALL PURCHASE ACTION

1.

Competition not feasible and practicable for the following reasons:

with an estimated cost of:

In compliance with FAR 13.106-1(b), I have reviewed the proposed acquisition of

2. On the basis of the facts above which are supported in the file, I have determined that it is impractical to obtain competition for this acquisition.

CONTRACTING OFFICER SIGNATURE

DATE

LEGAL REVIEW SIGNATURE (Waiver attached) pp-63 6 October 2015

CheckBox1: 0
CheckBox2: 0
CheckBox3: 0
CheckBox4: 1
CheckBox5: 0
CheckBox6: 0
CheckBox7: 0
CheckBox8: 0
CheckBox10: 0
Text3: Boldt Machinery
Text5: Boldt Machinery
Text4:
CheckBox11: 1
CheckBox9: 1
Text2: 72000.00000000
Text1: Steady Rests per Spec. # 6-16-3419
Date1: 2016-04-06
CONTRACTING OFFICER SIGNATURE:
PrintButton1:

File details come from the government source that posted it. Updated .