SOW Chrome Plating Process Details.pdf
PDF 105 KB Posted
- Attached to
- chrome plating of cover tubes
- Solicitation number
- W911N2-27-Q-A011
About this file
This is a Statement of Work for chrome plating services for cover tubes at Letterkenny Army Depot (LEAD). The contractor must perform pre-grinding and evaluation of parts received in original chrome-plated condition, stripping the seal area to remove damage while maintaining a minimum allowable diameter of 3.970 inches. The repaired seal area width must be 1.38 ± 0.12/–0.03 inches; if the received part's chrome-plated area is less than required, the contractor shall pre-grind and prepare it to meet specifications, but if greater than required, the contractor must contact the Government before proceeding.
Under Standard Plate and Finish procedures, the contractor shall chrome plate the seal area in accordance with SAE AMS-QQ-C-320, Class 2, then final grind to a diameter of 4.000 to 4.005 inches with a surface finish of 12 to 16 microinches. The transition from the chrome-plated seal area to the remainder of the 4-inch diameter tube must maintain consistent diameter and be free of ridges, troughs, and irregularities to prevent seal damage during assembly. A 0.0625-inch by 0.0625-inch chamfer must be ground at the edge of the re-chromed area, with no more than 0.0625 inch of material removed. Non-chromed areas shall be cleaned using coarse Scotch-Brite surface conditioning on the exterior and wire brush on the interior to remove rust, carbon, and residue. For parts that cannot be restored through standard procedures, the contractor shall document and communicate to the Government whether Non-Standard Repair Processes (such as weld repair for surface pitting) may be applicable; the Government Technical Point of Contact will review and the Contract Officer's Representative will approve or reject such requests on a part-by-part basis. The contractor is responsible for all transportation of materials from Letterkenny to the facility and return upon completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J16116-23.pdf | ||
| Combined Synopsis_Solicitation_W911N2-27-Q-A011.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Chrome Plating Process Details
STATEMENT OF WORK
INTRODUCTION:
This Statement of Work (SOW) outlines the scope, responsibilities, and requirements for the plating of cover tubes for Letterkenny Army Depot (LEAD).
SCOPE:
The Contractor shall be responsible for the following process according to the specifications on the drawing provided:
Pre-grind and Evaluate parts received in original chrome plated condition.
1. Strip/pre-grind the seal area to remove damage and to prepare the area for re-plating. A minimum of material should be removed to clean up the surface.
The minimum allowable diameter of the seal area after pre-grinding is 3.970 inches.
2. The width of the repaired seal area is to be 1.38 + 0.12/- 0.03 inches. If the chrome plated area of the part received is less than the requirement, pre-grind and prepare part to meet the plated width requirements in the plating and finishing steps. If the chrome plated area of the part received is greater than the requirement, contact the Government before proceeding.
3. Inspect the part. If the surface cannot be restored through the Standard Plate and Finish procedures below, document and communicate to the Government:
a. That the part can be repaired using Non-Standard Repair Processes.
The Government will review documentation and approve or reject these requests on a part-by-part basis. Do not proceed with additional repair processes without approval.
b. That the part is not repairable through Standard or Non-Standard
Processes documented in this Appendix. GENERAL DISPOSITIONS
Standard Plate and Finish all parts.
1. Chrome plate the seal area to build up size for final grinding. Mask off all other areas to preclude plating. Chrome plate the seal area surface IAW SAE AMS-QQ- C-320, Class 2 (supersedes QQ-C-320).
2. Final grind the re-chromed seal area to a diameter of 4.000 to 4.005 inches, with a surface finish of 12 to 16 microinches.
3. Maintain consistent diameter over the transition from the chrome plated seal area to the remainder of the 4-inch diameter of the tube. A seal must pass across this transition during assembly. The transition must be free of ridges, troughs and other surface irregularities that could damage the seal during assembly.
4. Grind the edge of the re-chromed area at the diameter change to remove excess chrome. Provide a 0.0625 inch by 0.0625-inch chamfer to allow for seal installation.
Do not remove more than 0.0625 inch of material from the edge.
5. Clean the non-chromed areas on the tube to remove rust, carbon and other residue. This has been accomplished in the past using coarse Scotch-Brite surface conditioning belt on the exterior and a wire brush on the interior.
Non-standard Repair Processes.
1. Repair surface pitting by welding. The Government Technical Point of Contact (TPOC) will review the proposed weld repair and provide a recommendation to the Contract Officer’s Representative (COR) to approve or reject this additional repair.
Contractor is responsible for transportation of material from Letterkenny to facility for processing and the return to Letterkenny upon completion.
File details come from the government source that posted it. Updated .