SOLICITATION Amendment W911N224R0005 0004.pdf

PDF 388 KB Posted

Attached to
Heat Exchanger Overhaul
Solicitation number
W911N2-24-
Issued by

About this file

This document is a solicitation amendment for a federal contract opportunity to provide inspection and overhaul services for PATRIOT Heat Exchanger Assemblies. The amendment revises the CLIN descriptions to clarify the requirements and extends the offeror due date to May 3, 2024. Key details include:

The contract requires the overhaul of the Ethylene Glycol and Water (EGW) side as well as the Polyalphaolefin (PAO) side of the Heat Exchanger. The work includes initial inspection, 100% work, and testing per the Statement of Work. The contract also includes CLINs for extra work to repair or replace damaged EGW and PAO cores, with cost constraints. The solicitation is issued by the Department of the Army Materiel Command Contracting Command Redstone Arsenal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W25G1Q3339R002

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provi ded herei n, all t erms and condit ions of t he document refere nced in Item 9A or 10A, as heretofore change d, remai ns unchanged and in ful l force and effect .

15A. NAME AND TIT LE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

ST ANDARD FORM 30 (Rev. 10-83) Prescr ibed by GSA

FAR (48 CFR) 53.243

It has been deemed necessary and in the best interest of the Government to revise the CLIN descriptions 0001 thru 4007 to clarify requirement and extend the of feror due date to 03 May 2024 @ 1200 hrs. All other terms and conditions remain unchanged.

1. CO NTRACT ID CODE P AGE OF P AGES

J 1 10

16A. NAME AND T ITLE OF CONTRACTING OFFICER (Type or print)

16C. DAT E SIGNED

BY 25-Apr-2024

16B. UNITED ST AT ES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contract ing Officer )(Signature of person authorized t o sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, Count y, Stat e and Zip Code) X W911N224R0005

X 9B. DAT ED (SEE IT EM 11)

05-Feb-2024

10B. DAT ED (SEE IT EM 13)

9A. AMENDMENT OF SOLICITAT ION NO.

11. THIS IT EM ONLY APPLIES T O AMENDMENT S OF SOLICITATIONS

X The above numbered soli cit ati on i s amended as set forth in It em 14. The hour and date specified for rece ipt of Offer X is ext ended, is not extended.

Offer must acknowl edge rece ipt of t his amendment pri or to the hour and date specified in the sol ici tat ion or as amended by one of t he fol lowing methods:

(a) By compl eti ng Items 8 and 15, and returning copi es of the amendment ; (b) By acknowledgi ng recei pt of thi s a mendment on each copy of t he offer submit ted;

or (c) By s epara te let ter or t elegram whi ch i ncludes a refe rence t o t he s olic ita tion and amendment numbers . FA ILURE OF YOU R A CKNOWLEDGMENT TO BE RECEIVED AT TH E P LACE D ESIGNATED FOR TH E RECEIPT OF OFFERS P RIO R TO THE HOUR AN D DATE SP ECIFIED MA Y RESULT IN

REJECTIO N OF YOUR OFFER. If by vir tue of thi s amendment you desire t o change an offer already submit ted, s uch c hange ma y be made by t ele gram or let ter, provided each t elegram or l ett er makes reference to the sol ici tat ion and this amendment , and is re ceived prior to the openi ng hour and dat e speci fi ed.

12. ACCOUNTING AND APPROPRIATION DAT A (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE

CONT RACT ORDER NO. IN ITEM 10A.

B. T HE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED T O REFLECT THE ADMINIST RATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORT H IN ITEM 14, PURSUANT TO T HE AUTHORITY OF FAR 43.103(B).

C. T HIS SUPPLEMENT AL AGREEMENT IS ENT ERED INTO PURSUANT TO AUTHORITY OF:

D. OT HER (Specify type of modification and authorit y)

E. IMPORTANT: Contract or is not, is required to sign this document and return copies t o the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/cont ract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/ MODIFICATION NO. 5. P ROJECT NO .(If appli cable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Apr -2024

CODE

LETTERKENNY ARMY DEPOT

LETTERKENNY CONTRACTING OFFICE - ACC

1 OVERCASH AVENUE CCAM-DSL BLDG 2S

CHAM BERSBURG PA 17201- 4150

W911N2 7. AD MINISTERED BY (If other t han item 6)

4. REQUISITION/PU RCHASE REQ. NO.

CODE

See I tem 6

FACILITY CODECODE

EMAIL:TEL:

W911N224R0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 21-Mar-2024 12:00 PM to 03-May-2024 12:00 PM.

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

100% Work: (Paragraph 9.3.1 thru 9.3.5), IAW Statement of work, Drawings; (Paragraph 9.1) & Evaluation (paragraph 9.2 (evaluation to determine if Para. 9.2.1-9.2.4 is required))

To:

Includes initial inspection (Paragraph 9.2.0), 100% Work (Paragraph 9.3.1 thru 9.3.5), and Testing (Paragraph 9.4.0) of the SOW.

CLIN 0002

Extra work required to fix a faulty EGW (Aluminum) core; In accordance with Paragraph 9.3.6 the cost to overhaul a faulty EGW core shall be a fixed rate not to exceed 65% of CLIN 0003.

Extra work required to fix a faulty EGW (Aluminum) core; In accordance with Paragraph 9.2.1 (IAW 9.3.6 not to exceed 65% of CLIN 0003) of the SOW.

CLIN 0003

The CLIN description has changed from Extra work required for returned damaged to Extra work to replace a damaged EGW.

The CLIN extended description has changed from:

Extra work required for returned damaged beyond repair EGW (Aluminum) core;Extra work required to replace a damaged beyond overhaul EGW core, IAW Para. 9.7 of the SOW, documentation is required showing the work needed to overhaul a faulty EGW core exceeds the cost of CLIN 0002.

Extra work required to replace a damaged beyond repair EGW (Aluminum) core IAW Paragraph 9.2.2 (IAW as per 9.7, documentation is required showing the work needed to repair a faulty EGW core exceeds the cost of CLIN 0002) of the SOW.

CLIN 0004

Extra work required to fix a faulty PAO (Copper) core; In accordance with Paragraph 9.3.6 Extra work to overhaul a faulty PAO shall be a fixed rate not to exceed 65% of CLIN 0005.

Extra work required to fix a faulty PAO (Copper) core; In accordance with Paragraph 9.2.3 (IAW 9.3.6 not to exceed 65% of CLIN 0005) of the SOW.

CLIN 0005

The CLIN description has changed from Extra work required for returned damaged to Extra work to relace a damaged PAO.

The CLIN extended description has changed from:

Extra work required for returned damaged beyond repair PAO (Copper) core; IAW Para. 9.7 of the SOW, documentation is required showing the work needed to Overhaul a faulty PAO core exceeds the cost of CLIN 0004.

Extra work required to replace a damaged beyond repair PAO (Copper) core; IAW Paragraph 9.2.4 (as per 9.7, documentation is required showing the work needed to repair a faulty PAO core exceeds the cost of CLIN 0004) of the SOW.

CLIN 0006

The cost constraint NSP has been added.

CLIN 0007

CLIN 1001

100% Work: (Paragraph 9.3.1 thru 9.3.5), IAW Statement of work, Drawings; (Paragraph 9.1) & Evaluation

Includes initial inspection (Paragraph 9.2.0), 100% Work (Paragraph 9.3.1 thru 9.3.5), and Testing (Paragraph 9.4.0)

CLIN 1002

Extra work required to fix a faulty EGW (Aluminum) core; In accordance with Paragraph 9.3.6 the cost to overhaul a faulty EGW core shall be a fixed rate not to exceed 65% of CLIN 1003.

Extra work required to fix a faulty EGW (Aluminum) core; In accordance with Paragraph 9.2.1 (IAW 9.3.6 not to exceed 65% of CLIN 1003) of the SOW.

CLIN 1003

replace a damaged EGW.

The CLIN extended description has changed from:

Extra work required for returned damaged beyond repair EGW (Aluminum) core;Extra work required to replace a damaged beyond overhaul EGW core, IAW Para. 9.7 of the SOW, documentation is required showing the work needed to overhaul a faulty EGW core exceeds the cost of CLIN 1002.

Extra work required to replace a damaged beyond repair EGW (Aluminum) core IAW Paragraph 9.2.2 (IAW as per 9.7, documentation is required showing the work needed to repair a faulty EGW core exceeds the cost of CLIN 1002) of the SOW.

CLIN 1004

Extra work required to fix a faulty PAO (Copper) core; In accordance with Paragraph 9.3.6 Extra work to overhaul a faulty PAO shall be a fixed rate not to exceed 65% of CLIN 1005.

Extra work required to fix a faulty PAO (Copper) core; In accordance with Paragraph 9.2.3 (IAW 9.3.6 not to exceed 65% of CLIN 1005) of the SOW.

CLIN 1005

The CLIN description has changed from Extra work required for returned damaged to Extra work to relace a damaged PAO.

The CLIN extended description has changed from:

documentation is required showing the work needed to Overhaul a faulty PAO core exceeds the cost of CLIN 1004.

Extra work required to replace a damaged beyond repair PAO (Copper) core; IAW Paragraph 9.2.4 (as per 9.7, documentation is required showing the work needed to repair a faulty PAO core exceeds the cost of CLIN 1004) of

CLIN 1006

CLIN 1007

CLIN 2001

100% Work: (Paragraph 9.3.1 thru 9.3.5), IAW Statement of work, Drawings; (Paragraph 9.1) & Evaluation

Includes initial inspection (Paragraph 9.2.0), 100% Work (Paragraph 9.3.1 thru 9.3.5), and Testing (Paragraph 9.4.0)

CLIN 2002

Extra work required to fix a faulty EGW (Aluminum) core; In accordance with Paragraph 9.3.6 the cost to overhaul a faulty EGW core shall be a fixed rate not to exceed 65% of CLIN 2003.

Extra work required to fix a faulty EGW (Aluminum) core; In accordance with Paragraph 9.2.1 (IAW 9.3.6 not to exceed 65% of CLIN 2003) of the SOW.

CLIN 2003

replace a damaged EGW.

The CLIN extended description has changed from:

Extra work required for returned damaged beyond repair EGW (Aluminum) core;Extra work required to replace a damaged beyond overhaul EGW core, IAW Para. 9.7 of the SOW, documentation is required showing the work needed to overhaul a faulty EGW core exceeds the cost of CLIN 2002.

Extra work required to replace a damaged beyond repair EGW (Aluminum) core IAW Paragraph 9.2.2 (IAW as per 9.7, documentation is required showing the work needed to repair a faulty EGW core exceeds the cost of CLIN 2002) of the SOW.

CLIN 2004

Extra work required to fix a faulty PAO (Copper) core; In accordance with Paragraph 9.3.6 Extra work to overhaul a faulty PAO shall be a fixed rate not to exceed 65% of CLIN 2005.

Extra work required to fix a faulty PAO (Copper) core; In accordance with Paragraph 9.2.3 (IAW 9.3.6 not to exceed 65% of CLIN 2005) of the SOW.

CLIN 2005

The CLIN description has changed from Extra work required for returned damaged to Extra work to relace a damaged PAO.

The CLIN extended description has changed from:

documentation is required showing the work needed to Overhaul a faulty PAO core exceeds the cost of CLIN 2004.

Extra work required to replace a damaged beyond repair PAO (Copper) core; IAW Paragraph 9.2.4 (as per 9.7, documentation is required showing the work needed to repair a faulty PAO core exceeds the cost of CLIN 2004) of

CLIN 2006

CLIN 2007

CLIN 3001

100% Work: (Paragraph 9.3.1 thru 9.3.5), IAW Statement of work, Drawings; (Paragraph 9.1) & Evaluation

Includes initial inspection (Paragraph 9.2.0), 100% Work (Paragraph 9.3.1 thru 9.3.5), and Testing (Paragraph 9.4.0)

CLIN 3002

Extra work required to fix a faulty EGW (Aluminum) core; In accordance with Paragraph 9.3.6 the cost to overhaul a faulty EGW core shall be a fixed rate not to exceed 65% of CLIN 3003.

Extra work required to fix a faulty EGW (Aluminum) core; In accordance with Paragraph 9.2.1 (IAW 9.3.6 not to exceed 65% of CLIN 3003) of the SOW.

CLIN 3003

replace a damaged EGW.

The CLIN extended description has changed from:

Extra work required for returned damaged beyond repair EGW (Aluminum) core;Extra work required to replace a damaged beyond overhaul EGW core, IAW Para. 9.7 of the SOW, documentation is required showing the work needed to overhaul a faulty EGW core exceeds the cost of CLIN 3002.

Extra work required to replace a damaged beyond repair EGW (Aluminum) core IAW Paragraph 9.2.2 (IAW as per 9.7, documentation is required showing the work needed to repair a faulty EGW core exceeds the cost of CLIN 3002) of the SOW.

CLIN 3004

Extra work required to fix a faulty PAO (Copper) core; In accordance with Paragraph 9.3.6 Extra work to overhaul a faulty PAO shall be a fixed rate not to exceed 65% of CLIN 3005.

Extra work required to fix a faulty PAO (Copper) core; In accordance with Paragraph 9.2.3 (IAW 9.3.6 not to exceed 65% of CLIN 3005) of the SOW.

CLIN 3005

The CLIN description has changed from Extra work required for returned damaged to Extra work to relace a damaged PAO.

The CLIN extended description has changed from:

documentation is required showing the work needed to Overhaul a faulty PAO core exceeds the cost of CLIN 3004.

Extra work required to replace a damaged beyond repair PAO (Copper) core; IAW Paragraph 9.2.4 (as per 9.7, documentation is required showing the work needed to repair a faulty PAO core exceeds the cost of CLIN 3004) of

CLIN 3006

CLIN 3007

CLIN 4001

100% Work: (Paragraph 9.3.1 thru 9.3.5), IAW Statement of work, Drawings; (Paragraph 9.1) & Evaluation

Includes initial inspection (Paragraph 9.2.0), 100% Work (Paragraph 9.3.1 thru 9.3.5), and Testing (Paragraph 9.4.0)

CLIN 4002

Extra work required to fix a faulty EGW (Aluminum) core; In accordance with Paragraph 9.3.6 the cost to overhaul a faulty EGW core shall be a fixed rate not to exceed 65% of CLIN 4003.

Extra work required to fix a faulty EGW (Aluminum) core; In accordance with Paragraph 9.2.1 (IAW 9.3.6 not to exceed 65% of CLIN 4003) of the SOW.

CLIN 4003

replace a damaged EGW.

The CLIN extended description has changed from:

Extra work required for returned damaged beyond repair EGW (Aluminum) core;Extra work required to replace a damaged beyond overhaul EGW core, IAW Para. 9.7 of the SOW, documentation is required showing the work needed to overhaul a faulty EGW core exceeds the cost of CLIN 4002.

Extra work required to replace a damaged beyond repair EGW (Aluminum) core IAW Paragraph 9.2.2 (IAW as per 9.7, documentation is required showing the work needed to repair a faulty EGW core exceeds the cost of CLIN 4002) of the SOW.

CLIN 4004

Extra work required to fix a faulty PAO (Copper) core; In accordance with Paragraph 9.3.6 Extra work to overhaul a faulty PAO shall be a fixed rate not to exceed 65% of CLIN 4005.

Extra work required to fix a faulty PAO (Copper) core; In accordance with Paragraph 9.2.3 (IAW 9.3.6 not to exceed 65% of CLIN 4005) of the SOW.

CLIN 4005

The CLIN description has changed from Extra work required for returned damaged to Extra work to relace a damaged PAO.

The CLIN extended description has changed from:

documentation is required showing the work needed to Overhaul a faulty PAO core exceeds the cost of CLIN 4004.

Extra work required to replace a damaged beyond repair PAO (Copper) core; IAW Paragraph 9.2.4 (as per 9.7, documentation is required showing the work needed to repair a faulty PAO core exceeds the cost of CLIN 4004) of

CLIN 4006

CLIN 4007

(End of Summary of Changes)