Amendment 0006.pdf
PDF 196 KB Posted
- Attached to
- Impregnation for Cast Parts
- Solicitation number
- W911N2-21-R-0025
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0007.pdf | ||
| Amendment 0005.pdf | ||
| Amendment 0004.pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| SOL W911N2-21-R-0025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MICHELLE FIKE
717-267-5325
LETTERKENNY CONTRACTING OFFICE - ACC
1 OVERCASH AVENUE CCAM-ALK BLDG 2S
CHAMBERSBURG PA 17201-4150
W25G1Q1006R002
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to answ er a vendor's question and to revise description in Quick Dip Process CLINs, Entire Cleaning Process 30 Minute CLINs and Entire Cleaning Process 40 Minute CLINS. See summary of changes. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Sep-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911N221R0025
X 9B. DATED (SEE ITEM 11)
04-May-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Sep-2021
CODE
LETTERKENNY ARMY DEPOT
LETTERKENNY CONTRACTING OFFICE - ACC-RSA-LEAD
1 OVERCASH AVENUE, ATTN: CCAM-MLK, BLDG 2S
CHAMBERSBURG PA 17201-4150
W911N2 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W911N2
FACILITY CODECODE
EMAIL:TEL:
W911N221R0025
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0015
The CLIN extended description has changed from:
PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS FOR THE ENTIRE CLEANING PROCESS FOR
EACH PART FOR 30 MINUTES.
To:
EACH PART FOR 30 MINUTES. THE PART NUMBERS WOULD BE 11465887, 11449142, AND 11449200.
CLIN 0016
EACH PART FOR 40 MINUTES.
EACH PART FOR 40 MINUTES. THE PARTS ARE M7499 AND 11463809.
CLIN 0017
PROVIDE ALL LABOR, MATERIALS AND EQUIPMENT FOR THE QUICK DIP CLEANING PROCESS IN
ACCORDANCE WITH THE ATTACHED PERFORMANCE WORK STATEMENT.
ACCORDANCE WITH THE ATTACHED PERFORMANCE WORK STATEMENT FOR ALL PARTS SENT IN
SHIPMENT.
CLIN 1008
EACH PART 30 MINUTES.
EACH PART 30 MINUTES. 11465887, 11449142, AND 11449200
CLIN 1009
EACH PART FOR 40 MINUTES
EACH PART FOR 40 MINUTES, THE PARTS ARE M7499 AND 11463809.
CLIN 1010
ACCORDANCE WITH THE ATTACHED PERFORMANCE WORK STATEMENT FOR ALL PARTS SENT IN
SHIPMENT
CLIN 2008
CLIN 2009
CLIN 2010
ACCORDANCE WITH THE ATTACHED PERFORMANCE WORK STATEMENT FOR ALL PARTS SENT IN
CLIN 3008
CLIN 3009
CLIN 3010
ACCORDANCE WITH THE ATTACHED PERFORMANCE WORK STATEMENT FOR ALL PARTS SENT IN
CLIN 4008
CLIN 4009
CLIN 4010
ACCORDANCE WITH THE ATTACHED PERFORMANCE WORK STATEMENT FOR ALL PARTS SENT IN
The following have been modified:
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT
FOR
CAST IMPREGNATION OF PARTS
1.0 General:
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, quality control and other items and non-personal services necessary to perform impregnation of cast parts for Letterkenny Army Depot (LEAD), Chambersburg, PA as defined in this PWS, except as specified in Paragraph 3.0 as Government Furnished.
The contractor shall perform to the standards in this contract. The PWS includes this document and the fifteen drawings of parts listed in Paragraph 3.1 as well as in Technical Exhibit 2.
1.2 Background: The cast parts concerning this service are copper/brass manifolds. They are components of a missile platform’s coolant system. They require impregnation because, in being cast, these manifolds tend to leak coolant once the missile system is deployed in the field – rendering the system inoperable. Letterkenny requires all their cast parts, which is a set of five per coolant system, to be impregnated in order to prevent any and all leakage.
This impregnation of cast parts is a vital service for LEAD’s production efforts. See Technical Exhibit 2 for a listing of the five parts that comprise a set.
1.3 Period of Performance (PoP): The Period of Performance shall be one Base Year of 12 months and four 12-month option years. The Period of Performance will be determined at time of award.
1.4 General Information:
1.4.1 Quality Control (QC): The contractor shall develop and maintain an effective QC program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QC program is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary.
1.4.2 Quality Assurance (QA): The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the
Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) (defect rate(s)).
1.4.2.1 Warranty and Operations/Maintenance Instructions: The contractor shall warrant work in accordance with their best standard commercial warranty and supply a copy of this warranty with the proposal. The contractor must comply with all Quality Assurance requirements given in the cite specifications.
1.4.2.2 Inspection and Acceptance: All impregnated parts will be inspected by LEAD’s Quality Assurance (QA) Personnel for finished dimensions and quality of the impregnation. Impregnated parts will be accepted only if they are found to be in compliance with the requirements given in MIL-STD-276A. Parts that do not meet the acceptance criteria for the impregnation will be returned to the contractor for corrective action at the contractor’s expense.
1.4.3 Recognized Holidays: The following are recognized US holidays and the date for each can be found at the following website: http://www.opm.gov/Operating_Status_Schedules/fedhol/Index.asp . Information is provided for shipping purposes to ensure the contractor is aware when the Depot is not open for operations and shipments will not be accepted:
1.4.3.1 New Year’s Day
1.4.3.2 Martin Luther King, Jr.’s Birthday
1.4.3.3 President’s Day
1.4.3.4 Memorial Day
1.4.3.5 Juneteenth
1.4.3.5 Independence Day
1.4.3.7 Labor Day
1.4.3.8 Columbus Day
1.4.3.9 Veteran’s Day
1.4.3.10 Thanksgiving Day
1.4.3.11 Christmas Day
1.4.3.11 When an observed holiday falls on a Tuesday or Thursday, the Depot regularly schedules a closure on the corresponding Monday or Friday.
1.4.4 Place and Performance of Services: The contractor will not be required to perform their services on a Government facility/installation. The component parts will be shipped to the contractor’s facility and the contractor shall perform all work at their own facility.
1.4.5 Security Requirements: If the contractor should ever require a site visit, the contractor and all associated subcontractor’s employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.
Contractor workforce shall comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1.4.6 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with Federal Acquisition Regulations Subpart 42.5. The KO, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. Attendance is not limited to a physical meeting and may be conducted via telephone in lieu of a physical meeting. At these meetings, the Contacting Officer will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.7 Contract Manager (CM): The contactor shall provide a CM who shall ensure performance under this contract.
The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
1.4.8 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5.
The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI.
The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.4.9 Safety and Environmental: The contractor is responsible for conducting his operation IAW applicable safety and environmental laws, regulations and standards. The government will not be responsible for contractor operations not carried out IAW applicable safety and environmental laws, regulations and standards. Any surcharges related to safety or environmental compliance requirements must be included in the contractor’s per-item price.
2.0 Definitions and Acronyms:
2.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2 CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3 CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5 DELIVERABLE. Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8 QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11 SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12 WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.13 WORK WEEK. Monday through Friday, unless specified otherwise.
2.2 ACRONYMS:
AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense FAR Federal Acquisition Regulation KO Contracting Officer OCI Organizational Conflict of Interest ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the facilities, equipment, materials, and/or services listed below:
3.1 Parts to be impregnated: The following parts shall be double impregnated IAW MIL-STD-276A using impregnant IAW MIL-I-17563C:
11465687, rev. H, Hydraulic Manifold 11449142, rev. U, Hydraulic System Accessories Manifold 11449200, rev. N, Hydraulic System Accessories Manifold M7498, Heater Tube Manifold M7499, Heater Tube Manifold 11463577, rev. B, Hydraulic System Accessories Manifold 11463809, rev. B, Manifold Assembly
3.2 Cleaning: Parts shipped to the contractor may be at various stages in the cleaning process in order to remove all liquid or solid organic materials. The contractor will be notified on the individual task orders whether a quick dip or complete cleaning needs to eb completed by the contractor. If not annotated the prior to shipment to the contractor parts will be cleaned in an acid blend and inspected by LEAD personnel. If the contractor impregnates parts that are later found to contain oxidation, metal discoloration or presence of “O” ring or gasket residues as a result of improper initial cleaning and inspection by LEAD personnel prior to shipment, the contractor shall not be held liable for this failure. It is the Government’s responsibility to ensure parts are clean and ready for impregnation prior to shipment to the contractor. Contractor shall return parts with the same general appearance as received.
4.0 Contractor Furnished Property, Materials, Equipment (CFP/M/E):
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
5.0 Requirements:
5.1 Impregnation of Cast Parts: The parts listed in paragraph 3.1 shall be processed in accordance with MIL-I- 17563C and MIL-STD 276A in their entirety (this includes the standardized marking of parts that they have been impregnated). Drawings of the parts are attached (reference Technical Exhibit 2). Contractor shall be responsible for cleaning the parts listed in paragraph 3.1 with a vapor degreasing process.
5.2 Proof Pressure Test: Contractor shall provide a copy of the test procedure along with test data for each finished part. Testing procedures shall be IAW with MIL-STD-276A paragraph 4.10 Proof Pressure Test. Unless otherwise stated in MIL-STD-276A, the basis for Proof Pressure Testing shall be the normal working pressure of 200 psi (pounds per square inch).
5.3 Set-Up and Fixture Costs: The cost of any procedures, fixtures, or other equipment that may be needed to clean and impregnate the parts included in this Performance Work Statement must be included in the per-item price.
5.4 Quick Dip Cleaning: This will be utilized when parts that are received from Letterkenny have already been cleaned of gasket and O-ring residue. The parts have also been dipped in a solution to remove any oxide build-up prior to shipment to the vendor. However, a small layer of oxidation may occur between the oxide-removing dip at Letterkenny and the impregnation process by the vendor. The vendor will use this CLIN to ensure that this small amount of oxide does not affect the impregnation of the parts. The vendor may clean the oxide using any means they see fit, so as long as it does not weaken or damage the parts.
5.5 The Entire Cleaning Process: This will be utilized when parts that are received from Letterkenny have not been cleaned of gasket residue, O-ring residue, or oxidation. The vendor shall remove all gasket residue, O-ring residue, and oxidation from the parts. The vendor may remove the residue using any means necessary (chemical dip, plastic scrapers, wire brushes, etc.) so long as the process does not weaken or damage the parts. A single process or multiple processes may be used to ensure the parts are clean and undamaged before going to the impregnation process.
5.6 Shipment and Delivery: LEAD shall be responsible for shipping the parts to the contractor and ensure that all outgoing manifolds comply with the PWS (Performance Work Statement). Contractor shall be responsible for preparing parts for return transportation/shipme nt using LEAD original packaging material ls receive with each shipment. Upon shipping, contractor shall provide tracking information to the LEAD contracting officer representative. Shipments containing 35 parts or less will be completed and shipped within 14 working days after they are received by the contractor. Shipment containing more than 35 parts may take longer, but will not exceed 21 days complete. If shipments are delayed the contractor shall notify the COR or Contracting Officer for the reason for the delay and provide a new shipping date of arrival.
5.7 FIRST ARTICLE TEST: Following award of contract and first delivery order, the contractor shall produce a first article of each item listed in Paragraph 3.1 for first article testing/acceptance by the Government. The techniques, equipment and chemicals used to produce the first articles shall be identical to those used for follow-on items.
5.7.1 Upon receipt of parts from LEAD, the contractor shall return first article test samples within 30 calendar days.
LEAD will evaluate all samples IAW Paragraph 1.4.2.2.
5.7.2 The contractor shall be given at least one opportunity to correct any deficiencies and resubmit additional first article test samples at no additional cost to the Government. If the contractor is unable to meet the first article testing requirements of the contract the contractor shall be deemed to have failed to make delivery within the meaning of the default per FAR 52.212-4(g).
6.0 Applicable Publications: Publications applicable to this PWS are listed below:
Publication (Chapter / Page)
Date of Publication Mandatory or
Advisory
Website
MIL-STD-276A,
DEPARTMENT
OF DEFENSE DESIGN
CRITERIA:
IMPREGNATION OF
POROUS
NONFERROUS ;
30 DEC 1992 Mandatory http://quicksearch.dla.mil/
MIL-I-17563C,
MILITARY
SPECIFICATION:
IMPREGNANTS
FOR CAST OR POWER
METAL
COMPONENTS
18 SEP 1992 Mandatory http://quicksearch.dla.mil/
TECHNICAL EXHIBIT 1
Performance Requirements Summary
This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
PWS Paragraph
Task
Performance Standard
Acceptable Quality Levels
(AQL)
Surveillance Method / By Whom
5.1, 5.2, 5.3, 5.4 Impregnate cast parts on a routine basis (appx. 5 sets per month)
Impregnate parts IAW MIL-
STD-276A, MIL-I-17563C
and this PWS.
Meet standard 100%
Periodic inspection by COR and QA personnel
5.6 Return delivered
parts to LEAD
Parts shall be received at LEAD within 14 days after receipt of parts.
Meet standard 95%
100% inspection by COR
5.7 First Article Test The contractor shall provide
first article test submissions IAW MIL-STD-276A, Proof Pressure Test described in paragraph 4.10. Submission must be returned to LEAD within 35 days of receipt of parts.
Meet standard 100%
100% inspection by LEAD’s Quality Assurance (QA) personnel.
TECHNICAL EXHIBIT 2
Estimated Workload Data
Workload is estimated at 5 sets per month.
Each set consists of the parts listed in the following table.
Item Annual Estimated
Quantity Reference Drawing(s)
11465687, rev. H, Hydraulic Manifold
25 Manifolds per year
11465687 (5 sheets)
-OR- -OR-
11463577, rev. B, Hydraulic System Accessories Manifold
11463577 (6 sheets)
M7499, Heater Tube Manifold
25 Manifolds per year
M7499 (2 sheets)
-OR- -OR-
M7498, Heater Tube Manifold M7498 (2 sheets)
11449142, rev. U, Hydraulic System Accessories Manifold
25 Manifolds per year 11449142 (3 sheets)
11449200, rev. N, Hydraulic System Accessories Manifold
25 Manifolds per year 11449200 (1 sheet)
11463809, rev. B, Manifold Assembly
25 Manifolds per year 11463809 (1 sheet)
Total estimated quantity of 25 sets per year, including all part types, though this amount is subject to LEAD’s workload requirements.
In addition to the drawing(s) for each of the set parts, the following drawings are attached to this PWS for further Reference:
9975792 Bushing Sleeve (2 sheets) 11449231 Flange, Pipe, Relief Valve Seal (1 sheet) 11449307 Tubing, Copper Alloy (1 sheet) 11449363 Flange, Tube (1 sheet) 11449364 Ring, Tube (1 sheet) 11449367 Manifold, Heater Tube (1 sheet) 11449367 Manifold, Heater Tube (1 sheet) 11472871 Tube, Assembly (2 sheets)
QUESTION AND ANSWER
Q1: The main question I had was about the reusable shipping containers that are mentioned in 5.4 of the contract. Since we will be expected to providing shipping for the material back to LEAD, it would help greatly if we could know the size and type of containers these are.
A1: The containers are wooden crates the size is below:
High 16” Long 46 ½” Wide 26”
Q2: Will the parts all be coming in the same box? For the sizes listed only the 2 larger assemblies would need a crate that big, so can you confirm if all parts will be individually packed or will come in one container.
A2: We have two or three of those boxes built. They all get shipped in those shipping containers.
Q3: P. 9 5.5 First Art icleTest - P.4 para 111 suggest we ask this requirement to be waived per P 38, 52.209-4 para (i). We Fulfilled this obligation per W911N2-16-D-0015 order 0001and accepted by the government September 2016.
A3: This requirement is competed those vendors who have not provided a first article test this will be required.
Q4: P.5 1.4.2.1Inspection and acceptance "Finished parts returned from the contractor will not be rejected by LEASD's quality Assurance (QA) Personnel for oxidation, metal discoloration or presence of o'ring/gasket residues as a result of improper cleaning by LEAD p ersonnel prior to shipp ing parts to the contractor.
A4: Government does not agree with this verbiage. The same verbiage stands in the Performance Work Statement.
The contractor shall put that cost in the pricing of the CLIN.
Q5: P.8 3.2 Cleaning-All parts shipped to the contractor shall be free of any liquid organic material.
Contractor not responsible for removing oxidating metal discoloration or presence of o'ring/gasket residues.
A5: Please see revised Section 3.1 and 5.4 and 5.5 in the Performance Work Statement.
Q6: P.8 5.2 Impregnation of Cast Parts - This solicitation does not include marking of parts. IAW MIL-STD-276A paragraph 4.8.
A6. Marking of parts is not required.
Q7: P.8 5.2 Proof Pressure Test - LEAD shall provide in writing Proof Pressure Test requirements for each part identified in paragraph 3.1. the PT crit eria was changed 6/2017 from 225 hold for 2 minutes to 250 hold for 5 minutes. The parts needed Hydrau lic PT - To remain the same 360 holt for 2 minutes.
A7: Contractor shall provide a copy of the test procedure along with test data for each finished part. Testing procedures shall be IAW with MIL-STD-276A paragraph 4.10 Proof Pressure Test. Proof Pressure Testing shall be conducted at 250 psi (pounds per square inch).
Q8: P.9, 5.4 Shipment and delivery- LEAD shall be responsible for shipping the parts to the contractor and ensure that all outgoing manifolds comply with the PW( Performance work statement). Contractor shall be responsible for preparing parts for return transport ation/shipme nt using LEAD original packaging material ls receive with each shipment. Upon shipping, contractor shall provide tracking information to the LEAD contracting officer representative. Shipments containing 35 parts or less will be completed and shipped within 14 working days after they are received by the contractor. Shipment containing more than 35 parts may take longer than 14 working days to complete .The contractor in not responsible for delays in delivery once parts have left the contractor's facility due to issues not controlled by contractor.
A8 P.9. 5.4 Shipment and delivery- LEAD shall be responsible for shipping the parts to the contractor and ensure that all outgoing manifolds comply with the PWS (Performance Work Statement). Contractor shall be responsible for preparing parts for return transportation/shipme nt using LEAD original packaging material ls receive with each shipment. Upon shipping, contractor shall provide tracking information to the LEAD contracting officer representative. Shipments containing 35 parts or less will be completed and shipped within 14 working days after they are received by the contractor. Shipment containing more than 35 parts may take longer, but will not exceed 21 days complete. If shipments are delayed the contractor shall notify the COR or Contracting Officer for the reason for the delay and provide a new shipping date of arrival.
Q9: Please advise - Mod mentions Pages 2 - 9 to clean etc. NO P/N's referenced. Then on page 16 - 17 it mentions impregnation and it does reference P/N'. I need you to explain to me what it is exactly whey is required.
A9: The cleaning process has been added to this requirement in Amendment P00005. The part numbers that go with the 30 Minute Cleaning process is 11465887, 11449142, and 11449200. Also Amendment P00006 the parts have been added to these CLINs. The part numbers that go with the 40 Minute Cleaning process is M7499, and 1143809. Both CLINs were setup to allow the contractor to perform the entire cleaning process and give Government flexibility on whether they are going to do the cleaning process.
If the Government chooses not to do the entire cleaning process for these parts, than the quick dip cleaning process will be required. The contractor will be informed in each delivery order whether the whole cleaning process is required or just the quick dip process.
(End of Summary of Changes)