Amendment W911N2-21-Q-0031 0001.pdf

PDF 661 KB Posted

Attached to
Blast Equipment Cleaning Federal contract opportunity
Solicitation number
W911N2-21-Q-0031
Issued by
Department of the Army Materiel Command Contracting Command Redstone Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to Blast Equipment Cleaning, newest first.
File Type Posted
Blast Equipment Pricing table W911N2-21-Q-0031.pdf PDF
Solicitation W911N2-21-Q-0031.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911N221Q0031

W25G1Q1125R003

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to answ er questions from potential offerors and extend the closing date to 9 July 2021 @ 4:00 pm Eastern Standard Time.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 22

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Jun-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911N221Q0031

X 9B. DATED (SEE ITEM 11)

27-May-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Jun-2021

CODE

LETTERKENNY ARMY DEPOT

LETTERKENNY CONTRACTING OFFICE - ACC-RSA-LEAD

1 OVERCASH AVENUE, ATTN: CCAM-MLK, BLDG 2S

CHAMBERSBURG PA 17201-4150

W911N2 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 28-Jun-2021 01:00 PM to 09-Jul-2021 04:00 PM.

The following have been added by full text:

BLAST EQUIPMENT PRICING TABLE

PRICING TABLE BLDG 37

BASE

YEAR OPTION YEAR 1

Component Nomenclature U/M QTY

LARGE BLAST-R6185 EA 1

SM BLAST-S3239 EA 1

CABINET-S0212 EA 1

CABINET=R4982 EA 1

PRICING TABLE BLDG 57

Component Nomenclature U/M QTY

LARGE BLAST-S0233 EA 1

LARGE BLAST-R6094 EA 1

TABLE BLAST-S0770 EA 1

HAND CABINET-R592 EA 1

PRICING TABLE BLDG 350

Component Nomenclature U/M QTY

BLAST BOOTH 44-D4833 EA 1

BLAST BOOTH 50-S0405 EA 1

BLAST BOOTH BLISS -R1005 EA 1

BLAST BOOTH MTA-V0708 EA 1

TABLE BLAST-D4819 EA 1

TUMBLE BLAST-U8136 EA 1

VIKING BLAST-T3165 EA 1

PRICING TABLE BLDG 370

Component Nomenclature U/M QTY

LARGE BLAST-S1944 EA 1

MEDIUM BLAST-S2455 B EA 1

TUMBLE BLAST-U00093 EA 1

HAND CABINET-S0203 EA 1

HAND CABINET-V1517 EA 1

SMALL CABINET-R1162 EA 1

QUESTIONS AND ANSWERS

Q1) – is there an incumbent for these services (or similar services) at LEAD? If so, who?

A1)-No there is not an incumbent

Q2) – is this project fully funded for either the current or next fiscal year?

A2)- Services will be funded on individual task orders issued from the base contract

Q3) – the requirement is to “…provide abatement through safe cleaning and removal of heavy metals (LEAD/CAD/CHROME) and dirt, dust and other debris from the roofs and exterior sides of all blast booths and blasting equipment”, for that equipment as noted in the PWS. Please indicate to what extent, if any, the Contractor should perform abatement on floors and on other ancillary equipment immediately adjacent to the specific booths and blasting equipment noted in the PWS.

A3)-Booths and equipment are to be cleaned tops and sides. Equipment attached to and related to the booth (duct work, ladders, elevators, gear boxes, conduit etc) are also to be cleaned to the point of exiting building for collector, bag house etc. Floors, chairs, buckets etc near booth are not to be cleaned.

Q4) – reference 1.4.3 of the PWS: please provide additional clarification on the allowable hours of execution of this work. Are the Contractor work hours limited to 0100 to 0600 each day? Or is work in Building 370 limited to the hours of 0100 to 0600? Please clarify.

A4)- Place and Performance of Services: The contractor shall provide services between the hours of 0600 and 1530 on Monday through Thursday and 0600 and 14:30 every other Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Should the need arise due to production, safety etc. the need may be required to be evenings/weekends. A timely notice from LEAD to contractor will be given.

Performance shall be at building 350, 370, 57, and The contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS wn the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.

Q5) – please confirm that the Government will properly de-energize (including LOTO) all applicable equipment prior to the Contractor performing services on/around the equipment.

A5)- The COR will be notified of the equipment that need de-energized and the COR will notify Industrial Equipment Maintenance to complete that task of lockout/tag out.

Q6) – please confirm that the Government will provide power (electric), water, and sanitation facilities as needed by the Contractor.

A6)-these will be provided

Q7) – reference 5.3 of the PWS, “The contractor shall provide testing during and after removal. Please use PCM (Phase Contrast Microscopy) during removal process and TEM (Transmission Electron Microscopy) for the final clearance”. Is this an artifact from another PWS/Requirement? PCM and TEM are analytical methods typically used for assessing for asbestos fibers, not for air or wipe confirmation testing for metals. Can the Government clarify, or can the Contractor offer alternate, more applicable clearance testing methodology?

A7) what LEAD is specifically asking for is general area air monitoring around the perimeter after the cleanup effort is completed to ensure hazardous dust that has been disturbed during the activit =y remains at a low enough level for workers to resume safely. Letterkenny uses 0.05mg/m3 for an 8 hour TWA.

Q8) In building 350, between the two booths there is a floor vent. It looks like it went to another room. Is that area included in the cleaning?

A8) That area is the pit which houses the augers for booth 44/50. It does not require this service.

Q9) In building 350. The piece of equipment that has the chain conveyor belt. There are a lot of screens on the equipment. Are the screens to be removed to clean under the equipment and then replace the screens?

A9)Screens will be left in place

Q10) In building 37. There were insulated curtains that extended out from the booth. Are the curtains to be cleaned?

A10) Yes.

Q11) There are multiple occasions where the bid specifications say to follow NESHAP (Page 7 and page 10 for sure). NEHSAP deals with asbestos. Can you clarify why this is?

A11) https://www.epa.gov/stationary-sources-air-pollution/metal-fabrication-and-finishing-source-categories-national-emission “On June 13, 2008 the Environmental Protection Agency (EPA) issued final national air toxics standards for smaller-emitting sources, known as area sources, for nine metal fabrication and finishing source categories. These standards affect any new or existing facility that performs metal fabrication or finishing operations which uses or emits compounds of cadmium, chromium, lead, manganese , and nickel; or uses or emits elemental forms of all except lead”.

Q12) Section 5.3 states that testing must be performed by PCM or TEM. Again, this is for asbestos not lead. Please clarify.

A12) Below are the OSHA standards for Lead, Cadmium, and hex chrome...

https://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.1025 https://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.1027 https://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.1026

Normally, exposure monitoring would be performed on the employees doing the hazardous work and that is what these standards refer to. What we are specifically asking for is general area air monitoring around the perimeter. For the surface sampling to ensure what contractor has cleaned is clean and the area around it is clean, we are asking for surface sampling to ensure lead levels are in compliance with 29 CFR 1910.1025(h)(1).

"Surfaces. All surfaces shall be maintained as free as practicable of accumulations of lead." Unfortunately OSHA does not give a number, the number we use is adapted by the Army from a NAVMED regulation. Only lead has a mention of surfaces for OSHA.

Q13) Section 4.1.4 state contractor shall supply hazardous waste drums. Section 5.16 states drums will be supplied by LEAD. Please clarify.

A13) Lead will supply drums, contractor will dispose of them

Q14) Will we have a place to store lifts throughout the year?

A14) Yes, will probably be outside storage

Q15) The schedule just says each booth must be cleaned once a year. Will there be a set schedule after the project is awarded?

A15) yes and the schedule will be determined by building and production workload. A schedule will be finalized with the vendor after award.

Q16) Page 16 of 38- states that “Booths or Equipment being worked on shall be barricaded to prevent fugitive dust for migrating. Does this mean full containment? Or does this mean drops on the floor and barricade tape and signage. Full containment on some of the booths might take an entire weekend just to build.

A16) Drops to the floor (complete surround), barricade tape and signage

Q17) If it takes longer that the weekend and/or overnight to clean a booth, esp the large booths, will the booth be shut down for the week until it can be finished the following night or weekend?

A17) this will be determined in coordination with contractor time estimates and production. The intent is to not undo previous cleaning effort and restart

Q18) Just to be clear- are we using the wage for Laborer: Common or General? In 2017 I believe that is what we used to clean two booths. $18.09 and fringe $8.34?

A18) - See Solicitation notes #13, WD 2015-4253 Rev 14 (note: it was just updated this month)

Q19) Clearance testing- If work is to be done on weekends. Labs will not get clearance tests, most likely until Tuesday. Will this be an issue? Will any containment stay up until cleared?

A19) see 17

Q20) Photographs of the blast equipment were not permitted to be taken during the pre-bid site visit. Could a photograph(s) of each specific piece of blasting equipment subject to this scope be provided with the name of the particular piece of equipment identified? Also, is it possible to have the limits of cleaning annotated on the photographs, especially for the large blast booth units, so that we can visualize the limits of the work area?

A20) see #3 and #40

Q21) The performance work statement refers to a containment area. What does LEAD consider a containment? Is it a fully enclosed, airtight containment that is placed under negative pressure with filtered air exhaust?

A21) See #16

Q22) We would like to request a 2-week extension of the proposal due date making the due date on July 12, 2021.

A22) Once all questions have been addressed the Government will ensure adequate time for vendors to propose

Q23) Please define scope of cleaning for all blast booth cleanings. We understand that the top and sides of the booth need to be cleaned but what other areas are included in the scope? Are rafters, air handling duct work included and if so where does the scope end? Are associated electrical controls also part of the cleaning?

A23) see #3

Q24) Several of the blast booths have piping and bag house equipment (and other ancillary components) that are located outside of a building. Does this scope include cleaning of any outdoor equipment?

A24) See #3

Q25) Some of the blasting booth equipment have a metal safety mesh that guards against exterior exposed moving parts such as gears, drive shafts and motors. This was noticed specifically on the Viking Blast (T3165) in Building

350. Does the scope include removal of the safety mesh guard, cleaning of the mesh guard, and the exterior moving equipment parts in the guarded area?

A25) See #9

Q26) Who is responsible for de-energizing and lock out/tag out of the equipment that we will be working on?

A26)See #5

Q27) Are we to assume that all waste is considered hazardous waste containing lead, cadmium, and chromium? Are contractors responsible for the disposal of any drum waste generated during the cleaning? If the contractor is NOT responsible for the disposal of the waste, will the base provide UN rated DOT drums to put all waste into?

A27) See #13

Q28) How are the cleanings going to be scheduled? Are all buildings going to be cleaned consecutively or will eachbuilding be cleaned at determined intervals over the year?

A28) See #15 and #17

Q29) You had mentioned that base passes can be obtained and that they are good for two weeks. After two weeks if the same individuals are coming back, do they need to go through the badge process again or can the passes be renewed fairly easily?

A29). Visitor Badges can be renewed every two weeks. The actual badge will be turned in daily but the paper one will be kept by the individual. 370 requires an escort. If work is going to last close to a year a contractor badge could be issued. The badge office number is 717-267-8003

Q30) Section 1.6.1 – Environmental Protection: In the Performance Work Statement Section 1.6.1 mentions that the work shall comply with the USEPA NESHAP regulations 40 CFR 61 Subpart M regarding requirements for removal of asbestos and prevention of worker/occupant exposure. However, there is no mention of asbestos removal in the performance work statement, nor was asbestos removal discussed during the pre-bid site walk. Please clarify whether or not the NESHAPs regulations apply to this project and if so, please include the associated asbestos scope.

A30) See #11

Q31) Section 5.3 of the Performance Work Statement mentions that Phase Contrast Microscopy (PCM) shall be used for air sampling during the removal process and that Transmission Electron Microscopy (TEM) shall be used for all clearance samples. However, PCM and TEM analyses are used for asbestos abatement jobs and would not be appropriate to use for a metals dust cleanup job. Please clarify whether or not PCM and TEM analyses are to be used, or if not, please state what methodology should be used to determine clearance.

A31) See #11

Q32) Section 1.6.8 Assignment of Environmental Compliance Designee (ECD) – This section states that an ECD shall be appointed for all contract work periods exceeding 180 consecutive days. We anticipate that the cleaning process would not occur over a 180 consecutive day period, but would occur in stages with several, shorter duration, and mobilizations. Please clarify if an ECD is required for this?

A32) An appointed employee of the contractor will be assigned as the POC/SME for hazmat related generation and waste/

Q33) What are the clearance criteria for determining appropriate cleanup of the equipment surfaces? Is clearance based on the results of surface wipe samples of the results of air sampling?

A33) We are specifically asking for general area air monitoring around the perimeter. For the surface sampling to ensure what has been cleaned is clean and the area Around it is clean, we are asking for surface sampling to ensure lead levels are in compliance with 29 CFR 1910.1025(h)(1). "Surfaces. All surfaces shall be maintained as free as practicable of accumulations of lead." Unfortunately OSHA does not give a number, the number we use is adapted by the Army from a NAVMED regulation. Only lead has a mention of surfaces for OSHA.

Q34) Many pieces of equipment not being cleaned are very close-by and/or attached to equipment being cleaned.

Please confirm all equipment being cleaned as well as equipment not being cleaned that are adjacent/near-by to equipment being cleaned will not be in use during cleaning activities.

A34)See #3

Q35) How much advanced notice is required to ensure full uninterrupted access for cleaning activities? Is there a potential for last-minute interruptions of cleaning activities, such as the need to use the equipment, to where we would have to shut down and move to other equipment? If this is possible, will we be able to immediately move to another piece of equipment either within the same building or another building should the potential exist that we arrive at a building and not permitted access for whatever reason?

A35) Luckily there is a lot of equipment in geographically close locations in the same building. Work will be scheduled with COR and Contractor site manager to finish on a certain day and begin in a new location on the next day. A schedule will be finalized with the vendor after award.

Q36) Please confirm whether the government will provide building water and electric or does contractor have to provide their own?

A36) see #6

Q37) Will contractor be provided closer access to the equipment from the many other egress points throughout these buildings or will they be required to bring equipment in/out from the egress points used during site walk?

A37) closest logistically suitable entrance will be used

Q38) In general, will all associated attached equipment, such as pipes/conduits, curtain protectors, valves, fittings, hoists, stairwells, walking platforms, supply/exhaust ducts, tanks, electrical components/panels, equipment inside metal grating, and other miscellaneous equipment require cleaning as well?

A38) See #3

Q39) In general, will all non-affixed equipment/materials surrounding equipment to be cleaned in scope, such as desks, counters, metal step grates, misc. buckets, drums, steel base support I-beams, horizontal support columns/beams, concrete housekeeping pads and ramps, trash cans, rubber mats, lockers, storage bins, shelves, parts/pieces/equipment on/in shelving/bins, fans, mirrors, and any/all other miscellaneous stand-alone equipment require cleaning as well?

A39)See #3

Q40) Since photos not permitted, contractor requests photos of all equipment requiring cleaning with suggested arrows pointing to equipment requiring/not requiring cleaning.

A40) Photos for this will not be provided. See question #3

Q41) Page 16 of SOW states to sweep the floors. Please confirm whether that’s interior and/or exterior of the booths and to what extent. Please also confirm in general that nothing interior is to be cleaned.

A41) Sweeping of the floors around the booth is an end of effort cleanup function. Area to be swept is wherever area worked/mess was generated. Nothing is required inside the booths or equipment.

The following have been modified:

BLAST EQUIPMENT CLEANING WORKS

Blast Booth Worksheet

Booth Dimensions (L X W X

H)

CFM Media Used

350 MTA

350MTA TBD Sweeper Floor Air Blast 50x30x20 60k Stainless Steel Shot

350 R1005 Sweeper Floor Air Blast 50'6"x18x12 36k Stainless Steel Shot

350 Main

350 D4833 44 Auger w/ Pit Pangborne 40x20x16'6" 56k Garnet

350 D4834 50 Auger w/ Pit Pangborne 36x20x18'6" 56k Plastic

Bldg 37

37 R6185 Pneumatic Floor Clemco 20x15x11 Aluminum Oxide and Plastic

37 S3239 Vibratory Bed Empire 18x9x9 Aluminum Oxide and Plastic

Bldg 57

57 S0233 Pneumatic Floor Wheelabrator 27x15x11 16.5k Garnet

57 R6094 Pneumatic Floor Clemco 20x15x11 16.5k Garnet

Bldg 370

370 S1944 Pneumatic Floor Wheelabrator 28x16x14 16.5k Glass Beads and Plastic

370 S2455 Pneumatic Floor Clemco 21x11.5x10 16.5k Glass Beads and Plastic

1. ASSET LOCATION AND DESCRIPTION REQUIRING THIS EFFORT:

i. 5P100 building 370:

ii. Large Blast Booth (S1944)

iii. Medium Blast Booth (S2455)

iv. Tumble Blast (U0093)

v. Hand Blast Cabinet (S0203)

vi. Hand Blast Cabinet (V1517)

vii. Small Hand Blast Cabinet (R1162)

viii. 5P200 building 350:

ix. Blast Booth 44 (D4833)

x. Blast Booth 50 (S0405)

xi. Blast Booth-Bliss (R1005)

xii. Blast Booth MTA (V0708)

xiii. Table Blast (D4819)

xiv. Tumble Blast (U8136)

xv. Viking Blast (T3165)

xvi. 5P800 building 57

xvii. Blast Booth (S0233)

xviii. Blast booth (R6094)

xix. Table blast (S0770)

xx. Hand cabinet (R5925)

xxi. 5P800 Building 37

xxii. Large Blast (R6185)

xxiii. SM Blast (S3239)

xxiv. Cabinet (S0212)

xxv. Cabinet (R4982)

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

FOR

BLAST EQUIPMENT CLEANING

1.0. General

1.1. Scope: This Performance Work Statement (PWS) provides the details and specifications / requirements of the contract for Blast Equipment Cleaning at Letterkenny Army Depot (LEAD) Chambersburg PA. The objective of this PWS is for the contractor to provide abatement through safe cleaning and removal of heavy metals (LEAD/CAD/CHROME) and dirt, dust and other debris from the roofs and exterior sides of all blast booths and blasting equipment.

1.2. Background: This contract is for the abatement through safe cleaning and removal of heavy metals (LEAD/CAD/CHROME) and dirt, dust and other debris from the roofs and exterior sides of all blast booths and blasting equipment in the Process Support Division, Directorate of Industrial Operations as defined in this PWS. See Paragraph 7.

1.3. Period of Performance (PoP): The Period of Performance shall be one Base Year of 12 months and one 12-month option year. The Period of Performance reads as follows:

1.3.1 Base Year: 01 April 2021 to 31 March 2022

1.3.2 Option Year One: 01 April 2022 to 31 March 2023

1.4. General Information:

1.4.1. Quality Assurance (QA): The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) (defect rate(s)).

1.4.2. Recognized Holidays: The following are recognized US holidays. The contractor shall not be required to perform services nor deliveries to the depot on these days, but shall be required to work entirely on Saturday/Sunday (weekends) and alternating Friday / Saturday /Sunday weekends to minimize employee exposure to airborne particulates disturbed during the abatement processes. Due to variable schedules depending on building numbers, those without a second shift are able to be accessed for contractor work after 15:30. This schedule to be coordinated with LEAD COR.:

1.4.2.1. New Year’s Day: January 1st

1.4.2.2. Martin Luther King, Jr.’s Birthday; Third Monday in January

1.4.2.3. President’s Day: Third Monday in February

1.4.2.4. Memorial Day: Last Monday in May

1.4.2.5. Juneteenth: June 19th

1.4.2.6. Independence Day: July 4th

1.4.2.7. Labor Day: First Monday in September

1.4.2.8. Columbus Day: Second Monday in October

1.4.2.9. Veteran’s Day: November 11th

1.4.2.10. Thanksgiving Day: Fourth Thursday in November

1.4.2.11. Christmas Day: December 25th

1.4.2.12. When an observed holiday falls on a Tuesday or Thursday, the Depot regularly schedules a closure on the corresponding Monday or Friday.

1.4.3. Place and Performance of Services: The contractor shall provide services between the hours of 0600 and 1530 on Monday through Thursday and 0600 and 14:30 every other Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Should the need arise due to production, safety etc. the need may be required to be evenings/weekends. A timely notice from LEAD to contractor will be given.

Performance shall be at building 350, 370, 57, and 37. The contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.

1.4.4. Security Requirements: Contractor and all associated sub-contractor’s employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce shall comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.4.5.Security, Safety, and Fire Protection: All work shall comply with LEAD safety manual 385-1. The equipment and the installation shall also meet all the safety criteria set forth in OSHA 1926.501, NEC, NFPA 33 and

ANSI/ASSE Z359.

1.4.6. Physical Security: The contractor shall safeguard all Government property including facilities and equipment.

At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.7. AT Level 1 Awareness Training: All contractor employees, to included subcontractor employees, requiring access to Army Installations, facilities, and controlled access areas shall complete AT Level 1 awareness training within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training. AT level 1 awareness training is available at https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf.

1.4.8. iWATCH Training: The contractor and all associated sub-contractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program. This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or contracting officer. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training. iWATCH training is available on the Letterkenny Army Depot homepage – http://www.letterkenny.army.mil/iwatch.html;

select "Contractor AT/OPSEC Resource."

1.4.9. OPSEC Training: Per AR 530-1, Operations Security, new contractor employees and associated sub-contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR and the contracting officer, within 15 calendar days after completion of training. Level 1 OPSEC training is available on the Letterkenny Army Depot homepage – www.lead.army.mil.

1.4.10. Badges: Identification badges shall be issued for admittance of personnel before performing work or service on this contract. The identification badge is the property of the US Government and shall be returned upon termination or demand. The contractor/vendor shall ensure all badges issued to employees are returned to the Badge and Identification Section, Security Division, Letterkenny Army Depot promptly on termination of need or on expiration, which occurs first. The badge room is located in Bldg 2, phone # 717-267-5301. Hours of operation are 7:30 AM to 3:30 PM, Monday thru Thursday, exclusive of Federal Holidays.

1.4.11. Conservation of Utilities: The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

1.4.12. Special Qualifications: The contractor shall ensure all employees possess all required licenses for operating any equipment used in the performance of this contract. NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified and qualified for the position in which they will be serving. The contractor shall submit with the solicitation a certificate or license certifying that the vendor is a certified and or licensed repair location for the manufactures listed in this PWS.

1.4.13. Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the Contracting Officer (KO) in accordance with Federal Acquisition Regulations Subpart

42.5. The KO, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the Contacting Officer will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.14. Contract Manager (CM): The contactor shall provide a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.

1.4.15. Identification of Contractor Employees: All contact personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. The contractor shall also ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. If visiting, all contractor personnel will be required to contact the COR and will be required to meet all security requirements and regulations which are provided by the COR for site visit. Requirements for a visit to the depot to support this contract are nonexistent.

1.5 Safety

1.5.1. The contractor is reminded that LEAD maintains a Safety Management System (SMS) and is either OHSAS 18001 or ISO 45001 certified.

1.5.2. LEAD’s safety policy and safety program (LEAD-R 385-1) can be found at https://www.letterkenny.army.mil/PDF/385-1.pdf

1.5.3. It is the contractor’s responsibility to be familiar with these documents and to comply with their contents.

1.5.4. All on site work at LEAD shall be completed in accordance with applicable OSHA, DOD, DOT, Army, and LEAD Safety requirements. As a federal installation, additional requirements other than OSHA apply to contractors performing work at LEAD. Examples include full conformance to all applicable NFPA standards, ANSI standards, and other consensus standards for the industry covered by the subject contract. It is the responsibility of the contractor to be familiar with all applicable standards prior to starting work. Additionally, the contractor shall make themselves familiar with and comply with LEAD's local safety regulation LEAD-R 385-1 prior to the start of any work at LEAD.

1.5.5. If contractor personnel determine a procedure is unsafe, they shall discontinue work immediately and contact their Program Manager who shall notify safety personnel and the COR. As soon as LEAD Safety Office personnel determine that the unsafe conditions have been corrected, the COR will notify the contractor Program Manager that personnel may resume work.

1.5.6. All contractor supervisors and employees shall read and be knowledgeable of the governing SOP(s) prior to signing the SOP(s) and starting the operation.

1.5.7. All contractor personnel shall wear the appropriate PPE (eye protection, hearing protection, safety shoes, fall harness, hard hats etc) when in the following work areas: industrial buildings, at construction sites, test sites and test facilities. Failure to wear/use PPE may cause removal from the job site and/or seizure of non-compliant equipment/items.

1.5.8. The contractor shall comply with reporting requirements of 29 CFR Part 1904, AR 385-40 and APGR 385-4, and shall report accidents resulting in injury or death and accidents resulting in damage to Government property, supplies, and equipment to the COR promptly of the occurrence.

1.5.9. In case of injury/accident, the contractor shall complete a safety investigation report and submit it to the COR Office with a copy to the LEAD Safety Office.

1.6. Environmental:

General: All work shall comply with LEAD 385-1. The equipment and installation shall meet all of the safety criteria set forth in ANSI Z9.4 and OSHA 29 CFR 1910.94. All activities shall comply with OSHA Publication 3697, 29 CFR 1910.94 (ventilation), 29 CFR 1910.1000 (air contaminants), 29 CFR

1910.1025 (Lead), 29 CFR 1910.1026 (chromium), 29 CFR 1910.1027 (cadmium), 29 CFR1910.1200 (hazard communication), 29 CFR 1910 subpart I (132-140 for PPE selection and use to include respirators).

Referenced information can be found at: https://www.osha.gov/Publications/OSHA3697.pdf and https://www.cdc.gov/niosh/topics/blasting/

1.6.1. Environmental Protection: All work shall comply with OSHA 29 CFR 1926.1101 regarding activities where Heavy Metals are to be removed or encapsulated. Work shall also comply with EPA, NESHAP 40 CFR 61 Subpart M regarding requirements for removal of asbestos and prevention of worker/occupant exposure. Reference Para 6.

1.6.1.1. Pollution Prevention / Hazardous Waste Minimization: Minimize the use of hazardous materials and the generation of hazardous waste. Consult with the installation Environmental Office for suggestions and to obtain a copy of the installation's pollution prevention/hazardous waste minimization plan for reference material when preparing this part of the plan.

1.6.2. Compliance with Environmental Laws and Regulations: Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and installation regulations and policies. Contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200-1, and any specifications within this contract to the Contracting Officer Representative (COR) as well as the Director of Engineering & Public Works.

1.6.3. Compliance with Green Procurement Requirements: Contractor shall follow Federal EPA Comprehensive Procurement guidelines (www.epa.gov/cpg) and Army Contracting Command Quick Guide (https://acc.aep.army.mil/accapps/ACCMAP/Documents/Quick-Guide-for-Sustainable-Procurement.docx) for acquisition of building materials and products and select materials that have a long life cycle; the least toxic materials; recyclable materials; materials that are resource-efficient; materials with the maximum recycled content;

materials harvested on a sustained yield basis; and products causing the least pollution during their manufacture, use, and reuse.

1.6.4. Notification of Federal and State Regulators: Contractor shall immediately notify Director of Engineering & Public Works and COR of the arrival on site of any Federal, State, and/or DOD environmental regulator or enforcement agent and/or the receipt of any correspondence from a Federal or State environmental agency.

1.6.5. Inspections of Work Sites: Contractor shall submit to potential Federal, State, Army and installation work site environmental regulatory inspections and/or investigations into noncompliance, and fully cooperate with such inspections/investigations by providing the appropriate records and documentation. Environmental regulatory agencies are authorized by law to inspect any work site for environmental compliance with regulatory requirements.

If an inspection is conducted, it will not stop or disrupt ongoing contract activities. The inspection will only require the work site environmental officer, or supervisor/manager to answer questions and/or escort the inspector to specific work site areas with the potential to affect environmental quality. Typical environmental work site inspections are conducted in less than 30 minutes with an approximate frequency of one inspection every two months.

1.6.6. Reporting Noncompliance: Contractor shall immediately report any nonconformance and/or noncompliance with applicable Federal, State or Local environmental laws, Army and installation environmental regulations or policies to the COR and Director of Engineering & Public Works.

1.6.7. Conformance with Environmental Management System: Contractor shall take the necessary actions to identify, monitor, and control those contract operations and activities that pose risk of contamination, or can negatively affect the natural and/or human environment.

1.6.8. Assignment of Environmental Compliance Designee (ECD): Contractor shall appoint an ECD for all contract work periods exceeding 180 consecutive days. Contractor shall appoint a primary and alternate ECD for each production, shop or work area that uses and/or stores hazardous materials and/or generates hazardous wastes.

Contractor ECDs shall monitor implementation of all environmental regulatory requirements, report all environmental noncompliance to the work site supervisor, correct all environmental noncompliance’s, and verify implementation of directed actions to correct identified environmental noncompliance. Contractor shall have at least one ECD on duty at all times at each shop or work area. Contractor shall require all personnel designated as ECDs to complete the initial ECD through the installation or Major Subordinate Command (MSC) environmental compliance point of contact within 15 days of the start of contract performance. Contractor shall require ECDs to complete a re-certification course within 365 days of the completion of the initial certification course to maintain ECD certification. Failure to complete the re-certification course within 365 days will necessitate re-taking the initial course to maintain ECD certification. Contractor personnel certified as ECDs may perform other duties provided they do not prevent the performance of ECD duties. Contractors may request a waiver of this requirement through the COR to Director of Engineering & Public Works, if using and/or storing very small quantities of hazardous materials.

1.6.9. Competency Training for Contractor Personnel: Contractor shall not allow personnel to perform any activities and/or tasks on AMC installations without proper and adequate qualifications or job competency training.

In the event of any identified noncompliance, the Contractor shall, if requested, provide proof of contract personnel training or qualification (individual name, training/qualification type, training/qualification certificate, and date of training/qualification) to perform those contract activities associated with the identified noncompliance.

1.6.10. Corrective Action for Noncompliance: Contractor shall when given a verbal and/or written notice of environmental noncompliance or nonconformance by the COR, take immediate corrective action. Failure or refusal to comply promptly may be grounds for the Contracting Officer to invoke the appropriate contractual remedies.

This may cause all or part of the work to be stopped immediately until satisfactory corrective action has been taken.

1.6.11. Generation of Waste and Hazardous Waste: Contractor shall follow Letterkenny SOP for waste management covered in EJ-017. This will be provided in the specification package.

2.0 Definitions and Acronyms:

2.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.2. CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.5. DELIVERABLE. Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.9. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.13. WORK WEEK. Monday through Friday, unless specified otherwise

2.14. ACRONYMS:

AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CFP Contractor’s Furnished Property COR Contracting Officer Representative DA Department of the Army DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense FAR Federal Acquisition Regulation KO Contracting Officer LEAD Letterkenny Army Depot OEM Original Equipment Manufacturer POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit

3.0. Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): LEAD shall provide no equipment or property.

3.1. Government Responsibility:

3.1.1. LEAD personnel shall be responsible for providing a clean, dry area for storage of all equipment before, during and after Hazardous dust/heavy metal removal

3.1.2. LEAD personnel shall be responsible for any inspections of the installation and startup.

3.1.3. LEAD personnel shall be responsible for any utilities that installers need to connect to 1 equipment.

3.1.4. LEAD shall provide layouts for size and location of the 4 sections of blast operations that shall be mitigated/abated.

3.1.5. LEAD POC shall report non-compliance issues immediately to depot environmental and safety personnel upon notification from the contractor or area personnel.

3.2. Utilities: All utilities in the facility will be available for the contractors use in the performance of this contract.

4.0. Contractor Furnished Property, Materials, Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

4.1.2. Provide all utility and installation requirements 60 days prior to work beginning including voltage and amperage requirements.

4.1.3. Supply all equipment/supplies necessary for removal and bagging of the waste.

4.1.4. Shall provide hazardous waste drums for the waste removed as part of this project.

4.1.5. Supply all equipment/supplies necessary for encapsulation of the surrounding work areas.

4.1.6. Supply all equipment/supplies necessary for enclosing the area prior to removal work and then for cleanup afterward.

4.1.7. All excess equipment, shipping crates, scrap and materials used by the contractor shall be removed.

5.0 Requirements:

5.1. Site/equipment measurements and dimensions will be obtained by the contractor. Any dimensions provided by government personnel shall be considered approximate and shall not be used for design purposes. Failure of the contractor to acquaint themselves with conditions attending the work site will not be considered sufficient reason for changing the cost or performance schedule of this project.

5.2. Contractor is responsible for gathering air tests to record PEL reading levels before and after abatement of each piece of equipment and provide readings to COR to verify acceptable air quality levels upon release of area to production. Additional sampling will be conducted (In accordance with 1910.1025(d)) at each change in phase of operations to include a TWA analysis on the first day to determine if levels exceed the PEL. In addition to the PEL readings, surface wipe sampling for heavy metals will also be conducted by Contract awardee and tested by an accredited laboratory of their choosing. A passing test of each type (PEL and Wipe) in each area work is performed will be mandatory during and after work is complete. The results will be furnished to the COR. Refer to Technical Exhibits 1 - 3 at the end of this PWS.

5.3. The contractor shall provide testing during and after removal. Please use PCM (Phase Contrast Microscopy) during removal process and TEM (Transmission Electron Microscopy) for the final clearance.

5.4. The contractor shall coordinate any/all work with LEAD. They cannot remove, unhook, de-energize, or turn off any systems without LEAD assistance and perform this with local rules and laws including OSHA lock out tag out program.

5.5. Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and installation regulations and policies. Contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200-1, and any specifications within this contract to the Contracting Officer Representative (COR) as well as the Director of Engineering & Public Works.

5.6. Contractor shall obtain all license and certification required by Federal, State, and Local environmental laws and regulations necessary to adhere to the specifications of this contract. The Contractor shall submit all plans, notifications, reports, submittal documents, and fees required by Federal, State, and Local environmental laws and regulations to the appropriate Federal, State,…