SOL_AMEND_W911N219R00310001.pdf
PDF 372 KB Posted
- Attached to
- Supply of Compressed and Liquefied Cylinders
- Solicitation number
- W911N219R0031
About this file
Solicitation Amendment to answer questions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOL_AMEND_W911N219R00310003.pdf | ||
| SOL_AMEND_W911N219R00310003_CONFORMED_COPY.pdf | ||
| SOL_AMEND_W911N219R00310002.pdf | ||
| PD_FINAL.pdf | ||
| APPENDIX_A.xlsx | XLSX spreadsheet | |
| SOL_W911N219R0031.pdf | ||
| PD_FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THOMAS C. HALL
LETTERKENNY CONTRACTING OFFICE
1 OVERCASH AVENUE, CCAM-ALK
717-267-5583
CHAMBERSBURG PA 17201-4150
W25G1Q9211R001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to answ er questions from prospective offerors and attach APPENDIX A to clarify cylinder sizes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 42
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911N219R0031
X 9B. DATED (SEE ITEM 11)
09-Sep-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Sep-2019
CODE
LETTERKENNY ARMY DEPOT
LETTERKENNY CONTRACTING OFFICE - ACC
1 OVERCASH AVENUE, ATTN: CCAM-ALK, BLDG 2S
CHAMBERSBURG PA 17201-4150
W911N2 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W911N2
FACILITY CODECODE
EMAIL:TEL:
W911N219R0031
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR
ACETYLENE Grade B 98.0% / BB-A-106 (Flammable) IN ACCORDANCE WITH THE
PURCHASE DESCRIPTION
To:
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR
ACETYLENE Grade B 98.0% / BB-A-106 (Flammable) IN ACCORDANCE WITH THE
PURCHASE DESCRIPTION AND APPENDIX A.
CLIN 0002
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR ARGON
99.99% AWS A53.2 SGA IN ACCORDANCE WITH THE PURCHASE DESCRIPTION.
99.99% AWS A53.2 SGA IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
APPENDIX A.
CLIN 0003
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR HELIUM
Grade A (99.995%)/BB-H-1168 IN ACCORDANCE WITH THE PURCHASE DESCRIPTION.
Grade A (99.995%)/BB-H-1168 IN ACCORDANCE WITH THE PURCHASE DESCRIPTION
AND APPENDIX A.
CLIN 0004
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR NITROGEN,
Type I, Grade A (99.98%) IN ACCORDANCE WITH THE PURCHASE DESCRIPTION.
Type I, Grade A (99.98%) IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 0005
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR OXYGEN,
Type I(GASEOUS) /CGA G-4 / CGA 4.3 IN ACCORDANCE WITH THE PURCHASE
DESCRIPTION.
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR OXYGEN,
Type I(GASEOUS) /CGA G-4 / CGA 4.3 IN ACCORDANCE WITH THE PURCHASE
DESCRIPTION AND APPENDIX A.
CLIN 0006
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR
ARGON/CO2/Oxygen 90% AR, 8% CO2, 2% 02 AWSA5.32M IN ACCORDANCE WITH
THE PURCHASE DESCRIPTION.
ARGON/CO2/Oxygen 90% AR, 8% CO2, 2% 02 AWSA5.32M IN ACCORDANCE WITH
THE PURCHASE DESCRIPTION AND APPENDIX A.
CLIN 0007
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR
Argon/Helium/CO2 TRI-MIX 90% HE, 7.5% AR, 2.5% CO2 IN ACCORDANCE WITH THE
PURCHASE DESCRIPTION.
Argon/Helium/CO2 TRI-MIX 90% HE, 7.5% AR, 2.5% CO2 IN ACCORDANCE WITH THE
CLIN 0008
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR 95%
ARGON, 5% CO2 IN ACCORDANCCE WITH THE PURCHASE DESCRIPTION.
ARGON, 5% CO2 IN ACCORDANCCE WITH THE PURCHASE DESCRIPTION AND
CLIN 0009
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR 75%
ARGON, 25% HELIUM IN ACCORDANCE WITH THE PURCHASE DESCRIPTION.
ARGON, 25% HELIUM IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 0010
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR
ARGON/CO2 75% ARGON, 25% CARBON DIOXIDE IN ACCORDANCE WITH THE
ARGON/CO2 75% ARGON, 25% CARBON DIOXIDE IN ACCORDANCE WITH THE
CLIN 0011
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR Ultra High Purity Nitrogen (PN: NI T5.0) 339 CF IN ACCORDANCE WITH THE PURCHASE
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR Ultra High Purity Nitrogen (PN: NI T5.0) 339 CF IN ACCORDANCE WITH THE PURCHASE
CLIN 0012
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR Ultra High Purity Helium (PN: HE T5.0) 339 CF IN ACCORDANCE WITH THE PURCHASE
Purity Helium (PN: HE T5.0) 339 CF IN ACCORDANCE WITH THE PURCHASE
CLIN 0013
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR 90%
Nitrogen 10% Helium (PN: NI HE10T) 339 CF IN ACCORDANCE WITH THE PURCHASE
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR 90%
Nitrogen 10% Helium (PN: NI HE10T) 339 CF IN ACCORDANCE WITH THE PURCHASE
CLIN 0014
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR UHP
Nitrogen (NI UHP300BA) IN ACCORDANCE WITH THE PURCHASE DESCRIPTION.
Nitrogen (NI UHP300BA) IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 0015
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR 12-Pack Nitrogen, Compressed, 2.2, 339 CF IN ACCORDANCE WITH THE EPURCHASE
DESCRIPTION
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR 12-Pack Nitrogen, Compressed, 2.2, 339 CF IN ACCORDANCE WITH THE EPURCHASE
CLIN 0016
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR High Pure Argon AR HP6K 99.998%, 6k PSI IN ACCORDANCE WITH THE PURCHASE
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR High Pure Argon AR HP6K 99.998%, 6k PSI IN ACCORDANCE WITH THE PURCHASE
CLIN 0017
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR
ARGON/OXYGEN 98% ARGON, 2% OXYGEN AWSA5.32M IN ACCORDANCE WITH
ARGON/OXYGEN 98% ARGON, 2% OXYGEN AWSA5.32M IN ACCORDANCE WITH
CLIN 0018
Pure Argon AR UHP300 IN ACCORDANCE WITH THE PURCHASE DESCRIPTION.
Pure Argon AR UHP300 IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 0019
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR 4ppm Carbon Dioxide/Argon (PN: X02AR99C15A2VT7) IN ACCORDANCE WITH THE
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR 4ppm
CLIN 0020
PROVIDE ALL LABOR, GAS, EQUIPMENT AND TOOLS TO REFILL PROPANE
CYLINDERS 8 GALLON, (33.5 lbs.) USED ON FORKLIFTS/FLOOR SCRUBBERS IN
ACCORDANCE WITH THE PURCHASE DESCRIPTION
PROVIDE ALL LABOR, GAS, EQUIPMENT AND TOOLS TO REFILL PROPANE
CYLINDERS 8 GALLON, (33.5 lbs.) USED ON FORKLIFTS/FLOOR SCRUBBERS IN
ACCORDANCE WITH THE PURCHASE DESCRIPTION AND APPENDIX A.
CLIN 0021
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR Acetylene, Dissolved 2.1, Size B 70SCF, 52.188 lb IN ACCORDANCE WITH THE PURCHASE
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR Acetylene, Dissolved 2.1, Size B 70SCF, 52.188 lb IN ACCORDANCE WITH THE PURCHASE
CLIN 0022
PROVIDE ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT TO DELIVER GAS
CYLINDERS AND PERFORM ON SITE REFILL OF PROPANE CYLINDERS IN
ACCORDANCE WITH THE PURCHASE DESCRIPTION.
PROVIDE ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT TO DELIVER GAS
CYLINDERS AND PERFORM ON SITE REFILL OF PROPANE CYLINDERS IN
CLIN 1001
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR
ACETYLENE Grade B 98.0% / BB-A-106 (Flammable) IN ACCORDANCE WITH THE
CLIN 1002
99.99% AWS A53.2 SGA IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 1003
Grade A (99.995%)/BB-H-1168 IN ACCORDANCE WITH THE PURCHASE DESCRIPTION
CLIN 1004
Type I, Grade A (99.98%) IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 1005
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR OXYGEN,
Type I(GASEOUS) /CGA G-4 / CGA 4.3 IN ACCORDANCE WITH THE PURCHASE
CLIN 1006
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR
ARGON/CO2/Oxygen 90% AR, 8% CO2, 2% 02 AWSA5.32M IN ACCORDANCE WITH
CLIN 1007
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR
Argon/Helium/CO2 TRI-MIX 90% HE, 7.5% AR, 2.5% CO2 IN ACCORDANCE WITH THE
CLIN 1008
ARGON, 5% CO2 IN ACCORDANCCE WITH THE PURCHASE DESCRIPTION AND
CLIN 1009
ARGON, 25% HELIUM IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 1010
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR
ARGON/CO2 75% ARGON, 25% CARBON DIOXIDE IN ACCORDANCE WITH THE
CLIN 1011
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR Ultra High
CLIN 1012
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR Ultra High
Purity Helium (PN: HE T5.0) 339 CF IN ACCORDANCE WITH THE PURCHASE
CLIN 1013
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR 90%
Nitrogen 10% Helium (PN: NI HE10T) 339 CF IN ACCORDANCE WITH THE PURCHASE
CLIN 1014
Nitrogen (NI UHP300BA) IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 1015
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR 12-Pack
Nitrogen, Compressed, 2.2, 339 CF IN ACCORDANCE WITH THE EPURCHASE
CLIN 1016
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR High Pure
Argon AR HP6K 99.998%, 6k PSI IN ACCORDANCE WITH THE PURCHASE
CLIN 1017
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR
ARGON/OXYGEN 98% ARGON, 2% OXYGEN AWSA5.32M IN ACCORDANCE WITH
CLIN 1018
Pure Argon AR UHP300 IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 1019
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR 4ppm
CLIN 1020
PROVIDE ALL LABOR, GAS, EQUIPMENT AND TOOLS TO REFILL PROPANE
CYLINDERS 8 GALLON, (33.5 lbs.) USED ON FORKLIFTS/FLOOR SCRUBBERS IN
CLIN 1021
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR Acetylene, Dissolved 2.1, Size B 70SCF, 52.188 lb IN ACCORDANCE WITH THE PURCHASE
CLIN 1022
PROVIDE ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT TO DELIVER GAS
CYLINDERS AND PERFORM ON SITE REFILL OF PROPANE CYLINDERS IN
CLIN 2001
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR
ACETYLENE Grade B 98.0% / BB-A-106 (Flammable) IN ACCORDANCE WITH THE
CLIN 2002
99.99% AWS A53.2 SGA IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 2003
Grade A (99.995%)/BB-H-1168 IN ACCORDANCE WITH THE PURCHASE DESCRIPTION
CLIN 2004
Type I, Grade A (99.98%) IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 2005
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR OXYGEN,
Type I(GASEOUS) /CGA G-4 / CGA 4.3 IN ACCORDANCE WITH THE PURCHASE
CLIN 2006
ARGON/CO2/Oxygen 90% AR, 8% CO2, 2% 02 AWSA5.32M IN ACCORDANCE WITH
CLIN 2007
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR
Argon/Helium/CO2 TRI-MIX 90% HE, 7.5% AR, 2.5% CO2 IN ACCORDANCE WITH THE
CLIN 2008
ARGON, 5% CO2 IN ACCORDANCCE WITH THE PURCHASE DESCRIPTION AND
CLIN 2009
ARGON, 25% HELIUM IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 2010
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR
ARGON/CO2 75% ARGON, 25% CARBON DIOXIDE IN ACCORDANCE WITH THE
CLIN 2011
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR Ultra High
CLIN 2012
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR Ultra High
Purity Helium (PN: HE T5.0) 339 CF IN ACCORDANCE WITH THE PURCHASE
CLIN 2013
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR 90%
Nitrogen 10% Helium (PN: NI HE10T) 339 CF IN ACCORDANCE WITH THE PURCHASE
CLIN 2014
Nitrogen (NI UHP300BA) IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 2015
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR 12-Pack
Nitrogen, Compressed, 2.2, 339 CF IN ACCORDANCE WITH THE EPURCHASE
CLIN 2016
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR High Pure
Argon AR HP6K 99.998%, 6k PSI IN ACCORDANCE WITH THE PURCHASE
CLIN 2017
ARGON/OXYGEN 98% ARGON, 2% OXYGEN AWSA5.32M IN ACCORDANCE WITH
CLIN 2018
Pure Argon AR UHP300 IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 2019
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR 4ppm
Carbon Dioxide/Argon (PN: X02AR99C15A2VT7) IN ACCORDANCE WITH THE
CLIN 2020
PROVIDE ALL LABOR, GAS, EQUIPMENT AND TOOLS TO REFILL PROPANE
CYLINDERS 8 GALLON, (33.5 lbs.) USED ON FORKLIFTS/FLOOR SCRUBBERS IN
CLIN 2021
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR Acetylene, Dissolved 2.1, Size B 70SCF, 52.188 lb IN ACCORDANCE WITH THE PURCHASE
CLIN 2022
PROVIDE ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT TO DELIVER GAS
CLIN 3001
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR
ACETYLENE Grade B 98.0% / BB-A-106 (Flammable) IN ACCORDANCE WITH THE
CLIN 3002
99.99% AWS A53.2 SGA IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 3003
Grade A (99.995%)/BB-H-1168 IN ACCORDANCE WITH THE PURCHASE DESCRIPTION
CLIN 3004
Type I, Grade A (99.98%) IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 3005
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR OXYGEN,
Type I(GASEOUS) /CGA G-4 / CGA 4.3 IN ACCORDANCE WITH THE PURCHASE
CLIN 3006
ARGON/CO2/Oxygen 90% AR, 8% CO2, 2% 02 AWSA5.32M IN ACCORDANCE WITH
CLIN 3007
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR
Argon/Helium/CO2 TRI-MIX 90% HE, 7.5% AR, 2.5% CO2 IN ACCORDANCE WITH THE
CLIN 3008
ARGON, 5% CO2 IN ACCORDANCCE WITH THE PURCHASE DESCRIPTION AND
CLIN 3009
ARGON, 25% HELIUM IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 3010
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR
ARGON/CO2 75% ARGON, 25% CARBON DIOXIDE IN ACCORDANCE WITH THE
CLIN 3011
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR Ultra High
CLIN 3012
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR Ultra High
Purity Helium (PN: HE T5.0) 339 CF IN ACCORDANCE WITH THE PURCHASE
CLIN 3013
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR 90%
Nitrogen 10% Helium (PN: NI HE10T) 339 CF IN ACCORDANCE WITH THE PURCHASE
CLIN 3014
Nitrogen (NI UHP300BA) IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 3015
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR 12-Pack
Nitrogen, Compressed, 2.2, 339 CF IN ACCORDANCE WITH THE EPURCHASE
CLIN 3016
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR High Pure
Argon AR HP6K 99.998%, 6k PSI IN ACCORDANCE WITH THE PURCHASE
CLIN 3017
ARGON/OXYGEN 98% ARGON, 2% OXYGEN AWSA5.32M IN ACCORDANCE WITH
CLIN 3018
Pure Argon AR UHP300 IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 3019
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR 4ppm
Carbon Dioxide/Argon (PN: X02AR99C15A2VT7) IN ACCORDANCE WITH THE
CLIN 3020
PROVIDE ALL LABOR, GAS, EQUIPMENT AND TOOLS TO REFILL PROPANE
CYLINDERS 8 GALLON, (33.5 lbs.) USED ON FORKLIFTS/FLOOR SCRUBBERS IN
CLIN 3021
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR Acetylene, Dissolved 2.1, Size B 70SCF, 52.188 lb IN ACCORDANCE WITH THE PURCHASE
CLIN 3022
PROVIDE ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT TO DELIVER GAS
CLIN 4001
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR
ACETYLENE Grade B 98.0% / BB-A-106 (Flammable) IN ACCORDANCE WITH THE
CLIN 4002
99.99% AWS A53.2 SGA IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 4003
Grade A (99.995%)/BB-H-1168 IN ACCORDANCE WITH THE PURCHASE DESCRIPTION
CLIN 4004
Type I, Grade A (99.98%) IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 4005
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR OXYGEN,
Type I(GASEOUS) /CGA G-4 / CGA 4.3 IN ACCORDANCE WITH THE PURCHASE
CLIN 4006
ARGON/CO2/Oxygen 90% AR, 8% CO2, 2% 02 AWSA5.32M IN ACCORDANCE WITH
CLIN 4007
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR
Argon/Helium/CO2 TRI-MIX 90% HE, 7.5% AR, 2.5% CO2 IN ACCORDANCE WITH THE
CLIN 4008
ARGON, 5% CO2 IN ACCORDANCCE WITH THE PURCHASE DESCRIPTION AND
CLIN 4009
ARGON, 25% HELIUM IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 4010
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR
ARGON/CO2 75% ARGON, 25% CARBON DIOXIDE IN ACCORDANCE WITH THE
CLIN 4011
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR Ultra High
CLIN 4012
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR Ultra High
Purity Helium (PN: HE T5.0) 339 CF IN ACCORDANCE WITH THE PURCHASE
CLIN 4013
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR 90%
Nitrogen 10% Helium (PN: NI HE10T) 339 CF IN ACCORDANCE WITH THE PURCHASE
CLIN 4014
Nitrogen (NI UHP300BA) IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 4015
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR 12-Pack
Nitrogen, Compressed, 2.2, 339 CF IN ACCORDANCE WITH THE EPURCHASE
CLIN 4016
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR High Pure
Argon AR HP6K 99.998%, 6k PSI IN ACCORDANCE WITH THE PURCHASE
CLIN 4017
ARGON/OXYGEN 98% ARGON, 2% OXYGEN AWSA5.32M IN ACCORDANCE WITH
CLIN 4018
Pure Argon AR UHP300 IN ACCORDANCE WITH THE PURCHASE DESCRIPTION AND
CLIN 4019
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR 4ppm
Carbon Dioxide/Argon (PN: X02AR99C15A2VT7) IN ACCORDANCE WITH THE
CLIN 4020
PROVIDE ALL LABOR, GAS, EQUIPMENT AND TOOLS TO REFILL PROPANE
CYLINDERS 8 GALLON, (33.5 lbs.) USED ON FORKLIFTS/FLOOR SCRUBBERS IN
CLIN 4021
PROVIDE ALL LABOR, GAS, EQUIPMENT, TOOLS, AND CYLINDERS FOR Acetylene, Dissolved 2.1, Size B 70SCF, 52.188 lb IN ACCORDANCE WITH THE PURCHASE
CLIN 4022
PROVIDE ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT TO DELIVER GAS CYLINDERS AND
PERFORM ON SITE REFILL OF PROPANE CYLINDERS IN ACCORDANCE WITH THE PURCHASE
PROVIDE ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT TO DELIVER GAS CYLINDERS AND
PERFORM ON SITE REFILL OF PROPANE CYLINDERS IN ACCORDANCE WITH THE PURCHASE
TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 PURCHASE
21-AUG-2019
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 2 APPENDIX A 13-SEP-2019 Attachment 3 PURCHASE
13-SEP-2019
(End of Summary of Changes)
File details come from the government source that posted it.