SEE ADDENDUM

(No Collect Calls)

W911N219Q0051 13-Aug-2019

b. TELEPHONE NUMBER

717-267-5536

8. OFFER DUE DATE/LOCAL TIME

10:00 AM 06 Sep 2019

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W911N29. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

SHAUN R. LEATHERMAN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W25G1Q922000Q8

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

LETTERKENNY ARMY DEPOT

LETTERKENNY CONTRACTING OFFICE - ACC

1 OVERCASH AVENUE, ATTN: CCAM-ALK, BLDG 2S

CHAMBERSBURG PA 17201-4150

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W25G1Q 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

DIRECTORATE OF OPS PLANNING & SUPPORT

BLDG 370 ASRS DOOR 18 AMLD-PLX

LETTERKENNY ARMY DEPOT

CHAMBERSBURG PA 17201-4150

TEL: FAX:

717-2679834FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

1,000

NAICS:

333318

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF31

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W911N219Q0051

Section SF 1449 - CONTINUATION SHEET

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 120 dys. ADC 1 DIRECTORATE OF OPS PLANNING &

SUPPORT

BLDG 370 ASRS DOOR 18 AMLD-PLX

LETTERKENNY ARMY DEPOT

CHAMBERSBURG PA 17201-4150

FOB: Destination

W25G1Q

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

SOLICITATION NOTES

1. System for Award Management (SAM): In accordance with FAR 4.1102, Offerors shall be registered in the SAM database in order to be eligible for contract award. No award will be made to an Offeror not registered.

Registration can be accomplished at https://www.sam.gov/portal/public/SAM/. Registration in this database shall remain active.

2. Annual Representations and Certifications: In accordance with FAR 4.1201, Offerors shall complete electronic annual representations and certifications within SAM as part of required registration. Registration in this database shall remain active and can be accessed at https://www.sam.gov/portal/public/SAM/.

3. Questions: Questions regarding this solicitation shall be submitted to the Contracting Officer, in writing, at least 10 calendar days prior to the closing date. Questions submitted after this time will be answered at the discretion of the Contracting Officer. The Contracting Officer for this action is Tommy Albrecht, tommy.r.albrecht.civ@mail.mil.

4. Award without Discussions: The Government intends to award without discussions, offerors should submit their best prices in their initial offer. If FAR Provision 52.212-2, Evaluation-Commercial Items, is included, Offerors must submit all information requested therein in order for the Government to determine technical acceptability.

5. Amendments: The Offeror shall submit to the Contracting Officer signed copies of all amendments issued to this solicitation. Failure to comply may cause your proposal to be rejected.

6. Payment: Payment for this action will be made by Electronic Funds Transfer (EFT) through the Defense Finance and Accounting Services (DFAS) utilizing Wide Area Work Flow (WAWF). See 252.232-7006 for more information.

7. Period for Acceptance of Offers: The Offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers.

8. Set- Aside: The proposed contract is 100% set-aside for small business concerns.

9. FOB Destination: Unless otherwise stated in the solicitation, Offerors shall provide FOB Destination prices.

10. Site Visit: A site visit is scheduled for 28 August 2019, 10AM Eastern Daylight Time. Site visit attendance is encouraged but is not mandatory; however, failure to attend a site visit shall not be a reason for price increases to the contract after contract award. Submit the names of all attendees to Shaun Leatherman, shaun.r.leatherman.civ@mail.mil. Submit this information no later than 23 August 2019, 4PM Eastern Daylight Time. Offerors who do not submit this information will not be given access to the site. All attendees will meet at Building 2S, Directorate of Contracting, 1 Overcash Avenue, Letterkenny Army Depot, Chambersburg, PA.

Offerors are required to obtain a visitor’s pass from the Main Gate prior to arriving at Building 2S. Please allow at least 45 minutes for this process. You must provide a current picture identification, vehicle registration and proof of insurance to obtain a pass.

11. Insurance (Fixed Price): Pursuant to the requirements of FAR clause 52.228-5 Insurance-Work on a Government Installation, the contractor shall obtain and maintain at least the following kinds of insurance and minimum liability coverage during any period of contract performance:

a. Workmen's Compensation and occupational disease coverage as required by law except that, if this contract is to be performed in a state which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such state will be satisfactory. The required Workmen's Compensation Insurance shall extend to cover employers' liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.

b. Comprehensive General Liability Insurance in the minimum limit of $500,000 per occurrence for bodily injury liability.

c. Comprehensive Automotive Liability Insurance with minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury, and a minimum limit of $200,000 per occurrence for property damage.

PURCHASE DESCRIPTION

LETTERKENNY ARMY DEPOT

PURCHASE DESCRIPTION

GANTRY TRUCK WASH – FILTRATION UPGRADES P2

1.0 GENERAL

1.1 SCOPE: This specification shall apply to a filtration upgrade for the gantry truck wash system at Letterkenny Army Depot. The gantry truck wash is located west of building 351 at Letterkenny Army Depot (LEAD), Chambersburg, PA. The filtration upgrades include new 2 new filtration units with back flush capability, controls for the back flush function, 2 new pressure washers, rain test valve change automation, and a new shorter rain test option for follow up testing. This work shall include equipment, controls, concrete work, plumbing, and electrical.

The specification calls for a turnkey operation and the successful contractor shall install the new system and associated components herein in their entirety. The contractor shall furnish all materials, equipment, and labor needed to meet all requirements described in this purchase description and shall provide a complete and usable system. The contractor shall also perform testing to indicate full operational compliance with this contract and shall also provide system training for necessary personnel at the gantry wash system (U2441).

1.2 GENERAL INFORMATION

1.2.1 Place and Performance of Installation: The existing system that shall be upgraded is located in the gantry truck wash which is west of bldg. 351 and north of bldg. 350. This upgrade will involve all equipment, controls, and labor in this specification. All work will be performed between the hours of 6:00 AM and 3:30 PM, Monday thru Thursday, exclusive of Federal Holidays and special depot closures (Typically the Monday before or Friday after Federal Holidays that fall on a Saturday, Sunday, Tuesday or Thursday). Other hours, weekend, and holiday work will be considered separately as requested by the contractor and approved by the Contracting Officer.

1.2.2 Security Requirements: The contractor shall be responsible to ensure that all employees and subcontractor employees that will visit the depot shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.

Contractor workforce shall comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.2.3 Security, Safety, and Fire Protection: All work shall comply with LEAD pamphlet 385-4. The equipment and the installation shall also meet all the safety criteria set forth in OSHA 1926.501 and ANSI/ASSE Z359.

1.2.4 AT Level I Awareness Training: All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: www.lead.army.mil.

1.2.5 iWATCH Training: The contractor and all associated sub-contractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program. This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the TPOC or contracting officer. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each affected contractor employee and subcontractor employee, to the TPOC and contracting officer within 15 calendar days after completion of training. iWATCH training is available on the Letterkenny Army Depot public homepage – www.lead.army.mil

1.2.6 OPSEC Training: Per AR 530-1, Operations Security. Contractor employees and associated sub-contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer if a COR is not assigned, within 15 calendar days after completion of training. Level 1 OPSEC training is available on the Letterkenny Army Depot public homepage

– www.lead.army.mil

1.2.7 Badges: Identification badges will be issued for admittance of personnel before performing work or service on this contract. The identification badge is the property of the US Government and shall be returned upon termination or demand. The contractor/vendor shall ensure all badges issued to employees are returned to the Badge and Identification Section, Security Division, Letterkenny Army Depot promptly on termination of need or on expiration, which occurs first. The badge room is located in Bldg. 2, phone # 717-267-5301. Hours of operation are 7:30 AM to 3:30 PM, Monday thru Thursday, exclusive of Federal Holidays.

2.0 GOVERNMENT FURNISHED PROPERTY AND MATERIALS: The government will provide the facilities, equipment, materials and/or services listed below

2.1. Facilities: The government will provide clear access to all working areas necessary for the contractor to perform the installation outlined, during the hours listed in section 1.2.1 above.

2.2. Equipment:

2.2.1. The existing system of recirculation loops for the truck wash, rain test, and the pressure washer. This system consists of a fresh water supply, reclaim tanks, soap tank, heat transfer loop, pumps, filtration, controls, heaters, etc. (See attachment A)

2.2.2. One underground tank for the wash/pressure wash waste water and one concrete sump box for the rain test waste water.

2.2.3. A manual valve for switching back and forth between the wash/pressure wash loop and the rain test loop.

Valve modifications shall be installed by contractor to automate switching as part of this specification. (See attachment A)

2.2.4. Two existing filtration units. One for the rain test loop and one for the pressure wash loop. These shall be removed and replaced with new units capable of handling the back flush modifications. (See attachment B-1 and B- 2)

2.2.5. One electric pressure washer that shall be replaced with two (See attachment A).

2.2.6. Existing control panels for wash, pressure wash, and rain test systems. The existing control panel for the wash process shall be used to add the shorter follow up rain test program (see attachment A).

2.2.7. Three reclaim water tanks; one for each circulation loop (wash process, rain test, pressure washer). (See attachment B-1 and B-2)

2.2.8. Two pressure wash wands, controls, and hose reels in wash bay. These shall be hooked up to the new pressure washers.

2.2.9. Water drainage trough in the center of the wash bay. One underground main tank for gantry wash and pressure washer. One underground sump for rain test which is a separate circulation loop. (See attachment A).

2.2.10. Equipment room and wash bay for housing all system equipment and controls (see attachment A).

2.3. Materials/Services:

2.3.1. Provide a single point of connection for power within 25 feet of the gantry wash system. Power will be provided via a fused disconnect switch.

2.3.2. Provide a connection point for water, and compressed air within 25 feet of the recirculation system.

2.3.3. Provide electricity and compressed air for vendor hand tools during installation.

2.3.4. Provide space to layout out supplies, tools, etc. needed to complete the project.

2.3.5. Provide a location for disposal and demo’d parts for recycle.

3.0 Contractor Responsibilities: The contractor shall be responsible for the following:

3.1 Provide a summary of the required utilities and general layout 60 days prior to the equipment delivery, and the detailed installation requirements (to include installation schematics and installation schedule) 30 days prior to equipment delivery.

3.2 Supply all equipment, parts, labor and materials necessary for off-loading, positioning, installation and operation of the system.

3.3 All equipment, plumbing supplies, controls, supporting hardware, and labor required to complete the system modifications.

3.4 Removal of all current bag filters. Modification of piping and filter housings to accommodate a new back flush system.

3.5 Controls and control panel for back flush system.

3.6 Controls and control panel to switch from rain test to gantry wash/pressure wash loops.

3.7 Below grade concrete boxes to house valves and controls for switching between rain test and gantry wash/pressure wash operations.

3.8 Shorten the trench to make way for box (or boxes) that will house valves, valve controls, piping, and hardware.

3.9 Removal of existing pressure washer and addition of two new pressure wash units to replace the current single pressure wash unit.

3.10 Program change in wash system to add shorter rain test follow up test.

3.11 Ensure that all welding is performed in accordance with AWS D1.1.

3.12 Ensure that all plumbing follows the applicable codes for ASME B31.3 process piping.

3.13 Ensure that the electrical installation is performed in accordance with the National Electrical Code. All electrical work shall be subject to inspection by LEAD electricians.

3.14 Contractor shall make final connection to a government installed disconnect switch located within 25 feet of the control panel. Supplied voltage will be 480 Volt, 3-phase, 3-wire with a separate equipment grounding conductor. Contractor shall provide any transformation to other required voltages.

3.15 Remove all excess equipment, shipping crates, scrap and consumable materials used by the contractor for shipment and installation of the room.

3.16 The contractor shall supply no fewer than two of each special tool required to service the room and its components.

3.17 The contractor shall be responsible for obtaining site/equipment measurements and dimensions. Any dimensions provided by government personnel shall be considered approximate and shall not be used for design purposes. Failure of the contractor to acquaint himself with conditions attending the work site will not be considered sufficient reason for changing the cost or performance schedule of this project.

3.18 The contractor shall coordinate all wall penetrations and concrete cutting with the government representative.

No structural members shall be removed or modified to make penetrations. All penetrations shall be sealed with a material acceptable for use in an industrial environment.

4.0 SPECIFICATIONS

4.1 Filtration (With Back Flush) Specifications

4.1.1 Two new filtration units shall be capable of handling filtration and back flush up to 50 gallons per minute each unit (see attachment C). One filtration system shall be for the pressure washers and one filtration system shall be for the rain test system.

4.1.2 The filtration systems shall be designed for 5 micron filter bags.

4.1.3 Back flush shall be the opposite direction of the filtration flow and shall push water up and into the filter bag to move solids off of the filter bag. (See attachment C)

4.1.4 The filtration systems shall be capable of directing solids back to either underground sump (rain test sump or the wash process sump).

4.1.5 The filtration systems shall be integrated with system operation such that when back flush is occurring; the rain test remains dormant or the pressure washers remain dormant.

4.1.6 The back flush/filtration systems shall have controls that control the frequency and time for back flushing.

These controls shall be adjustable to allow for optimizing efficiency as necessary when wash requirements change.

The time for the back flush and the frequency for the back flush are the features that need to be adjustable.

4.2 Automatic Valve Changing Between Rain Test and Wash

4.2.1 The upgrade shall include automatic actuation so the operator can close the trench connection to the underground wash tank and open trench access to the rain test loop and back when necessary.

4.2.2 The drainage trench shall be shortened by no more than 36” to make room for the necessary piping, valves, hardware, and controls necessary to automate the valve change for the system change from rain test to wash/pressure wash and back.

4.2.3 The upgrade shall include air actuated valves to control the changeover from the rain test circulation loop to the wash/pressure washer circulation loops. A minimum of two air actuated valves shall be utilized with one valve normally open and one valve normally closed for the primary wash loop. The valves will be actuated to changeover to the rain test loop using the controls described in 4.2.1.

4.2.4 Two electrical panels shall be included. One panel for the equipment room and one for the wash bay. The wash bay panel shall house the control switch and lights to show valve positions. The equipment room panel shall house controls for the switching valves.

4.2.5 The panels shall be installed for the valve actuation controls that switch between the rain test and gantry wash/pressure wash. One panel shall be for controls for switching valves, air bank, and PLS in the equipment room.

One panel shall be for control switches and lights to show valve positions. There shall be lights showing open and closed for the two air actuated valves with the following four lights:

GW (gantry wash loop) Open GW (gantry wash loop)Closed RT (rain test loop) Open RT (rain test loop) Closed

4.2.6 The air operated valves and necessary controls shall be located in a concrete box (or boxes) below floor grade in the area between the rain test sump and the piping going into the equipment room from the wash rack (attachment A).

4.2.7 Sub floor boxes shall be formed in the concrete to house all the necessary valves, hardware, and controls for the automatic actuation required to change between the rain test and the wash system and then back again.

4.2.8 The sub floor boxes for piping, hardware, controls, etc. shall have stainless steel lids and stainless steel frame in the concrete box for attaching the stainless steel lids. All boxes shall be designed to handle 10,000 lbs./square foot.

4.3 Pressure Washers

4.3.1 Two new electric pressure wash units. Pressure washers shall be rated for 5HP, 4GPM, and 2000PSI. Units shall be 480V, 3 Phase, and 60 Hz. Units shall be rated for the UL-1776 safety standard.

4.3.2 The pressure washers shall be connected to the two existing pressure washer locations in the wash bay. All connections shall yield two fully independent pressure wash units in the wash bay that can be run at the same time with no loss of capabilities. The pressure washers shall be part of the gantry wash loop. See attachment A.

4.3.3 The increased flow of using two pressure washers at a time shall be included in the vendor’s design such that the existing pressure washer flows through the circulation loop will remain balanced with no loss of operational efficiency.

4.4 Design Specifications

4.4.1 General

4.4.1.1 Back flush system plumbing and controls. This includes demo of the exiting bag filters, setting up new filter housing, plumbing for the back flush, valves, hardware, controls, and control panel.

4.4.1.2 The back flush controls shall allow for adjusting the time for the back flush and the frequency for the back flush. Controls shall be integrated so that back flush operations will not interfere with the other system flow.

4.4.1.3 All upgrades to the rain test loop and the gantry wash / pressure wash loops shall be capable of balancing incoming and outgoing flows of up to 25 gallons a minute (rinse pump rating) for the rain test and up to 140 gallons per minute (high pressure wash pump rating) for the wash process.

4.4.1.4 Valve activation shall be tied to the rain test system on/off. When the rain test is turned on the valves will actuate for the rain test loop. Once the rain test turns off, the valves will reset back to the wash loop. The valves for switching back and forth shall be electronically controlled air valves. One flow direction will be for the rain test circulation loop and one flow direction will be for the wash and pressure wash circulation loop.

4.4.1.5 Integration with the existing control system and software shall be required. The integration shall include the existing system plus the back flush filtration tie in and the shortened rain test program option. The control system and software is owned by Whiting Systems. Contact information is:

Whiting Systems, Inc.

Greg Jenkins, Senior VP gej@whitingsystems.com 800-542-9031 (main office) 501-690-1723 (cell)

4.4.1.6 All welding design procedures shall conform to AWS D1.1/D1.1M.

4.4.1.7 All plumbing, regulators, plumbing lines, and plumbing hardware shall follow applicable codes for ASME B31.3 for process piping.

4.4.1.8 The system shall be painted in accordance with the manufacturer’s standard practice.

4.4.1.9 Labor and materials required for wall penetrations and concrete work shall be the responsibility of the contractor. All wall penetrations shall be sealed, flashed, and made watertight. All concrete work, sealing and or flashing needs to be pre-approved by the technical POC before work starts.

4.4.1.9 All control panels shall be rated for NEMA 4X.

4.4.1.10 Contractor shall be prepared to provide pressure and flow calculations to support design for all system plumbing components.

4.4.2 Hardware, etc.

4.4.2.1 Air valves and schedule 80 piping shall be utilized for plumbing modifications to the rain test valve changeover portion of this project.

4.4.2.2 A stainless steel cover and stainless steel frame shall be utilized for the sub floor area(s) necessary to house the valves, piping, and controls for the automatic actuation of the system changeover between the rain test and the wash system circulation loops.

4.4.2.3 The location of the sump pump shall allow for easy access for maintenance, repair and/or replacement.

4.4.2.4 Piping, valves, fittings, etc. shall be provided for the complete rain test circulation loop such that the system remains balanced between incoming and outgoing water flow.

4.4.2.5 Junctions in piping shall be provided in all unions that may require future service or repair work.

4.4.2.6 A minimum of two maintenance kits with replacement seals and main wear parts for the sump pump shall be provided.

4.4.2.7 There shall be a minimum of three control panels included with the project. At least one control panel will be for back flush filtration for the rain test and the pressure wash filtration with back flush. The other two control boxes will be for the valve activation between rain test and wash/pressure wash. One control panel will be for activation in the wash bay and one panel will be in the equipment room for controls for the switching valves. This panel will contain the necessary air bank and PLS for controls.

4.4.3 Electrical

4.4.3.1 All electric equipment and wiring in the booth shall be installed based on damp or wet environment as specified in the NFPA 70/National Electric Code.

4.4.3.2 Complete electrification shall be provided.

4.4.3.3 All bus box disconnects, conduit, control boxes, starters, and associated electrical components necessary to make the equipment operational shall be included.

4.4.3.4 The primary voltage shall be 480 volt, 3-phase, 60 hertz, and 3 wire with a separate equipment grounding conductor. Contractor shall provide any transformation to other required voltages.

4.4.3.5 All enclosures shall have a NEMA 4x rating.

5.0 NAMEPLATE: A corrosion resistant metal nameplate shall be securely attached to the rain test recirculation pump skid. The nameplate shall contain the information listed below:

- Nomenclature

- Manufacturer’s Name

- Manufacturer’s Model Designation

- Manufacturer’s Serial Number

- Input Voltage, Current, Phase, and Hertz

- Date of Manufacture

6.0 DRAWINGS AND MANUALS: Two sets of the manufacturer’s design drawings shall be submitted for approval within 4 weeks of award. Approval shall be provided within 10 days after receipt by LEAD engineering personnel. Two sets of operator instruction manuals, maintenance service manuals and parts listing manuals shall be provided for the unit. Electronic and written versions shall be provided. These manuals shall be written in the English language.

7.0 HAZARDOUS MATERIALS: Two sets listing all lubricants, seals, and/or any other hazardous material necessary for preventive and corrective maintenance along with their respective Material Safety Data Sheets (SDS) shall be submitted for approval within 4 weeks of award. These lists and SDS shall be written in the English language.

8.0 WARRANTY: A standard commercial warranty or a one year commercial warranty, whichever is larger, shall be furnished with the rain test recirculation system in its entirety. The warranty shall cover the system and all components. The warranty period begins when the LEAD Contracting Officer provides official confirmation that the system has satisfied all operational provisions of the contract.

9.0 STANDARD PRODUCTS: The unit and ancillary equipment shall be new and regularly advertised products in order to provide a constant source of replacement parts and technical assistance.

10.0 PRESERVATION, PACKAGING AND DELIVERY: The contractor shall utilize standard commercial methods for preservation and packaging appropriate for the equipment provided. As a minimum, all areas susceptible to damage from exposure to the elements shall be preserved and/or packed to prevent damage. The contractor shall be responsible for ensuring the equipment is delivered to LEAD in good condition. LEAD will assume no responsibility for off-loading or storage of the provided equipment.

11.0 INSPECTION AND ACCEPTANCE

11.1 The back flush filtration systems for the wash and rain test circulation loops and associated equipment shall be examined for design, construction, materials, components, and workmanship to determine compliance with the contract and this specification. Any deviation from these requirements shall be cause for rejection.

11.2 The contractor shall be responsible for developing test procedures to demonstrate compliance with the requirements of this specification. All test procedures shall be submitted to and approved be Depot Technical Point of Contact (TPOC) prior to the start of testing. To support the testing procedures, LEAD will provide a supply of material for use during the performance tests and training.

12.0 INSTRUCTION: The contractor shall conduct no less than 2 hours of operator training for up to 6 personnel that are already familiar with the operation of LEAD’s wash operations, pressure wash operations, and rain test operations, and shall conduct no less than 4 hours of maintenance training for up to 6 personnel familiar with the maintenance of LEAD’s existing gantry wash systems and processes.

13.0 APPLICABLE DOCUMENTS

OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)

29 CFR, 1910.General industry regulations (Copies may be obtained at www.osha.gov)

AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)

B31.3 Code for Pressure Piping, Process Piping (Copies may be obtained at www.asme.org)

NATIONAL ELECTRICAL MANUFACTURER’S ASSOCIATION (NEMA)

NEMA 250 Enclosures for Electrical Equipment (Copies may be obtained at www.nema.org)

AMERICAN WELDING SOCIETY (AWS)

AWS D1.1/D1.1M Structural Welding Code (Copies may be obtained at www.aws.org)

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 National Electrical Code (NEC) NFPA 101 Life Safety Code (Copies may be obtained at www.nfpa.org)

LETTERKENNY ARMY DEPOT (LEAD)

LEAD Regulation 385-1 Safety and Occupational Health Program Copies may be obtained from LEAD Directorate of Contracting, Bldg. 2)

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Each Gantry Wash Upgrade

FFP

Supply and install the Gantry wash upgrade in accordance with the purchase description.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

NSN: 01X190013:NDM7

MILSTRIP: W25G1Q922000Q8

PURCHASE REQUEST NUMBER: W25G1Q922000Q8

PSC CD: 4610

NET AMT

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

OCT 2018

52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law

FEB 2016

52.212-1 Instructions to Offerors--Commercial Items OCT 2018 52.212-3 Alt I Offeror Representations and Certifications--Commercial

Items (OCT 2018) Alternate I

OCT 2014

52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.222-3 Convict Labor JUN 2003 52.222-19 Child Labor -- Cooperation with Authorities and Remedies JAN 2018 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016

52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-50 Combating Trafficking in Persons JAN 2019 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.228-5 Insurance - Work On A Government Installation JAN 1997 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-1 Site Visit APR 1984 52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination NOV 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

OCT 2016

252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials

SEP 2014

252.225-7001 Buy American And Balance Of Payments Program-- Basic DEC 2017 252.225-7002 Qualifying Country Sources As Subcontractors DEC 2017 252.225-7035 Buy American--Free Trade Agreement--Balance Of Payments

Program Certificate--Basic

NOV 2014

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.247-7023 Transportation of Supplies by Sea FEB 2019

CLAUSES INCORPORATED BY FULL TEXT

52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (OCT 2018)

ADDENDUM TO FAR 52.212-1, INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS:

Paragraph (c) is changed to read: Period for acceptance of offers. The Offeror agree to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of provision)

ADDENDUM TO FAR 52.212-2, BASIS OF AWARD:

A. General Information:

1. The basis of award will be the Lowest Priced, Technically Acceptable offer. Offerors must receive a rating of Technically Acceptable in all factors/subfactors in order for their overall proposal to be determined Technically Acceptable.

2. By submission of its offer, the offeror accedes to all solicitation requirements, including terms and conditions, and technical requirements.

3. The Government intends to make award without discussions, unless the Contracting Officer determines that discussions are necessary. Offerors should provide their most favorable prices in their initial offers.

B. Non-Price Evaluation Factors and Subfactors:

1. Factor 1- Technical:

(a) Subfactor 1 Equivalence: The offerer shall provide the following to the Government POC:

a. A written summary of the project to evaluate possible equivalents.

b. Information including, but is not limited to: brochures, videos, and drawings pertaining to all equipment included in their proposal.

c. Any equipment specifications with regard to their proposal that can be used to evaluate possible equivalents.

(b) Subfactor 2 Past Experience: The offeror shall provide:

a. Three (3) invoices and/or work orders to validate past experience with the supply and installation of a truck wash filtration upgrade or related project.

b. References from other related projects which the government POC can contact to verify work described above.

2. Factor 2 – Past Performance: The Offerors shall provide three recent and relevant Government or private sector projects completed within the past three years that demonstrates the ability to perform the requirements in this solicitation. The Offeror shall identify the contract title, contract number, dollar value, client name and address, location of work, point of contact with telephone number, and an explanation of how each project related to the work requirements of this solicitation.

C. Price Evaluation Factor: Offerors shall complete the Schedule B with pricing for each Contract Line Item Number (CLIN).

D. Proposals will be evaluated initially independently of the price to determine the Offerors’ ability to meet the Government’s requirement set forth in the solicitation. The Government may make a final rating determination based on the proposal as submitted without requesting any further information. For all proposals determined to be Technically Acceptable, the offer providing the lowest price will receive the contract award.

1. Offerors’ technical proposals will receive an overall rating based on the following:

(a) Technically Acceptable: Offeror meets all requirements or technical specifications or has submitted all documentation requested in any technical evaluation criteria and all documentation meets the standard set forth in the solicitation.

(b) Technically Unacceptable: Offerer fails to meet all requirements or technical specifications or has failed to comply in submitting requested documentation in any technical evaluation criteria or the submitted documentation fails to meet the standard set forth in the solicitation.

(End of Addendum)

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS--COMMERCIAL ITEMS (MAY 2019)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.

113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(3) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(4) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(5) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

___ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) (Pub. L. 109-

282) (31 U.S.C. 6101 note).

___ (5) [Reserved]

___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div.

C).

___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub.

L. 111-117, section 743 of Div. C).

___ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).

____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).

____ (10) [Reserved]

____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).

____ (ii) Alternate I (NOV 2011) of 52.219-3.

____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

____ (ii) Alternate I (JAN 2011) of 52.219-4.

____ (13) [Reserved]

____ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).

____ (ii) Alternate I (NOV 2011).

____ (iii) Alternate II (NOV 2011).

____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

____ (ii) Alternate I (Oct 1995) of 52.219-7.

____ (iii) Alternate II (Mar 2004) of 52.219-7.

____ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)).

____ (17)(i) 52.219-9, Small Business Subcontracting Plan (Aug 2018) (15 U.S.C. 637(d)(4)).

____ (ii) Alternate I (Nov 2016) of 52.219-9.

____ (iii) Alternate II (Nov 2016) of 52.219-9.

____ (iv) Alternate III (Nov 2016) of 52.219-9.

____ (v) Alternate IV (Aug 2018) of 52.219-9.

____ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).

____ (19) 52.219-14, Limitations on Subcontracting (JAN 2017) (15 U.S.C. 637(a)(14)).

____ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C.

657f).

____ (22) 52.219-28, Post Award Small Business Program Rerepresentation (July 2013) (15 U.S.C. 632(a)(2)).

____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women- Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).

____(24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).

____ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

____(26) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (Jan 2018) (E.O. 13126).

____ (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

____ (28)(i) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).

____ (ii) Alternate I (Feb 1999) of 52.222-26.

____ (29)(i) 52.222-35, Equal Opportunity for Veterans (OCT 2015)(38 U.S.C. 4212).

____ (ii) Alternate I (July 2014) of 52.222-35.

____ (30)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).

____ (ii) Alternate I (July 2014) of 52.222-36.

____ (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).

____ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O.

13496).

____ (33)(i) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627).

____ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

____ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

____ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O. 13693).

____ (37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016) (E.O. 13693).

____ (38) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (OCT 2015) of 52.223-13.

____ (39)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-14.

____ (40) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).

____ (41)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-16.

____ (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O.

13513).

____ (43) 52.223-20, Aerosols (Jun 2016) (E.O. 13693).

____ (44) 52.223-21, Foams (Jun 2016) (E.O. 13693).

____ (45)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

____ (ii) Alternate I (JAN 2017) of 52.224-3.

____ (46) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).

____ (47) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L.

103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

____ (ii) Alternate I (May 2014) of 52.225-3.

____ (iii) Alternate II (May 2014) of 52.225-3.

____ (iv) Alternate III (May 2014) of 52.225-3.

____ (48) 52.225-5, Trade Agreements (AUG 2018) 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

____ (49) 52.225-13, Restrictions on Certain Foreign Purchases (JUNE 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

____ (50) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

____ (51) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150

____ (52)…