Room Layout.pdf
PDF 60 KB Posted
- Solicitation number
- W911KF-23-Q-0049
About this file
This document includes a room layout drawing and details of a related federal contract opportunity. The room layout drawing provides dimensions and notes for installing a CNC vertical grinding center at the Anniston Army Depot in West End Building 147. The federal contract opportunity is solicitation number W911KF-23-Q-0049 from the Department of the Army Materiel Command Contracting Command Detroit Arsenal to provide the CNC vertical grinding center. The solicitation seeks to install the grinding center at the specified location in the depot according to the room dimensions and notes in the attached drawing.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AP 28
O H
C
O H
C
H O
I S
T L
B R
ID
G
E
T
O N
H O
I S
T
B R
ID
G
E
T
O N
11'-6"
11'-10 5/8 "
O H
C
DESIGNED BY: DATE: DRAWN BY:
DWG. NO.SHEET 1 OF 1SCALE: NTS
DATE: REVISION: BY
ANNISTON ARMY DEPOT
PROCESS MANAGEMENT DIV.
BUILDING 147 WEST END
SHOP FLOOR LAYOUT FOR CNC VERTICAL GRINDER
WATER
LOCATION
BREAKER
POWER
MAIN
12'- 1/8 "
13'-2 7/8 "
10'-0"
16'-0"
28'-8"
( BACK)
ROOF HEIGHT
(FRONT)
ROOF HEIGHT
10. ROOF HEIGHT INDER PERLIN BACK - 15'-11"
9. ROOF HEIGHT UNDER PERLIN MIDDLE - 16'-6"
8 ROOF HEIGHT UNDER PERLIN FRONT - 17'-4"
7. HEIGHT UNDER OVERHEAD CRANE BEAM - 11'-4-3/4"
6. HEIGHT UNDER OVERHEAD CRANE RAIL - 9'-4-1/2"
5. WATER LINE HEIGHT - 14'-4"
4. HEATER HEIGHT - 13' -4-7/16"
3. FIRE WATER SPRINKLER HEIGHT - 13'-8"
2. ROOM DOOR HEIGHT - 9' - 11"
1. ENTRANCE DOOR HEIGHT - 12' -1/4"
APPROXIMTE DIMENSIONS OF THE PROPSOED AREA:
24'-4"
(MIDDLE)
ROOF HEIGHT
GRINDER
ID/OD
16'-0"
INSTALLATION LOCATION
ENTRANCE DOOR ACCESS
2'-4"
TRANSFORMER
ELECTRICAL
FIRE WATER RISER
AUG 23, 2023GHGH
PMD-CNCVG D-1
TO BE USED ONLY AS A REFERENCE TO THE INFORMATION REQUIRED FOR THE CURRENT PROJECT.
ONLY. ALL DIMENSIONS ARE APPROXIMATE AND ARE SHOWN FOR REFERENCE ONLY. THIS LAYOUT IS
INSTALLATION OF CNC VERTICAL GRINDER. ALL OBJECTS SHOWN ARE RELATIVE AND FOR REFERENCE
PROPOSED AREA FOR WEST END OF BUILDING 147. LAYOUT OUTLINES FEATURES RELATED TO THE
SHED
STORAGE
File details come from the government source that posted it. Updated .