This document is an amendment to a solicitation issued by the Department of the Army Materiel Command Contracting Command Detroit Arsenal for a CNC Vertical Grinding Center for the Anniston Army Depot. The amendment extends the response due date from August 28, 2023 to September 5, 2023 at 10:00 AM CST. It also releases drawings of parts to be ground and the proposed machine room layout. The amendment provides answers to 21 questions from industry relating to machine specifications, part dimensions, room dimensions and access points, material properties, voltage requirements, and performance testing standards. Key specifications for the vertical grinding machine include the ability to perform ID and OD grinding, flat surface grinding, coordinated vector grinding, and vertical turning of parts measuring up to 14.63 inches in length and 19 inches in length made of hard chrome with a hardness of 62-65 RC.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See page tw o.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Aug-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911KF23Q0049
X 9B. DATED (SEE ITEM 11)
02-Aug-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Aug-2023
CODE
ACC-ANAD
ANNISTON ARMY DEPOT
7 FRANKFORD AVENUE, BLDG 35
ANNISTON AL 36201-4199
W911KF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911KF23Q0049
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT NOTES
1. The purpose of this modification is to answer industry questions, extend the closing date and release drawings.
2. The solicitation closing date is hereby extended to September 5th, 2023 at 10:00 AM CST.
3. Drawings are posted as attachments titled “Vertical Grinder Part 1,” Vertical Grinder Part
2,” and “Room Layout.”
4. Industry qiestions and answers are listed below.
5. All other terms and conditions remain unchanged.
Industry Questions & Answers
1. Question: What is a maximum grinding length from the part top?
Answer: The cradle length is 14.63" +/- 0.30 And the piston length is 19."
2. Question: 3.1. “Geared drive system” is requested. Our manufacturer uses more advanced direct motor for the table drive. Please confirm that the direct motor table drive is permitted.
Answer: The cone drive worm gear box design is requested. However, any proposed new technology will be evaluated.
3. Question: 3.1.1. What is a maximum grinding length from the part top? (we asked already this question in email dated August 5, 2023) Answer: The cradle length is 14.63" +/- 0.30 And the piston length is 19."
4. Question: 3.1.5. “The table shall be driven directly by a cone drive worm gear box design” is a requirement. Our manufacturer uses more advanced direct motor instead of cone drive worm gear box. Please confirm that the direct motor table drive is permitted.
Answer: The cone drive worm gear box design is requested. However, any proposed new technology will be evaluated.
5. Question: 3.1.6. “Collet chuck with tooling for ID and OD” is requested. It is a problem to find in industry the collet chucks for such table size. What are ranges of clamping diameters and clamping torques for ID and OD? Are another types of work clamping system permitted?
Answer: 5.1. ID 17.625” / 17.875” OD 14.00” / 14.375”.
5.2. Yes. If the fixtures design holds the part in a manner that support the dimensional characteristics required for acceptance by Quality Control.
6. Question: 3. Question: 3.1.14. Please defined CGC true mount system.
Answer: This is an feature alignment.
7. Question: 3.3. Is it possible to increase the floor space to 20’ x 20’? That space is required for a vertical grinder with requested machining envelope.
Answer: Yes.
8. Question: 5.1. In the Statement of Work the project completion is 300 calendar days of award. In Solicitation it is 365 calendar days of award. Unfortunately that is impossible.
We ask to permit 450 calendar days of award.
Answer: The completion time requested will remain at 365 days
9. Question: What is the room size where machine will be placed?
Answer: The approximate dimensions of the proposed room are 24 feet- 2 inches wide side to side by 28 feet- 8 inches deep front to back.
10. Question: What is the door size for machine entry?
Answer: The Door access to room is approximately 10 foot wide.
11. Question: What is roof height of installation place?
*Please provide length, width, and/or height, if applicable.
Answer: Front 17 feet 4 inches, Back 15 feet 11 inches.
The approximate dimensions of the proposed room are 24 feet- 4 inches wide side to side by 28 feet- 8 inches deep front to back.
12. Question: Will there be an overhead crane installed in the room area?
Answer: Yes. There will be an overhead crane installed. The intention is to duplicate the process that is currently in place.
13. Question: Will it be installed before or after delivery?
Answer: Any overhead crane system needed to support the process will be installed after installation of the equipment. There is currently no timeline for the purchase and installation of an overhead crane in the new area.
14. Question: 3.3. If there is an overhead crane in the machine shop area, what is a height under rail? Also, is it permitted to put the grinder in the pit?
Answer: 15.1 A pit will be considered and evaluated as an option.
15. Question: Would it be possible to get a 2D drawing of the two principal parts that y’all want to grind on the new machine? We just need the chucking and grinding requirements mainly.
Answer: Yes
16. Question: Would it be possible to get the floor layout with walls and access points in a 2D drawing so we can see precisely what the install parameters would be like?
Answer: Yes.
17. Question: The incoming door width and height next to the room that the grinder is slated to be installed in would be a helpful number to have as there is a corner that needs to be turned going in during the installation. Can we get this size as well?
Answer: The outside overhead door width is 10.0 feet, and the height is approximately 10.0 Feet. The inside overhead door width is 10.0 feet, and the height is approximately 10.0 Feet.
18. Question: Just to verify the material type is hard chrome? Is there a specification for this material?
Answer: The material is Hard Chrome the hardness is 62-65 RC.
19. Question: What voltage and amperage is currently in the room where the new machine would be installed?
Answer: Voltage 480/277 3PH 60Hz 4 Wire 1200 AMP
20. Question: 3.1 General Requirements. The CNC Vertical Grinding Machine shall be capable of performing the operations of I.D. and O.D. grinding, flat-surface grinding, coordinated vector grinding, and vertical turning.
Answer: Yes. vertical turning is required.
21. Question: 4.3 Performance Test. Unless otherwise specified the performance test shall consist of the tests listed in ASME B5.16. The Government reserves the right to specify any or all the test listed in these standards.
Answer: The following ASME Standards will be added to the evaluation criteria ASME B5.32.1, ASME B5.47 and ASME B5.57.
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 28-Aug-2023 10:00 AM to 05-Sep-2023 10:00 AM.
(End of Summary of Changes)