1_-_Performance_Work_Statement.pdf

PDF 78 KB Posted

Attached to
Technical, Engineering, Program Management and Integrated Services
Solicitation number
W911KF-16-R-0276
Issued by

About this file

Attachment 1 Performance Work Statement

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement For a

Technical, Engineering, Program Management, and Integration Services Contract

In Support Of Anniston Army Depot (ANAD), The Center of Industrial and Technical Excellence (CITE), For Ground Combat Systems Under The

Integrated Systems Rapid Response Center (ISRRC) Concept

1. BACKGROUND

1.1 The purpose of this contract is to provide various support services to ANAD, the Ground Combat Systems Center of Industrial and Technical Excellence, the technical, engineering, program management, and integration services required for the successful execution of ANAD’s mission to provide Life Cycle Product Support for all systems assigned to their care. ANAD’s mission continuously evolves to meet the needs of the US Army and Department of Defense.

ANAD supports rebuild/overhaul/recapitalization for wheel/track vehicles (manned and unmanned), towed, self-propelled ground support equipment, sets, kits, and outfits, shelters, bridge launchers, bridging, small caliber weapons, the soldier, and associated component systems. Services provided will support, maintain and enhance ANAD’s Center of Industrial and Technical Excellence core capabilities as well as other capabilities traditionally performed at ANAD. The Program Executive Offices (PEOs) are increasingly relying on ANAD to provide technical leadership, program/project management, an alternative to escalating costs in the application and integration of weapons system upgrades, technology insertion, product integration, maintenance, and integrated logistics that occurs after system fielding and during the maintenance process.

1.2 The general areas to be supported for the duration of the contract are set forth in this Performance Work Statement (PWS). These areas are not meant to be definitive, but rather represent in summary form the general areas to be supported. Therefore, the PWS is deemed to be a basic expression of the contract requirement. Specific performance requirements will be set forth in Task Order(s) (T/Os) issued under the contract.

1.3 This contract will be for services outside the capability of ANAD or overflow requirements.

2. GENERAL REQUIREMENTS

2.1 The contractor shall provide Program Management and other services to expand the full program execution capabilities of ANAD. The contractor shall integrate appropriate technical, analytical, logistics, program management, and program support for the engineering, design, prototyping, fabrication/manufacturing, assembly, integration, tech data/configuration management, test/qualification, training support, production, and sustainment of electronic and mechanical systems, subsystems and components functions for which ANAD is responsible.

The contractor shall select and manage appropriate subcontractors, and procure materials as necessary to satisfy work performed under this contract. This contract shall include support for all phases of systems/components/ life cycle including production, fielding, field support, depot repair/overhaul and disposal.

2.2 The contractor shall provide services in the following disciplines: engineering, product assurance and test, program/project management, and integrated logistics services. The contractor shall provide support, including; delivery of hardware and software integration, training support and equipment, technical data development and other logistical and technical services to support systems/components throughout the product life cycle as described in Section 3.

2.3 All work under this contract shall be performed only to the extent authorized by task orders, which have been approved by the Contracting Officer. Tasks and requirements under this PWS will be more specifically defined in individual TOs.

2.4 The contractor, as an independent contractor, and not as an agent of the Government, shall provide all necessary labor, materials, supplies, services, facilities (if required), and equipment (if required) to perform the specific work and services required by individual TOs.

2.5 The contractor shall have access to Government data (if required), Government facilities (if required) and Government equipment (if required) for the accomplishment of work under this contract. All parties will sign Non-Disclosure Agreements for Proprietary and Competition Sensitive Information.

2.6 The contractor shall manage and control the resources necessary to ensure timely achievement of all requirements of this contract in the most economical manner possible.

Frequent liaison and coordination shall be required with the Contracting Officer, Project/Program Manager and other assigned personnel.

2.7 Pursuant to Federal Acquisition Regulation (FAR) Subpart 9.5, Organizational and Consultant Conflicts of Interest (OCI). Contractor certifies that contractor has and shall continue to avoid, neutralize and mitigate all OCIs in connection with contractor’s support efforts relating to any requirement. Contractor shall ensure the immediate implementation of OCI Mitigation Plans for contractor or any lower-tier subcontractor to mitigate OCIs, including OCIs that might result from work that contractor may be involved with in connection with the requirement. OCI Plan shall be submitted within 10 calendar days after award.

3.0 FUNCTIONAL AREAS: The contractor shall provide qualified personnel, materials, facilities and equipment (if required), test instrumentation, data collection and analysis, hardware and software and other services that will support ANAD in the execution of their overall mission. Functional areas to be supported are described in the sections below.

3.1 Project Management: The contractor shall provide the full range of Project Management functions essential to completing all awarded TOs. This includes applying the business, financial management, and technical management disciplines required to timely and affordably accomplishing modifications, technology insertion and modernization of system and components during the execution of ANAD’s maintenance mission. This functional area represents an integration of a complex system of differing but related functional disciplines that must work together to achieve the project/program goals through all phases of the work effort.

3.2 Engineering, Systems Engineering and Process Engineering Support: This functional area consists of supporting the application of engineering disciplines to technically support development of new and existing system/component capabilities, technically support development of alterations to existing systems and components, technically support integration and interface of existing equipment and software, support evaluation of non-developmental systems, equipment and technologies, and supporting production facility processes. Expertise must include that which encompasses the entire technical range of the products supported by ANAD. This shall be especially important with regard to engineering analysis of legacy systems supported by ANAD.

3.3 Modeling, Simulation, Simulation, and Analysis Support: This functional area consists of the application or use of models, including emulators, prototypes, and simulators to develop data as the basis of making technical decisions.

3.4 Prototyping, Preproduction, Production and Fabrication and Manufacturing Support: This functional area consists of the building, fabrication, testing, evaluating mock-ups, prototypes, preproduction units and research and development items. Fabrication, manufacturing and machining of parts or equipment for fielded systems is included.

3.5 System Design Documentation and Technical Data Support: The functional areas include the engineering effort required to prepare and assure that the detailed technical data documentation that is necessary to support the systems and component development, integration or modification reflects the design, configuration, integration and installation concepts. Technical documentation may be in the form of paper, electronic (digital) or interactive computer systems.

3.6 Reliability, Maintainability, and Availability Support: This functional area consists of applying engineering and analytical disciplines to ensure the systems/components reliability and maintainability and availability requirements are integrated with the system design, development and life cycle sustainment resulting in war fighting capabilities that function effectively when required.

3.7 System Safety Engineering Support: This functional area consists of applying engineering and analytical disciplines to ensure that safety is considered in all aspects of design, modifications, technology insertion, operation, maintenance and modification of systems and components.

3.8 Configuration Management Support: This functional area consists of applying engineering and analytical disciplines to identify, document, and verify the functional, performance, and physical characteristics of the systems/components to control changes and non-conformance, and to track actual configurations of the systems and components. The contractor shall have the capability to manage and maintain technical data packages (TDPs), digitize drawings in a consistent electronic format, maintain legacy data, and establish virtual depot databases.

3.9 Quality Assurance Support: This functional area consists of applying engineering and analytical disciplines to ensure that the processes and products used in the design, development, fabrication, manufacture and installation result in a quality product.

3.10 Measurement Equipment, Facilities and Instrumentation Support: This functional area consists of applying engineering, analytical and technician disciplines to support requirements for measurement and equipment used for testing, evaluating, experimenting and exercising systems and components.

3.11 Logistics Support: This functional area consists of applying the analytical and technical disciplines required to ensure that fielded systems and components are materially sustained, to include direct support at field locations. Supply chain management functions are included within this functional area.

3.12 Technical Training Support: This functional area consists of applying the engineering and analytical disciplines required to ensure the Warfighter and the technical support communities are provided with adequate instruction regarding the systems and components for which ANAD is responsible for providing technical/new equipment training.

3.13 Integrated Logistics Support: This functional area consists of applying the engineering and analytical disciplines to implement acquisition logistics as a multi-functional technical management discipline associated with the engineering, development, production, test fielding sustainment and improvement of systems/components that achieve the Warfighters’ peacetime and wartime readiness. The principle objective is to ensure that support considerations are an integral part of the work effort, that the systems/components can be cost effectively supported through the remaining life cycle, and the infrastructure element necessary to the operation and maintenance of the system/component are identified, developed and acquired.

3.13.1 This functional area also consists of applying the analytical and technical disciplines required to ensure the fielded Warfighting capabilities are materially sustained. The principal objectives of this functional area are to ensure that material for operation and maintenance of the systems/components are available when required, that material are properly stored and transported, and inventories are managed in a cost effective manner to sustain supported system/components.

3.14 Integration Support (including software integration): This functional area consists of applying the engineering and scientific disciplines to perform selection, technical analysis or technical development of hardware and computer software, modification to existing hardware and software for systems, test facilities, production or training facilities. This area also consists of software engineering efforts and programming support required to technically support software implementation in systems, sub-systems, and components utilizing computers, electronics and software.

3.15 Equipment Training Support: This functional area consists of applying the engineering and analytical disciplines required to ensure that the Warfighter and the technical support communities are provided with adequate instruction including applied exercises resulting in the attainment and retention of knowledge, skills and abilities regarding the platform, systems, components and war fighting capabilities they operate and maintain, to include direct support at filed locations.

3.16 Quality Assurance Surveillance Plan (QASP): A QASP will be provided and incorporated into the solicitation for accessing the contractors performance. A detailed QASP will be incorporated into each T/O applicable to that specific PWS.

4.0 Contractor Manpower Reporting (CMR). The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address: https://cmra.army.mil. The required information includes:

(1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative;

(2) Contract number, including task and delivery order number;

(3) Beginning and ending dates covered by reporting period;

(4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data;

(5) Estimated direct labor hours (including sub-contractors);

(6) Estimated direct labor dollars paid this reporting period (see note below) (including sub-contractors);

(7) Total payments (including sub-contractors);

(8) Predominant Federal Service Code (FSC) reflecting services provided by contractor

(and separate predominant FSC for each sub-contractor if different);

(9) Estimated data collection cost;

(10) Organizational title associated with the Unit Identification Code (UIC) for the Army

Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information);

(11) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest city, county, when in an overseas location, using standardized nomenclature provided on website);

(12) Presence of deployment of contingency contract language; and

(13) Number of contractor, and sub-contractor employees deployed in theater this reporting period (by country).

4.1 Cost of CMR Reporting. As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of performance not to exceed 12 months ending September 30 of each government fiscal year (October through September) and must be reported by October 31 of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a contractor’s systems to the secure web site without the need for separate data entries for each https://cmra.army.mil/ required data element at the web site. The specific formats for the XML direct transfer may be downloaded from the web site.

File details come from the government source that posted it. Updated .