This file is an Industry Day Presentation for the Lowell Creek Flood Diversion project by the U.S. Army Corps of Engineers, Alaska District. The project involves constructing a new flood diversion system in Seward, Alaska, with key components including an inlet diversion dam, an 18-foot diameter tunnel with approximately 8,500 cubic feet per second flow capacity, an extended outlet flume, and select tree removal. The recommended plan (Alternative 4A) aims to minimize flood risks to critical infrastructure, including a hospital, senior living center, and local businesses by improving the existing flood diversion system originally constructed in 1940.

The contract (Solicitation Number W911KB26RA003) is an unrestricted, fully designed, firm fixed-price construction project with an estimated magnitude between $250-$500 million. The contract award is anticipated for the first quarter of FY27 and will be based on a tradeoff process evaluating factors such as past performance, technical approach, project execution, small business participation, and price. An Industry Day is scheduled for June 24, 2025, in Anchorage, Alaska, where potential contractors can learn about the project, provide feedback, and potentially engage in one-on-one consultations. Interested participants must submit their information by June 17, 2025, to Tammy Davis and Michelle Mandel.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOWELL CREEK FLOOD

DIVERSION

Industry Day 2 Presentation

Presenters:

Jathan Garrett, PM Coleman Chalup P.E., Lead Engineer

Anchorage, AK

24 JUN 2025

The U.S. Army Corps of Engineers, Alaska District, is conducting an Industry Day to improve Industry's understanding of USACE's Lowell Creek Flood Diversion project, specifically for construction of the inlet structure, 18 ft diameter tunnel and outlet flume located in Seward, Alaska, answer questions on the project and gain an understanding of how the contractor community can support this project.

Presentation Agenda (1330-1430) Welcome Introductions Project Overview

One-on-ones (1430-1530) Sign-up sheet

PURPOSE & AGENDA

CONTRACTING

• W911KB26RA003 LOWELL CREEK FLOOD DIVERSION – Unrestricted, Fully Designed, Firm Fixed-Price Construction Project

• Estimated Magnitude is $250 - $500 Million

• Award will be based on Tradeoff process described in FAR 15.101-1 to determine the proposal which represents the best value to the Government. All evaluation factors, other than price, when combined, are approximately equal to price.

• Evaluation Factors will include Past Performance, Technical Approach, Project Execution Concept/Schedule, Extent Of Participation Of Small Businesses, and Price.

• Small Business Subcontracting Plan – Required for LG Businesses - Upon request by the Contracting Officer for the apparently successful offeror

*Important: Any remarks, comments, or explanations provided during the Industry Day Conference should be verified within the future solicitation.

LOWELL CREEK DIRECTORS REPORT VIDEO

https://youtu.be/XoT5qxxVBr8?si=KmFuBXFl96-MYLlg

The existing Lowell Creek Flood Diversion System authorized by the Flood Control Act of 1936 (PL 74-738) with an authorized project purpose of flood risk management

The flood diversion system reroutes Lowell Creek through Bear Mountain and diverts flows to Resurrection Bay prior to those flows entering Seward. Completed by USACE in

Present structure has diversion dam, emergency spillway, and 10 ft tunnel that is around 2000 ft in length estimated to divert 2,800 cfs

Spillway is 800 ft upstream of critical infrastructure including hospital and senior living center

PROJECT BACKGROUND

System was designed to pass the largest event at that time of 2,800 cfs which is now considered to have greater than 2% annual chance of exceedance

Landslides are commonplace in the basin and can contribute to an outburst surge of 2.5 times larger than existing stream flow

Basin above diversion is in steep, rugged, mountainous terrain with near endless supply of sediment

Sediment is transported through the tunnel and accumulates at the outfall, which in high water events cuts off Lowell Point road access and city uses heavy equipment to flood fight/manage debris at bridge

Accumulation of debris can also damage critical infrastructure at outfall including City’s sewage treatment facility, Shellfish hatchery and Alaska SeaLife Center

PROJECT BACKGROUND CONTINUED

Identified feasible solution that provides safe, reliable, and efficient flood diversion of the waters from Lowell Creek during precipitation and surge events.

This project reduces risk to:

life safety economic damages flood fighting activities reactionary debris management costs

Project justified by reduction in risk to life safety

FEASIBILITY STUDY

OVERTOPPING INUNDATION SCENARIO

SCOUR HOLE IN EXISTING TUNNEL

EXISTING PROJECT FEATURES

N

S

EW

CURRENT DIVERSION FOR REPAIRS

2003 Repair

2017/18 Repair

The Recommended Plan as stated in the Director’s Memo is Alternative 4A Construct New Flood Diversion System

RECOMMENDED PLAN

# Components of this alternative include:

1 Inlet diversion dam

2 18-ft-diameter tunnel flow capacity ~8,500 cfs

3 Extending the outfall 150 ft to take flow and debris over the Lowell Point Road

4 Protecting the tunnel inlet from landslide with a canopy

5 Non-structural components include select tree removal

Refurbishing the existing tunnel to provide backup for new diversion system and to accept diverted flow during inspection and maintenance

65% Plans and Specs Geotechnical Data Report with Geotechnical Baseline Report Questionnaire

PROVIDED DOCUMENTS

PROJECT OVERVIEW

AREA GEOLOGY

INLET AND OUTLET BORINGS

OUTLET

AREA

INLET

AREA

CURRENT DESIGN – INLET AND BYPASS

INLET

TRAINING

WALLS

STOPLOGS

INLET

FLUME

GENERATING

POWERHOUSE

BUILDING

(PROTECT DURING

CONSTRUCTION) PERMANENT

BYPASS

CULVERT

EMERGENCY

SPILLWAY

TUNNEL

PORTAL

GENERAL

LOCATION OF

POWER SOURCE

POTENTIAL GROUND

WATER ELEVATION

INLET

AREA

CURRENT DESIGN – INLET CHANNEL

STEEL RAIL LINER

INLET FLUME PROFILE

INLET ISOMETRIC

VIEW

GROUND IMPROVEMENT

Objective Connected to inlet flume Minimize rocking of flume during seismic loading due to differential settlement Liquefaction Seismic compression

Increase kinematic dissipation of ground motions

Counter hydrostatic pressure uplift

TUNNEL

CURRENT DESIGN - OUTLET

PLUNGE POOL AREA

SEALIFE CENTER

FRESH WATER

PUMP HOUSE

TUNNEL

PORTAL

ELEVATED FLUME

DRILLED PIER

(END BEARING)

RELOCATED LOWELL

POINT ROAD

GRAYWACKE

EMBEDMENT

SLATE

EMBEDMENT

SOLIS SWITZERLAND

SEDIMENT BYPASS OUTFALL

LOWELL OUTFALL RENDITION

(8,500 CFS DISCHARGE)

BAY

EXISTING FLOOD

SEDIMENT REMOVAL AREA

OVERHEAD POWER

SEWER LINE

COMMUNICATION LINE

WATER LINE

SEALIFE WATER LINE

BURIED DEBRIS/TRAIN CAR

(1964 EARTHQUAKE)

EXISTING TUNNEL OUTFALL SEDIMENT REMOVAL VIDEO

https://youtube.com/clip/Ugkxe0ofdbe7Cect1XAjBoQi0wX0HJ0ntZh1?si=URIoVXjawROKQ7xK https://youtube.com/clip/Ugkxe0ofdbe7Cect1XAjBoQi0wX0HJ0ntZh1?si=URIoVXjawROKQ7xK

POTENTIAL LAYDOWN/STAGING AREAS

Two areas identified as potential laydown/staging areas

Potential for utilizing Barge to assist with staging

~ 10 Miles from project site to laydown and staging area across the bay

~ 60,000 cu. yds of disposal materialNS

E W

IN-WATER

DISPOSAL AREA

PROJECT SITE

LAYDOWN AND

STAGING AREA

SNOW REMOVAL AREA

SITE ACCESS

INLET AREA GRAVEL ROAD

DOWNTOWN TO OUTLET AREA

OUTFALL AREA

OUTFALL AREA

Single access route into inlet valley Use of City roads to access potential laydown areas away from project site Lowell Point Road only route to community located south of Outfall area

QUESTIONS?

Lowell creek flood diversion
Purpose & agenda
Contracting
Lowell Creek Directors Report Video
project Background
Project Background continued
Feasibility study
Existing project features
Current diversion for repairs
Recommended plan
Provided Documents
Project overview
Area Geology
Inlet and Outlet Borings
Current design – Inlet and bypass
Current Design – inlet channel
Ground Improvement
Tunnel
Current design - outlet
Slide Number 21
Existing tunnel outfall Sediment Removal Video