This document is an amendment to a solicitation for the repair of a turbine generator at Eielson Air Force Base in Alaska. The amendment provides changes to the proposal schedule, including extending the proposal due date to February 5, 2021. It substitutes revised specification sections and substitutes the proposal schedule in its entirety. The work includes demolishing two existing steam turbine generators and associated equipment and installing a new 10 megawatt steam turbine generator and related auxiliary equipment. The project is located at the Eielson Air Force Base Central Heating and Power Plant. Offerors are advised to closely coordinate construction activities with the contracting officer and plant personnel to avoid impacts to plant operations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE: EIE443 Repair CHPP Turbine Generator, Eielson AFB, Alaska.
a. This amendment provides changes to the solicitation as indicated on page 2 of this document.
b. PROPOSAL DUE DATE IS EXTENDED TO FRIDAY, FEBRUARY 5, 2021 AT 2:00 PM.
c. POC for this amendment is Yolanda M Ikner, (907)753-2553.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Jan-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB21R0012
X 9B. DATED (SEE ITEM 11)
25-Nov-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Jan-2021
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SUMMARY OF CHANGES
a. The following drawings are substituted for the superseded documents/sections:
NONE
b. The following drawings are added:
c. The following revised documents/sections are substituted for the superseded documents/sections: The identifier “AM#6” appears before and after new and/or revised materials and as noted below.
1. Proposal Schedule (replaced in its entirety)
2. Specifications, Section 01 11 00 (reference changes to Paragraphs 1.3 and 1.3.1)
d. The following sections are deleted:
e. The following documents are added:
f. The following revisions are incorporated:
g. Other:
(End of Summary of Changes)
ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME.
PS- 1
PROPOSAL SCHEDULE
REPAIR CHPP TURBINE GENERATOR, EIE443
EIELSON AFB, ALASKA
BASE ITEMS
Item No. Description Quantity Unit Unit Price Amount
0001 AM#006...Construct all CHPP Turbine Generator features within the building 5-foot lines, not including
Demolition Plan, complete....AM#006
1 Job $_________ $_________
AM#006...
0001A
Develop Demolition Plan, Complete ****
1 Job $_________
...AM#006
0002 Construct permanent site work and utilities beyond the building 5-foot lines, complete.
1 Job $_________ $_________
0003 Stockpile and Sample 600 Cubic Yards of Potentially Contaminated Soil Including Construction of Holding Cells, Complete *
Estimated Quantity
600 CY $_________ $_________
0004 Dispose of 200 Cubic Yards of POL Contaminated Soil, Complete **
Estimated Quantity
200 CY $_________ $_________
0005 Dispose of 600 Cubic Yards of Contaminated Soil at a RCRA Facility, Complete **
Estimated Quantity
600 CY $_________ $_________
Total of Base Items 0001 thru 0005 $_________
OPTION ITEMS
0006 Purchase and install one (1) floating evaporative cooling system, including floating power umbilical, site power connection and self-contained controls, complete ***
1 Job $_________ $_________
PS-2
0007 Purchase and install one (1) floating evaporative cooling system, including floating power umbilical, site power connection and self-contained controls, complete ***
0008 Purchase and install one (1) floating evaporative cooling system, including floating power umbilical, site power connection and self-contained controls, complete. Includes common components shared by up to three floating cooling systems. ***
0009 Stockpile and Sample 100 Cubic Yards of Potentially Contaminated Soil Including Construction of Holding Cells, Complete *
Estimated Quantity
100 CY $_________ $_________
0010 Dispose of 100 Cubic Yards of POL Contaminated Soil, Complete **
Estimated Quantity
100 CY $_________ $_________
0011 Dispose of 100 Cubic Yards of Contaminated Soil at a RCRA Facility, Complete **
Estimated Quantity
100 CY $_________ $_________
AM#006...
Trace and verify 200 active circuits within raceways affected by the demolition scope of work, Complete*****
Estimated Quantity
200 EA $_________ $_________
0013 Trace and verify 100 active circuits within raceways affected by the demolition scope of work, Complete*****
Estimated Quantity
100 EA $_________ $_________
PS- 3
Total of Optional Items 0006 thru 0013 $_________
TOTALS
Total of Base and Optional Items 0001 thru 0013
...AM#006
Proposed Contract Duration: ____________________
AM#006... CLINs 0003, 0004, 005, 0009, 0010, 0011, 0012, and 0013 are estimated quantities....AM#006 Equitable adjustments will be made in accordance with FAR CLAUSE 52.211-18, VARIATION IN ESTIMATED QUANTITY (APR 1984). No additional time will be added to the contract completion date if any option is exercised.
* Work on CLINs 0003 and 0009 shall be the cost for work identified in Specs 02 61 13 “Excavation and Handling of Contaminated Material” and Section 01 57 19 “Temporary Environmental Controls” that is additional to the requirements of the normal project excavation and the field screening identified in Section 31 09 20.00 29 “Field Screen Testing of Soils for POL Contamination”. For CLIN CLINs 0003 and 0009, the Contractor shall keep a record of the amount of contaminated soil being excavated and stockpiled. CLIN 0009 can be awarded at any time during the Construction Contract period and will not affect the duration of the contract.
CLIN 0009 can be awarded up to four times.
** For CLINs 0004, 0005, 0010 and 0011 the Contractor shall keep a record of the amount of contaminated soil being disposed of. This is the soil determined to be contaminated through the testing of soil required by CLINs 0003 and 0009 to be stockpiled and sampled. Upon completion, if the amount of contaminated soil disposed of is less than the estimated quantities shown, the Government will receive a credit based upon the unit price noted in the associated CLIN. CLINs 0010 and 0011 can be awarded at any time during the Construction Contract period and will not affect the duration of the contract. CLINs 0010 and 0011 can each be awarded up to four times. CLINs 0004, 0005, 0010, and 0011 include the provision of clean soil meeting specifications requirements for backfill as required to replace the contaminated soil removed.
*** CLINs 0006, 0007 and 0008 can be awarded up to 90 calendars days following Base Item NTP and will not affect the duration of the contract.
AM#006... **** Work for CLIN 0001A includes tracing and verification of active circuits within raceways affected by the demolition scope of work, as well as the identification of all impacted
PS-4
utilities/controls, the method by which they will be made safe (deenergized/depressurized), the outages required to complete the work, and the temporary utilities that are required to allow continued operation of the rest of the facility. Work under this CLIN assumes 200 active circuits will need to be traced. The Contractor shall keep a record of the number of circuits that are traced, and notify the Government once a total of 100 circuits have been traced, and again once a total of 150 have been traced. If more than 200 active circuits are required to be traced, the cost to trace and verify the additional circuits over 200 will be covered under CLINs 0012 and
0013.
***** For CLINs 0012 and 0013, the Contractor shall keep a record of the number of circuits that are traced under each CLIN. Each CLIN can be awarded up to 200 calendars days following
NTP and will not affect the duration of the contract....AM#006
EVALUATION OF OFFERS.
1. AWARD: Award will be made in accordance with Section 00 22 11 – PROPOSAL, SUBMISSION REQUIREMENTS, EVALUATION CRITERIA AND BASIS OF AWARD ONE
STEP – BEST VALUE.
2. All Options will be exercised in writing by the Contracting Officer.
3. INCOMPLETE OFFERS: Failure to submit an offer on all items in the schedule constitutes an incomplete offer. Incomplete offers may be rejected. Lump sum or unit prices must be shown for each item within the schedule.
4. EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
5. SPECIAL CONDITION: If a modification to an offer based on unit prices is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the proposal schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the proposal schedule.
-- END OF PROPOSAL SCHEDULE –
EIE 443, Repair CHPP Turbine Generator Eielson AFB, Alaska
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
1.1.2 Location
1.1.3 Site Physical Conditions
1.1.4 Plant Layout and Access
1.2 OCCUPANCY OF PREMISES
1.3 COORDINATION OF CONSTRUCTION ACTIVITIES
1.3.1 Outages
1.4 EXISTING WORK
1.5 LOCATION OF UNDERGROUND UTILITIES
1.5.1 Notification Prior to Excavation
PART 2 PRODUCTS
PART 3 EXECUTION
ATTACHMENTS:
NOAA Design Criteria for Eielson AFB, Alaska
-- End of Section Table of Contents --
SECTION 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The project site currently consists of the Eielson Air Force Base Central Heat and Power Plant (CHPP), associated ancillary structures, and adjacent open space. The CHPP facility contains six 120,000 lb/hr stoker type boilers burning coal (Boilers #1 through #4 and Boilers #5A and #6A). The steam generated by these boilers is throttled through one of five steam turbine generators before departing the CHPP facility through utilidor tunnels for use on base.
The work includes the replacement of two existing steam turbine -generators (steam turbines), Units #1 and #2, with a single 10 Mega-Watt (MW) steam turbine, Unit #6. The new steam turbine will be similar in size and design to the existing Unit #5. The work also includes the replacement of the equipment directly associated with the existing turbines including the surface condensers, steam jet air ejectors, gland steam condensers, and hotwell pumps. Electrical and controls equipment supporting the existing units will be modified or upgraded to support the installation of the new turbine.
It has also been determined that the installation of a larger steam turbine will increase the required heat rejection beyond the current capacity of the circulating (cooling) water system. To address this issue, evaporators will be added to the pond to increase the heat rejection capacity.
Existing circulating water pumps will be upgraded and their associated Variable Frequency Drives (VFDs) will be replaced.
Existing Equipment and Facilities to be Demolished
a. Steam Turbine - Generators #1 and #2
(1) Steam Turbines
(2) Generators
(3) Condensers
(4) Condenser hotwell pumps
(5) Lube oil systems
(6) Gland steam condensers
(7) Steam jet air ejectors
(8) Interconnecting piping
(9) Associated wiring for instrumentation, controls and power supply.
SECTION 01 11 00 Page 2
Conductors and conduits to be removed back to the source or endpoint equipment.
(10) Turbine and generator control panels
b. Cooling (circulating) water system
(1) Existing cooling water pumps variable frequency drives
(a) Variable frequency drives
(2) Existing 150 kVA pole mounted transformer and associated downstream distribution equipment.
c. Electrical power system (7.2 kV)
(1) Existing power conductors from Generators #1 and #2 to the Generator Switchgear
d. Electrical power system (480V)
(1) Any power conductors and conduit supplying the condenser hotwell pumps, lube oil pumps or other associated powered equipment that is to be removed.
e. Piping within the construction envelope, including
(1) High pressure steam
(2) Low pressure (extraction) steam
(3) Turbine drains
(4) Lube oil
(5) Compressed air
(6) Cooling water
(7) Condensate
(8) Makeup water
(9) Fire water
f. Hazardous materials abatement, including
(1) Asbestos containing materials
(2) Lead based paint
(3) Silica and metal contaminated dust
(4) Light fixtures containing Polychloninated Biphenyls (PCBs)
Existing Equipment to be Modified:
a. Cooling (circulating) water pumps
SECTION 01 11 00 Page 3
b. Generator switchgear
c. Generator #1 breaker control panel
d. MCC A and MCC H
(1) Starter buckets added to support new STG auxiliaries
Existing Equipment to Remain:
a. All existing equipment outside of the construction envelope, except as noted on the drawings
Existing Equipment to be Relocated:
a. Makeup water pump skid
New Equipment
a. Steam Turbine – Generator #6, including:
(1) Steam turbine
(2) Gearbox
(3) Generator
(4) Neutral grounding resistor
(5) Lube oil system
(6) Gland steam condenser
(7) Interconnecting piping
b. Condenser
(1) Condenser
(2) Steam jet air ejector / hogger
c. Condenser hotwell pumps
d. Cooling water
(1) Floating evaporative coolers
(2) Cooling water pumps
e. Piping as necessary for proper operation, including
(1) High pressure steam
(2) Low pressure (extraction) steam
(3) Turbine drains
(4) Lube oil
SECTION 01 11 00 Page 4
(5) Compressed air
(6) Cooling water
(7) Condensate
(8) Makeup water
(9) Fire water
f. Electrical equipment and wiring
(1) Motor control center starter buckets
(2) Variable frequency drives (VFDs)
(3) Circulating water pump motors
(4) 125 volt DC battery of 100 amp/hour capacity (HOLD)
(5) 125 volt DC battery charger
(6) 125 volt DC motor starter
(7) 600 volt, 600 amp distribution panel board
(8) 15 kV 750 MCM copper power conductors
(9) 600 volt power conductors of varying sizes
(10) Miscellaneous Wiring
(11) Conduit / Raceway
(12) Lighting
(13) Receptacles
g. Instrumentation and Controls
(1) Instrumentation required for proper operation
(2) New programmable logic controllers (PLCs)
(a) Turbine #6 Auxiliary Systems PLC
(b) Turbine #6 PLC (vendor supplied)
(3) New control panels
(a) Turbine #6 Auxiliary Systems Control Panel
(b) Turbine Control Panel (TCP) (vendor supplied)
(c) Generator Control Panel (GCP) (vendor supplied)
Commissioning Activities
a. Equipment startup
SECTION 01 11 00 Page 5
b. System commissioning
c. Operational and performance testing
1.1.2 Location
The work is located at the Eielson AFB Central Heating Plant. Eielson AFB is located 23 road miles southeast of Fairbanks, AK.
Existing Facility Address:
2676 Industrial Drive Eielson AFB, AK 99702-1899 Approximate Coordinates:
64° 40.282'N, 147° 40.556'W
1.1.3 Site Physical Conditions
a. Elevation: MSL +542 feet
b. Barometer: 29.37 in Hg abs.
c. Weather: NOAA Design Criteria for Eielson AFB, Alaska (Attachment 1)
d. Interior conditions: Varies between 50 degree F and 115 degree F.
Highest temperatures occur on upper floors in summer months.
1.1.4 Plant Layout and Access
The plant, as shown in the design documents, has been laid out in accordance with the following general rules. In the event that a conflict between these rules and the design presented on the design documents is identified, the Contractor shall notify the Contracting Officer. These rules shall also apply to any portions of the work that are intended to be field routed/located by the Contractor.
a. The facility shall be laid out generally to accommodate the spaces required to service equipment as well as to maintain and operate the plant. Access aisles and clearance shall be provided for operation, maintenance, and equipment removal. Provisions shall also be made for personnel access to equipment and other access points, including, doors, stairs, ladders and other approved means. Elevated walkway platforms shall be interconnected with stairs or ladders to prevent personnel from having to return to grade level to access a different walkway, where practical. Single component access platforms may have ladder access.
b. Personnel and maintenance equipment access to plant piping and its related features shall include personnel access/egress relating to security and life-safety, within normally occupied spaces. In plant equipment areas, personnel access aisles for operation and light maintenance activities shall be 4 foot wide and 6 foot 8 inches high, as a minimum.
c. Permanent direct access shall be provided for systems and equipment that require scheduled operation and maintenance. Devices and other components that do not require scheduled operation and maintenance are not required to be provided with permanent direct access from a platform, ladder, or stairs, but will be required to be accessed by a
SECTION 01 11 00 Page 6 mobile work platform, man lift or ladder provided by Owner. Chain operators may be used for valve operation. Access requirements for instrumentation and equipment shall be subdivided into three levels:
(1) Category I: Items in this category shall be provided with room to allow temporary access by way of an owner provided personnel lift, step ladder, scaffolding, scissor lift etc. No permanent platform or ladder will be provided. Instrument indicators and gauges will be located and displays sized so they can be read from a permanent access way. Category I items include the following:
(a) Analysis Probes/Sensors
(b) Small Bore Manual valves
(c) Flow Elements/Meters
(d) Gauges/Indicators
(e) Level Elements/Probes
(f) Process Switches
(g) Temperature Elements/Wells
(2) Category II: Items in this category have the ability to be routed to other platforms nearby and do not require a dedicated platform.
Access is to be provided by platforms near the item. Category II items include the following:
(a) In-Line Analyzers
(b) Hand Switches
(c) Local Controllers
(d) Transmitters
(3) Category III: Items in this category require a dedicated platform if the item is not accessible from grade. Category III items include the following:
(a) Rotating Equipment
(b) Equipment Manways and View Ports
(c) Control Panels
(d) Large Bore Manual Valves
(e) Regulator Valves
(f) Control Valves
(g) Large Bore Safety Relief Valves
(h) Motorized or Pneumatic Valve or Damper Actuators
(4) Major equipment such as steam turbine-generator and condenser
SECTION 01 11 00 Page 7 shall have platforms as recommended by the manufacturer.
d. Floor or platform openings around the steam turbine-generator, piping, and equipment necessitated by expansion and movement requirements shall be protected in accordance with OSHA standards, as applicable.
e. Plant fire protection and life safety features shall be considered in the plant layout and be designed in accordance with national and local codes, and permits.
1.2 OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work under this Contract. Occupancy notifications indicating areas of construction activity and access restrictions will be posted in a prominent location in the work area.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.3 COORDINATION OF CONSTRUCTION ACTIVITIES
AM#0006... The Contractor shall maintain a project schedule in accordance with the requirements of Section 01 32 01.00 10 PROJECT SCHEDULE. This schedule shall be closely coordinated with the Contracting Officer and plant personnel to ensure that demolition and construction activities do not impact normal plant operations. Demolition activities that could adversely impact plant operations shall be conducted during the summer months (April through September) unless otherwise approved by the Contracting Officer. Demolition activities not expected to adversely impact plant operations or require an outage can occur throughout the year.
Equipment, utility, and system outages required for the Contractor to complete the work shall be scheduled with the Contracting Officer and plant personnel as soon as possible after the need for an outage is identified.
For outages only expected to impact operations within the CHPP, provide notification to the Government a minimum of 21 days prior to the desired outage date. The Government will make every effort to provide approval and accommodate outages in less than 7 days. Outages requiring interruption or curtailment of steam or electrical output to Eielson AFB shall be scheduled with the Contracting officer a minimum of 3 months prior to the desired outage date. All outages of steam or power to the base shall be restricted to the summer months unless otherwise approved by the Contracting Officer.
Contractor shall update the schedule at least weekly to ensure accurate reporting of planned activities. The Contracting Officer reserves the right to delay any outage as deemed necessary to ensure reliable production of steam and electricity.The Contractor shall maintain a project schedule in accordance with the requirements of Section 01 32 01.00 10 PROJECT SCHEDULE. This schedule shall be closely coordinated with the Contracting Officer and plant personnel to ensure that demolition and construction activities do not impact normal plant operations. Demolition activities that could adversely impact plant operations shall be conducted during the summer months (April through September) unless otherwise approved by the Contracting Officer. Equipment, utility, and system outages required for the Contractor to complete the work shall be scheduled with the Contracting Officer and plant personnel as soon as possible after the need for an outage is identified, but not less than 21 days prior to the desired outage date. Outages requiring interruption or curtailment of steam or electrical output shall be scheduled with the Contracting officer a minimum of 3
SECTION 01 11 00 Page 8 months prior to the desired outage date. All outages shall be restricted to the summer months unless otherwise approved by the Contracting Officer.
Contractor shall update the schedule at least weekly to ensure accurate reporting of planned activities. The Contracting Officer reserves the right to delay any outage as deemed necessary to ensure reliable production of steam and electricity.
1.3.1 Outages
It is not expected that an interruption of steam or electrical output to Eielson AFB will be required. If it does become necessary, the contract completion date will be extended by the number of days it takes the Government to provide approval for the outage following notification of the required outage by the Contractor.
For required outages that are internal to the CHPP, requiring a 21 day notification, the contract completion date will be extended by the number of days beyond 7 that it takes for the Government to provide approval for the outage following notification of the required outage by the Contractor. ...AM#0006
1.4 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.5 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed
1.5.1 Notification Prior to Excavation
Reference the requirements identified in Sections 01 19 30.02 29 SPECIAL ITEMS FOR EIELSON AFB PROJECTS and Section 02 61 13 EXCAVATION AND HANDLING
OF CONTAMINATED MATERIAL.
SECTION 01 11 00 Page 9
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --