B.08.03 AM0003 W911KB21R0012 EIE443.pdf

PDF 21 MB Posted

Attached to
AM #6 to EIE443 Turbine Generator Repair at the Central Heat & Power Plant (CHPP), Eielson AFB, AK
Solicitation number
W911KB21R0012
Issued by

About this file

This solicitation is for AM #6 to EIE443 Turbine Generator Repair at the Central Heat & Power Plant (CHPP) at Eielson Air Force Base in Alaska. The Department of the Army Corps of Engineers Engineering District Alaska is seeking responses for repairs to turbine generators including replacement of rotor and stator windings, replacement of exciter rotor and stator, replacement of generator bearings, and performance of on-site operational tests. Responses are due by June 15, 2021. The award date is expected to be July 15, 2021. The contract will be a firm-fixed price award for a one-year base period with four one-year option periods. This is an unrestricted procurement open to small and large businesses.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE: EIE443 Repair CHPP Turbine Generator, Eielson AFB, Alaska

a. This amendment provides changes to the solicitation as indicated on page 2 of this document.

b. PROPOSAL DUE DATE HAS NOT CHANGED. Submit proposals in accordance w ith Section 00 21 00, paragraph 1.13, Proposal Submittals.

POC for this amendment is Angela Padua, 907-753-5714.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB21R0012

X 9B. DATED (SEE ITEM 11)

25-Nov-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Dec-2020

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KB21R0012

SUMMARY OF CHANGES

a. The following drawings are submitted for the superseded documents/sections:

• Drawing G-002 (Drawing Index revised to add sheet CIW-123A)

• Drawing DI604B (Revision to piping near PRV-001)

• Drawing DS501 (Clarification added to drawing regarding pipe support detail numbering)

• Drawing DS502 (Clarification added to drawing regarding pipe support detail

“sheet numbers”)

• Drawing CIW-141 (Revision to piping isometric)

b. The following drawings are added:

• Drawing CIW-123A (Adds missing isometric following CIW-123)

c. The following revised documents/sections are submitted for the superseded documents/sections:

• RFP Specifications, Section 26 05 19.1010, Attachment “Cable Schedule” (electronic pages 1163 through 1201 of 2048 pages)

• RFP Specifications, Appendix B “Mechanical Lists”, ML003, Pipeline Schedule (electronic pages 1987 through 2004 of 2048 pages)

• RFP Specifications, Appendix B “Mechanical Lists”, ML004, Valve Schedule (electronic pages 2005 through 2035 of 2048 pages)

d. The following sections are deleted:

• NONE

e. The following documents are added:

• RFP Specification Package, Appendix C, adding 12-month historical steam extraction data (highest hourly flow rate in K-Lbs, and monthly flow totals in M- Lbs)

• RFP Specification Package, Appendix C, adding as-built drawing “ftqw_06203_008_041_Floor_drains” to show existing locations of turbine basement drains

f. The following revisions are incorporated:

• NONE

g. Other:

• NONE

(End of Summary of Changes)

ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME.

J4COEBJT

Text Box EIE443 Amendment R0003

EIE443, Amendment R0003

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

S T

A N

L E

Y C

O N

S U

L T

A N

T S

IN

C

S

O U

T H C

H E

S T

E R S

T R

E E

T S

U

IT

E

C E

N T

E N

N

IA

L

C O

L O

R A

D O w w w .s ta n le y c o n s u lt a n ts .c o m

A L

A S

K A D

IS

T R

IC

T

W

K B -1

-D -0

N O

V E

M B

E R

A N

S I

D

W

K B

R

E

IE

L S

O N A

IR

F

O R

C E B

A S

E

A L

A S

K A

R E

P A

IR

C

E N

T R

A L H

E A

T P

O W

E R P

L A

N T T

U R

B

IN

E G

E N

E R

A T

O R

E

IE

DESIGN COMPLETE

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

GOVERNMENT APPROVAL PER PARAGRAPH 1.10 OF SECTION 01 33 00.

ACTIVITIES ASSOCIATED WITH THE SUBMITTAL PRIOR TO RECEIPT OF

CONTRACTOR SHALL NOT PROCEED WITH FABRICATION OR ERECTION

WITH SPECIFICATION SECTION 01 33 00 - SUBMITTAL PROCEDURES.

REVIEW AND VERIFICATION OF DESIGN TO THE GOVERNMENT IN ACCORDANCE

CONTRACTOR SHALL SUBMIT FINAL EQUIPMENT VENDOR DRAWINGS FOR

IN THE PROJECT “BASIS OF DESIGN” AS IDENTIFIED IN THE SPECIFICATIONS.

CONTRACT DOCUMENTS WERE PREPARED BASED ON INFORMATION CONTAINED

DS: AEC_Screen.dscript.dscriptPD: AEC_pdf.pltcfg11:54:37 AM 11/20/2020

EIE443DS501.dgn

B

D A

H L

P R

O C

E S

S

DS501

R T

U R

N E

R

R T

U R

N E

R

J S

O L

A N

P

IP

E S

U P

P O

R T D

E T

A

IL

S

Highlight

Highlight

Highlight

Highlight

Highlight

Highlight

Highlight

Highlight

Highlight

Highlight

Rectangle

J4COEBJT

Text Box These "Support Details" are contained within Contract Drawing Sheets DS501 through DS506 (see Support Schedule on DS601 and DS602)

J4COEBJT

Text Box

DS502

J4COEBJT

Text Box

DS504, DS505

J4COEBJT

Text Box

DS504

J4COEBJT

Text Box

DS503

J4COEBJT

Text Box

DS505, DS506

J4COEBJT

Text Box

DS502

J4COEBJT

Text Box

DS503

J4COEBJT

Callout To clarify, this is:

"M700, SHEET 1"

J4COEBJT

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

S T

A N

L E

Y C

O N

S U

L T

A N

T S

IN

C

S

O U

T H C

H E

S T

E R S

T R

E E

T S

U

IT

E

C E

N T

E N

N

IA

L

C O

L O

R A

D O w w w .s ta n le y c o n s u lt a n ts .c o m

A L

A S

K A D

IS

T R

IC

T

W

K B -1

-D -0

N O

V E

M B

E R

N

S I

D

W

K B

R

E

IE

L S

O N A

IR

F

O R

C E B

A S

E

A L

A S

K A

R E

P A

IR

C

E N

T R

A L H

E A

T P

O W

E R P

L A

N T T

U R

B

IN

E G

E N

E R

A T

O R

E

IE

DESIGN COMPLETE

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

GOVERNMENT APPROVAL PER PARAGRAPH 1.10 OF SECTION 01 33 00.

ACTIVITIES ASSOCIATED WITH THE SUBMITTAL PRIOR TO RECEIPT OF

CONTRACTOR SHALL NOT PROCEED WITH FABRICATION OR ERECTION

WITH SPECIFICATION SECTION 01 33 00 - SUBMITTAL PROCEDURES.

REVIEW AND VERIFICATION OF DESIGN TO THE GOVERNMENT IN ACCORDANCE

CONTRACTOR SHALL SUBMIT FINAL EQUIPMENT VENDOR DRAWINGS FOR

IN THE PROJECT “BASIS OF DESIGN” AS IDENTIFIED IN THE SPECIFICATIONS.

CONTRACT DOCUMENTS WERE PREPARED BASED ON INFORMATION CONTAINED

DS: AEC_Screen.dscript.dscriptPD: AEC_pdf.pltcfg11:55:51 AM 11/20/2020

EIE443DS502.dgn

D A

H L

P R

O C

E S

S

DS502

R T

U R

N E

R

R T

U R

N E

R

J S

O L

A N

P

IP

E S

U P

P O

R T D

E T

A

IL

S

Rectangle

J4COEBJT

Callout To clarify, this is:

"M701, SHEET 2"

J4COEBJT

EIE443, Amendment R0003

CABLE SCHEDULE (Last Iss Date: ) Rev:1

Constraints: NONE

12/17/2020 < EAFB, EIE443 CHPP TURBINE GENERATOR > Job Number: 27751

12/17/2020

FROM TAG TO TAG

FROM DESCRIPTION TO DESCRIPTION

CABLE NUMBER CABLE TYPE ROUTING

SEGR CODE PLANT SYSTEM FROM DWG TO DWG CABLE LAYING METHOD

WORK PACKAGE START UP SYSTEM FROM WIRING DWG TO WIRING DWG LEN CABLE NOTE REV

00-CIW-C-058 9/C #12 00-CIW-CPL-001 EAST WELL PANEL 1000FT FIELD ROUTE CONDUIT 0

C COOLING WATER CONTROL PANEL

EI100

EI821, EI822 EI821, EI822

00-CIW-C-059 9/C #12 00-CIW-CPL-001 WEST WELL PANEL 1000FT FIELD ROUTE CONDUIT 0

EI821, EI822 EI821, EI822

00-CIW-C-060 9/C #12 00-CIW-CPL-001 NORTH WELL PANEL 800FT FIELD ROUTE CONDUIT 0

EI821, EI823 EI821, EI823

00-CIW-C-061 9/C #12 00-CIW-CPL-001 SOUTH WELL PANEL 1000FT FIELD ROUTE CONDUIT 0

EI821, EI823 EI821, EI823

00-CIW-L-100 3/C #12 AWG 00-CIW-LTG-PNL 00-CIW-NPL-100 50FT 120VAC PWR CONN., FIELD ROUTE CONDUIT 0

L COOLING POND PUMP HOUSE COOLING WATER NETWORK PANEL

LIGHTING PANEL

EP107 EI107

00-CIW-M-500 3/C (15KV) #2 O-T-CIRC-14 00-CIW-XFMR-001 100FT CONNECTION TO OVERHEAD CIRCUIT #14, FIELD ROUTE 1

M AWG W/G OVERHEAD TRANSMISSION TAP 7200/480VAC 3PH TRANSFORMER CONDUIT

FROM CIRCUIT #14

E-605 E-605

12/17/2020 < EAFB, EIE443 CHPP TURBINE GENERATOR > Job Number: 27751

12/17/2020

FROM TAG TO TAG

FROM DESCRIPTION TO DESCRIPTION

CABLE NUMBER CABLE TYPE ROUTING

SEGR CODE PLANT SYSTEM FROM DWG TO DWG CABLE LAYING METHOD

WORK PACKAGE START UP SYSTEM FROM WIRING DWG TO WIRING DWG LEN CABLE NOTE REV

00-CIW-M-501 3/C (15KV) #2 O-T-CIRC-2 00-CIW-XFMR-002 60FT CONNECTION TO OVERHEAD CIRCUIT #2, FIELD ROUTE 1

M AWG W/G OVERHEAD TRANSMISSION TAP 7200/480VAC 3PH 300KVA CONDUIT

FROM CIRCUIT #2 TRANSFORMER

00-CIW-M-701 3/C (2KV) #350 00-CIW-VFD-001A 00-CIW-MTR-001A 100FT PWR CONN., FIELD ROUTE CONDUIT 0

M KCMIL W/GND VFD CIRCULATING WATER PUMP A VFD CIRCULATING WATER PUMP MOTOR

EI107 DI604

00-CIW-M-703 3/C (2KV) #350 00-CIW-VFD-001B 00-CIW-MTR-001B 100FT PWR CONN., FIELD ROUTE CONDUIT 0

M KCMIL W/GND VFD CIRCULATING WATER PUMP B VFD CIRCULATING WATER PUMP MOTOR

00-CIW-M-705 3/C (2KV) #350 00-CIW-VFD-001C 00-CIW-MTR-001C 100FT PWR CONN., FIELD ROUTE CONDUIT 0

M KCMIL W/GND VFD CIRCULATING WATER PUMP C VFD CIRCULATING WATER PUMP MOTOR

C

00-CIW-P-501 3/C #500 KCMIL 00-CIW-XFMR-001 00-CIW-PNL-002 150FT PWR CONN., FIELD ROUTE CONDUIT 0

P W/GND 7200/480VAC 3PH TRANSFORMER 480V ELECTRICAL DISTRIBUTION

PANEL

00-CIW-P-502 3/C #500 KCMIL 00-CIW-XFMR-001 00-CIW-PNL-002 150FT PWR CONN., FIELD ROUTE CONDUIT 0

P W/GND 7200/480VAC 3PH TRANSFORMER 480V ELECTRICAL DISTRIBUTION

12/17/2020 < EAFB, EIE443 CHPP TURBINE GENERATOR > Job Number: 27751

12/17/2020

FROM TAG TO TAG

FROM DESCRIPTION TO DESCRIPTION

CABLE NUMBER CABLE TYPE ROUTING

SEGR CODE PLANT SYSTEM FROM DWG TO DWG CABLE LAYING METHOD

WORK PACKAGE START UP SYSTEM FROM WIRING DWG TO WIRING DWG LEN CABLE NOTE REV

00-CIW-P-503 3-1/C #4/0, #4 00-CIW-XFMR-002 00-CIW-PNL-001 165FT DUCT A1 1

P G 7200/480VAC 3PH 300KVA 480V ELECTRICAL DISCTIBUTION

TRANSFORMER PANEL

00-CIW-P-504 3-1/C #4/0, #4 00-CIW-XFMR-002 00-CIW-PNL-001 165FT DUCT A2 1

P G 7200/480VAC 3PH 300KVA 480V ELECTRICAL DISCTIBUTION

TRANSFORMER PANEL

00-CIW-P-700 3/C #500 KCMIL 00-CIW-PNL-001 00-CIW-VFD-001A 30FT PWR CONN., FIELD ROUTE CONDUIT 0

P W/GND 480V ELECTRICAL DISCTIBUTION CIRCULATING WATER PUMP A VFD

E-605 EI107

00-CIW-P-702 3/C #500 KCMIL 00-CIW-PNL-002 00-CIW-VFD-001B 30FT PWR CONN., FIELD ROUTE CONDUIT 0

P W/GND 480V ELECTRICAL DISTRIBUTION CIRCULATING WATER PUMP B VFD

00-CIW-P-704 3/C #500 KCMIL 00-CIW-PNL-002 00-CIW-VFD-001C 30FT PWR CONN., FIELD ROUTE CONDUIT 0

P W/GND 480V ELECTRICAL DISTRIBUTION CIRCULATING WATER PUMP C VFD

00-CIW-P-706 3/C #500 KCMIL 00-CIW-PNL-002 00-CIW-SKD-101 720FT PWR CONN., FIELD ROUTE CONDUIT 0

P W/GND 480V ELECTRICAL DISTRIBUTION SPRAY POND EVAPORATOR SYSTEM

PANEL (PROV. ELEC. TP)

E-605 DI604

12/17/2020 < EAFB, EIE443 CHPP TURBINE GENERATOR > Job Number: 27751

12/17/2020

FROM TAG TO TAG

FROM DESCRIPTION TO DESCRIPTION

CABLE NUMBER CABLE TYPE ROUTING

SEGR CODE PLANT SYSTEM FROM DWG TO DWG CABLE LAYING METHOD

WORK PACKAGE START UP SYSTEM FROM WIRING DWG TO WIRING DWG LEN CABLE NOTE REV

00-COM-T-003 FIBER 6 SM 00-CIW-NPL-100 00-CIW-CPL-100 750FT COMMUNICATIONS, FIELD ROUTE CONDUIT 0

T COOLING WATER NETWORK PANEL COOLING POND AUGMENTATION

SYSTEM CONTROL PANEL

EI107 EP108

EI605 EI606

00-COM-T-004 CAT 6 ETHERNET 00-CIW-NPL-100 POND HOUSE NPL (EXIST) 50FT COMMUNICATIONS, FIELD ROUTE CONDUIT 0

T COOLING WATER NETWORK PANEL

EI107

EI605 EI606

00-COM-T-005 CAT 6 ETHERNET 00-CIW-VFD-001A 00-CIW-NPL-100 50FT FIELD ROUTE CONDUIT 0

T CIRCULATING WATER PUMP A VFD COOLING WATER NETWORK PANEL

EI107 EI107

00-COM-T-006 CAT 6 ETHERNET 00-CIW-VFD-001B 00-CIW-NPL-100 50FT FIELD ROUTE CONDUIT 0

T CIRCULATING WATER PUMP B VFD COOLING WATER NETWORK PANEL

00-COM-T-007 CAT 6 ETHERNET 00-CIW-VFD-001C 00-CIW-NPL-100 50FT FIELD ROUTE CONDUIT 0

T CIRCULATING WATER PUMP C VFD COOLING WATER NETWORK PANEL

00-COM-T-008 CAT 6 ETHERNET 00-CIW-VFD-110 00-CIW-CPL-100 30FT FIELD ROUTE CONDUIT 0

T FLOATING EVAPORATION UNIT 1 COOLING POND AUGMENTATION

PUMP VFD SYSTEM CONTROL PANEL

EI108 EP108

EI606 EI606

12/17/2020 < EAFB, EIE443 CHPP TURBINE GENERATOR > Job Number: 27751

12/17/2020

FROM TAG TO TAG

FROM DESCRIPTION TO DESCRIPTION

CABLE NUMBER CABLE TYPE ROUTING

SEGR CODE PLANT SYSTEM FROM DWG TO DWG CABLE LAYING METHOD

WORK PACKAGE START UP SYSTEM FROM WIRING DWG TO WIRING DWG LEN CABLE NOTE REV

00-COM-T-009 CAT 6 ETHERNET 00-CIW-VFD-111A 00-CIW-CPL-100 30FT FIELD ROUTE CONDUIT 0

T FLOATING EVAPORATION UNIT 1 COOLING POND AUGMENTATION

FAN A VFD SYSTEM CONTROL PANEL

EI108 EP108

EI606 EI606

00-COM-T-010 CAT 6 ETHERNET 00-CIW-VFD-111B 00-CIW-CPL-100 30FT FIELD ROUTE CONDUIT 0

T FLOATING EVAPORATION UNIT 1 COOLING POND AUGMENTATION

FAN B VFD SYSTEM CONTROL PANEL

EI108 EP108

EI606 EI606

00-COM-T-011 CAT 6 ETHERNET 00-CIW-VFD-111C 00-CIW-CPL-100 30FT FIELD ROUTE CONDUIT 0

T FLOATING EVAPORATION UNIT 1 COOLING POND AUGMENTATION

FAN C VFD SYSTEM CONTROL PANEL

EI108 EP108

EI606 EI606

00-COM-T-012 CAT 6 ETHERNET 00-CIW-VFD-111D 00-CIW-CPL-100 30FT FIELD ROUTE CONDUIT 0

T FLOATING EVAPORATION UNIT 1 COOLING POND AUGMENTATION

FAN D VFD SYSTEM CONTROL PANEL

EI108 EP108

EI606 EI606

00-COM-T-013 CAT 6 ETHERNET 00-CIW-VFD-120 00-CIW-CPL-100 30FT FIELD ROUTE CONDUIT 0

T FLOATING EVAPORATION UNIT 2 COOLING POND AUGMENTATION

PUMP VFD SYSTEM CONTROL PANEL

EI108 EP108

EI606 EI606

00-COM-T-014 CAT 6 ETHERNET 00-CIW-VFD-121A 00-CIW-CPL-100 30FT FIELD ROUTE CONDUIT 0

T FLOATING EVAPORATION UNIT 2 COOLING POND AUGMENTATION

FAN A VFD SYSTEM CONTROL PANEL

EI108 EP108

12/17/2020 < EAFB, EIE443 CHPP TURBINE GENERATOR > Job Number: 27751

12/17/2020

FROM TAG TO TAG

FROM DESCRIPTION TO DESCRIPTION

CABLE NUMBER CABLE TYPE ROUTING

SEGR CODE PLANT SYSTEM FROM DWG TO DWG CABLE LAYING METHOD

WORK PACKAGE START UP SYSTEM FROM WIRING DWG TO WIRING DWG LEN CABLE NOTE REV

00-COM-T-015 CAT 6 ETHERNET 00-CIW-VFD-121B 00-CIW-CPL-100 30FT FIELD ROUTE CONDUIT 0

T FLOATING EVAPORATION UNIT 2 COOLING POND AUGMENTATION

FAN B VFD SYSTEM CONTROL PANEL

EI108 EP108

EI606 EI606

00-COM-T-016 CAT 6 ETHERNET 00-CIW-VFD-121C 00-CIW-CPL-100 30FT FIELD ROUTE CONDUIT 0

T FLOATING EVAPORATION UNIT 2 COOLING POND AUGMENTATION

FAN C VFD SYSTEM CONTROL PANEL

EI108 EP108

EI606 EI606

00-COM-T-017 CAT 6 ETHERNET 00-CIW-VFD-121D 00-CIW-CPL-100 30FT FIELD ROUTE CONDUIT 0

T FLOATING EVAPORATION UNIT 2 COOLING POND AUGMENTATION

FAN D VFD SYSTEM CONTROL PANEL

EI108 EP108

EI606 EI606

00-COM-T-018 CAT 6 ETHERNET 00-CIW-VFD-130 00-CIW-CPL-100 30FT FIELD ROUTE CONDUIT 0

T FLOATING EVAPORATION UNIT 3 COOLING POND AUGMENTATION

PUMP VFD SYSTEM CONTROL PANEL

EI108 EP108

EI606 EI606

00-COM-T-019 CAT 6 ETHERNET 00-CIW-VFD-131A 00-CIW-CPL-100 30FT FIELD ROUTE CONDUIT 0

T FLOATING EVAPORATION UNIT 3 COOLING POND AUGMENTATION

FAN A VFD SYSTEM CONTROL PANEL

EI108 EP108

EI606 EI606

00-COM-T-020 CAT 6 ETHERNET 00-CIW-VFD-131B 00-CIW-CPL-100 30FT FIELD ROUTE CONDUIT 0

T FLOATING EVAPORATION UNIT 3 COOLING POND AUGMENTATION

FAN B VFD SYSTEM CONTROL PANEL

EI108 EP108

12/17/2020 < EAFB, EIE443 CHPP TURBINE GENERATOR > Job Number: 27751

12/17/2020

FROM TAG TO TAG

FROM DESCRIPTION TO DESCRIPTION

CABLE NUMBER CABLE TYPE ROUTING

SEGR CODE PLANT SYSTEM FROM DWG TO DWG CABLE LAYING METHOD

WORK PACKAGE START UP SYSTEM FROM WIRING DWG TO WIRING DWG LEN CABLE NOTE REV

00-COM-T-021 CAT 6 ETHERNET 00-CIW-VFD-131C 00-CIW-CPL-100 30FT FIELD ROUTE CONDUIT 0

T FLOATING EVAPORATION UNIT 3 COOLING POND AUGMENTATION

FAN C VFD SYSTEM CONTROL PANEL

EI108 EP108

EI606 EI606

00-COM-T-022 CAT 6 ETHERNET 00-CIW-VFD-131D 00-CIW-CPL-100 30FT FIELD ROUTE CONDUIT 0

T FLOATING EVAPORATION UNIT 3 COOLING POND AUGMENTATION

FAN D VFD SYSTEM CONTROL PANEL

EI108 EP108

EI606 EI606

00-COM-T-023 2TSP #24, RS485 SECTION 105 TURBINE #3 AVR (EXIST) 250FT FIELD ROUTE CONDUIT 0

T MASTER CONTROL CUBICLE MODBUS RS-485 NETWORK FOR GOVERNORS AND AVR'S

EP103

EI603 EI603

00-COM-T-024 1TSP #18 TX SECTION 107 SECTION 104 100FT FIELD ROUTE CONDUIT 0

T GENERATOR 6 CONTROL CUBICLE MASTER CONTROL CUBICLE LONWORKS NETOWRK FOR DSLC'S

EP103 EP103

EI604 EI604

06-CIW-I-013 1TSP #16 06-BOP-CPL-001 06-CIW-FIT-001 100FT FIELD ROUTE CONDUIT, TC-001/2, FIELD ROUTE 0

I STG 6 BALANCE OF PLANT STG 6 CIRCULATING WATER FLOW CONDUIT

CONTROL PANEL XMTR

EP102 EI101C

EI802 EI802

06-CIW-I-014 1TSP #16 06-BOP-CPL-001 06-CIW-FIT-010 150FT FIELD ROUTE CONDUIT, TC-001/2, TC-002/2, FIELD 0

I STG 6 BALANCE OF PLANT UNIT 6 POTABLE WATER FLOW ROUTE CONDUIT

CONTROL PANEL XMTR

EP102 EI101C

EI813 EI813

12/17/2020 < EAFB, EIE443 CHPP TURBINE GENERATOR > Job Number: 27751

12/17/2020

FROM TAG TO TAG

FROM DESCRIPTION TO DESCRIPTION

CABLE NUMBER CABLE TYPE ROUTING

SEGR CODE PLANT SYSTEM FROM DWG TO DWG CABLE LAYING METHOD

WORK PACKAGE START UP SYSTEM FROM WIRING DWG TO WIRING DWG LEN CABLE NOTE REV

06-CIW-I-026 1TSP #16 06-BOP-CPL-001 06-CIW-TIT-005 100FT FIELD ROUTE CONDUIT, TC-001/2, TC-002/2, FIELD 0

I STG 6 BALANCE OF PLANT TURBINE 6 COND COOLING WATER ROUTE CONDUIT

CONTROL PANEL INLET HEADER TEMP XMTR

EP102 EI101C

EI813 EI813

06-CIW-I-027 1TSP #16 06-BOP-CPL-001 06-CIW-TIT-023 100FT FIELD ROUTE CONDUIT, TC-001/2, TC-002/2, FIELD 0

I STG 6 BALANCE OF PLANT TURBINE 6 COND COOLING WATER ROUTE CONDUIT

CONTROL PANEL OUTLET HEADER TEMP XMTR

EP102 EI101C

EI813 EI813

06-CIW-L-001 2/C #12 AWG 06-BOP-CPL-001 06-CIW-FIT-010 150FT FIELD ROUTE CONDUIT 0

L W/GND STG 6 BALANCE OF PLANT UNIT 6 POTABLE WATER FLOW

CONTROL PANEL XMTR

EP102 EI101C

EI813 EI813

06-CIW-L-002 2/C #12 AWG 06-BOP-CPL-001 06-CIW-FIC-090 150FT FIELD ROUTE CONDUIT 0

L W/GND STG 6 BALANCE OF PLANT STG 6 CIRC WATER FILTRATION

CONTROL PANEL UNIT CONTROLLER

EP102 EI101C

EI806 EI806

06-CND-C-004 7/C #14 06-BOP-CPL-001 MCC-A 100FT FIELD ROUTE CONDUIT 0

C STG 6 BALANCE OF PLANT 480VAC MCC, 3PH, 3W, 800A MCC BUCKET A15, 06-CND-PMP-601A DISCRETE INPUT

CONTROL PANEL (EXIST) SIGNALS

EP102 EP102, E-604

EI806 E-616, EI806

06-CND-C-005 7/C #14 06-BOP-CPL-001 MCC-A 100FT FIELD ROUTE CONDUIT 0

C STG 6 BALANCE OF PLANT 480VAC MCC, 3PH, 3W, 800A MCC BUCKET A14, 06-CND-PMP-604A DISCRETE INPUT

CONTROL PANEL (EXIST) SIGNALS

EP102 EP102, E-604

EI806 E-616, EI806

12/17/2020 < EAFB, EIE443 CHPP TURBINE GENERATOR > Job Number: 27751

12/17/2020

FROM TAG TO TAG

FROM DESCRIPTION TO DESCRIPTION

CABLE NUMBER CABLE TYPE ROUTING

SEGR CODE PLANT SYSTEM FROM DWG TO DWG CABLE LAYING METHOD

WORK PACKAGE START UP SYSTEM FROM WIRING DWG TO WIRING DWG LEN CABLE NOTE REV

06-CND-C-009 5/C #14 06-BOP-CPL-001 MCC-A 100FT FIELD ROUTE CONDUIT 0

C STG 6 BALANCE OF PLANT 480VAC MCC, 3PH, 3W, 800A MCC BUCKET A15, 06-CND-PMP-601A DISCRETE OUTPUT

CONTROL PANEL (EXIST) SIGNALS

EP102 EP102, E-604

EI809 E-616, EI809

06-CND-C-010 5/C #14 06-BOP-CPL-001 MCC-A 100FT FIELD ROUTE CONDUIT 0

C STG 6 BALANCE OF PLANT 480VAC MCC, 3PH, 3W, 800A MCC BUCKET A14, 06-CND-PMP-604A DISCRETE OUTPUT

CONTROL PANEL (EXIST) SIGNALS

EP102 EP102, E-604

EI809 E-616, EI809

06-CND-C-014 5/C #14 06-BOP-CPL-001 06-CND-VB-635 100FT FIELD ROUTE CONDUIT, TC-001/3, TC-002/3, FIELD 0

C STG 6 BALANCE OF PLANT TURBINE 6 CONDENSER VACUUM ROUTE CONDUIT

CONTROL PANEL BREAKER VALVE DISCRETE INPUT SIGNALS

EP102 EI101B

EI816 EI816

06-CND-C-015 7/C #14 06-BOP-CPL-001 MCC-H 100FT FIELD ROUTE CONDUIT 0

C STG 6 BALANCE OF PLANT 480VAC MCC, 3PH, 3W, 800A MCC BUCKET H9, 06-CND-PMP-601B DISCRETE INPUT

CONTROL PANEL (EXIST) SIGNALS

EP102 EP102, E-604

EI817 E-616, EI817

06-CND-C-016 7/C #14 06-BOP-CPL-001 MCC-H 100FT FIELD ROUTE CONDUIT 0

C STG 6 BALANCE OF PLANT 480VAC MCC, 3PH, 3W, 800A MCC BUCKET H10, 06-CND-PMP-604B DISCRETE INPUT

CONTROL PANEL (EXIST) SIGNALS

EP102 EP102, E-604

EI817 E-616, EI817

06-CND-C-020 3/C #14 06-BOP-CPL-001 06-CND-VB-635 100FT FIELD ROUTE CONDUIT, TC-001/3, TC-002/3, FIELD 0

C STG 6 BALANCE OF PLANT TURBINE 6 CONDENSER VACUUM ROUTE CONDUIT

CONTROL PANEL BREAKER VALVE DISCRETE OUTPUT SIGNALS

EP102 EI101B

EI819 EI819

12/17/2020 < EAFB, EIE443 CHPP TURBINE GENERATOR > Job Number: 27751

12/17/2020

FROM TAG TO TAG

FROM DESCRIPTION TO DESCRIPTION

CABLE NUMBER CABLE TYPE ROUTING

SEGR CODE PLANT SYSTEM FROM DWG TO DWG CABLE LAYING METHOD

WORK PACKAGE START UP SYSTEM FROM WIRING DWG TO WIRING DWG LEN CABLE NOTE REV

06-CND-C-021 5/C #14 06-BOP-CPL-001 MCC-H 100FT FIELD ROUTE CONDUIT 0

C STG 6 BALANCE OF PLANT 480VAC MCC, 3PH, 3W, 800A MCC BUCKET H9, 06-CND-PMP-601B DISCRETE OUTPUT

CONTROL PANEL (EXIST) SIGNALS

EP102 EP102, E-604

EI819 E-616, EI819

06-CND-C-022 5/C #14 06-BOP-CPL-001 MCC-H 100FT FIELD ROUTE CONDUIT 0

C STG 6 BALANCE OF PLANT 480VAC MCC, 3PH, 3W, 800A MCC BUCKET H10, 06-CND-PMP-604B DISCRETE OUTPUT

CONTROL PANEL (EXIST) SIGNALS

EP102 EP102, E-604

EI819 E-616, EI819

06-CND-I-007 1TSP #16 06-BOP-CPL-001 06-CND-LIT-631A 100FT FIELD ROUTE CONDUIT, TC-001/2, TC-002/2, FIELD 0

I STG 6 BALANCE OF PLANT TURBINE 6 CONDENSER HOTWELL ROUTE CONDUIT

CONTROL PANEL LEVEL A

EP102 EI101B

EI802 EI802

06-CND-I-008 1TSP #16 06-BOP-CPL-001 06-CND-PDIT-610A 50FT FIELD ROUTE CONDUIT, TC-001/2, FIELD ROUTE 0

I STG 6 BALANCE OF PLANT TURBINE 6 COND HOTWELL PUMP CONDUIT

CONTROL PANEL A SUCTION STRNR DIFF PRESS

EP102 EI101B

EI802 EI802

06-CND-I-009 1TSP #16 06-BOP-CPL-001 06-CND-TIT-615 50FT FIELD ROUTE CONDUIT, TC-001/2, TC-002/2, FIELD 0

I STG 6 BALANCE OF PLANT TURBINE 6 CONDENSER HOTWELL ROUTE CONDUIT

CONTROL PANEL PUMPS DISCHARGE TEMP XMTR

EP102 EI101B

EI802 EI802

06-CND-I-010 1TSP #16 06-BOP-CPL-001 06-CND-PIT-616 50FT FIELD ROUTE CONDUIT, TC-001/2, TC-002/2, FIELD 0

I STG 6 BALANCE OF PLANT TURBINE 6 COND HOTWELL PUMPS ROUTE CONDUIT

CONTROL PANEL DISCHARGE PRESSURE

EP102 EI101B

EI802 EI802

12/17/2020 < EAFB, EIE443 CHPP TURBINE GENERATOR > Job Number: 27751

12/17/2020

FROM TAG TO TAG

FROM DESCRIPTION TO DESCRIPTION

CABLE NUMBER CABLE TYPE ROUTING

SEGR CODE PLANT SYSTEM FROM DWG TO DWG CABLE LAYING METHOD

WORK PACKAGE START UP SYSTEM FROM WIRING DWG TO WIRING DWG LEN CABLE NOTE REV

06-CND-I-011 1TSP #16 06-BOP-CPL-001 06-CND-FIT-001 50FT FIELD ROUTE CONDUIT, TC-001/2, FIELD ROUTE 0

I STG 6 BALANCE OF PLANT TURBINE 6 CONDENSER HOTWELL CONDUIT

CONTROL PANEL PUMPS DISCHARGE FLOW XMTR

EP102 EI101B

EI802 EI802

06-CND-I-012 1TSP #16 06-BOP-CPL-001 06-CND-TIT-002 100FT FIELD ROUTE CONDUIT, TC-001/2, TC-002/2, FIELD 0

I STG 6 BALANCE OF PLANT TURBINE 6 SJAE CONDENSATE ROUTE CONDUIT

CONTROL PANEL OUTLET TEMP XMTR

EP102 EI101B

EI802 EI802

06-CND-I-015 1TSP #16 06-BOP-CPL-001 06-CND-FCV-001 50FT FIELD ROUTE CONDUIT, TC-001/2, FIELD ROUTE 0

I STG 6 BALANCE OF PLANT TURBINE 6 CONDENSER HOTWELL CONDUIT

CONTROL PANEL RECIRC FCV

EP102 EI101B

EI804 EI804

06-CND-I-020 1TSP #16 06-BOP-CPL-001 06-CND-PIT-630 100FT FIELD ROUTE CONDUIT, TC-001/2, TC-002/2, FIELD 0

I STG 6 BALANCE OF PLANT TURBINE 6 CONDENSER PRESSURE ROUTE CONDUIT

CONTROL PANEL

EP102 EI101B

EI812 EI812

06-CND-I-021 1TSP #16 06-BOP-CPL-001 06-CND-LIT-631B 100FT FIELD ROUTE CONDUIT, TC-001/2, TC-002/2, FIELD 0

I STG 6 BALANCE OF PLANT TURBINE 6 CONDENSER HOTWELL ROUTE CONDUIT

CONTROL PANEL LEVEL B

EP102 EI101B

EI812 EI812

06-CND-I-022 1TSP #16 06-BOP-CPL-001 06-CND-TIT-633 100FT FIELD ROUTE CONDUIT, TC-001/2, TC-002/2, FIELD 0

I STG 6 BALANCE OF PLANT TURBINE 6 CONDENSER HOTWELL ROUTE CONDUIT

CONTROL PANEL TEMP XMTR

EP102 EI101B

EI812 EI812

12/17/2020 < EAFB, EIE443 CHPP TURBINE GENERATOR > Job Number: 27751

12/17/2020

FROM TAG TO TAG

FROM DESCRIPTION TO DESCRIPTION

CABLE NUMBER CABLE TYPE ROUTING

SEGR CODE PLANT SYSTEM FROM DWG TO DWG CABLE LAYING METHOD

WORK PACKAGE START UP SYSTEM FROM WIRING DWG TO WIRING DWG LEN CABLE NOTE REV

06-CND-I-023 1TSP #16 06-BOP-CPL-001 06-CND-PDIT-610B 50FT FIELD ROUTE CONDUIT, TC-001/2, FIELD ROUTE 0

I STG 6 BALANCE OF PLANT TURBINE 6 COND HOTWELL PUMP CONDUIT

CONTROL PANEL B SUCTION STRNR DIFF PRESS

EP102 EI101B

EI812 EI812

06-CND-I-024 1TSP #16 06-BOP-CPL-001 06-CND-FIT-640 50FT FIELD ROUTE CONDUIT, TC-001/2, FIELD ROUTE 0

I STG 6 BALANCE OF PLANT TURBINE 6 CONDENSATE FLOW CONDUIT

CONTROL PANEL XMTR

EP102 EI101B

EI813 EI813

06-CND-I-025 1TSP #16 06-BOP-CPL-001 06-CND-LIT-603 75FT FIELD ROUTE CONDUIT, TC-001/2, TC-002/2, FIELD 0

I STG 6 BALANCE OF PLANT STG 6 CONDENSATE DRAINS TANK ROUTE CONDUIT

CONTROL PANEL LEVEL XMTR

EP102 EI101B

EI813 EI813

06-CND-I-028 1TSP #16 06-BOP-CPL-001 06-CND-LIT-631C 100FT FIELD ROUTE CONDUIT, TC-001/2, TC-002/2, FIELD 0

I STG 6 BALANCE OF PLANT TURBINE 6 CONDENSER HOTWELL ROUTE CONDUIT

CONTROL PANEL LEVEL C

EP102 EI101B

EI813 EI813

06-CND-I-029 1TSP #16 06-BOP-CPL-001 06-CND-LCV-631 50FT FIELD ROUTE CONDUIT, TC-001/2, FIELD ROUTE 0

I STG 6 BALANCE OF PLANT TURBINE 6 CONDENSER HOTWELL CONDUIT

CONTROL PANEL LCV

EP102 EI101B

EI815 EI815

06-CND-I-053 1TST #16 06-CND-TE-615 06-CND-TIT-615 30FT FIELD ROUTE CONDUIT 0

I TURBINE 6 CONDENSER HOTWELL TURBINE 6 CONDENSER HOTWELL

PUMPS DISCH RTD PUMPS DISCHARGE TEMP XMTR

EI101B EI101B

EI802 EI802

12/17/2020 < EAFB, EIE443 CHPP TURBINE GENERATOR > Job Number: 27751

12/17/2020

FROM TAG TO TAG

FROM DESCRIPTION TO DESCRIPTION

CABLE NUMBER CABLE TYPE ROUTING

SEGR CODE PLANT SYSTEM FROM DWG TO DWG CABLE LAYING METHOD

WORK PACKAGE START UP SYSTEM FROM WIRING DWG TO WIRING DWG LEN CABLE NOTE REV

06-CND-I-054 1TST #16 06-CND-TE-602 06-CND-TIT-002 30FT FIELD ROUTE CONDUIT 0

I SJAE CONDENSATE OUTLET TEMP TURBINE 6 SJAE CONDENSATE

ASSEMBLY OUTLET TEMP XMTR

EI101B EI101B

EI802 EI802

06-COM-T-001 FIBER 2 MM SECTION 105 06-TURB-CPL-001 300FT COMMUNICATIONS, FIELD ROUTE CONDUIT 0

T MASTER CONTROL CUBICLE TURBINE 6 CONTROL PANEL

EP103 EP102

EI601 EI601

06-COM-T-002 FIBER 2 MM SECTION 105 06-BOP-CPL-001 300FT COMMUNICATIONS, FIELD ROUTE CONDUIT 0

T MASTER CONTROL CUBICLE STG 6 BALANCE OF PLANT

CONTROL PANEL

EP103 EP102

EI601 EI601

06-COM-T-025 CAT 6 ETHERNET 06-GEN-CPL-001 06-TURB-CPL-001 30FT FIELD ROUTE CONDUIT 0

T GENERATOR 6 CONTROL PANEL TURBINE 6 CONTROL PANEL

W/AVR (NEW)

EP102 EP102

EI601 EI601

06-HPS-C-001 7/C #14 06-BOP-CPL-001 06-HPS-MOV-001 100FT FIELD ROUTE CONDUIT, TC-001/3, TC-002/3, FIELD 0

C STG 6 BALANCE OF PLANT TURBINE 6 HIGH PRESSURE ROUTE CONDUIT

CONTROL PANEL STEAM SUPPLY ISOL VLV

EP102 EI101

EI805 EI805

06-HPS-C-002 5/C #14 06-BOP-CPL-001 06-HPS-LCV-601 125FT FIELD ROUTE CONDUIT, TC-001/3, TC-002/3, FIELD 0

C STG 6 BALANCE OF PLANT TURBINE 6 HIGH PRESSURE ROUTE CONDUIT

CONTROL PANEL STEAM SUPPLY DRAIN POT LCV

EP102 EI101

EI805 EI805

12/17/2020 < EAFB, EIE443 CHPP TURBINE GENERATOR > Job Number: 27751

12/17/2020

FROM TAG TO TAG

FROM DESCRIPTION TO DESCRIPTION

CABLE NUMBER CABLE TYPE ROUTING

SEGR CODE PLANT SYSTEM FROM DWG TO DWG CABLE LAYING METHOD

WORK PACKAGE START UP SYSTEM FROM WIRING DWG TO WIRING DWG LEN CABLE NOTE REV

06-HPS-C-006 5/C #14 06-BOP-CPL-001 06-HPS-MOV-001 100FT FIELD ROUTE CONDUIT, TC-001/3, TC-002/3, FIELD 0

C STG 6 BALANCE OF PLANT TURBINE 6 HIGH PRESSURE ROUTE CONDUIT

CONTROL PANEL STEAM SUPPLY ISOL VLV

EP102 EI101

EI809 EI809

06-HPS-C-0062 7/C #14 06-HPS-MOV-001 06-HPS-LCS-001 125FT FIELD ROUTE CONDUIT 0

C TURBINE 6 HIGH PRESSURE HIGH PRESS STEAM SUPPLY ISOL

STEAM SUPPLY ISOL VLV VLV LOCAL CNTRL STATION

EI101

EI809 EI809

06-HPS-C-007 3/C #14 06-BOP-CPL-001 06-HPS-LCV-601 30FT FIELD ROUTE CONDUIT, TC-001/3, TC-002/3, FIELD 0

C STG 6 BALANCE OF PLANT TURBINE 6 HIGH PRESSURE ROUTE CONDUIT

CONTROL PANEL STEAM SUPPLY DRAIN POT LCV

EP102 EI101

EI805 EI805

06-HPS-I-001 1TSP #16 06-BOP-CPL-001 06-HPS-LIT-601A 125FT FIELD ROUTE CONDUIT, TC-001/2, TC-002/2, FIELD 0

I STG 6 BALANCE OF PLANT TURBINE 6 HIGH PRESSURE ROUTE CONDUIT

CONTROL PANEL STEAM DRAIN POT LEVEL XMTR A

EP102 EI101

EI802 EI802

06-HPS-I-002 1TSP #16 06-BOP-CPL-001 06-HPS-FIT-002 100FT FIELD ROUTE CONDUIT, TC-001/3, TC-002/3, FIELD 0

I STG 6 BALANCE OF PLANT TURBINE 6 HIGH PRESSURE ROUTE CONDUIT

CONTROL PANEL STEAM SUPPLY FLOW XMTR

EP102 EI102

EI802 EI802

06-HPS-I-016 1TSP #16 06-BOP-CPL-001 06-HPS-LIT-601B 125FT FIELD ROUTE CONDUIT, TC-001/3, TC-002/3, FIELD 0

I STG 6 BALANCE OF PLANT TURBINE 6 HIGH PRESSURE ROUTE CONDUIT

CONTROL PANEL STEAM DRAIN POT LEVEL XMTR B

EP102 EI101

EI812 EI812

12/17/2020 < EAFB, EIE443 CHPP TURBINE GENERATOR > Job Number: 27751

12/17/2020

FROM TAG TO TAG

FROM DESCRIPTION TO DESCRIPTION

CABLE NUMBER CABLE TYPE ROUTING

SEGR CODE PLANT SYSTEM FROM DWG TO DWG CABLE LAYING METHOD

WORK PACKAGE START UP SYSTEM FROM WIRING DWG TO WIRING DWG LEN CABLE NOTE REV

06-HPS-I-058 1TST #16 06-HPS-TE-002 06-HPS-FIT-002 30FT FIELD ROUTE CONDUIT 0

I TURBINE 6 HIGH PRESSURE TURBINE 6 HIGH PRESSURE

STEAM SUPPLY RTD STEAM SUPPLY FLOW XMTR

EI102 EI102

EI802 EI802

06-LOL-C-064 3/C #14 06-LOL-CPL-001 06-TURB-CPL-001 100FT FIELD ROUTE CONDUIT, TC-001/3, TC-002/3, FIELD 0

C OIL PURIFIER SKID CONTROL TURBINE 6 CONTROL PANEL ROUTE CONDUIT

PANEL

EP101 EP102

BY VENDOR BY VENDOR

06-LPS-C-003 7/C #14 06-BOP-CPL-001 06-LPS-MOV-003 30FT FIELD ROUTE CONDUIT, TC-001/3, FIELD ROUTE 0

C STG 6 BALANCE OF PLANT TURB 6 LOW PRESS STEAM CONDUIT

CONTROL PANEL EXTRACT ISOL VLV

EP102 EI101A

EI805 EI805

06-LPS-C-008 5/C #14 06-BOP-CPL-001 06-LPS-MOV-003 30FT FIELD ROUTE CONDUIT, TC-001/3, FIELD ROUTE 0

C STG 6 BALANCE OF PLANT TURB 6 LOW PRESS STEAM CONDUIT

CONTROL PANEL EXTRACT ISOL VLV

EP102 EI101A

EI809 EI809

06-LPS-C-011 5/C #14 06-BOP-CPL-001 06-LPS-LCV-601 75FT FIELD ROUTE CONDUIT, TC-001/3, TC-002/3, FIELD 0

C STG 6 BALANCE OF PLANT TURB 6 LOW PRESS STEAM ROUTE CONDUIT

CONTROL PANEL EXTRACT DRAIN POT LCV

EP102 EI101A

EI816 EI816

06-LPS-C-012 5/C #14 06-BOP-CPL-001 06-LPS-LCV-602 50FT FIELD ROUTE CONDUIT, TC-001/3, FIELD ROUTE 0

C STG 6 BALANCE OF PLANT TURB 6 LOW PRESS STEAM CONDUIT

CONTROL PANEL EXTRACT ISOL VLV DRN POT LCV

EP102 EI101A

EI816 EI816

12/17/2020 < EAFB, EIE443 CHPP TURBINE GENERATOR > Job Number: 27751

12/17/2020

FROM TAG TO TAG

FROM DESCRIPTION TO DESCRIPTION

CABLE NUMBER CABLE TYPE ROUTING

SEGR CODE PLANT SYSTEM FROM DWG TO DWG CABLE LAYING METHOD

WORK PACKAGE START UP SYSTEM FROM WIRING DWG TO WIRING DWG LEN CABLE NOTE REV

06-LPS-C-013 5/C #14 06-BOP-CPL-001 06-LPS-LCV-603 75FT FIELD ROUTE CONDUIT, TC-001/3, FIELD ROUTE 0

C STG 6 BALANCE OF PLANT TURB 6 LOW PRESS STEAM CONDUIT

CONTROL PANEL RECYCLE DRAIN POT LCV

EP102 EI101A

EI816 EI816

06-LPS-C-017 3/C #14 06-BOP-CPL-001 06-LPS-LCV-601 75FT FIELD ROUTE CONDUIT, TC-001/3, TC-002/3, FIELD 0

C STG 6 BALANCE OF PLANT TURB 6 LOW PRESS STEAM ROUTE CONDUIT

CONTROL PANEL EXTRACT DRAIN POT LCV

EP102 EI101A

EI819 EI819

06-LPS-C-018 3/C #14 06-BOP-CPL-001 06-LPS-LCV-602 50FT FIELD ROUTE CONDUIT, TC-001/3, FIELD ROUTE 0

C STG 6 BALANCE OF PLANT TURB 6 LOW PRESS STEAM CONDUIT

CONTROL PANEL EXTRACT ISOL VLV DRN POT LCV

EP102 EI101A

EI819 EI819

06-LPS-C-019 3/C #14 06-BOP-CPL-001 06-LPS-LCV-603 75FT FIELD ROUTE CONDUIT, TC-001/3, FIELD ROUTE 0

C STG 6 BALANCE OF PLANT TURB 6 LOW PRESS STEAM CONDUIT

CONTROL PANEL RECYCLE DRAI

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .