B.08.03_Final_Amend_00002_SF30_Q&A.pdf
PDF 2 MB Posted
- Solicitation number
- W911KB19T0004
About this file
Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.08.03_Amend_3_19T0004_Final.pdf | ||
| W911KB19T0004.pdf | ||
| W911KB19T0004-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W911KB19T0004 is modif ied as follow s:
a. Provide answ ers to questions from potential offerors. See attachment 3-12-19 Questions and Answ ers.
b. Establish an end date for Questions and Answ ers for 25 March 2019 at 10:00 a.m. Alaska time.
c. Typo correction to Amendment 0001 in block 14 should read as follow s:
The closing time for receipt of propoosals is 2:00 p.m. Alaska time, on 27 Mar 2019.
d. Attached is Mow ing Area Map
e. See Summary of Changes for further details.
f . ACKNOWLEDGE RECEIPT OF ALL AMENDMENTS.
All other terms and conditions of Solicitation W911KB19T0004 remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Mar-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB19T0004
X 9B. DATED (SEE ITEM 11)
27-Feb-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Mar-2019
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911KB19T0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
Amendment 00002 to Solicitation W911KB19T0004 Mowing Floodway/Seepage Collector Channel and Seed/Grain Planting
CHENA RIVER LAKES FLOOD CONTROL PROJECT
Attachment 1:
Questions and Answers
Attachment 2:
Mowing Area Map
Amendment 00002 to Solicitation W911KB19T0004 Mowing Floodway/Seepage Collector Channel and Seed/Grain Planting
CHENA RIVER LAKES FLOOD CONTROL PROJECT
Question 00002-01:
Will the Government load the fertilizer containers onto the Contractors vehicle for deployment to the planting areas?
Answer 00002-01:
Yes, the Government will be able to load fertilizer containers into the Contractor's vehicle using a front end loader.
Question 00002-02:
When performing the seed/grain planting operations, what will be the maximum equipment traveling distance between 2 or more separate seed/grain planting areas selected by the Government?
Answer 00002-02:
Planting areas run the entire length of the floodway (potentially). So maximum distance could be as much as 7 miles.
Question 00002-03:
Will there be seed/grain planting on the north side of the project area that requires traveling over the concrete Dam?
Answer 00002-03:
Planting areas are located both North & South of the Chena River. Therefore, the Contractor may be required to cross the concrete dam to the North planting areas. Planting areas have yet to be determined by the Chena Project Manager.
Question 00002-04:
Is there a map of the seed/grain planting areas and mowing areas that accompanies the statement of work as indicated under work item 2.1?
Answer 00002-04:
Yes, attached.
Question 00002-05:
What is the cutoff date and time for questions relating to this contract?
Question 00002-05:
March 25, 2019 at 10:00 am Alaska Time.
Legend Mowing Areas
Area 1 Area 2 Area 3
0 0.55 1.10.275 Miles
Mowing Floodway/Seepage Collector Channel and Seed/Grain Planting Areas Chena River Lakes Flood Control Project
File details come from the government source that posted it.