CLR043-Amendment 0006

View the file

Other files

File Type Posted
AM_5_Package.pdf PDF
Amendment_4_package.pdf PDF
Approved_JA_18-01_Redacted.pdf PDF
Clear_AFS_Visit_Request_Worksheet.xlsx XLSX spreadsheet
CLR043_AM_2_Package.pdf PDF
CLR043_AM_1_Package.pdf PDF
A.01.22_18R0018-CLR043_Solicitation-29_Nov_2017.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE/LOCATION: CLR043, Fire Station, Clear Air Force Station, Alaska

a. This amendment provides changes to the solicitation as indicated on the continuation pages of this document

b. PHASE II PROPOSAL DUE DATE IS HEREBY EXTENDED UNTIL 9 MARCH 2018 AT 1400 ALASKA TIME. Proposals shall be submitted in accordance w ith Section 00 21 00, Para 1.10, Proposal Submittals.

c. YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THIS STANDARD FOR 1442.

1. CONTRACT ID CODE PAGE OF PAGES

1 21

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Mar-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB18R0018

X 9B. DATED (SEE ITEM 11)

29-Nov-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Mar-2018

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

a. The following drawings are substituted for the superseded documents/sections:

NONE

b. The following revised documents/sections are substituted for the superseded documents/sections: The identifier “AM#06” appears before and after new and/or revised materials, except as noted below.

NOTE: Revisions within the following documents do not contain the above referenced identifiers:

SECTION 00 11 00 – STANDARD FORM 1442, BLOCK 13

The required response date/time has changed from 07-Mar-2018 02:00 PM to 9-Mar-2018 02:00 PM

c. The following sections are deleted:

d. The following documents are added:

Bid Inquiry Contractor Report

e. The following revisions are incorporated:

f. Other:

(End of Summary of Changes)

ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME.

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Bid Inquiry Contractor Report All Inquiries

Project: Fire Station FY17 Review: CLR043 Phase II part 2 (00004) (sorted by CommentID ) Displaying 77 inquiries.

Id Discipline Sheet Detail Spec

7297290 General 00 22 20

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 00 22 20 5.2.1.1-(e) & (f) call for schematic floor plans and presentation drawings showing the overall floor plan of the facility. Similarly section 00 22 20 5.2.1.3-(d) & (e) also call for schematic floor plans and presentation drawings showing the overall floor plan of the facility.

It would appear that this is a double up on the requirements for presentation drawings. Considering the page limits for the narrative section all schematic floor plans and presentation drawings would fit better in the presentation drawings section 00 20 20 5.2.1.1. Please advise?

On: Jan 29 2018.

Government Response. . Section 00 22 20, paragraph 5.2.1.3 (d) & (e) will be removed via amendment On: Feb 05 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7298909 Civil 01 10 00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The Statement of Work paragraph 2.2.13.A states that a topographic survey will be provided by the Corps. Please provide CAD files of the topographic survey ASAP for use in development of proposed site plan.

On: Jan 30 2018.

Government Response. . Topographic Survey CADD files are available and have been issued via AMRDEC SAFE file transfer site to Phase II offerors. On: Feb 06 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7298915 Architectural A-101

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

UFC 4730-10 paragraph 3-2 states there is a preference for single-story fire stations, and the solicitation proof of concept drawings demonstrate a single story solution. Please confirm if there is also a local user preference for a single-story structure and/or any restrictions against a two-story structure.

On: Jan 30 2018.

Government Response. . There is not a local user restriction against a two story structure. On: Feb 05

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7299107 General 02 22 20

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Paragraphs 5.3.3.2.e and 5.3.2.3.f are both regarding Secure Areas / Controlled Areas. However, there are no Secure Areas identified in the Statement of Work. Please confirm that there are Secure/Controlled Areas in this Fire Station, and that these paragraphs need to be addressed in the proposal.

On: Jan 30 2018.

Government Response. . Yes, there are Secured/Controlled Areas in this facility. The Emergency Communication Room 101, and related spaces 101A, 102 and 103 require controlled access IAW UFC 4-730-10 Fire Stations, NFPA 1221 and related design criteria referenced in those publications. Apparatus Bay Room 111, PPE Gear Storage Room 112 and others require security systems. Additionally, refer to 01

Page 1 of 19ProjNet: Logged In User

3/1/2018https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll...

10 00/2.6 for Telecomm and ESS requirements, Appendix J for conceptual drawings and Appendix K for appropriate Room Criteria Sheets. On: Feb 05 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7301477 Fire Protection/Life Safety 01 10 00-2.7.6 & 01 45 04.00 29

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specification Section 01 10 00-2.7.6 identifies the QC requirements relating to the Fire Protection scope of work. This section identifies the significant amount of site visits the FPE of record is to attend during construction.

Specification Section 01 45 04.00 29-3.4.3 requires that a "Registered Fire Protection" engineer with 4 yrs related experience be on site full time while fire protection work is taking place. If both of these sections are taken literally there would be two Registered Fire Protection Engineers on this project one as the FPE of Record which will visit the site as required and another FPE that is to be on site full time while fire protection is taking place.

Is it acceptable for "Registered Fire Protection" engineer in accordance with 01 45 04 to be the Fire Protection Specialist which can be certified Level IV NICET Technician? This would avoid unneccessary duplication of a FPE included with the project costs.

Or, is it the intent of solicitation that FPE of Record shall be partially on site per 01 10 00-2.7.6 and another FPE shall be on site full time per 01 45 04.00 29?

On: Jan 31 2018.

Government Response. . The Electrical QC and the Mechanical QC can perform the daily QC work as long as they have a minimum of 2 years of experience with fire protection QC work. The FPE of record will be responsible for all other site visits as notated in the contract. This will be updated via amendment. On:

Feb 13 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7304990 Civil referenced NFPA

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that backup sanitation facilities required by NFPA 1221 Para 4.3.8.1 are not required to be installed as part of this project.

On: Feb 02 2018.

Government Response. . There's no specific requirement for permanent backup water/sanitation facilities.

On: Feb 06 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7304994 Fire Protection/Life Safety 02 22 20

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Fire Pumps are listed in Section 02 22 20 Proposed Materials Identification paragraph 5.3.2.3.e. However, determining the need for a fire pump is to be based on results of water flow tests as stated in 01 33 16.00 Design After Award, Attachment D – Sample Fire Protection & Life Safety Code Review paragraph 1.12.5. In order to provide an accurate bid, please provide current hydrant flow data so we may determine if available water is adequate for fire suppression and domestic water requirements, or if a fire pump will be required.

On: Feb 02 2018.

Government Response. . The following is to be used as historical data purposes only and is derived from building 99, in 2014.

-62 psi static fed by small pump, main fire pump on at 50 psi residual.

-52 residual at 766 gpm flowing main pump running.

-Pump is a 1000 gpm pump, not a fire pump

Domestic water is not adequate for fire services On: Feb 13 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7306202 Other n/a n/a n/a

Page 2 of 19ProjNet: Logged In User

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Do we need to provide demo drawings of the existing building? And site?

On: Feb 05 2018.

Government Response. . No, existing building and site demolition drawings are not required for proposal submittal. On: Feb 06 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7306206 Other n/a n/a

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Is the existing building Demo required to be part of the LEED Project? Or in terms of LEED, can it be treated as a separate from the LEED New Construction project?

On: Feb 05 2018.

Government Response. . Recommend Demo portion of project be handled separately from New construction in terms of LEED. However, both portions (Demo and New) need to be accounted for together in terms of the 60% Waste Diversion requirements. On: Feb 06 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7306211 LEED n/a n/a n/a

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

A LEED Checklist (Scoresheet) and HPSB Scoresheet are referenced but do not appear to be included in the document. Can these be provided?

On: Feb 05 2018.

Government Response. . Yes, the score sheet has been sent out to all Phase II offerors. On: Feb 06

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7306219 Building Design & Engineering Section 01 10 00 pg23, Item 2.3.5

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 01 10 00 pg23, Item 2.3.5 notes that sloped standing seam roofing is "To be included as a bid item alternate above all spaces outside the apparatus bay." The Proposal Schedule (bid form) has an entry for "Upgrade building roof above residential, training and admin area to sloping roof." Is the intent/desire to put a sloped roof on just the admin functions? Bay functions? Or both?

On: Feb 05 2018.

Government Response. . Intent is to have sloped roof over the admin/residential area but there is not any constraint/limiting factor for sloped roof over apparatus area as well. On: Feb 06 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7311196 Antiterrorism-Force Protection 01 10 00 - 1.3

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specification Section 01 10 00 1.3 described the AT/FP criteria that the New Fire Station is supposed to meet. The project classifies the building as a Primary Gathering Structure, but the UFC 4-010-01 allows "Low occupancy portions of buildings can be treated for the purposes of these standards as separate from the inhabited portions." and that "Only low occupancy portions can be treated separately".

Low occupancy building is defined by UFC 4-010-01 as "Any building or portion of a building routinely occupied by fewer than 11 DoD personnel or with a population density of less than one person per 430 gross square feet"

Considering the building is designed to sleep 14 individuals and assuming that this would be for a day and night shift, can the Apparatus Bay be classified as a "Low Occupancy Space" in accordance with UFC 4-010-01?

Page 3 of 19ProjNet: Logged In User

The UFC 4-010-01 document confirms that "Because it is impractical to design conventional overhead doors to meet the required performance in Table 2-1, ensure overhead doors do not open into inhabited spaces or ensure that if they fail that they are intercepted by walls \1\ or tether systems /1/ that are designed with sufficient strength to keep the overhead doors from translating into areas that meet the definition of inhabited spaces."

Since a intercepting wall or a tether system would be prohibitive for door cycle times defining the Apparatus Bay as a "Low Occupancy Area" will allow for the overhead doors in that area comply with the UFC AT/FP requirements.

On: Feb 07 2018.

Government Response. . Yes. However, approval comes with the following stipulation: Because of critical function, mission, training cycles (use of bay to train by entire compliment or in conjunction with other units), regular daily PPE and Apparatus maintenance/re-stocking and other concerns, all other aspects of the building structure shall be designed as Primary Gathering and corresponding structural/seismic design requirements. Reduction of structural requirements for this portion of the building based on allowances for "Low Occupancy" provided for in UFC 4-010-01 and other UFCs are not allowed without written approval.

Also coordinate with 01 10 00/1.3 AT/FP for CCSD design requirements/guidance. On: Feb 13 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7315290 Architectural Room Criteria Sheets RM 111

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

RFP Room Data Sheet for Room No: 111, Name : Apparatus Bay, indicates the space is to be column fee. Is it acceptable to have two columns in the apparatus bay out of the drive through bay, or is the intent for the space to be completely open.

On: Feb 09 2018.

Government Response. . Intent is for space to be column free to allow for Apparatus/functional changes and not pose a risk to personnel during response events. On: Feb 13 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7315514 Structural 01 10 00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Paragraph 2.4.5 M requires "Gravity load resisting system shall be fully grouted, reinforced CMU." Are interior steel columns permitted, or are interior vertical supports required to be CMU columns and/or bearing walls?

On: Feb 09 2018.

Government Response. . Spaces identified as "Column Free" in Room Criteria Sheets shall have no interior columns. Exits shall not be obstructed by columns. Group spaces like conference rooms and physical therapy shall be column free. The Apparatus Bay shall be column free. In all other places not designated as column free, where possible hide interior columns in partitions. This will be updated via amendment. On: Feb 15 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7315520 Structural AISC Design Guide 11

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

If a two-story structure is proposed, will the floor design be required to follow the floor vibration criteria set forth in AISC Design Guide 11, "Vibrations of Steel-Framed Structural Systems Due to Human Activity"?

On: Feb 09 2018.

Government Response. . Scope of work does not reference AISC Design Guide 11 and designing to the design guide is not required. On: Feb 15 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7315738 Mechanical 01 10 00 - 2.5.3

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Page 4 of 19ProjNet: Logged In User

Section 01 10 00 2.5.3-C state that as part of this solicitation the contractor is to provide redundant oil-fired boilers as "Option Item 4". Considering the Proposal Schedule does not include an option item for this system, and that the impacts of including an optional redundant boiler system will drastically change the mechanical space included with the floor plan and therefore change the layout of the entire building, it is assumed that this optional redundant boiler system will not be required. Please confirm?

On: Feb 09 2018.

Government Response. . No, the optional redundant boiler system is still required. The Bid Option in the proposal schedule is CLIN 0006. This will be corrected in an upcoming amendment. On: Feb 13 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7315776 General 00 22 20 - 5.2.1.1

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Spec section 00 22 20 - 5.2.1.1 lists the required presentation drawings that are required for submission with the proposal and limits the total amount of drawings as 25. The Proposal Schedule requires that the contractor provide an option item to construct a sloping roof over the residential, training, and admin areas. Does the government want any drawings and or renderings of this option item scenario? If so, what additional drawings are required and where within our proposal documents shall they be included?

On: Feb 09 2018.

Government Response. . It is the offerors discretion if they wish to provide renderings of any option items On: Feb 15 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7315840 General 01 19 30.00 29 - 1.9

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Spec section 01 19 30.00 29-1.9-b states that cafeteria usage can be requested thru the Clear AFS Project Manager, but approval is not assured. Considering the duration & location of this project this is a big uncertainty with large costs associated with providing a camp with a cafeteria. To help the government get comparable proposals from the competition pool can the government dictate an assumption that states whether or not the contractor can assume the Cafeteria will be usable for the labor force on this project, or not?

On: Feb 09 2018.

Government Response. . Offerors shall not assume the Clear AFS cafeteria will be available for their use and should budget accordingly. On: Feb 13 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7315855 Architectural C-101

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Are there any details showing the interconnection of Building 251 and the existing above ground utilidor. Are contractors to assume work will need to be done to patch the existing utilidor.

On: Feb 09 2018.

Government Response. . As-built drawings of the existing utility connections at building 251 are available and will be provided via upcoming amendment. Yes patching/ sealing of the existing service utiliduct at MH 5A is required. See Section 01 10 00, 2.1.5 "The penetration holes for the water, steam and condensate lines or utilidor/utiliduct shall be sealed and made watertight." On: Feb 13 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7315872 Civil 2.2.21

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Paragraph 2.2.21 indicates that a lift station shall be designed for future projects, including the CE Complex and Security Forces Facility. Please provide the anticipated wastewater flow from those 2 future facilities for our use in sizing and design of the wastewater lift station.

Page 5 of 19ProjNet: Logged In User

Where should the for the lift station come from? The new Fire Station Service or another location?

On: Feb 09 2018.

Government Response. . The wastewater design flows for the 2 new facilities have not been determined.

However, the CE Complex is expected to have 50-60 personnel working during the day shift. The SF Facility is expected to have 90-100 personnel working during the day shift. The anticipated location for the new lift station is shown on sheet C-101 at the 90-degree turn in the SS line. The CE Complex and SF Facility are expected to be located to the north / NE of the lift station. Information will be updated via Amendment. On: Feb 13 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7315887 Architectural 2.3.9 Air Barrier:

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

On past fire stations air barrier testing was to done for the administration and living quarters only the apparatus bay was excluded. Does the apparatus barrier in the apparatus bay have to be tested?

On: Feb 09 2018.

Government Response. . No. Apparatus Bay as an Industrial space does not need to be tested, only inspected per UFC 3-101-01/Section 3-6.3. On: Feb 13 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7315905 Mechanical Section 01 10 00 Page 49

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Teh RFP says to Provide 1-1/2" water lines in Apparatus Room to refill fire truck water tanks. Provide outlets next to fire trucks needing refill capability.

UFC 4-730-10 requires 3 in. to each vehicle.

Which reference should apply.

On: Feb 09 2018.

Government Response. . From previous inquiries, It has been confirmed that the 1-1/2" water lines in the Apparatus Bays is only for "topping off" fire truck tanks. Clear AFS has confirmed that fire truck tanks will be primarily filled from hydrants at fire incident sites. Therefore, criteria should follow Section B Equipment, paragraph r stating 1-1/2 in. water fill lines. On: Feb 13 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7315930 Architectural Proposal Schedule

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm the RFP reference to bid option 4 should be bid option 0006 as shown on the proposal schedule.

On: Feb 09 2018.

Government Response. . Confirmed. The RFP reference to bid option 4 should be bid option 0006 as shown on the proposal schedule. This will be corrected via upcoming amendment. On: Feb 13 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7315968 Architectural 2.3.7 Exterior Wall Materials:

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

RFP states "Exposed interior masonry shall have a ground face with penetrating sealer." Ground face CMU is not readily available at local sources and is very expensive to ship. Can a standard face cmu be used instead of Ground face?

On: Feb 09 2018.

Government Response. . No. Requirement is for Ground Faced CMU with sealer. On: Feb 15 2018

Current Request Status: Request Closed

Page 6 of 19ProjNet: Logged In User

Information for this report is procurement sensitive.

7316180 Project Management 00 22 20-5.5.1.2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

This project has an NTP date of April 18, 2018 and a total contract duration of 732 days. Section 2.0 requires us to demo the existing fire station building 251 after the new fire station is operational. We are then to re-grade the area topsoil and seed. 2.2.26 states seeding shall be applied using hydro-seeding methods between May 15 to August 1.

Please advise if we can demo and landscape the exiting fire station outside of the contract period? If not it appears the new fire station has to be completed by June 15, 2019 (9 months prior to the contract completion date) to complete this scope of work.

On: Feb 09 2018.

Government Response. . Demo and Seeding may take place outside of the 732 day\ duration. Demo would be expected late spring/early summer of 2020 and seeding if not possible in 2020, spring of 2021.

Note: Final grading after demo will need to be in place prior to winter to prevent any flooding or pooling/ponding of water. On: Feb 13 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7316512 Architectural 01 10 00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The requirements for the casework, ventilation, and equipment on the kitchen is unclear. While the UFC 4-730-16 Fire Stations states the "The kitchen should resemble a residential kitchen as much as possible". Conversely the Rood Data Sheet 131 stated "Space for commercial cooking equipment", and 01 10 00-2.3.25 is calling for 18 Ga stainless steel casework.

The cost of a full stainless steel kitchen with commercial appliances & ventilation increases the cost of the space by factor of 4 over what most fire stations in Alaska and other government agencies are doing for casework, appliances, and kitchen hood with fire protection; which typically consist of top grade residential casework and stainless appliances.

Please confirm an institutional-looking kitchen, with all stainless kitchen appliances is what the users want and not a "Commercial Grade Kitchen"?

On: Feb 11 2018.

Government Response. . Main Kitchen Rm 131 shall have Commercial Grade Appliances as specified.

Both Main Kitchen Rm 131 and ECC Kitchenette Rm 101A shall have Custom Grade wood casework and solid surface countertops per 01 10 00/2.3.24. Stainless Steel Casework specifications apply to other equipment, such as the SST Work Table in Protective Clothing Laundry Rm 113. On: Feb 13 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7317104 Site 01 10 00-2.2.23

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Spec 01 10 00 2.2.23 states that the existing Frank Loop Road is the preferred type of gate. Can a photo or as-built of this gate be provided?

On: Feb 12 2018.

Government Response. . A photo will be provided via upcoming amendment. On: Feb 13 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7317119 Communications 01 10 00 - 2.6.10

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Spec section 01 10 00 2.6.10-B-2 identifies the telecom required to be installed from building 201 to the new fire station. Please provide a photo of the panel where the new FO and Copper communications lines are to be installed.

On: Feb 12 2018.

Government Response. . Photo will be released via upcoming amendment Appendix I of revised RFP as new photos Pages 10-15. On: Feb 15 2018

Page 7 of 19ProjNet: Logged In User

Current Request Status: Request Closed

7318111 Electrical NFPA 12221

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

NFPA 1221, Section 4.7.8.2 requires a UPS for dispatch loads. What is the load value of equipment that will be connected in the dispatch area?

On: Feb 12 2018.

Government Response. . Contractor to assume a minimum of 10KVA UPS. On: Feb 22 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7318156 Architectural Appendix G Page 40 of 126

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In the Facilities Excellence Plan has a paragraph 2.9.3.7 Prohibited Materials

Prohibited materials include wood and log construction, stucco, EIFS, glass block, shingle roofing, standing-seam metal siding, fiberboard sheathing, metal lap siding, exposed aggregate concrete, concrete fascia panels, and CMU, with the exception of split-face as specified in the standard.

EIFS is listed as a prohibited material but is also a requested material by the RFP and in other locations in this document. Please confirm what are the acceptable materials that can be used.

On: Feb 12 2018.

Government Response. . Project Site is located in the Composite Character Area, not the SSPARS Area.

EIFS is allowed in this area. Refer to Figure 1.1 Character Area map (page 15 of 126) and Section 2.7 (starting on page 33 of 126). On: Feb 13 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7318176 Mechanical Room Contents Schedule

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Is an electric water cooler or chilled drinking fountain required for Lobby 134 as per USAF Fire Station Design Guide? It is not mentioned on the room criteria sheet included with the RFP.

On: Feb 12 2018.

Government Response. . No. A drinking fountain is not required in the Lobby. UFC 4-730-10 only asks that it be considered; it is not a requirement. On: Feb 13 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7318955 Materials N/A

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Can we utilize something other than CMU considering that another material could be lesser in cost and provide for a faster schedule?

On: Feb 13 2018.

Government Response. . If question is related to structural/exterior wall construction, the answer is no.

CMU was chosen as the prime construction material based on other mission/Installation parameters. On:

Feb 13 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7318970 Safety n/a

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Page 8 of 19ProjNet: Logged In User

What is the load rating on the lid of the hatches on the pump station? Are they H-20 compliant?

On: Feb 13 2018.

Government Response. . There are multiple "pump stations" (sewer, liquid fuel) around existing fire station location and new project site. Question does not provide specific location reference with which to provide definitive answer. In general, new U/G pump stations located in or around roadways or within landscaped areas accessible by vehicles (such as fire apparatus) shall have traffic rated lids. Above ground pump stations may have non-traffic rated lids and be protected from vehicular damage through use of bollards. On: Feb 28 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7320191 Construction Management 01 19 30.00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 1.9 states "No water or sewer services are provided in the "old camp", so contractors will have to provide their own water as well as wastewater removal services."

Please clarify the availability or non-availability of water and sewer services at this location. Are there any drawings available?

On: Feb 13 2018.

Government Response. . As stated in RFP, there are no utilities at Old Camp. Contractors will need to provide their own water/wastewater services. No drawings are available for this. On: Feb 15 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7320195 Construction Management 01 19 30.00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Paragraph 1.9 states that "Unmetered electrical power will be provided, but contractors will need to provide/set their own transformers..."

Please provide the available power information (voltage and phase) at the "old camp" area so we may budget for a transformer.

On: Feb 13 2018.

Government Response. . Power available is maximum 500KW, 4160V, 3 Phase power. However, per new USAF guidance, power will be metered. This specification will be revised via amendment to state:

"Metered electrical power will be provided, but contractors will need to provide/set their own transformers and meters (and back-up generators, if desired). The contractor will have to issue an AF332, to install the transformer and disconnect. Prior to final connection and energizing the Clear AFS CE Electrical Engineer or CE Electrician has to inspect the connection to ensure no damage will occur to the system. The power to the set down transformer has to have a shunt trip, so if there is a power outage the transformer and camp is dropped off the local distribution. If the camp needs backup power the contractor has to provide their own generator. The generator connection to the camp has to have either an automatic or manual transfer switch to completely isolate the generator from the grid when it is operating." On: Feb 15 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7324667 Fire Protection/Life Safety 02 22 20 & ProjNet question

7304994

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In ProjNet question 7304994, the Government's response stated "Domestic water is not adequate for fire services".

Please expand on this response. Is the Government requiring a fire pump be installed to serve this building? Can we assume that the given water supply is still applicable? If a fire pump is required, please advise the type of fire pump (vertical turbine, horizontal split case, etc.), the water supply (base-wide domestic water, ground water, storage tank, etc.), if a redundant pump is required, and the power requirements (electric or diesel).

On: Feb 15 2018.

Government Response. . Assume adequate water supply is available for the building. On: Feb 22 2018

Current Request Status: Request Closed

Page 9 of 19ProjNet: Logged In User

7324951 Fire Protection/Life Safety 01 10 00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Existing site fire protection water flow properties are not readily found in the RFP package. Please provide most recent Fire Hydrant test flows from fire hydrants near the project site.

1. FH-20, Fire hydrant at NW corner of Building #200.

2. FH-19, Fire hydrant at North side of Buildings #202, #203.

On: Feb 15 2018.

Government Response. . Fire hydrant flow are not applicable to the project as the hydrants are fed by fire pumps.

The previous pump data was provided in Inquiry ID: 7304994 On: Feb 22 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7324953 Fire Protection/Life Safety 01 10 00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please provide water flow source information for the project site.

1. Pump information, flow curve and nameplate data for primary site water pump in the old camp area, Building #5

2. Pump information, flow curve and nameplate data for backup site water pump off the Building #200 parking lot, in building #199

On: Feb 15 2018.

Government Response. . Contractor to assume adequate water supply is available for the building. On:

Feb 22 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7326726 Mechanical 01 10 00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The RFP lists a second heat exchanger for the dispatch room; however, UFC 4-730-10 only calls for separate environmental control equipment. Please clarify to what extent the environmental controls need to be separated. Our interpretation is that the space will have individual controls for HVAC, not separate systems.

On: Feb 16 2018.

Government Response. . Contractor to follow the requirements of RFP and NFPA 1221.

UFC 3-600-01 requires NFPA 1221 to be followed. On: Feb 22 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7326731 Mechanical 01 10 00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The RFP calls for single handle, ac powered automatic sensor operated lavatories. Typically, its one or the other but not both. Automatic faucets don't normally have handles. Please clarify the intent.

On: Feb 16 2018.

Government Response. . Units should be "ac powered automatic sensor operated lavatories" type.

"Single handle" should not have been included. This will be revised via upcoming amendment. On: Feb 22

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7326735 Mechanical 01 10 00

Page 10 of 19ProjNet: Logged In User

The RFP calls for in-floor utility pits with water lines. The RFP also states that under slab supply piping shall be limited to the service entrance only. Please clarify, including allowable piping materials.

On: Feb 16 2018.

Government Response. . Water lines may be run in-floor for the utility pits. Limitation on under slab supply piping will be revised via upcoming amendment. On: Feb 22 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7326741 Mechanical 01 10 00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Per the RFP, we need an air compressor capable of 23 SCFM @ 90 PSI with 30 gallon tank. The compressed air requirement of -4 deg. F. will require an extremely large whole-system desiccant dryer or point-of-use desiccant dryers. A refrigerated air dryer is only good to @38 deg. F. dew point. A desiccant dryer provides ultra-dry air -40 to -100 deg. F. and often requires regeneration that wastes compressed air or heat. Twin-tower desiccant dryers are able to constantly regenerate but are air and power hogs, and electrical heated units require power to heat the media for regeneration. Most applications can use the 38 deg. air. Can we get a variance to provide standard dry air at most locations and ultra-dry air at critical locations?

On: Feb 16 2018.

Government Response. . Dry air temperature requirement will be corrected to 38 degrees F via upcoming amendment. On: Feb 22 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7327875 Mechanical UFC 4-730-10, 2006 design criteria

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

UFC 4-730-10, 2006 design criteria requires a foot operated Mop sink in the apparatus bay. Can this sink be in the janitors room? Does it require foot operation?

On: Feb 19 2018.

Government Response. . Yes, mop sink is to be located in Janitor's Closet Rm 176, per Appendix K Room Criteria Sheets. No, sink does not need foot operator. On: Feb 22 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7327899 Architectural Attachment B

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm the following are FF&E items to be supplied and installed by the government.

Bed w/ storage below, Night Stand, Desk w/ Chair, Lamp, Lockable Closets, Study Carrels, (desk w/ chair), Workstations, Supervisor Station, CCTV Monitor, Folding Table, Lockable Cabinet, Executive Desk w/ credenza, Office Desk, Computer, Office Chair, Bookcase, Guest chair, Closet, 42 inch wide 5 tier file, Heavy Duty 4 drawer file cabinet, Printer/Copy/Fax Machine ( free standing), Conference Table, Conference Chairs, Dining Tables, Dining Chairs, Comfortable, durable seating, Recliners, Large Screen TV, Coffee Table, End Tables, Pool Table, Ping Pong Table, Dart Board, Card Table, and UPS

On: Feb 19 2018.

Government Response. . Furniture like desks, chairs and beds will be GFGI through separate contract/procurement method. However, Construction Contractor/DOR team are responsible for selection, designing of spaces to accommodate and presentation as part of the FF&E design package per 01 33

16.00 29 Attachment B. Built-in items, bolted in-place, attached to wall surfaces and infrastructure or infrastructure support items such as H.D. shelving units, lockers, stainless steel sinks and casework style work benches, network server racks, UPS, generators and similar are CFCI and the responsibility of the Construction Contractor/DOR team to select, design spaces to accommodate and present as part of the FF&E design package per 01 33 16.00 29 Attachment B. On: Feb 22 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7327903 Architectural Attachment B

Page 11 of 19ProjNet: Logged In User

Please confirm that the following are indeed MUE (Mission Unique Equipment) items and that these would not need to be supplied or installed by the contractor.

Universal Strength Training Machine,Free Weights - Complete set, Elliptical, Treadmill, Stationary Bike, Stair Climber, Rowing Machine, Comm Control network server equipment racks, Data patch panels/racks

On: Feb 19 2018.

Government Response. . MUE such as exercise equipment, printers, and copiers will be GFGI through separate contract/procurement method. However, infrastructure or infrastructure support items such as network server racks, patch panels, cabling and conduit are CFCI. Head-end equipment to be placed into server racks, such as network switches, CCTV data recorders/switches will be GFGI through separate contract/procurement method. On: Feb 22 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7327914 Architectural Room Contents Schedule

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

We are unclear if the following items are FF&E or not that are listed in the Room Criteria Sheets. Please confirm whether or not these are considered FF&E items or if we would be responsible for supplying and installing the listed items.

Marker Board, Tack Board, SST work table, Heavy Duty Open Shelving, Wheeled Mobile hose reels, Drying Racks, SST Hanging tub, Drip Dry Rack, Hanging Racks, Heavy Duty Storage Units, Storage Shelving/Parts Bin, 24 inch deep stainless steel work counter, Free standing Open Steel Shelving, Wall mounted adjustable Shelving, and Map Rack System

On: Feb 19 2018.

Government Response. . Any built-in items, bolted in-place, attached to wall surfaces and infrastructure or infrastructure support items such as stainless steel sinks and casework style work benches, H.D.

shelving units, wall mounted adjustable shelving, lockers, work tables (if bolted to slab), marker boards, tack boards, map rack are part of FF&E, CFCI and the responsibility of the Construction Contractor/DOR team to select, design spaces to accommodate and present as part of the FF&E design package per 01 33 16.00 29 Attachment B. On: Feb 22 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7327917 Architectural paragraph 2.3.26.J

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

According to the Statement of Work, paragraph 2.3.26.J, it references an Epoxy Mortar Floor Coating system that is required "throughout entire work bay, AGE Storage, tool rooms, storage areas and any high foot traffic or material handling/transportation areas like shop related corridors with exposed concrete as a floor finish and where pallet jacks or hand trucks may be used." This would seem to contradict the 1997 US Air Force Fire Station Design guide where Seated Concrete is mentioned for these types of room finishes and the 2006 UFC guide, Chapter 4 where sealed concrete floors are required. Please advise what type of flooring is required for the concrete floors in areas such as the Apparatus Bay, Mech, Comm, Elec areas, storage areas, etc.

On: Feb 19 2018.

Government Response. . AF Fire Station Design Guide – 1997, has been cancelled and replaced by UFC 4-730-10. UFC 4-730-10 does allow for "A non-skid, low-maintenance traffic coating may also be acceptable" in certain rooms. As such, Clear AFS has elected to require a floor coating system. However, as noted, the locations called out in paragraph 2.3.26.j do not coincide with functional spaces for this facility. The following spaces are to receive the 5-part epoxy floor coating: 111 Apparatus Bay, 112 PPE Storage, 113 Protective Clothing Laundry, 114 Disinfection/Biohazard, 115 Hose Storage, 116 SCBA, 176 Janitor's Closet, 117 Fire Agent Storage. This will be revised via upcoming amendment. On: Feb 22 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7328808 Civil 01 10 00 - 2.2.25

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Page 12 of 19ProjNet: Logged In User

Specification Section 01 10 00 - 2.2.25 states that culverts are to have ADOT&PF standard thaw pipes. ADOT&PF has two standard details one with circulated steam thaw pipe and another with electric heat trace. Which detail is preferred? If the circulated steam pipe is the preferred detail which mounting scenario is preferred, top of bottom mounted?

On: Feb 20 2018.

Government Response. . Requirement for culverts to have thaw pipe has been deleted by Clear AFS.

This will be revised via amendment. On: Feb 28 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7328828 Civil 01 10 - 1.2.2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

RFP Article 1.2.2 states ADA parking is not required for the facility then goes on to describe number of ADA stalls. In Bid Option 0005, Additional Parking, (1) ADA parking stall is described. In the RFP Proof of Concept Site Plan C-101 there is no ADA parking described inside the Base Bid area. Is it the Government's intent to have all ADA parking part of Base Bid 0005?

On: Feb 20 2018.

Government Response. . Please ensure that you have the correct version of the Proposal Schedule which lists CLIN 0007 as the Additional Parking option item. Additionally C-101 does mention ADA parking.

In response to question, ADA is not required for this building. However, 01 10 00/1.2.2 does instruct the Contractor to provide certain ADA compliant measures, including (2) ADA compliant parking stalls, as directed by Clear AFS. Place ADA compliant parking stalls under CLIN 0007 Additional Parking. All other ADA compliant features listed in 01 10 00/1.2.2 shall be placed in the base bid. On: Feb 22 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7329635 General 00 22 00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Will drawing sheets required to depict Option Items for this project count towards the 25 Page drawing limit? If not, how many additional drawings will be allowed to represent the Bid Options?

On: Feb 20 2018.

Government Response. . Yes, as per the RFP only 25 drawings will be evaluated. Anything over the 25 drawing limit will not be evaluated. On: Feb 22 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7331465 Architectural Room Criteria Sheets

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Is the physical therapy whirlpool hot tub to be OFCI or CFCI?

On: Feb 21 2018.

Government Response. . Therapy whirlpool will be CFCI. On: Feb 28 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7331466 Architectural Room Criteria Sheets

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Is the Finlandia Sauna to be OFCI or CFCI?

On: Feb 21 2018.

Government Response. . Sauna will be CFCI. On: Feb 22 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7331495 Equipment Room Criteria Sheets

Page 13 of 19ProjNet: Logged In User

Are the washers/dryers, casework, folding table in Laundry OFCI or CFCI? If CFCI, Please provide a make and model for the heavy duty washer and dryers.

On: Feb 21 2018.

Government Response. . Casework is CFCI. Folding table is GFGI. All Washer/Dryers are GFCI.

Washers/Dryers in Laundry Room 138 will be H.D. residential grade. Washer/Dryers in Protective Clothing Laundry Room 113 will be 55# Washer/Extractor (Ex. Continental Girbau, Inc. G-Flex hardmount, or equal) and 75# Dryers (Ex. Continental Girbau, Inc. ExpressDry75 hardmount, or equal) and (6) set gear dryer (Ex. Continental Girbau, Inc. ExpressDry Gear Dryer C6-MU, or equal) that are NFPA PPE care compliant.

Protective Clothing Laundry Room Criteria Sheet will be revised via amendment. On: Feb 28 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7331513 Fire Protection/Life Safety SEction 01 10 00 Paragraph 2.7.3

B

Comment Classification: Unclassified\\For…

This is the start of the file's text. The full file is on GovTribe.