Amendment 0005 to Solicitation W911KB-18-R-0017 Extend Steam/Water to the South Loop, Eielson AFB, Alaska.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EIE405_Amendment_0004.pdf | ||
| EIE405_Amendment_0002.pdf | ||
| EIE405_AM_1.pdf | ||
| Base_Pass_List_(as_of_20170926).xlsx | XLSX spreadsheet | |
| 02_EIE405-DWGS-RFP.pdf | ||
| 01_EIE405-SPECS-RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EIE405
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE/LOCATION: Extend Steam/Water to the South Loop Utilidor, Eielson AFB, Alaska (EIE405).
The purpose of this amendment is to provide changes to the specifications and draw ings as outlined in the attached Summary of Changes page.
YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.
All other terms and conditions of the solicitation remain the same.
POC for this amendment is Ron Jackson, 907 753-5596.
1. CONTRACT ID CODE PAGE OF PAGES
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Nov-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-18-R-0017
X 9B. DATED (SEE ITEM 11)
12-Oct-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Nov-2017
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
Amendment #05 (AM#05)
21 November 2017
Summary of Changes
a. The following drawings are substituted for the superseded documents/sections:
Clarification of drawings changed in AM#05:
Revised drawings in response to Bidder Questions.
Drawings changed in AM#05:
G‐001, G‐002, C‐502
b. The following drawings are added:
NONE
c. The following revised documents/sections are substituted for the superseded documents/sections:
The identifier “AM #05” appears before and after new and/or revised materials, except as noted below.
01 57 20.01 29 Attachment 1 / Eielson AFB Waste Disposal – Borrow Pit Worksheet 03 15 00.00 10 Paragraph 2.4.2 33 05 29.00 29 Paragraph 2.3.1.1, Paragraph 2.11.5
d. The following sections are added:
02 41 00 DEMOLITION
e. The following sections are deleted:
NONE
f. Other:
1.) The Corps of Engineers has been informed that the map showing possible capped and un‐ capped laydown yard/parking locations is no longer valid, please disregard these locations.
2.) Updated Wage Rates Attached.
3.) Bidder Inquiry Report Attached.
ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME
(End of Summary of Changes)
F-35A EXTEND STEAM-WATER
UTILIDUCT TO SOUTH LOOP
W911KB-18-R-0017
EIELSON AFB, ALASKA
FTQW180111
AM#05, 21 NOV 2017
Drawing # AF-890-181-02 Sheet 1 of 55
EIE405
US Army Corps of Engineers®
Alaska District
22 SHEETS (IN BOLD ON INDEX SHEETS) CHANGED WITH THIS AMENDMENT
43 SHEETS (IN BOLD ON INDEX SHEETS) CHANGED WITH THIS AMENDMENT
37 SHEETS (IN BOLD ON INDEX SHEETS) CHANGED WITH THIS AMENDMENT
11 SHEETS (IN BOLD ON INDEX SHEETS) CHANGED WITH THIS AMENDMENT
3 SHEETS (IN BOLD ON INDEX SHEETS) CHANGED WITH THIS AMENDMENT
8 C-107 UTILIDUCT - STA 68+00 TO 78+00
9 C-108 UTILIDUCT - STA 78+00 TO 88+00
10 C-109 UTILIDUCT - STA 88+00 TO 98+00
11 C-110 UTILIDUCT - STA 98+00 TO 99+50
CIVIL: SECTIONS
12 C-201 NEW UTILIDUCT SECTIONS
13 C-202 RENOVATED UTILIDOR SECTIONS
14 C-203 TRACK REPLACEMENT
15 C-204 EXCAVATION 1 OF 2
16 C-205 EXCAVATION 2 OF 2
CIVIL: LARGE SCALE VIEWS - MANHOLES (STA 10+00 TO 82+50)
17 C-301 MANHOLE LP-28 NEW PLAN ISOMETRIC VIEW
18 C-302
MANHOLE LP-28 NEW PLAN (LOWER)
19 C-303
MANHOLE LP-28 NEW PLAN (UPPER)
20 C-304 MANHOLE LP-28 NEW SECTIONS - 1 OF 3
21 C-305 MANHOLE LP-28 NEW SECTIONS - 2 OF 3
22 C-306 MANHOLE LP-28 NEW SECTIONS - 3 OF 3
23 C-307
MANHOLE TYPE A (11.25° L) NEW PLAN ISOMETRIC VIEW
24 C-308
MANHOLE TYPE A (11.25° L) NEW PLAN
25 C-309
MANHOLE TYPE A (11.25° L) NEW SECTIONS - 1 OF 2
26 C-310
MANHOLE TYPE A (11.25° L) NEW SECTIONS - 2 OF 2
27 C-311
MANHOLE TYPE B (11.25° R) NEW PLAN ISOMETRIC VIEW
28 C-312
MANHOLE TYPE B (11.25° R) NEW PLAN
29 C-313
MANHOLE TYPE B (11.25° R) NEW SECTIONS - 1 OF 2
30 C-314
MANHOLE TYPE B (11.25° R) NEW SECTIONS - 2 OF 2
31 C-315
MANHOLE TYPE C (22.50° L) NEW PLAN ISOMETRIC VIEW
32 C-316
MANHOLE TYPE C (22.50° L) NEW PLAN
33 C-317
MANHOLE TYPE C (22.50° L) NEW SECTIONS - 1 OF 2
34 C-318
MANHOLE TYPE C (22.50° L) NEW SECTIONS - 2 OF 2
35 C-319
MANHOLE TYPE D (22.50° R) NEW PLAN ISOMETRIC VIEW
36 C-320
MANHOLE TYPE D (22.50° R) NEW PLAN
37 C-321
MANHOLE TYPE D (22.50° R) NEW SECTIONS - 1 OF 2
38 C-322
MANHOLE TYPE D (22.50° R) NEW SECTIONS - 2 OF 2
39 C-323
MANHOLE TYPE E (45.00° L) NEW PLAN ISOMETRIC VIEW
40 C-324
MANHOLE TYPE E (45.00° L) NEW PLAN
41 C-325
MANHOLE TYPE E (45.00° L) NEW SECTIONS - 1 OF 2
42 C-326
MANHOLE TYPE E (45.00° L) NEW SECTIONS - 2 OF 2
43 C-327
MANHOLE TYPE F (45.00° R) NEW PLAN ISOMETRIC VIEW
44 C-328
MANHOLE TYPE F (45.00° R) NEW PLAN
45 C-329
MANHOLE TYPE F (45.00° R) NEW SECTIONS - 1 OF 2
46 C-330
MANHOLE TYPE F (45.00° R) NEW SECTIONS - 2 OF 2
47 C-331
MANHOLE TYPE G (56.25° L) NEW PLAN ISOMETRIC VIEW
48 C-332
MANHOLE TYPE G (56.25° L) NEW PLAN
49 C-333
MANHOLE TYPE G (56.25° L) NEW SECTIONS - 1 OF 2
50 C-334
MANHOLE TYPE G (56.25° L) NEW SECTIONS - 2 OF 2
51 C-335
MANHOLE TYPE H (STRAIGHT) NEW PLAN ISOMETRIC VIEW
52 C-336
MANHOLE TYPE H (STRAIGHT) NEW PLAN
53 C-337
MANHOLE TYPE H (STRAIGHT) NEW SECTIONS - 1 OF 2
54 C-338
MANHOLE TYPE H (STRAIGHT) NEW SECTIONS - 2 OF 2
1 G-001 COVER SHEET
2 G-002 INDEX SHEET - 1 OF 2
3 G-003 INDEX SHEET - 2 OF 2
GENERAL: PLANS
4 G-101 PROJECT SITE LAYOUT
GENERAL: PLANS - DEMOLITION
5 GX201 UTILIDUCT - STA 10+00 TO 18+00
6 GX202 UTILIDUCT - STA 18+00 TO 28+00
7 GX203 UTILIDUCT - STA 28+00 TO 38+00
8 GX204 UTILIDUCT - STA 38+00 TO 48+00
9 GX205 UTILIDUCT - STA 48+00 TO 58+00
10 GX206 UTILIDUCT - STA 58+00 TO 68+00
11 GX207 UTILIDUCT - STA 68+00 TO 78+00
12 GX208 UTILIDUCT - STA 78+00 TO 88+00
13 GX209 UTILIDUCT - STA 88+00 TO 98+00
14 GX210 UTILIDUCT - STA 98+00 TO 99+50
GENERAL: LARGE-SCALE VIEWS - MANHOLE DEMOLITION
15 GX401 MANHOLE LP-28 DEMO PLAN ISOMETRIC VIEW
16 GX402
MANHOLE LP-28 DEMO PLAN (LOWER)
17 GX403
MANHOLE LP-28 DEMO PLAN (UPPER)
18 GX404 MANHOLE LP-28 DEMO SECTIONS - 1 OF 3
19 GX405 MANHOLE LP-28 DEMO SECTIONS - 2 OF 3
20 GX406 MANHOLE LP-28 DEMO SECTIONS - 3 OF 3
21 GX407 MANHOLE 528-1 DEMO PLAN ISOMETRIC VIEW
22 GX408 MANHOLE 528-1 DEMO PLAN
23 GX409 MANHOLE 528-1 DEMO SECTIONS - 1 OF 2
24 GX410 MANHOLE 528-1 DEMO SECTIONS - 2 OF 2
25 GX411 MANHOLE 528 DEMO PLAN ISOMETRIC VIEW
26 GX412 MANHOLE 528 DEMO PLAN
27 GX413 MANHOLE 528 DEMO SECTIONS
28 GX414 MANHOLE 527 DEMO PLAN ISOMETRIC VIEW
29 GX415 MANHOLE 527 DEMO PLAN
30 GX416 MANHOLE 527 DEMO SECTIONS
31 GX417 MANHOLE 525-526 DEMO PLAN ISOMETRIC VIEW
32 GX418 MANHOLE 525-526 DEMO PLAN
33 GX419 MANHOLE 525-526 DEMO SECTIONS - 1 OF 2
34 GX420 MANHOLE 525-526 DEMO SECTIONS - 2 OF 2
35 GX421 MANHOLE 524 DEMO PLAN ISOMETRIC VIEW
36 GX422 MANHOLE 524 DEMO PLAN
37 GX423 MANHOLE 524 DEMO SECTIONS
38 GX424 MANHOLE 523 DEMO PLAN ISOMETRIC VIEW
39 GX425 MANHOLE 523 DEMO PLAN
40 GX426 MANHOLE 523 DEMO SECTIONS
41 GX427 MANHOLE 522 DEMO PLAN ISOMETRIC VIEW
42 GX428 MANHOLE 522 DEMO PLAN
43 GX429 MANHOLE 522 DEMO SECTIONS
44 GX430 MANHOLE 521 DEMO PLAN ISOMETRIC VIEW
45 GX431 MANHOLE 521 DEMO PLAN
46 GX432 MANHOLE 521 DEMO SECTIONS
47 GX433 MANHOLE 519-2 DEMO PLAN ISOMETRIC VIEW
48 GX434 MANHOLE 519-2 DEMO PLAN
49 GX435 MANHOLE 519-2 DEMO SECTIONS
50 GX436 MANHOLE 519 DEMO PLAN ISOMETRIC VIEW
51 GX437
MANHOLE 519 DEMO PLAN (LOWER)
52 GX438
MANHOLE 519 DEMO PLAN (UPPER)
53 GX439 MANHOLE 519 DEMO SECTIONS - 1 OF 2
54 GX440 MANHOLE 519 DEMO SECTIONS - 2 OF 2
GENERAL: GENERAL EXHIBITS
55 GX701 EXHIBIT - G-103 EIE376 PLAN
SURVEY & MAPPING: PLANS
1 V-101 TOPOGRAPHIC SURVEY
2 V-102 TOPOGRAPHIC SURVEY
3 V-103 TOPOGRAPHIC SURVEY
4 V-104 TOPOGRAPHIC SURVEY
5 V-105 TOPOGRAPHIC SURVEY
6 V-106 TOPOGRAPHIC SURVEY
7 V-107 TOPOGRAPHIC SURVEY
8 V-108 TOPOGRAPHIC SURVEY
9 V-109 TOPOGRAPHIC SURVEY
10 V-110 TOPOGRAPHIC SURVEY
11 V-111 TOPOGRAPHIC SURVEY
12 V-112 TOPOGRAPHIC SURVEY
13 V-113 TOPOGRAPHIC SURVEY
14 V-114 TOPOGRAPHIC SURVEY
15 V-115 TOPOGRAPHIC SURVEY
16 V-116 TOPOGRAPHIC SURVEY
17 V-117 TOPOGRAPHIC SURVEY
18 V-118 TOPOGRAPHIC SURVEY
19 V-119 TOPOGRAPHIC SURVEY
GEOTECHNICAL: SCHEDULES AND DIAGRAMS
1 B-601 TEST BORING LOG - 1 OF 9
2 B-602 TEST BORING LOG - 2 OF 9
3 B-603 TEST BORING LOG - 3 OF 9
4 B-604 TEST BORING LOG - 4 OF 9
5 B-605 TEST BORING LOG - 5 OF 9
6 B-606 TEST BORING LOG - 6 OF 9
7 B-607 TEST BORING LOG - 7 OF 9
8 B-608 TEST BORING LOG - 8 OF 9
9 B-609 TEST BORING LOG - 9 OF 9
CIVIL: GENERAL
1 C-001
NOTES, LEGEND AND ABBREVIATIONS
CIVIL: PLAN & PROFILES
2 C-101 UTILIDUCT - STA 10+00 TO 18+00
3 C-102 UTILIDUCT - STA 18+00 TO 28+00
4 C-103 UTILIDUCT - STA 28+00 TO 38+00
5 C-104 UTILIDUCT - STA 38+00 TO 48+00
6 C-105 UTILIDUCT - STA 48+00 TO 58+00
7 C-106 UTILIDUCT - STA 58+00 TO 68+00
55 C-339
MANHOLE TYPE I (56.25° L MODIFIED) NEW PLAN ISOMETRIC VIEW
56 C-340
MANHOLE TYPE I (56.25° L MODIFIED) NEW PLAN
57 C-341
MANHOLE TYPE I (56.25° L MODIFIED) NEW SECTIONS - 1 OF 3
58 C-342
MANHOLE TYPE I (56.25° L MODIFIED) NEW SECTIONS - 2 OF 3
59 C-343
MANHOLE TYPE I (56.25° L MODIFIED) NEW SECTIONS - 3 OF 3
CIVIL: LARGE SCALE VIEWS - MANHOLES (STA 82+50 TO 99+50)
60 C-401 MANHOLE 528-1 NEW PLAN ISOMETRIC VIEW
61 C-402 MANHOLE 528-1 NEW PLAN
62 C-403 MANHOLE 528-1 NEW SECTIONS - 1 OF 3
63 C-404 MANHOLE 528-1 NEW SECTIONS - 2 OF 3
64 C-405 MANHOLE 528-1 NEW SECTIONS - 3 OF 3
65 C-406 MANHOLE 528 NEW PLAN ISOMETRIC VIEW
66 C-407 MANHOLE 528 NEW PLAN
67 C-408 MANHOLE 528 NEW SECTIONS
68 C-409 MANHOLE 527 NEW PLAN ISOMETRIC VIEW
69 C-410 MANHOLE 527 NEW PLAN
70 C-411 MANHOLE 527 NEW SECTIONS
71 C-412 MANHOLE 525-526 NEW PLAN ISOMETRIC VIEW
72 C-413 MANHOLE 525-526 NEW PLAN
73 C-414 MANHOLE 525-526 NEW SECTIONS - 1 OF 2
74 C-415 MANHOLE 525-526 NEW SECTIONS - 2 OF 2
75 C-416 MANHOLE 524 NEW PLAN ISOMETRIC VIEW
76 C-417 MANHOLE 524 NEW PLAN
77 C-418 MANHOLE 524 NEW SECTIONS
78 C-419 MANHOLE 523 NEW PLAN ISOMETRIC VIEW
79 C-420 MANHOLE 523 NEW PLAN
80 C-421 MANHOLE 523 NEW SECTIONS
81 C-422 MANHOLE 522 NEW PLAN ISOMETRIC VIEW
82 C-423 MANHOLE 522 NEW PLAN
83 C-424 MANHOLE 522 NEW SECTIONS
84 C-425 MANHOLE 521 NEW PLAN ISOMETRIC VIEW
85 C-426 MANHOLE 521 NEW PLAN
86 C-427 MANHOLE 521 NEW SECTIONS
87 C-428 MANHOLE 519-2 NEW PLAN ISOMETRIC VIEW
88 C-429 MANHOLE 519-2 NEW PLAN
89 C-430 MANHOLE 519-2 NEW SECTIONS
90 C-431 MANHOLE 519 NEW PLAN ISOMETRIC VIEW
91 C-432
MANHOLE 519 NEW PLAN (LOWER)
92 C-433
MANHOLE 519 NEW PLAN (UPPER)
93 C-434 MANHOLE 519 NEW SECTIONS - 1 OF 2
94 C-435 MANHOLE 519 NEW SECTIONS - 2 OF 2
CIVIL: DETAILS
95 C-501 ACCESS GATE - FENCING
96 C-502 WATER & SEWER
97 C-503 CULVERTS
98 C-504 ASPHALT & CONCRETE
99 C-505 MANHOLE ACCESSORIES
CIVIL: SCHEDULES AND DIAGRAMS
100 C-601 UTILIDUCT DIAGRAM - STA 10+00 TO 18+00
101 C-602 UTILIDUCT DIAGRAM - STA 18+00 TO 28+00
102 C-603 UTILIDUCT DIAGRAM - STA 28+00 TO 38+00
103 C-604 UTILIDUCT DIAGRAM - STA 38+00 TO 48+00
104 C-605 UTILIDUCT DIAGRAM - STA 48+00 TO 58+00
105 C-606 UTILIDUCT DIAGRAM - STA 58+00 TO 68+00
106 C-607 UTILIDUCT DIAGRAM - STA 68+00 TO 78+00
107 C-608 UTILIDUCT DIAGRAM - STA 78+00 TO 88+00
108 C-609 UTILIDUCT DIAGRAM - STA 88+00 TO 98+00
109 C-610 UTILIDUCT DIAGRAM - STA 98+00 TO 99+50
110 C-621 STEAM-CONDENSATE SCHEDULE AND DETAILS
111 C-622 STEAM EXPANSION JOINT SCHEDULE
112 C-623 CONDENSATE EXPANSION JOINT SCHEDULE
113 C-624 WATER & SEWER EXPANSION SCHEDULES
114 C-625 SUMP PUMP DIAGRAM
LANDSCAPE: PLANS
1 L-101 LANDSCAPE PLAN - STA 10+00 TO 18+00
2 L-102 LANDSCAPE PLAN - STA 18+00 TO 28+00
3 L-103 LANDSCAPE PLAN - STA 28+00 TO 38+00
4 L-104 LANDSCAPE PLAN - STA 38+00 TO 48+00
5 L-105 LANDSCAPE PLAN - STA 48+00 TO 58+00
6 L-106 LANDSCAPE PLAN - STA 58+00 TO 68+00
7 L-107 LANDSCAPE PLAN - STA 68+00 TO 78+00
8 L-108 LANDSCAPE PLAN - STA 78+00 TO 88+00
9 L-109 LANDSCAPE PLAN - STA 88+00 TO 98+00
10 L-110 LANDSCAPE PLAN - STA 98+00 TO 99+50
STRUCTURAL: GENERAL
1 S-001 GENERAL NOTES & ABBREVIATIONS
2 S-002 REBAR LAP SPLICES - HOOKS
STRUCTURAL: PLANS
3 S-101 MANHOLE TYPE A FLOOR SLAB PLAN
4 S-102 MANHOLE TYPE A ROOF SLAB PLAN
5 S-103 MANHOLE TYPE B FLOOR SLAB PLAN
6 S-104 MANHOLE TYPE B ROOF SLAB PLAN
7 S-105 MANHOLE TYPE C FLOOR SLAB PLAN
8 S-106 MANHOLE TYPE C ROOF SLAB PLAN
9 S-107 MANHOLE TYPE D FLOOR SLAB PLAN
10 S-108 MANHOLE TYPE D ROOF SLAB PLAN
11 S-109 MANHOLE TYPE E FLOOR SLAB PLAN
12 S-110 MANHOLE TYPE E ROOF SLAB PLAN
13 S-111 MANHOLE TYPE F FLOOR SLAB PLAN
14 S-112 MANHOLE TYPE F ROOF SLAB PLAN
15 S-113 MANHOLE TYPE G FLOOR SLAB PLAN
16 S-114 MANHOLE TYPE G ROOF SLAB PLAN
17 S-115 MANHOLE TYPE H FLOOR SLAB PLAN
18 S-116 MANHOLE TYPE H ROOF SLAB PLAN
19 S-117 MANHOLE TYPE I FLOOR SLAB PLAN
20 S-118 MANHOLE TYPE I ROOF SLAB PLAN
21 S-119 MANHOLE 528-1 FLOOR SLAB PLAN
22 S-120 MANHOLE 528-1 ROOF SLAB PLAN
ALASKA DISTRICT U.S. ARMY CORPS OF ENGINEERS
W911KB-18-R-0017
AM#05 - EIE405, 21 NOV 2017
F-35A EXTEND STEAM-WATER UTILIDUCT TO SOUTH LOOP
EIELSON AFB, ALASKA
SCHEDULE OF DRAWINGS
REF.
NUM.
SHEET TITLESHT
REF.
NUM.
SHEET TITLESHT
REF.
NUM.
SHEET TITLESHT
REF.
NUM.
SHEET TITLESHT
REF.
NUM.
SHEET TITLESHT
Drawing # AF-890-181-02 Sheet 2 of 55
3 SHEETS (IN BOLD) CHANGED IN THIS AMENDMENT (3 ON THIS SHEET)
3" SUMP DISCHARGE PIPE
4" SUMP DISCHARGE PIPE
OR 12" WATER MAIN
45° MAX
2" BRASS
BALL VALVE
12" MAX
SERVICE SADDLE
2" SCHED 40 ASTM A53
GALVANIZED STEEL PIPE
FLOW
CORE DRILL, SEAL RISER TO
ROOF WITH NON-SHRINK GROUT
INSTALL 8" Ø DI
CLEANOUT RISER PLUMB
CLOSED CELL SPRAY
FOAM INSULATION
UTILIDOR LID OR MANHOLE CEILING
FLANGED 8"x8"x8"
DI WYE (SEE NOTE 3)
MANHOLE FLOOR
8" Ø DI GRAVITY
SEWER MAIN
FG
CLASSIFIED FILL, COMPACT
TO 90% DRY DENSITY (TYP)
8" Ø 45° BEND
PLAIN END PIPE
FLEXIBLE CUT-GROOVED
COUPLING, ADJUST GAP BASED
ON AMBIENT TEMPERATURE AT
TIME OF INSTALLATION
14" Ø SONOTUBE® OR
APPROVED EQUAL
CORE DRILL, SEAL RISER TO
ROOF WITH NON-SHRINK GROUT
APPLY PRIMER / SEALER AND A COAT
OF SHERWIN WILLIAMS ROCK TAN
PAINT OR APPROVED EQUAL TO ALL
EXPOSED CONCRETE SURFACES
CONCRETE ROOF
INSTALL 53" SPRING
LOADED NORDIC FLEXI
FLAG OR APPROVED EQUAL
CLASSIFIED FILL, COMPACT
TO 95% DRY DENSITY (TYP)
DRY BARREL
FIRE HYDRANT
BREAKAWAY FLANGE
WITH NOTCHED BOLTS
8" MAX
24" SQUARE
6"
CLOSED CELL SPRAY
FOAM INSULATION
12" Ø SONOTUBE® OR
APPROVED EQUAL
A A
A-A
DO NOT INSTALL PIPE
INSULATION BETWEEN WATER
MAIN TEE AND THIS POINT
2"
2"
3"
#3 REBAR
#3 REBAR
HYDRANT
SEWER
COVER SHALL BE
IMPRINTED WITH "SEWER"
SQUARE CONCRETE
COLLAR, APPLY PRIMER /
SEALER AND A COAT OF
SHERWIN WILLIAMS ROCK
TAN PAINT OR APPROVED
EQUAL TO ALL EXPOSED
CONCRETE SURFACES
9" CAST ALUMINUM
EXPANSION PLUG
10" CAST IRON SEWER
CLEAN-OUT TOP FLANGE
(ASTM A48, CLASS 30B)
2" GALV STEEL PIPE
COMBINATION AIR VALVE,
SINGLE BODY
12" x 4" FLANGED
DI REDUCING TEE (SEE NOTE 7)
4" FLAT BLIND FLANGE
WITH 2" TAP
FLOODSAFE® INFLOW
PREVENTER OR
APPROVED EQUAL
2" BRASS GATE VALVE, FNPT
WITH WHEEL HANDLE AND
NON-RISING STEM
6" MAX
12" WATER MAIN
INSTALL VALVE
STEM BETWEEN
0° AND 90° AS
REQUIRED.
90°
FLANGED
CONNECTIONS ONLY
ALASKA DISTRICT
D A
T E
D E
S C
R I P
T I O
N A
P P
D
D E
S I G
N E
D
B
Y
U S
A
R M
Y
C
O R
P S
O
F
E
N G
I N
E E
R S
R D
T R
E E
T
A L
A S
K A
I S
T R
I C
T
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
J B
E R
A
L A
S
D E
S I G
N
F
I R
M
C I T
Y
S
T A
E
Z
P
S T
R E
D
R E
S S
A D
D R
E S
S
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
A N
S I
D
S I Z
E
F I L E
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
C
N
D R
A W
I N
G
T R
A C
K I N
G A
C T
I O
N D
A T
E M
A R
K D
E S
C R
I P
T I O
N M
A
E
L S
B
A
L A
S K
A
F
X T
E N
D
S
T E
A M
W
A T
U
I L I D
U C
T
T
O
S
O U
H
L
O P
AM#05
N
V
W
K B
R
F T
Q W
E I E
A F
D r a w i n g
X
U
N I F
I E
D E
N T
E J o b s E
I E
D w g s C
A D
E
I E
C d w g l a s t s a v e d o n
P
M w a s p l o t t e d b y
G i l l
T h o m a s
J
C
A
R M
Y
C
E P
S o n
P
M
VERIFY SCALES: IF THIS LINE 0 2"
DOES NOT MEASURE 2", ADJUST SCALE ACCORDINGLY.
W A
T E
W
E R
G
S
C H
M I D
T
S
G
E P
P E
R T
T
G
I L
L
T
G
I L
L
C I V
I L
E I E
C d w g
C-502
D E
T A
I L S
Scale: NTS
SANITARY SEWER CLEANOUT DETAIL
E1
NOTES:
1. DRAIN ASSEMBLY MAY BE ROTATED 45° MAX FROM BOTTOM OF MAIN IF
NECESSARY TO AVOID OTHER PIPING OR APPURTENANCES. INSTALL WITH
ADEQUATE ROOM FOR OPERATION AND MAINTENANCE.
2. INSTALL A TOTAL OF THIRTY (30) SADDLES AND DRAIN ASSEMBLIES AT LOW
POINTS ON THE WATER MAIN, INCLUDING ONE IN EVERY NEW MANHOLE, ONE
IN MH 525/526 AND ONE IN MH 523.
3. INSTALL ONE (1) SADDLE AND DRAIN ASSEMBLY AT THE LOW POINT ON
3-INCH SUMP DISCHARGE PIPE IN MH 523.
4. INSTALL FIVE (5) SADDLES AND DRAIN ASSEMBLIES AT LOW POINTS ON THE
4-INCH SUMP DISCHARGE PIPE INCLUDING ONE IN MH LP-28, MH 41, MH 47,
MH 55 AND MH 64.
5. SERVICE SADDLES SHALL COMPLY WITH SECTION 33 05 29.00 29 / 2.14.
6. NO INSULATION REQUIRED ON DRAIN ASSEMBLY.
NOTES:
1. REFERENCE C-401 THROUGH C-415 AND STRUCTURAL SHEETS FOR FURTHER
DETAILS.
2. ROTATE WYE AND 45° BEND AS NECESSARY TO AVOID OTHER PIPING AND
APPURTENANCES.
3. A GROOVED WYE FITTING, VICTAULIC NO. 30-C OR APPROVED EQUAL, MAY BE
USED IN LIEU OF FLANGED WYE FITTING.
NOTES:
1. CONCRETE COLLAR SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 4000 PSI.
2. REINFORCING STEEL SHALL MEET ASTM C-478 AND MAY BE LAP TIED OR SQUARE HOOPS.
3. PAINT HYDRANT DISCHARGE CAPS ACCORDING TO FLOW TESTING RESULTS. SEE SECTION 33 05 29.00 29 / 2.6 FOR DETAILS.
4. PAINT HYDRANT ID NUMBERS ON HYDRANTS AS DESCRIBED IN SECTION 33 05 29.00 29, PARAGRAPH 3.11.1.
5. ORIENT PUMPER NOZZLE TO FACE NEAREST ROADWAY.
Scale: NTS
FIRE HYDRANT DETAIL
E5
24" SQUARE
3.5"
3" (MIN)
Scale: NTS
CLEANOUT FRAME AND COVER DETAIL
A1
NOTE:
1. READY-MIX CONCRETE CONFORMING TO THE REQUIREMENTS
OF ASTM C-94 (AASHTO M-157) MAY BE USED FOR COLLAR.
A1
C-502
Scale: NTS
DRAIN DETAIL
E10
NOTES:
1. INSTALL COMBINATION AIR VALVES AT HIGH POINTS WITHIN THE
IDENTIFIED MANHOLES AS SHOWN.
2. INLET AND OUTLET SHALL BE 2" NPT. ORIFICE SHALL BE 3/32".
3. NO INSULATION SHALL BE ATTACHED TO THE COMBINATION AIR VALVE.
4. INSTALL WITH ADEQUATE ROOM FOR OPERATION AND MAINTENANCE.
5. APPLY THREAD SEALANT TO MATING PIPE NIPPLE.
6. ENSURE GATE VALVE IS IN OPEN POSITION PRIOR TO FILLING WATER
MAIN.
7. A GROOVED AWWA FITTING MAY BE USED IN LIEU OF FLANGED FITTING.
Scale: NTS
COMBINATION AIR VALVE FOR WATER MAIN
A5
COMBINATION AIR VALVE LOCATIONS
MH# 43
MH# 49
MH# 59
MH# 68
MH# 519
CLEANOUT LOCATIONS
MH# 528-1
MH# 528
MH# 527
APPROX STA 85+85
APPROX STA 87+10
MH# 525/526
HYDRANT LOCATIONS
MH# 528-1
MH# 527
MH# 525/526
MH# 524
MH# 522
Scale: NTS
WATER GATE VALVE - SUMP DISCHARGE CHECK VALVE
A9
WATER GATE VALVE LOCATIONS
MANHOLE SIZE QUANTITY
MH# 54 12-INCH 1
MH# 528-1
6-INCH 1
8-INCH 1
12-INCH
MH# 527
6-INCH 1
8-INCH 1
MH# 525/526
6-INCH 1
8-INCH 1
12-INCH 2
MH# 524
-INCH 1
6-INCH 1
MH# 522 6-INCH 1
MH# 519 12-INCH 1
TOTALS
-INCH 1
6-INCH 5
8-INCH 3
12-INCH 5
CHECK VALVE LOCATIONS
MANHOLE SIZE QUANTITY
MH# 524 3-INCH 1
MH# LP-28 4-INCH 1
NOTE:
1. AWWA C508 CERTIFIED CHECK VALVES SHALL BE VAL-MATIC
SWING-FLEX® OR APPROVED EQUAL.
M
A
D D
E
L
J G
A
D D
T
T I N
G
O
P T
I O
G
5 5
R
L
H R
E A
G
AutoCAD SHX Text
OR APPROVED EQUAL.
Eielson AFB Waste Disposal / Borrow Pit Worksheet
-Page 1 -
FTQW # / PROJECT TITLE: FTQW180111 F-35A Extend Steam-Water Utiliduct to South Loop
Air Force Project Manager / Office Symbol / Telephone Number: Mark Hoague, 354 CES/CENMP, 377-1867
Contractor Project Engineer / Company / Telephone Number:
--PART I (To be completed by the project manager)--
ATTACH AF FORM 332 FOR PROJECT
The proponent must submit an electronic copy of the AF Form 332 with the “Waste Disposal / Borrow Pit Worksheet”.
HISTORICAL: Is this work occurring on the run-way (1131) or at one of the following buildings, note the new building numbers are in parentheses: 1120 (2287), 1121 (2311), 1123 (2339), 1124 (2341), 1125 (2347), 1127 (2355), 1128 (2357), 1132 (2359), 1133 (2383), 1134 (2381), 1135 (2379), 1136 (2377), 1138 (2421), 1140 (2511), 1141 (2509), 1146 (2577), 1161 (2615), 1183 (2681), 1190 (2685) or 3112 (354)?
Yes ☐ No ☒
REQUIRED SURVEYS:
1. Lead-based paint survey accomplished? Yes ☐ No ☒ Scan and attach the results or state why a survey is not required:
2. Asbestos survey accomplished? Yes ☐ No ☒ Scan and attach the results or state why a survey is not required:
WASTES TO BE GENERATED:
1. Trees: 0 number, square feet, or acres
2. Trees and brush or hydro-axed vegetation and soil mixture: 38,000 CYs
3. Clean soil: cubic yards - give brief description (percent silt, sand, gravel, organics etc): 4,000 cubic yards; silt 96% fines average
4. Contaminated soil: 100 cubic yards. Type of contaminate(s): PFOS/PFOA 2,000 cubic yards. Type of contaminate(s): POL 100 cubic yards. Type of contaminate(s): Barium
Please Note: Proponent must provide CEIE a soil sampling site map and copies of the sample results.
5. Concrete: 50 cubic yards
6. Asphalt:
a. Chunk: 300 cubic yards
b. Milled: 0 cubic yards j4en9tjg Polygon j4en9tjg Text Box
AM#05
j4en9tjg Text Box
EIE405
j4en9tjg Text Box
ATTACHMENT 1
01 57 20.01 29
-Page 2 -
FTQW # / PROJECT TITLE:
WASTES TO BE GENERATED (continued):
7. Asbestos: 100 cubic yards
8. Lead-Based Paint Debris: 0 Give brief description:
XRF Results:
TCLP Results:
9. Hazardous Wastes (quantities):
PCB light ballasts: 0 Non-PCB light ballasts: 0 Exit light ballasts: 0 Non-incandescent lights: 0 Transformers: 2 Transformer oil: 0 Mercury thermostats: 0 Smoke detectors: 0 Batteries: 0 Rags with oil, grease, or solvents: 0 Used spray cans: 0 Solvent, asbestos removal: 0 Capacitors and switching gear: 0 Used solvents (Quantity of used solvents collected in liquid form): 0
10. Construction / Demolition Wastes (wood, glass, sheetrock, pipe, etc):
a. Remove and dispose of chain-link security fencing (incl posts, wire mesh and barbed wire): 700 LF Remove and dispose of abandoned 3-inch POL pipes (actual length unknown – estimate is conservative): 5,000 LF Remove and dispose of steel pipe racks and steel anchors: 1,660 LF of existing utilidor Remove and dispose of 8-inch DI water main: 1,660 LF Remove and dispose of 6-inch steel steam pipe: 580 LF Remove and dispose of 3-inch steel condensate pipe: 580 LF Remove and dispose of 3-inch steel sewer pipe: 225 LF Remove and dispose of manhole ladder / ladder rungs: 11 manholes Remove and dispose of access hatches: 11 manholes Remove and dispose of utility / light poles: 3 Remove and dispose of CMP culverts: 1
b. Salvage railroad ties and return to the Government: 90
Salvage fire hydrants and return to the Government: 5
c. Items to be recycled: 0
BORROW PITS: Materials required for the project:
1. Gravel: 37,000 cubic yards
Please Note: Bailed gravel stored adjacent to an active gravel pit shall become property of the Government on 31 December of year it is bailed. To retain rights to the gravel the following year the Contractor shall provide written coordination prior to 31 December informing 354 CES/CEIE of their gravel needs.
2. Topsoil: 13,000 cubic yards
-Page 3 -
FTQW # / PROJECT TITLE:
--PART II (To be completed by 354 CES/CEIE)--
INSTRUCTIONS FOR THE DISPOSAL OF WASTES:
1. Tree Protection, Transplanting, Replacement, and Methods:
2. Wastes to be disposed on base:
a. Trees, Soil, Concrete:
b. Hazardous Waste and Asbestos:
3. Wastes to be disposed off base: All construction wastes (except hazardous wastes) not listed for on base disposal shall be disposed off base by the contractor in an approved landfill in accordance with applicable state and federal regulations. Estimated quantities or copies of landfill weight tickets of wastes disposed off base must be reported to the Solid Waste Manager for tracking at 377-1659.
Please Note: Prior to project completion the proponent shall provide CEIE written sampling result(s) and copy of the disposal tare for debris, e.g., lead painted materials disposed at the Fairbanks North Star Borough Landfill.
BORROW PITS:
1. Borrow pit(s) to be used:
Gravel -
Topsoil -
2. Pit development, rehabilitation, and/or expansion work required for the privilege of using borrow pit(s): Note:
Notify the Eielson Natural Resources Office (377-5182 when pit development is about to begin.
Reviewers:
CEIEC CEO CEOH CEOII CEIEA (NR)
Date of Issue This Coordination Review becomes invalid if the project is not awarded within one year from the date of issue.
F-35A EXTEND STEAM-WATER UTILIDUCT TO SOUTH LOOP W911KB-18-R-0017
EIE405 AM#05
SECTION TABLE OF CONTENTS
DIVISION 02 - EXISTING CONDITIONS
SECTION 02 41 00
DEMOLITION
PART 1 GENERAL
1.1 REFERENCES
1.2 PROJECT DESCRIPTION
1.2.1 Demolition Plan
1.2.2 General Requirements
1.3 ITEMS TO REMAIN IN PLACE
1.3.1 Existing Construction Limits and Protection
1.3.2 Utility Service
1.4 SUBMITTALS
1.5 QUALITY ASSURANCE
1.5.1 Dust and Debris Control
1.6 PROTECTION
1.6.1 Traffic Control Signs
1.6.2 Protection of Personnel
1.7 RELOCATIONS
1.8 EXISTING CONDITIONS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 EXISTING FACILITIES TO BE REMOVED
3.1.1 Structures
3.1.2 Utilities and Related Equipment
3.1.2.1 General Requirements
3.1.2.2 Disconnecting Existing Utilities
3.1.3 Paving and Slabs
3.1.4 Miscellaneous Metal
3.1.5 Electrical Equipment and Fixtures
3.1.5.1 Fixtures / Structures
3.1.5.2 Electrical Devices
3.1.5.3 Conduit and Miscellaneous Items
3.2 DISPOSITION OF MATERIAL
3.2.1 Title to Materials
3.2.2 Reuse of Materials and Equipment
3.2.3 Salvaged Materials and Equipment
3.2.4 Unsalvageable and Non-Recyclable Material
3.3 CLEANUP
3.4 DISPOSAL OF REMOVED MATERIALS
3.4.1 Regulation of Removed Materials
3.4.2 Burning on Government Property
3.5 REUSE OF SALVAGED ITEMS
-- End of Section Table of Contents --
Section 02 41 00 Page 1
Section 02 41 00 Page 2
SECTION 02 41 00
DEMOLITION
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE A10.6 (2006) Safety Requirements for Demolition Operations
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.2 PROJECT DESCRIPTION
1.2.1 Demolition Plan
Prepare a Demolition Plan and submit proposed salvage, demolition, and removal procedures for approval before work is started. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, a detailed description of methods and equipment to be used for each operation and of the sequence of operations.
Refer to Section 01 19 30.02 29 / 1.9.1 for a list of salvageable material items to be returned to the Government. Coordinate with Waste Management Plan. Provide procedures for safe conduct of the work in accordance with EM 385-1-1. Plan shall be approved by Contracting Officer prior to work beginning.
1.2.2 General Requirements
Do not begin demolition until authorization is received from the Contracting Officer. The work includes demolition, salvage of identified items and materials and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections.
1.3 ITEMS TO REMAIN IN PLACE
Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer.
Coordinate the work of this section with all other work indicated.
Section 02 41 00 Page 3
Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract. Do not overload pavements to remain. Provide new supports and reinforcement for existing structures or utility poles weakened by demolition or removal work.
Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.
1.3.1 Existing Construction Limits and Protection
Do not disturb existing structures or utility poles beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of utility poles to prevent settlement or other movement.
1.3.2 Utility Service
Maintain existing utilities indicated to stay in service and protect against damage during demolition operations. Prior to start of work, utilities serving each area of alteration or removal will be shut off by the Government and disconnected and sealed by the Contractor.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Demolition Plan Existing Conditions
1.5 QUALITY ASSURANCE
Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSE/SAFE A10.6. Use of explosives will not be permitted.
1.5.1 Dust and Debris Control
Prevent the spread of dust and debris and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution.
1.6 PROTECTION
1.6.1 Traffic Control Signs
Where pedestrian and driver safety is endangered in the area of removal work, use traffic barricades with flashing lights. Anchor barricades in a manner to prevent displacement by wind. Notify the Contracting Officer
Section 02 41 00 Page 4 prior to beginning such work.
1.6.2 Protection of Personnel
Before, during and after the demolition work continuously evaluate the condition of the structure being demolished and take immediate action to protect all personnel working in and around the project site.
1.7 RELOCATIONS
Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Repair or replace items to be relocated which are damaged by the Contractor with new undamaged items as approved by the Contracting Officer.
1.8 EXISTING CONDITIONS
Before beginning any demolition work, survey the site and examine the drawings and specifications to determine the extent of the work. Record existing conditions in the presence of the Contracting Officer showing the condition of structures and other facilities adjacent to areas of alteration or removal. Photographs sized 4 inch will be acceptable as a record of existing conditions. Include in the record the elevation of the top of foundation walls, finish floor elevations, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to before starting work. It is the Contractor's responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the record document.
PART 2 PRODUCTS
Not Applicable
PART 3 EXECUTION
3.1 EXISTING FACILITIES TO BE REMOVED
Inspect and evaluate existing structures onsite for reuse. Existing construction scheduled to be removed for reuse shall be disassembled.
Dismantled and removed materials are to be separated, set aside, and prepared as specified, and stored or delivered to a collection point for reuse, remanufacture, recycling, or other disposal, as specified.
Materials shall be designated for reuse onsite whenever possible.
3.1.1 Structures
Remove existing structures as indicated on the drawings.
3.1.2 Utilities and Related Equipment
3.1.2.1 General Requirements
Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by the Contracting Officer. Do not interrupt existing utilities serving facilities occupied and used by the Government except when approved in writing and then only after temporary utility services have been approved and provided. Do not begin demolition
Section 02 41 00 Page 5 work until all utility disconnections have been made. Shut off and cap utilities for future use, as indicated.
3.1.2.2 Disconnecting Existing Utilities
Remove existing utilities, as indicated, and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the Contracting Officer. When utility lines are encountered but are not indicated on the drawings, notify the Contracting Officer prior to further work in that area.
3.1.3 Paving and Slabs
Remove sawcut concrete curbing and asphaltic concrete paving including aggregate base as indicated on the drawings. Provide neat sawcuts at limits of pavement removal as indicated.
3.1.4 Miscellaneous Metal
Recycle scrap metal as part of demolition and deconstruction operations.
Provide separate containers to collect scrap metal and transport to a scrap metal collection or recycling facility, in accordance with the Waste Management Plan.
3.1.5 Electrical Equipment and Fixtures
3.1.5.1 Fixtures / Structures
Remove and dispose of electrical fixtures / structures as indicated.
3.1.5.2 Electrical Devices
Remove and dispose of switches, switchgear, transformers, conductors including wire and nonmetallic sheathed and flexible armored cable, regulators, meters, instruments, plates, circuit breakers, panelboards, outlet boxes, and similar items as indicated.
3.1.5.3 Conduit and Miscellaneous Items
Consider corroded, bent, or damaged metal conduit as scrap metal.
3.2 DISPOSITION OF MATERIAL
3.2.1 Title to Materials
Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting from demolition, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the Contractor's demolition and removal procedures, and authorization by the Contracting Officer to begin demolition. The Government will not be responsible for the condition or loss of, or damage to, such property after contract award. Showing for sale or selling materials and equipment on site is prohibited.
Section 02 41 00 Page 6
3.2.2 Reuse of Materials and Equipment
Remove and store materials, signs and equipment indicated in the drawings to be reused or relocated to prevent damage, and reinstall as the work progresses.
3.2.3 Salvaged Materials and Equipment
Remove materials and equipment that are specified in Section 01 19 30.02 29 to be removed by the Contractor and that are to remain the property of the Government, and deliver to a location on Eielson AFB as determined by the Contracting Officer.
a. Store all materials salvaged for the Contractor as approved by the Contracting Officer and remove from Government property before completion of the contract. On site sales of salvaged material is prohibited.
b. Remove salvaged items to remain the property of the Government in a manner to prevent damage. Items damaged during removal or storage must be repaired or replaced to match existing items.
3.2.4 Unsalvageable and Non-Recyclable Material
Dispose of unsalvageable and non-recyclable noncombustible material in the approved disposal areas identified by Eielson AFB through coordination with the Contracting Officer.
3.3 CLEANUP
Remove debris and rubbish from within the project limits. Remove and transport the debris in a manner that prevents spillage on streets or adjacent areas. Apply local regulations regarding hauling and disposal.
3.4 DISPOSAL OF REMOVED MATERIALS
3.4.1 Regulation of Removed Materials
Dispose of debris, rubbish, scrap, and other nonsalvageable materials resulting from removal operations in compliance with all applicable federal, state and local regulations as contractually specified in the Waste Management Plan.
3.4.2 Burning on Government Property
Burning of materials removed from demolished and deconstructed structures will not be permitted on Government property.
3.5 REUSE OF SALVAGED ITEMS
Recondition salvaged materials, signs and equipment designated for reuse before installation. Replace items damaged during removal and salvage operations or restore them as necessary to usable condition.
-- End of Section --
Section 02 41 00 Page 7
SECTION TABLE OF CONTENTS
DIVISION 03 - CONCRETE
SECTION 03 15 00.00 10
CONCRETE ACCESSORIES
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.1 CONTRACTION JOINT STRIPS
2.2 PREFORMED EXPANSION JOINT FILLER
2.3 SEALANT
2.3.1 Preformed Polychloroprene Elastomeric Type
2.3.2 Lubricant for Preformed Compression Seals
2.3.3 Field-Molded Type
2.4 WATERSTOPS
2.4.1 Non-Metallic Materials
2.4.2 Non-Metallic Hydrophilic
2.4.3 Preformed Plastic Adhesive
2.4.3.1 Chemical Composition
2.4.3.2 Adhesion Under Hydrostatic Pressure
2.4.3.3 Sag of Flow Resistance
2.4.3.4 Chemical Resistance
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Contraction Joints
3.1.1.1 Joint Strips
3.1.1.2 Sawed Joints
3.1.2 Expansion Joints
3.1.3 Joint Sealant
3.1.3.1 Joints With Preformed Compression Seals
3.1.3.2 Joints With Field-Molded Sealant
3.2 WATERSTOPS, INSTALLATION AND SPLICES
3.2.1 Non-Metallic
3.2.1.1 Rubber Waterstop
3.2.1.2 Polyvinyl Chloride Waterstop
3.2.1.3 Quality Assurance
3.2.2 Non-Metallic Hydrophilic Waterstop Installation
3.2.3 Preformed Plastic Adhesive Installation
3.3 CONSTRUCTION JOINTS
Section 03 15 00.00 10 Page 1
SECTION 03 15 00.00 10
CONCRETE ACCESSORIES
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO T 111 (2011; R 2015) Standard Method of Test for Mineral Matter or Ash in Asphalt Materials
AMERICAN HARDBOARD ASSOCIATION (AHA)
AHA A135.4 (1995; R 2004) Basic Hardboard
ASTM INTERNATIONAL (ASTM)
ASTM C919 (2012) Use of Sealants in Acoustical Applications
ASTM C920 (2014a) Standard Specification for Elastomeric Joint Sealants
ASTM D1751 (2004; E 2013; R 2013) Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types)
ASTM D1752 (2004a; R 2013) Standard Specification for Preformed Sponge Rubber Cork and Recycled PVC Expansion
ASTM D2628 (1991; R 2011) Standard Specification for Preformed Polychloroprene Elastomeric Joint Seals for Concrete Pavements
ASTM D2835 (1989; R 2012) Lubricant for Installation of Preformed Compression Seals in Concrete Pavements
ASTM D4 (1986; R 2010) Bitumen Content
ASTM D412 (2015a) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension
ASTM D471 (2016a) Standard Test Method for Rubber
Section 03 15 00.00 10 Page 2
Property - Effect of Liquids
ASTM D5249 (2010; R 2016) Standard Specification for Backer Material for Use with Cold-and Hot-Applied Joint Sealants in Portland-Cement Concrete and Asphalt Joints
ASTM D6/D6M (1995; E 2011; R 2011) Loss on Heating of Oil and Asphaltic Compounds
U.S. ARMY CORPS OF ENGINEERS (USACE)
COE CRD-C 513 (1974) Corps of Engineers Specifications for Rubber Waterstops
COE CRD-C 572 (1974) Corps of Engineers Specifications for Polyvinylchloride Waterstops
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Waterstops; G
SD-03 Product Data
Preformed Expansion Joint Filler Sealant Waterstops
SD-04 Samples
Lubricant for Preformed Compression Seals Field-Molded Type Waterstops
SD-07 Certificates
Preformed Expansion Joint Filler Sealant Waterstops
1.3 DELIVERY, STORAGE, AND HANDLING
Protect material delivered and placed in storage off the ground from moisture, dirt, and other contaminants. Deliver sealants in the manufacturer's original unopened containers. Remove sealants from the site whose shelf life has expired.
Section 03 15 00.00 10 Page 3
PART 2 PRODUCTS
2.1 CONTRACTION JOINT STRIPS
Use 1/8 inch thick tempered hardboard contraction joint strips conforming to AHA A135.4, Class 1. In lieu of hardboard strips, rigid polyvinylchloride (PVC) or high impact polystyrene (HIPS) insert strips specifically designed to induce controlled cracking in slabs on grade may be used. Such insert strips must have removable top section.
2.2 PREFORMED EXPANSION JOINT FILLER
Use preformed expansion joint filler material conforming to ASTM D1751 or ASTM D1752. Unless otherwise indicated, filler material must be 3/8 inch thick and of a width applicable for the joint formed. Backer material, when required, must conform to ASTM D5249.
2.3 SEALANT
Joint sealant conforming to the following:
2.3.1 Preformed Polychloroprene Elastomeric Type
ASTM D2628.
2.3.2 Lubricant for Preformed Compression Seals
ASTM D2835. Submit a piece not less than 9 ft of 1 inch nominal width or wider seal or a piece not less than 12 ft of compression seal less than 1 inch nominal width. Provide one quart of lubricant.
2.3.3 Field-Molded Type
ASTM C920. Use Type M, Grade P or NS, Class 25, Use sealant for horizontal joints. Type M, Grade NS, Class 25, Use NT for vertical joints.
Use polyethylene tape, coated paper, metal foil or similar type materials as bond breaker. The back-up material must be compressible, non-shrink, nonreactive with sealant, and non-absorptive material type such as extruded butyl or polychloroprene rubber. Submit 1 gallon of field-molded sealant and 1 quart of primer (when primer is recommended by the sealant manufacturer) identified to indicate manufacturer, type of material, quantity, and shipment or lot represented.
2.4 WATERSTOPS
Submit a sample of each material consisting of a piece not less than 12 inches long cut from each 200 feet of finished waterstop furnished, but not less than a total of 4 linear feet of each type and size furnished. For spliced segments of waterstops to be installed in the work, furnish one spliced sample of each size and type for every 50 splices made in the factory and every 10 splices made at the job site for inspection and testing. Make the spliced samples using straight run pieces with the splice located at the mid-length of the sample and finished as required for the installed waterstop; the total length of each spliced sample not less than 12 inches. Submit waterstop materials and splice samples for inspection and testing identified to indicate manufacturer, type of material, size and quantity of material and shipment represented. Submit a shop drawing of the waterstops showing the placement and configuration.
Section 03 15 00.00 10 Page 4
2.4.1 Non-Metallic Materials`
Manufacture non-metallic waterstops from a prime virgin resin; reclaimed material is not acceptable. The compound must contain plasticizers, stabilizers, and other additives to meet specified requirements. Rubber waterstops conforming to COE CRD-C 513. Polyvinylchloride waterstops conforming to COE CRD-C 572. Thermoplastic elastomeric rubber waterstops conforming to ASTM D471. Submit a piece not less than 12 inch long cut from each 200 ft of finished waterstop furnished, but not less than a total of 4 ft of each type, size, and lot furnished. One splice sample of each size and type for every 50 splices made in the factory and every 10 splices made at the job site. Make the splice samples using straight run pieces with the splice located at the mid-length of the sample and finished as required for the installed waterstop; the total length of each splice not less than 12 inches long.
2.4.2 Non-Metallic Hydrophilic
Swellable strip type compound of polymer modified chloroprene rubber that swells upon contact with water conforming to ASTM D412 as follows: Tensile strengthAM#05... 300 psiAM#05... minimum; ultimate elongation 600 percent minimum. Hardness must be 50 minimum on the type A durometer and the volumetric expansion ratio in distilled water at 70 degrees F shall be 3 to 1 minimum.
2.4.3 Preformed Plastic Adhesive
Produce preformed plastic adhesive waterstops from blends of refined hydrocarbon resins and plasticizing compounds reinforced with inert mineral filler, containing no solvents, asbestos, irritating fumes or obnoxious odors. The compound cannot depend on oxidizing, evaporating, or chemical action for its adhesive or cohesive strength.
2.4.3.1 Chemical Composition
Meet the chemical composition of the sealing compound requirements shown below:
PERCENT BY WEIGHT
COMPONENT MINIMUM MAXIMUM TEST
Bitumen (Hydrocarbon plastic)
50 70 ASTM D4
Inert Mineral Filler 30 50 AASHTO T 111
Volatile Matter 2 ASTM D6/D6M
2.4.3.2 Adhesion Under Hydrostatic Pressure
The sealing compound must not leak at the joints for a period of 24 hours under a vertical 6 foot head pressure. In a separate test, the sealing compound must not leak under a horizontal pressure of 10 psi which is reached by slowly applying increments of 2 psi every minute.
Section 03 15 00.00 10 Page 5
2.4.3.3 Sag of Flow Resistance
Sagging must not be detected when tested as follows: Fill a wooden form 1 inch wide and 6 inches long flush with sealing compound and place in an oven at 135 degrees F in a vertical position for 5 days.
2.4.3.4 Chemical Resistance
The sealing compound when immersed separately in a 5 percent solution of caustic potash, a 5 percent solution of hydrochloric acid, 5 percent solution of sulfuric acid and a saturated hydrogen sulfide solution for 30 days at ambient room temperature must show no visible deterioration.
PART 3 EXECUTION
3.1 INSTALLATION
Provide joint locations and details, including materials and methods of installation of joint fillers and waterstops, as specified and indicated.
In no case may any fixed metal be continuous through an expansion or contraction joint.
3.1.1 Contraction Joints
Contraction joints may be constructed by inserting tempered hardboard strips or rigid PVC or HIPS insert strips into the plastic concrete using a steel parting bar, when necessary, or by cutting the concrete with a saw after concrete has set. Make joints 1/8 inch to 3/16 inch wide and extend into the slab one-fourth the slab thickness, minimum, but not less than 1 inch.
3.1.1.1 Joint Strips
Provide strips of the required dimensions and as long as practicable.
After the first floating, groove the concrete with a tool at the joint locations. Insert the strips in the groove and depress them until the top edge of the vertical surface is flush with the surface of the slab. Float and finish the slab as specified. Workf the concrete adjacent to the joint the minimum necessary to fill voids and consolidate the concrete. Where indicated, saw out the top portion of the strip after the curing period to form a recess for sealer. Discard the removable section of PVC or HIPS strips and leave the insert in place. Maintain true alignment of the strips during insertion.
3.1.1.2 Sawed Joints
Saw joints early enough to prevent uncontrolled cracking in the slab, but late enough that this can be accomplished without appreciable spalling.
Start cutting as soon as the concrete has hardened sufficiently to prevent raveling of the edges of the saw cut. Complete cutting before shrinkage stresses become sufficient to produce cracking. Use concrete sawing machines that are adequate in number and power, and with sufficient replacement blades to complete the sawing at the required rate. Cut joints to true alignment and in sequence of concrete placement. Remove sludge and cutting debris. Form reservoir for joint sealant.
3.1.2 Expansion Joints
Use preformed expansion joint filler in expansion and isolation joints in
Section 03 15 00.00 10 Page 6 slabs around columns and between slabs on grade and vertical surfaces where indicated. Extend the filler to the full slab depth, unless otherwise indicated.