EIE405_Amendment_0002.pdf
PDF 44 MB Posted
- Solicitation number
- W911KB-18-R-0017
About this file
Amendment 0002 to Solicitation W911KB-18-R-0017 Extend Steam/Water to the South Loop, Eielson AFB, Alaska.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EIE405_Amendment_No_5.pdf | ||
| EIE405_Amendment_0004.pdf | ||
| EIE405_AM_1.pdf | ||
| Base_Pass_List_(as_of_20170926).xlsx | XLSX spreadsheet | |
| 02_EIE405-DWGS-RFP.pdf | ||
| 01_EIE405-SPECS-RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EIE405
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE/LOCATION: Extend Steam/Water to the south Loop Utilidor, Eielson AFB, Alaska (EIE405).
The purpose of this amendment is to provide changes to the specifications and draw ings as outlined in the attached Summary of Changes page.
YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.
All other terms and conditions of the solicitation remain the same.
POC for this amendment is Ron Jackson, 907 753-5596.
1. CONTRACT ID CODE PAGE OF PAGES
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Nov-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-18-R-0017
X 9B. DATED (SEE ITEM 11)
12-Oct-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Nov-2017
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
Amendment #02 (AM#02)
Summary of Changes
a. The following drawings are substituted for the superseded documents/sections:
Clarification of drawings changed in AM#02:
Drawings were revised to include structural revisions to enlarge manhole 519.
Other drawings were revised to add dimensions to new manholes where they were missing.
Drawings changed in AM#02:
G‐001, G‐002, G‐003, GX208, C‐101, C‐102, C‐103, C‐104, C‐105, C‐106, C‐316, C‐317, C‐324, C‐ 325, C‐328, C‐329, C‐332, C‐333, 336, C‐337, C‐340, C‐341, C‐624, S‐002, S‐121, S‐122, S‐125, S‐ 303, S‐304, S‐511, S‐512, S‐601 and E‐501
b. The following drawings are added:
S‐123, S‐124, S‐513 and E‐604
c. The following revised documents/sections are substituted for the superseded documents/sections:
The identifier “AM #02” appears before and after new and/or revised materials, except as noted below.
PROPOSAL SCHEDULE – CLIN references were revised to update a reference.
SECTION 02 61 13 – EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
‐ Paragraphs 3.4.1 and 3.6.1c were revised.
SECTION 03 30 00.00 10 – CAST‐IN‐PLACE CONCRETE
‐ Paragraphs 1.1.1, 1.1.2 and 1.2 were revised.
SECTION 33 05 29.00 29 – WATER DISTRIBUTION SYSTEMS IN UTILIDORS
‐ Paragraphs 1.4.4 and 2.1 were revised.
SECTION 33 05 33.00 29 – SEWERS IN UTILIDORS
‐ Paragraphs 2.1.1 and 2.1.3 were revised
SECTION 33 05 37.00 29 – HEAT DISTRIBUTION SYSTEMS IN UTILIDORS AND MANHOLES
‐ Paragraphs 2.2.1.4, 2.2.3, 3.3.1 and 3.3.3.2 were revised.
SECTION 33 05 41.00 29 – UTILIDOR SYSTEM
‐ Paragraphs 2.1 and 2.7 were revised.
d. The following sections are deleted:
NONE
e. Other:
Site Visit Sign‐In Roster Chemical Data Report Revised clause 52.211‐12
(End of Summary of Changes)
F-35A EXTEND STEAM-WATER
UTILIDUCT TO SOUTH LOOP
W911KB-18-R-0017
EIELSON AFB, ALASKA
FTQW180111
AM#02, 26 OCT 2017
Drawing # AF-890-181-02 Sheet 1 of 114
EIE405
US Army Corps of Engineers®
Alaska District
22 SHEETS (IN BOLD ON INDEX SHEETS) CHANGED WITH THIS AMENDMENT
THE FOLLOWING SPECIFICATION SECTIONS CHANGED WITH THIS AMENDMENT:
01 19 30.02 29 / PARAGRAPH 1.23.2
33 05 29.00 29 / PARAGRAPH 3.16.2
33 05 37.00 29 / PARAGRAPH 2.9.3
33 05 41.00 29 / PARAGRAPH 2.11.2
37 SHEETS (IN BOLD ON INDEX SHEETS) CHANGED WITH THIS AMENDMENT
THE FOLLOWING SPECIFICATION SECTIONS CHANGED WITH THIS AMENDMENT:
02 61 13 / PARAGRAPHS 3.4.1, 3.6.1c
03 30 00.00 10 / PARAGRAPHS 1.1.1, 1.1.2, 1.2
33 05 29.00 29 / PARAGRAPHS 1.4.4, 2.1
33 05 33.00 29 / PARAGRAPHS 2.1.1, 2.1.3
33 05 37.00 29 / PARAGRAPHS 2.2.1.4, 2.2.3, 3.3.1, 3.3.3.2
33 05 41.00 29 / PARAGRAPHS 2.1, 2.7
8 C-107 UTILIDUCT - STA 68+00 TO 78+00
9 C-108 UTILIDUCT - STA 78+00 TO 88+00
10 C-109 UTILIDUCT - STA 88+00 TO 98+00
11 C-110 UTILIDUCT - STA 98+00 TO 99+50
CIVIL: SECTIONS
12 C-201 NEW UTILIDUCT SECTIONS
13 C-202 RENOVATED UTILIDOR SECTIONS
14 C-203 TRACK REPLACEMENT
15 C-204 EXCAVATION 1 OF 2
16 C-205 EXCAVATION 2 OF 2
CIVIL: LARGE SCALE VIEWS - MANHOLES (STA 10+00 TO 82+50)
17 C-301 MANHOLE LP-28 NEW PLAN ISOMETRIC VIEW
18 C-302
MANHOLE LP-28 NEW PLAN (LOWER)
19 C-303
MANHOLE LP-28 NEW PLAN (UPPER)
20 C-304 MANHOLE LP-28 NEW SECTIONS - 1 OF 3
21 C-305 MANHOLE LP-28 NEW SECTIONS - 2 OF 3
22 C-306 MANHOLE LP-28 NEW SECTIONS - 3 OF 3
23 C-307
MANHOLE TYPE A (11.25° L) NEW PLAN ISOMETRIC VIEW
24 C-308
MANHOLE TYPE A (11.25° L) NEW PLAN
25 C-309
MANHOLE TYPE A (11.25° L) NEW SECTIONS - 1 OF 2
26 C-310
MANHOLE TYPE A (11.25° L) NEW SECTIONS - 2 OF 2
27 C-311
MANHOLE TYPE B (11.25° R) NEW PLAN ISOMETRIC VIEW
28 C-312
MANHOLE TYPE B (11.25° R) NEW PLAN
29 C-313
MANHOLE TYPE B (11.25° R) NEW SECTIONS - 1 OF 2
30 C-314
MANHOLE TYPE B (11.25° R) NEW SECTIONS - 2 OF 2
31 C-315
MANHOLE TYPE C (22.50° L) NEW PLAN ISOMETRIC VIEW
32 C-316
MANHOLE TYPE C (22.50° L) NEW PLAN
33 C-317
MANHOLE TYPE C (22.50° L) NEW SECTIONS - 1 OF 2
34 C-318
MANHOLE TYPE C (22.50° L) NEW SECTIONS - 2 OF 2
35 C-319
MANHOLE TYPE D (22.50° R) NEW PLAN ISOMETRIC VIEW
36 C-320
MANHOLE TYPE D (22.50° R) NEW PLAN
37 C-321
MANHOLE TYPE D (22.50° R) NEW SECTIONS - 1 OF 2
38 C-322
MANHOLE TYPE D (22.50° R) NEW SECTIONS - 2 OF 2
39 C-323
MANHOLE TYPE E (45.00° L) NEW PLAN ISOMETRIC VIEW
40 C-324
MANHOLE TYPE E (45.00° L) NEW PLAN
41 C-325
MANHOLE TYPE E (45.00° L) NEW SECTIONS - 1 OF 2
42 C-326
MANHOLE TYPE E (45.00° L) NEW SECTIONS - 2 OF 2
43 C-327
MANHOLE TYPE F (45.00° R) NEW PLAN ISOMETRIC VIEW
44 C-328
MANHOLE TYPE F (45.00° R) NEW PLAN
45 C-329
MANHOLE TYPE F (45.00° R) NEW SECTIONS - 1 OF 2
46 C-330
MANHOLE TYPE F (45.00° R) NEW SECTIONS - 2 OF 2
47 C-331
MANHOLE TYPE G (56.25° L) NEW PLAN ISOMETRIC VIEW
48 C-332
MANHOLE TYPE G (56.25° L) NEW PLAN
49 C-333
MANHOLE TYPE G (56.25° L) NEW SECTIONS - 1 OF 2
50 C-334
MANHOLE TYPE G (56.25° L) NEW SECTIONS - 2 OF 2
51 C-335
MANHOLE TYPE H (STRAIGHT) NEW PLAN ISOMETRIC VIEW
52 C-336
MANHOLE TYPE H (STRAIGHT) NEW PLAN
53 C-337
MANHOLE TYPE H (STRAIGHT) NEW SECTIONS - 1 OF 2
54 C-338
MANHOLE TYPE H (STRAIGHT) NEW SECTIONS - 2 OF 2
1 G-001 COVER SHEET
2 G-002 INDEX SHEET - 1 OF 2
3 G-003 INDEX SHEET - 2 OF 2
GENERAL: PLANS
4 G-101 PROJECT SITE LAYOUT
GENERAL: PLANS - DEMOLITION
5 GX201 UTILIDUCT - STA 10+00 TO 18+00
6 GX202 UTILIDUCT - STA 18+00 TO 28+00
7 GX203 UTILIDUCT - STA 28+00 TO 38+00
8 GX204 UTILIDUCT - STA 38+00 TO 48+00
9 GX205 UTILIDUCT - STA 48+00 TO 58+00
10 GX206 UTILIDUCT - STA 58+00 TO 68+00
11 GX207 UTILIDUCT - STA 68+00 TO 78+00
12 GX208 UTILIDUCT - STA 78+00 TO 88+00
13 GX209 UTILIDUCT - STA 88+00 TO 98+00
14 GX210 UTILIDUCT - STA 98+00 TO 99+50
GENERAL: LARGE-SCALE VIEWS - MANHOLE DEMOLITION
15 GX401 MANHOLE LP-28 DEMO PLAN ISOMETRIC VIEW
16 GX402
MANHOLE LP-28 DEMO PLAN (LOWER)
17 GX403
MANHOLE LP-28 DEMO PLAN (UPPER)
18 GX404 MANHOLE LP-28 DEMO SECTIONS - 1 OF 3
19 GX405 MANHOLE LP-28 DEMO SECTIONS - 2 OF 3
20 GX406 MANHOLE LP-28 DEMO SECTIONS - 3 OF 3
21 GX407 MANHOLE 528-1 DEMO PLAN ISOMETRIC VIEW
22 GX408 MANHOLE 528-1 DEMO PLAN
23 GX409 MANHOLE 528-1 DEMO SECTIONS - 1 OF 2
24 GX410 MANHOLE 528-1 DEMO SECTIONS - 2 OF 2
25 GX411 MANHOLE 528 DEMO PLAN ISOMETRIC VIEW
26 GX412 MANHOLE 528 DEMO PLAN
27 GX413 MANHOLE 528 DEMO SECTIONS
28 GX414 MANHOLE 527 DEMO PLAN ISOMETRIC VIEW
29 GX415 MANHOLE 527 DEMO PLAN
30 GX416 MANHOLE 527 DEMO SECTIONS
31 GX417 MANHOLE 525-526 DEMO PLAN ISOMETRIC VIEW
32 GX418 MANHOLE 525-526 DEMO PLAN
33 GX419 MANHOLE 525-526 DEMO SECTIONS - 1 OF 2
34 GX420 MANHOLE 525-526 DEMO SECTIONS - 2 OF 2
35 GX421 MANHOLE 524 DEMO PLAN ISOMETRIC VIEW
36 GX422 MANHOLE 524 DEMO PLAN
37 GX423 MANHOLE 524 DEMO SECTIONS
38 GX424 MANHOLE 523 DEMO PLAN ISOMETRIC VIEW
39 GX425 MANHOLE 523 DEMO PLAN
40 GX426 MANHOLE 523 DEMO SECTIONS
41 GX427 MANHOLE 522 DEMO PLAN ISOMETRIC VIEW
42 GX428 MANHOLE 522 DEMO PLAN
43 GX429 MANHOLE 522 DEMO SECTIONS
44 GX430 MANHOLE 521 DEMO PLAN ISOMETRIC VIEW
45 GX431 MANHOLE 521 DEMO PLAN
46 GX432 MANHOLE 521 DEMO SECTIONS
47 GX433 MANHOLE 519-2 DEMO PLAN ISOMETRIC VIEW
48 GX434 MANHOLE 519-2 DEMO PLAN
49 GX435 MANHOLE 519-2 DEMO SECTIONS
50 GX436 MANHOLE 519 DEMO PLAN ISOMETRIC VIEW
51 GX437
MANHOLE 519 DEMO PLAN (LOWER)
52 GX438
MANHOLE 519 DEMO PLAN (UPPER)
53 GX439 MANHOLE 519 DEMO SECTIONS - 1 OF 2
54 GX440 MANHOLE 519 DEMO SECTIONS - 2 OF 2
GENERAL: GENERAL EXHIBITS
55 GX701 EXHIBIT - G-103 EIE376 PLAN
SURVEY & MAPPING: PLANS
1 V-101 TOPOGRAPHIC SURVEY
2 V-102 TOPOGRAPHIC SURVEY
3 V-103 TOPOGRAPHIC SURVEY
4 V-104 TOPOGRAPHIC SURVEY
5 V-105 TOPOGRAPHIC SURVEY
6 V-106 TOPOGRAPHIC SURVEY
7 V-107 TOPOGRAPHIC SURVEY
8 V-108 TOPOGRAPHIC SURVEY
9 V-109 TOPOGRAPHIC SURVEY
10 V-110 TOPOGRAPHIC SURVEY
11 V-111 TOPOGRAPHIC SURVEY
12 V-112 TOPOGRAPHIC SURVEY
13 V-113 TOPOGRAPHIC SURVEY
14 V-114 TOPOGRAPHIC SURVEY
15 V-115 TOPOGRAPHIC SURVEY
16 V-116 TOPOGRAPHIC SURVEY
17 V-117 TOPOGRAPHIC SURVEY
18 V-118 TOPOGRAPHIC SURVEY
19 V-119 TOPOGRAPHIC SURVEY
GEOTECHNICAL: SCHEDULES AND DIAGRAMS
1 B-601 TEST BORING LOG - 1 OF 9
2 B-602 TEST BORING LOG - 2 OF 9
3 B-603 TEST BORING LOG - 3 OF 9
4 B-604 TEST BORING LOG - 4 OF 9
5 B-605 TEST BORING LOG - 5 OF 9
6 B-606 TEST BORING LOG - 6 OF 9
7 B-607 TEST BORING LOG - 7 OF 9
8 B-608 TEST BORING LOG - 8 OF 9
9 B-609 TEST BORING LOG - 9 OF 9
CIVIL: GENERAL
1 C-001
NOTES, LEGEND AND ABBREVIATIONS
CIVIL: PLAN & PROFILES
2 C-101 UTILIDUCT - STA 10+00 TO 18+00
3 C-102 UTILIDUCT - STA 18+00 TO 28+00
4 C-103 UTILIDUCT - STA 28+00 TO 38+00
5 C-104 UTILIDUCT - STA 38+00 TO 48+00
6 C-105 UTILIDUCT - STA 48+00 TO 58+00
7 C-106 UTILIDUCT - STA 58+00 TO 68+00
55 C-339
MANHOLE TYPE I (56.25° L MODIFIED) NEW PLAN ISOMETRIC VIEW
56 C-340
MANHOLE TYPE I (56.25° L MODIFIED) NEW PLAN
57 C-341
MANHOLE TYPE I (56.25° L MODIFIED) NEW SECTIONS - 1 OF 3
58 C-342
MANHOLE TYPE I (56.25° L MODIFIED) NEW SECTIONS - 2 OF 3
59 C-343
MANHOLE TYPE I (56.25° L MODIFIED) NEW SECTIONS - 3 OF 3
CIVIL: LARGE SCALE VIEWS - MANHOLES (STA 82+50 TO 99+50)
60 C-401 MANHOLE 528-1 NEW PLAN ISOMETRIC VIEW
61 C-402 MANHOLE 528-1 NEW PLAN
62 C-403 MANHOLE 528-1 NEW SECTIONS - 1 OF 3
63 C-404 MANHOLE 528-1 NEW SECTIONS - 2 OF 3
64 C-405 MANHOLE 528-1 NEW SECTIONS - 3 OF 3
65 C-406 MANHOLE 528 NEW PLAN ISOMETRIC VIEW
66 C-407 MANHOLE 528 NEW PLAN
67 C-408 MANHOLE 528 NEW SECTIONS
68 C-409 MANHOLE 527 NEW PLAN ISOMETRIC VIEW
69 C-410 MANHOLE 527 NEW PLAN
70 C-411 MANHOLE 527 NEW SECTIONS
71 C-412 MANHOLE 525-526 NEW PLAN ISOMETRIC VIEW
72 C-413 MANHOLE 525-526 NEW PLAN
73 C-414 MANHOLE 525-526 NEW SECTIONS - 1 OF 2
74 C-415 MANHOLE 525-526 NEW SECTIONS - 2 OF 2
75 C-416 MANHOLE 524 NEW PLAN ISOMETRIC VIEW
76 C-417 MANHOLE 524 NEW PLAN
77 C-418 MANHOLE 524 NEW SECTIONS
78 C-419 MANHOLE 523 NEW PLAN ISOMETRIC VIEW
79 C-420 MANHOLE 523 NEW PLAN
80 C-421 MANHOLE 523 NEW SECTIONS
81 C-422 MANHOLE 522 NEW PLAN ISOMETRIC VIEW
82 C-423 MANHOLE 522 NEW PLAN
83 C-424 MANHOLE 522 NEW SECTIONS
84 C-425 MANHOLE 521 NEW PLAN ISOMETRIC VIEW
85 C-426 MANHOLE 521 NEW PLAN
86 C-427 MANHOLE 521 NEW SECTIONS
87 C-428 MANHOLE 519-2 NEW PLAN ISOMETRIC VIEW
88 C-429 MANHOLE 519-2 NEW PLAN
89 C-430 MANHOLE 519-2 NEW SECTIONS
90 C-431 MANHOLE 519 NEW PLAN ISOMETRIC VIEW
91 C-432
MANHOLE 519 NEW PLAN (LOWER)
92 C-433
MANHOLE 519 NEW PLAN (UPPER)
93 C-434 MANHOLE 519 NEW SECTIONS - 1 OF 2
94 C-435 MANHOLE 519 NEW SECTIONS - 2 OF 2
CIVIL: DETAILS
95 C-501 ACCESS GATE - FENCING
96 C-502 WATER & SEWER
97 C-503 CULVERTS
98 C-504 ASPHALT & CONCRETE
99 C-505 MANHOLE ACCESSORIES
CIVIL: SCHEDULES AND DIAGRAMS
100 C-601 UTILIDUCT DIAGRAM - STA 10+00 TO 18+00
101 C-602 UTILIDUCT DIAGRAM - STA 18+00 TO 28+00
102 C-603 UTILIDUCT DIAGRAM - STA 28+00 TO 38+00
103 C-604 UTILIDUCT DIAGRAM - STA 38+00 TO 48+00
104 C-605 UTILIDUCT DIAGRAM - STA 48+00 TO 58+00
105 C-606 UTILIDUCT DIAGRAM - STA 58+00 TO 68+00
106 C-607 UTILIDUCT DIAGRAM - STA 68+00 TO 78+00
107 C-608 UTILIDUCT DIAGRAM - STA 78+00 TO 88+00
108 C-609 UTILIDUCT DIAGRAM - STA 88+00 TO 98+00
109 C-610 UTILIDUCT DIAGRAM - STA 98+00 TO 99+50
110 C-621 STEAM-CONDENSATE SCHEDULE AND DETAILS
111 C-622 STEAM EXPANSION JOINT SCHEDULE
112 C-623 CONDENSATE EXPANSION JOINT SCHEDULE
113 C-624 WATER & SEWER EXPANSION SCHEDULES
114 C-625 SUMP PUMP DIAGRAM
LANDSCAPE: PLANS
1 L-101 LANDSCAPE PLAN - STA 10+00 TO 18+00
2 L-102 LANDSCAPE PLAN - STA 18+00 TO 28+00
3 L-103 LANDSCAPE PLAN - STA 28+00 TO 38+00
4 L-104 LANDSCAPE PLAN - STA 38+00 TO 48+00
5 L-105 LANDSCAPE PLAN - STA 48+00 TO 58+00
6 L-106 LANDSCAPE PLAN - STA 58+00 TO 68+00
7 L-107 LANDSCAPE PLAN - STA 68+00 TO 78+00
8 L-108 LANDSCAPE PLAN - STA 78+00 TO 88+00
9 L-109 LANDSCAPE PLAN - STA 88+00 TO 98+00
10 L-110 LANDSCAPE PLAN - STA 98+00 TO 99+50
STRUCTURAL: GENERAL
1 S-001 GENERAL NOTES & ABBREVIATIONS
2 S-002 REBAR LAP SPLICES - HOOKS
STRUCTURAL: PLANS
3 S-101 MANHOLE TYPE A FLOOR SLAB PLAN
4 S-102 MANHOLE TYPE A ROOF SLAB PLAN
5 S-103 MANHOLE TYPE B FLOOR SLAB PLAN
6 S-104 MANHOLE TYPE B ROOF SLAB PLAN
7 S-105 MANHOLE TYPE C FLOOR SLAB PLAN
8 S-106 MANHOLE TYPE C ROOF SLAB PLAN
9 S-107 MANHOLE TYPE D FLOOR SLAB PLAN
10 S-108 MANHOLE TYPE D ROOF SLAB PLAN
11 S-109 MANHOLE TYPE E FLOOR SLAB PLAN
12 S-110 MANHOLE TYPE E ROOF SLAB PLAN
13 S-111 MANHOLE TYPE F FLOOR SLAB PLAN
14 S-112 MANHOLE TYPE F ROOF SLAB PLAN
15 S-113 MANHOLE TYPE G FLOOR SLAB PLAN
16 S-114 MANHOLE TYPE G ROOF SLAB PLAN
17 S-115 MANHOLE TYPE H FLOOR SLAB PLAN
18 S-116 MANHOLE TYPE H ROOF SLAB PLAN
19 S-117 MANHOLE TYPE I FLOOR SLAB PLAN
20 S-118 MANHOLE TYPE I ROOF SLAB PLAN
21 S-119 MANHOLE 528-1 FLOOR SLAB PLAN
22 S-120 MANHOLE 528-1 ROOF SLAB PLAN
ALASKA DISTRICT U.S. ARMY CORPS OF ENGINEERS
W911KB-18-R-0017
AM#02 - EIE405, 26 OCT 2017
F-35A EXTEND STEAM-WATER UTILIDUCT TO SOUTH LOOP
EIELSON AFB, ALASKA
SCHEDULE OF DRAWINGS
REF.
NUM.
SHEET TITLESHT
REF.
NUM.
SHEET TITLESHT
REF.
NUM.
SHEET TITLESHT
REF.
NUM.
SHEET TITLESHT
REF.
NUM.
SHEET TITLESHT
Drawing # AF-890-181-02 Sheet 2 of 114
22 SHEETS (IN BOLD) CHANGED IN THIS AMENDMENT
19 SHEETS (IN BOLD) CHANGED ON THIS SHEET
23 S-121 MANHOLE 519 FLOOR SLAB BOTTOM REINF PLAN
24 S-122 MANHOLE 519 FLOOR SLAB TOP REINF PLAN
25 S-123 MANHOLE 519 CEILING SLAB BOTTOM REINFORCEMENT PLAN
26 S-124 MANHOLE 519 CEILING SLAB TOP REINFORCEMENT PLAN
27 S-125 MANHOLE LP-28 TIE IN PLANS
STRUCTURAL: SECTIONS
28 S-301 MANHOLE 528-1 SECTIONS - 1 OF 2
29 S-302 MANHOLE 528-1 SECTIONS - 2 OF 2
30 S-303 MANHOLE 519 SECTIONS - 1 OF 2
31 S-304 MANHOLE 519 SECTIONS - 2 OF 2
32 S-305 FIRE HYDRANT THRUST BLOCK SECTIONS
33 S-306 MANHOLE LP-28 TIE IN SECTIONS 1 OF 3
34 S-307 MANHOLE LP-28 TIE IN SECTIONS 2 OF 3
35 S-308 MANHOLE LP-28 TIE IN SECTIONS 3 OF 3
STRUCTURAL: DETAILS
36 S-501 TYPICAL DETAILS
37 S-502 UTILIDUCT DETAILS - 1 OF 3
38 S-503 UTILIDUCT DETAILS - 2 OF 3
39 S-504 UTILIDUCT DETAILS - 3 OF 3
40 S-511 MANHOLE DETAILS - 1 OF 3
41 S-512 MANHOLE DETAILS - 2 OF 3
42 S-513 MANHOLE DETAILS - 3 OF 3
43 S-521 PIPE ANCHOR DETAILS - 1 OF 3
44 S-522 PIPE ANCHOR DETAILS - 2 OF 3
45 S-523 PIPE ANCHOR DETAILS - 3 OF 3
46 S-524 UTILDUCT PIPE SUPPORT DETAILS - 1 OF 2
47 S-525 UTILIDUCT PIPE SUPPORT DETAILS - 2 OF 2
48 S-531 EXISTING UTILIDOR LID DETAILS
STRUCTURAL: SCHEDULES AND DIAGRAMS
49 S-601 MANHOLE & UTILIDUCT SCHEDULES
50 S-602 SPECIAL INSPECTION SCHEDULES
ELECTRICAL: GENERAL
1 E-001 NOTES & LEGEND
2 E-002 SITE PLAN
ELECTRICAL: PLANS
3 E-101 UTILIDUCT - STA 10+00 TO 28+00
4 E-102 UTILIDUCT - STA 28+00 TO 48+00
5 E-103 UTILIDUCT - STA 48+00 TO 68+00
6 E-104 UTILIDUCT - STA 68+00 TO 88+00
7 E-105 UTILIDUCT - STA 88+00 TO 99+50
ELECTRICAL: DETAILS
8 E-501 TYPICAL PANEL DETAIL
9 E-502 MISC DETAILS
ELECTRICAL: SCHEDULES AND DIAGRAMS
10 E-601 ONELINE DIAGRAMS
11 E-602 POWER ONELINE PULLBOX
12 E-603 POWER ONELINE PULLBOX
13 E-604 TYPICAL PANEL DETAIL
ALASKA DISTRICT U.S. ARMY CORPS OF ENGINEERS
W911KB-18-R-0017
AM#02 - EIE405, 26 OCT 2017
F-35A EXTEND STEAM-WATER UTILIDUCT TO SOUTH LOOP
EIELSON AFB, ALASKA
SCHEDULE OF DRAWINGS
REF.
NUM.
SHEET TITLESHT
REF.
NUM.
SHEET TITLESHT
REF.
NUM.
SHEET TITLESHT
REF.
NUM.
SHEET TITLESHT
REF.
NUM.
SHEET TITLESHT
Drawing # AF-890-181-02 Sheet 3 of 114
22 SHEETS (IN BOLD) CHANGED IN THIS AMENDMENT
3 SHEETS (IN BOLD) CHANGED ON THIS SHEET
O
H
E
X
X
O H
E
C
O
M
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
V
V
V
V
V
E
O
H
/E
O
H /E
O H
/E
O H
/E
O H
/E
O H
/E
G
R
A
V
E
L
R
A
D
O
H E
UE
U E
U
E
U
E
U
E
COM
COM
C
O
M
C O
M
C O
M
C O
M
IN
D
U S
T R
IA
L D
R
IV
E
G R
A V
E L S
H O
U L D
E R
C
O
M
C O
M
C O
M
C O
M
C O
M
C O
M
O
H
E
O H
E
BLDG
P
A
V
D
A
D
MH# 67
STA 78+67.97
MH# 68
STA 81+40.24
MH# 528-1
STA 82+55.31
MH# 527
STA 84+59.33
90'
30' (TYP)
100'
30' (TYP)
35' (TYP)
35' (TYP)
10' (TYP)
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
MH# 528
STA 83+24.96
P O
L
P O
L
P O
L
P O
L
120'
45'
25'
15'
10'
25' (TYP)
CONTROL POINT TABLE
POINT #
DESCRIPTION
MANHOLE 67
MANHOLE 68
NORTHING
3899100.09
3899355.10
EASTING
1472444.16
1472348.75
PIPE DEMO MH528-1 TO MH528
UTILITY PIPE MATERIAL PIPE DIAMETER
PIPE LENGTH (FT)
WATER DUCTILE IRON 8-INCH 70
SEWER * DUCTILE IRON 8-INCH 70
STEAM STEEL 6-INCH 70
CONDENSATE STEEL 3-INCH 70
PIPE DEMO MH528 TO MH527
UTILITY PIPE MATERIAL PIPE DIAMETER
PIPE LENGTH (FT)
WATER DUCTILE IRON 8-INCH 140
SEWER * DUCTILE IRON 8-INCH 140
STEAM STEEL 6-INCH 140
CONDENSATE STEEL 3-INCH 140
PIPE DEMO MH527 TO MH525/526
UTILITY PIPE MATERIAL PIPE DIAMETER
PIPE LENGTH (FT)
WATER DUCTILE IRON 8-INCH 370
SEWER * DUCTILE IRON 8-INCH 370
STEAM STEEL 6-INCH 370
CONDENSATE STEEL 3-INCH 370
00 40' 80'
ALASKA DISTRICT
D A
T E
D E
S C
R I P
T I O
N A
P P
D
D E
S I G
N E
D
B
Y
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
T R
E E
T
A L
A S
K A
I S
T R
I C
T
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
J B
E R
A
L A
S
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
A N
S I
D
S I Z
E
F I L E
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
C
N
D R
A W
I N
G
T R
A C
K I N
G A
C T
I O
N D
A T
E M
A R
K D
E S
C R
I P
T I O
N M
A
E
L S
B
A
L A
S K
A
F
X T
E N
D
S
T E
A M
W
A T
U
I L I D
U C
T
T
O
S
O U
O P
AM#02
O
W
K B
R
F T
Q W
E I E
A F
D r a w i n g
X
U
N I F
I E
D E
N T
E J o b s E
I E
D w g s C
A D
E
I E
G
X d w g l a s t s a v e d o n
A
M w a s p l o t t e d b y
G i l l
T h o m a s
J
C
V
A
R M
Y
C
E P
S o n
P
M
VERIFY SCALES: IF THIS LINE 0 2"
DOES NOT MEASURE 2", ADJUST SCALE ACCORDINGLY.
U T
I L I D
U C
T
S
T
O
G
S
C H
M I D
T
S
G
E P
P E
R T
T
G
I L
L
T
G
I L
L
G E
N E
R A
L
E I E
G
X d w g
GX208
D E
M O
L I T
I O
N
P
L A
N S
PROJECT LIMITS
POLE BARN NOT
TO BE DISTURBED
Scale: 1" = 40'
DEMOLITION PLAN - STA 78+00 TO 88+00
D1
DEMOLITION RELATED NOTES:
REMOVE AND REPLACE THE ASPHALT ROADWAY WITHIN
MAXIMUM EXTENTS SHOWN (2,100 SF, 2,100 SF, 1,500 SF AND 3,600
SF). PAVEMENT IS ASSUMED TO BE 3" THICK. MATCH EXISTING
(ME) PAVEMENT ELEVATION.
PROTECT UTILITY AND FLOODLIGHT POLES ADJACENT TO
ALIGNMENT IN PLACE.
REMOVE AND SALVAGE HYDRANT 275-90 INCLUDING LOWER
BARREL AND BASE. GOVERNMENT RETAINS OWNERSHIP RIGHTS.
NEW HYDRANT 275-90 SHALL BE INSTALLED ABOVE SAME MH.
DEMOLISH AND REPLACE NO MORE THAN 500 LINEAR FT OF
6-FOOT CHAIN-LINK SECURITY FENCING. DEMOLITION SHALL
TERMINATE AT A LINE OR CORNER POST. CONNECT NEW
FENCING TO EXISTING.
CLEAR AND GRUB IN AREAS SHOWN. CONTACT 354 CES AT
377-5182 FOR DISPOSAL LOCATION. FURTHER DETAILS CAN BE
FOUND IN SPECIFICATIONS SECTION 31 11 00.
ABANDONED POL LINES MAY BE FOUND IN THIS AREA. SEE
SECTION 01 19 30.02 29 SPECIAL ITEMS FOR EIELSON AFB
PROJECTS FOR REMOVAL AND DISPOSAL INSTRUCTIONS.
MANHOLE 528-1 REQUIRES MODIFICATION / EXPANSION. SEE CIVIL
AND STRUCTURAL SHEETS FOR FURTHER DETAILS.
REMOVE AND REINSTALL R2-1 SPEED LIMIT SIGN AT SAME
LOCATION.
REMOVE AND SALVAGE ABOVE GRADE COMPONENTS FOR
HYDRANTS 275-80 AND 275-70. ATTACH BLIND FLANGE AT BASE OF
UPPER BARREL. BELOW GRADE HYDRANT COMPONENTS SHALL
BE ABANDONED IN PLACE. GOVERNMENT RETAINS OWNERSHIP
RIGHTS. NEW HYDRANT 275-80 SHALL BE INSTALLED ADJACENT
TO MH 527. NEW HYDRANT 275-70 SHALL BE INSTALLED ABOVE MH
525/526.
REMOVE AND DISPOSE OF ALL PIPES AND APPURTENANCES IN
THE EXISTING UTILIDOR AND MANHOLES BETWEEN MH 528-1 AND
MH 519. SEE TABLES ON THIS SHEET FOR FURTHER DETAILS.
PIPE LENGTHS ARE APPROXIMATE. RETAIN AND PROTECT
COMMUNICATION CABLES WITHIN UTILIDOR. PIPE DEMOLITION
POINTS OF DEMARCATION WITHIN INDIVIDUAL MANHOLES ARE
SHOWN ON SHEETS GX407 - GX416. UTILIDOR AND MANHOLES
SHALL BE THOROUGHLY CLEANED, CRACKS SHALL BE GROUTED
AND JOINTS SEALED TO ENSURE WATER TIGHTNESS.
CONTRACTOR SHALL COORDINATE UTILITY OUTAGES WITH
CONTRACTING OFFICER. BUILDING 3446 SHALL REQUIRE
TEMPORARY WATER FOR SPRINKLER SYSTEM ONLY.
SEE SPEC 33 05 41.00 29 UTILIDOR SYSTEM REGARDING
REPLACEMENT OF DAMAGED UTILIDOR LIDS.
REMOVE AND REINSTALL RV STORAGE LOT SIGN AT SAME
LOCATION.
PROTECT BURIED COMMUNICATION CABLES AND DUCTBANKS ON
BOTH SIDES OF THE ROADWAY IN PLACE. COMMUNICATION
CABLES AND DUCTBANKS WILL BE LOCATED ABOVE PROPOSED
UTILIDUCT LIDS AT THIS LOCATION.
EXTENT OF CHAIN-LINK FENCING
DEMOLITION
CONTRACTOR
ACCESS TO LOT
ACCESS THROUGH THIS
GATE SHALL BE
MAINTAINED FOR BLDG
3406 PERSONNEL
CONTRACTOR SHALL NOTIFY
CONTRACTING OFFICER 30 DAYS PRIOR
TO USE OF THIS STAGING AREA.
PAVEMENT DAMAGED BY THE
CONTRACTOR SHALL BE REPAIRED TO
THE SATISFACTION OF THE
CONTRACTING OFFICER AT NO
ADDITIONAL COST TO THE GOVERNMENT.
ME
ME
ME
ME
ME
ME
HYDRANT 275-70
HYDRANT 275-80
HYDRANT 275-90
F7
C-501
A1
C-504
A1
C-504
A1
C-504
A1
C-504
LEGEND
CLEARING & GRUBBING LIMITS
REMOVE / REPLACE
ASPHALT PAVEMENT
X
INSTALL TEMPORARY
FENCING
* EXISTING GRAVITY SEWER MAIN IS TRANSITE LINED STEEL PIPE. UTILIDOR LID MASTIC MAY CONTAIN ASBESTOS.
REMOVE / REPLACE
GRAVEL AREA
M
C
O R
R E
B
D
G
J G
AutoCAD SHX Text
-0 .6
-0.34%
0.20% 0.20%
-0 .6
-0.34%
S T
A
COMBINATION AIR VALVE
GRAVEL
ACCESS ROAD ℄
FG
EG
ENSURE A MIN 8"
COVER OVER RIGID
INSULATION
FROZEN
FROZEN
E l e v a t i o n
E l e v a t i o n
9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00
F G
E G
FROZEN
AP-5997
AP-5996
AP-5991
M H
L P
E
X I S
T I N
G
R
E
F L O
E
I N
V
M H
T
Y P
E
F L O
E
I N
V
I N
V
M H
T
Y P
E
F L O
E
I N
V
I N
V
M H
T
Y P
E
I
R
E
F L O
E
I N
V
I N
V
S T
A
550.69 550.24 549.86 549.57 549.36 549.23 549.19 549.20 549.20 549.20 549.19 549.18 549.16 549.14 549.13 549.11 549.09 549.07 549.05 549.02ROAD ℄
V
V
V
V
J
V
V
V
V
V
V
V
V
U
E
U
E
U E
C
O
M
WOODS
WOODS
WOODS
WOODS
MH# 42
MH# 43
12' (TYP)
MH# LP-28
MH# 41
MH# 44
X
X
X
X
R50.0'
NORTHING: 3,893,987.94
EASTING: 1,475,743.12
AP-5991
AP-5996
AP-5997
STATION=14+00
OFFSET=-32.0 FT
STATION=15+00
OFFSET=-32.0 FT
STATION=16+00
OFFSET=-32.0 FT
STATION=17+00
OFFSET=-32.0 FT
STATION=18+00
OFFSET=-32.0 FT
STATION=19+00
OFFSET=-32.0 FT
R .0
00 40' 80'
ALASKA DISTRICT
D A
T E
D E
S C
R I P
T I O
N A
P P
D
D E
S I G
N E
D
B
Y
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
E E
T
A L A
S K
A
D
I S
T R
I C
T
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
J B
E R
A
L A
S
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
A N
S I
D
S I Z
E
F I L E
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
D R
A W
I N
G
T R
A C
K I N
G A
C T
I O
N D
A T
E M
A R
K D
E S
C R
I P
T I O
N M
A
E
L S
B
A
L A
S K
A
F
T
E N
D
S
T E
A M
W
A T
I L I D
U C
T
T
O
S
O U
O P
AM#02
O
W
K B
R
F T
Q W
E I E
A F
D r a w i n g
X
U
N I F
I E
D E
N T
E J o b s E
I E
D w g s C
A D
X r e f P a n d P
M o d e l
F i l e d w g l a s t s a v e d o n
P
M w a s p l o t t e d b y
G i l l
T h o m a s
J
C
A
R M
Y
C
E P
S o n
P
M
VERIFY SCALES: IF THIS LINE 0 2"
DOES NOT MEASURE 2", ADJUST SCALE ACCORDINGLY.
U T
I L I D
U C
T
S
T
O
G
S
C H
M I D
T
S
G
E P
P E
R T
T
G
I L
L
T
G
I L
L
C I V
I L
P a n d
P
M o d e l
F i l e d w g
C-101
P L A
O
F I L E
S
BLDG 713
Scale: 1" = 40'
UTILIDUCT PROFILE - STA 10+00 TO 18+00
A1
Scale: 1" = 40'
UTILIDUCT PLAN - STA 10+00 TO 18+00
E1
INSTALL
ACCESS GATE
INSTALL 4' CHAIN-LINK
FENCING TO
CLEARING LIMITS
LEGEND
PROJECT LIMITS
GRAVEL ACCESS ROAD
REMOVABLE KEYED
VEHICLE TRAFFIC LID
REMOVABLE
NON-TRAFFIC LID
S-502
E1
S-503
F1
NOTES:
1. EIE376 CONTRACTOR WILL BE WORKING IN
THIS AREA BETWEEN STA 10+00 AND 12+50
AFTER 1 OCTOBER 2018 TO CONSTRUCT A
POV PARKING LOT AND DRAINAGE SWALE.
2. NEW PIPES INSTALLED BETWEEN STA 10+00
AND STA 12+50 SHALL BE FLUSHED AND
PRESSURE TESTED BY NLT 1 OCTOBER 2018.
3. EIE405 CONTRACTOR SHALL HAVE ALL
MATERIALS, EQUIPMENT, VEHICLES AND
PERSONNEL MOVED OUT OF THIS AREA BY
NLT 1 OCTOBER 2018.
4. PRIOR TO VACATING THE AREA, EIE405
CONTRACTOR SHALL ENSURE UTILIDUCT
BETWEEN STA 10+00 AND 12+50 HAS A 1-FOOT
MINIMUM DEPTH OF CLASSIFIED MATERIAL
COVER OVER THE RIGID BOARD INSULATION.
5. EIE405 CONTRACTOR SHALL STAKE THE
CENTERLINE OF THE UTILIDUCT EVERY
25-FEET BETWEEN STA 10+00 AND 12+50 AND
IDENTIFY ON THE LATH THE COVER DEPTH.
6. GROUNDWATER SYMBOLS SHOWN ON THE
PROFILE REPRESENT THE HIGHEST
GROUNDWATER TABLE ELEVATIONS
MEASURED DURING OR AFTER DRILLING. TEST
BORINGS WERE COMPLETED BETWEEN
4-APR-2017 AND 9-APR-2017.
SEE NOTES 1-5
C-501
A1
C-501
A8
C-301
A3
C-339
A3
C-335
A3
C-335
A3
GRAVEL ACCESS ROAD TURNAROUND,
SEE STA 42+50 FOR DIMENSIONS
(CROSSING OVER UTILIDUCT MUST BE
BETWEEN MH#42 AND STA 14+40)
U
P D
A T
L L O
B
B
G
2 2 e v a t i o n
E l e v a t i o n
18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00
F G
E G
0.40%
.8
.8
0.40%
.8
.8
GRAVEL
ACCESS ROAD ℄
FG
ENSURE A MIN 8"
COVER OVER RIGID
INSULATION
FROZEN
AP-5995
AP-5994
M H
T
Y P
E
F L O
E
I N
V
I N
V
M H
T
Y P
E
F L O
E
I N
V
I N
V
M H
T
Y P
G
E
F L O
E
I N
V
I N
V
M H
T
Y P
E
F L O
E
I N
V
I N
V
S T
A
549.02 549.00 548.97 548.94 548.90 548.87 548.83 548.79 548.76 548.72 548.66 548.58 548.49 548.38 548.25 548.10 547.94 547.75 547.55 547.44 547.52 547.63 547.74 547.83 547.90 547.95 547.97 547.98 547.98 547.96 547.92 547.86 547.78 547.69 547.57 547.44 547.33 547.31 547.37 547.51 547.80ROAD ℄
EG
O
H
E
C
O
M
WOODS
O
H
E
O
H
E
O
H
E
C
O
M
C
O
M C
O
M
C
O
M
C
O
M
WOODS
WOODS
MH# 45
MH# 46
P
O
L
7 5
MH# 44
MH# 47
C
A
R
G
A
A
D
AP-5994
AP-5995
X
X
X
X
X
STATION=18+00
OFFSET=-32.0 FT
STATION=19+00
OFFSET=-32.0 FT
STATION=20+00
OFFSET=-32.0 FT
STATION=21+00
OFFSET=-32.0 FT
STATION=22+00
OFFSET=-32.0 FT
STATION=23+00
OFFSET=-32.0 FT
STATION=24+00
OFFSET=-32.0 FT
STATION=26+00
OFFSET=-32.0 FT
STATION=27+00
OFFSET=-32.0 FT
STATION=28+00
OFFSET=-33.5 FT
R80.0'
WOODS
NORTHING: 3,894,539.68
EASTING: 1,475,675.49
R60.0'
NORTHING: 3,895,070.69
EASTING: 1,475,553.81
18+00
19+00
X
X
X
X
X
X
X
00 40' 80'
ALASKA DISTRICT
D A
T E
D E
S C
R I P
T I O
N A
P P
D
D E
S I G
N E
D
B
Y
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
E E
T
A L A
S K
A
D
I S
T R
I C
T
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
J B
E R
A
L A
S
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
A N
S I
D
S I Z
E
F I L E
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
D R
A W
I N
G
T R
A C
K I N
G A
C T
I O
N D
A T
E M
A R
K D
E S
C R
I P
T I O
N M
A
E
L S
B
A
L A
S K
A
F
T
E N
D
S
T E
A M
W
A T
I L I D
U C
T
T
O
S
O U
O P
AM#02
O
W
K B
R
F T
Q W
E I E
A F
D r a w i n g
X
U
N I F
I E
D E
N T
E J o b s E
I E
D w g s C
A D
X r e f P a n d P
M o d e l
F i l e d w g l a s t s a v e d o n
P
M w a s p l o t t e d b y
G i l l
T h o m a s
J
C
A
R M
Y
C
E P
S o n
P
M
VERIFY SCALES: IF THIS LINE 0 2"
DOES NOT MEASURE 2", ADJUST SCALE ACCORDINGLY.
U T
I L I D
U C
T
S
T
O
G
S
C H
M I D
T
S
G
E P
P E
R T
T
G
I L
L
T
G
I L
L
C I V
I L
P a n d
P
M o d e l
F i l e d w g
C-102
P L A
O
F I L E
S
Scale: 1" = 40'
UTILIDUCT PLAN - STA 18+00 TO 28+00
E1
Scale: 1" = 40'
UTILIDUCT PROFILE - STA 18+00 TO 28+00
A1
INSTALL
ACCESS GATE
INSTALL 4' CHAIN-LINK
FENCING TO
CLEARING LIMITS
INSTALL 4' CHAIN-LINK
FENCING TO
CLEARING LIMITS
LEGEND
PROJECT LIMITS
GRAVEL ACCESS ROAD
REMOVABLE
NON-TRAFFIC LID
NOTE:
1. GROUNDWATER SYMBOLS SHOWN ON THE
PROFILE REPRESENT THE HIGHEST
GROUNDWATER TABLE ELEVATIONS
MEASURED DURING OR AFTER DRILLING.
TEST BORINGS WERE COMPLETED BETWEEN
4-APR-2017 AND 9-APR-2017.
C-501
A1
C-501
A8
C-501
A8
C-319
A3
C-335
A3
C-331
A3
C-335
A3
ME
GRAVEL ACCESS ROAD TURNAROUND,
SEE STA 42+50 FOR DIMENSIONS
(CROSSING OVER UTILIDUCT MUST BE
BETWEEN STA 24+50 AND MH#46)
INSTALL
ACCESS GATE
C-501
A1
E1
C-205
A1
C-205
S-502
E1
U
P D
A T
L L O
B
B
G
2 2 e v a t i o n
E l e v a t i o n
28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00
F G
E G
CARGAIN ROAD
CROSSING
-0.08%
0.15%
-0.08%
0.15%
S T
A
FIBER OPTIC
DUCTBANK
S T
A
GRAVEL
ACCESS ROAD ℄ FG
EG
ENSURE A MIN 8"
COVER OVER RIGID
INSULATION
S T
A
FROZEN
AP-5993
AP-5992
AP-5990 AP-5989
M H
T
Y P
E
F L O
E
I N
V
I N
V
M H
T
Y P
E
F L O
E
I N
V
I N
V
M H
T
Y P
E
F L O
E
I N
V
I N
V
.2
.2
547.80ROAD ℄ 547.41 547.29 547.19 547.10 547.03 546.97 546.93 546.91 546.90 546.89 546.88 546.87 546.86 546.86 546.85 546.84 546.83 546.83 546.82 546.81 546.80 546.79 546.79 546.78 546.77 546.76 546.76 546.75 546.74 546.73 546.72 546.70 546.68 546.65 546.63 546.61
M W
P
O
L
OH/E
OH/E
OH/E
OH/E
C
O
M
WOODS
WOODS
WOODS
WOODS
BRUSH
TOP OF ASBESTOS LANDFILL BERM
OH/E
O
H
E
P
O
L
C
O
M
C
O
M
C
O
M
C
O
M
C
O
M
C
O
M
C
O
M
C
O
M
C
O
M
C
O
M
C
O
M
C
O
M C
O
M C
O
M
MH# 48
MH# 49
MH# 50
P
O
L
MH# 47
C
A
R
G
A
A
D
AP-5989
AP-5990
AP-5992
AP-5993
STATION=28+00
OFFSET=-33.5 FT
STATION=29+10
OFFSET=28.0 FT
STATION=30+00
OFFSET=28.0 FT
STATION=31+00
OFFSET=30.0 FT
STATION=32+00
OFFSET=30.0 FT
STATION=33+00
OFFSET=30.0 FT
STATION=35+00
OFFSET=30.0 FT
STATION=36+00
OFFSET=30.0 FT
STATION=37+00
OFFSET=30.0 FT
STATION=38+00
OFFSET=30.0 FT
R40.0
NORTHING: 3,895,628.91
EASTING: 1,474,943.36
NORTHING: 3,895,776.11
EASTING: 1,475,046.96
NORTHING: 3,895,489.09
EASTING: 1,475,246.28
R90.0
R90.0
R90.0
NORTHING: 3,895,721.46
EASTING: 1,475,097.75
31+00
32+00
33+00
34+00
35+00
36+00
37+00
38+00
00 40' 80'
ALASKA DISTRICT
D A
T E
D E
S C
R I P
T I O
N A
P P
D
D E
S I G
N E
D
B
Y
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
E E
T
A L A
S K
A
D
I S
T R
I C
T
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
J B
E R
A
L A
S
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
A N
S I
D
S I Z
E
F I L E
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
D R
A W
I N
G
T R
A C
K I N
G A
C T
I O
N D
A T
E M
A R
K D
E S
C R
I P
T I O
N M
A
E
L S
B
A
L A
S K
A
F
T
E N
D
S
T E
A M
W
A T
I L I D
U C
T
T
O
S
O U
O P
AM#02
O
W
K B
R
F T
Q W
E I E
A F
D r a w i n g
X
U
N I F
I E
D E
N T
E J o b s E
I E
D w g s C
A D
X r e f P a n d P
M o d e l
F i l e d w g l a s t s a v e d o n
P
M w a s p l o t t e d b y
G i l l
T h o m a s
J
C
A
R M
Y
C
E P
S o n
P
M
VERIFY SCALES: IF THIS LINE 0 2"
DOES NOT MEASURE 2", ADJUST SCALE ACCORDINGLY.
U T
I L I D
U C
T
S
T
O
G
S
C H
M I D
T
S
G
E P
P E
R T
T
G
I L
L
T
G
I L
L
C I V
I L
P a n d
P
M o d e l
F i l e d w g
C-103
P L A
O
F I L E
S
Scale: 1" = 40'
UTILIDUCT PLAN - STA 28+00 TO 38+00
E1
Scale: 1" = 40'
UTILIDUCT PROFILE - STA 28+00 TO 38+00
A1
GRAVEL ACCESS ROAD TURNAROUND,
SEE STA 42+50 FOR DIMENSIONS
(CROSSING OVER UTILIDUCT MUST BE
BETWEEN STA 30+00 AND MH#48)
PLACE SANDBAGS BETWEEN RIGID
BOARD INSULATION AND DUCTBANK
FOR THE WIDTH OF UTILIDUCT
PROTECT UTILITY
POLE / MONITORING
WELL IN PLACE
PROTECT UTILITY
POLE IN PLACE
WETLANDS
LEGEND
PROJECT LIMITS
GRAVEL ACCESS ROAD
REMOVABLE KEYED
VEHICLE TRAFFIC LID
REMOVABLE
NON-TRAFFIC LID
S-502
E1
S-503
F1
NOTE:
1. GROUNDWATER SYMBOLS SHOWN ON THE
PROFILE REPRESENT THE HIGHEST
GROUNDWATER TABLE ELEVATIONS
MEASURED DURING OR AFTER DRILLING.
TEST BORINGS WERE COMPLETED BETWEEN
4-APR-2017 AND 9-APR-2017.
C-311
A3
C-335
A3
C-335
A3
E1
C-205
A1
C-205
U
P D
A T
L L O
B
B
G
2 2 e v a t i o n
E l e v a t i o n
38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00
F G
E G
0.10%
0.05%
0.30%
0.25%
0.10%
0.05%
0.30%
0.25%
GRAVEL
ACCESS ROAD ℄
FG
EG
ENSURE A MIN 8"
COVER OVER RIGID
INSULATION
AP-5988
AP-5987
M H
T
Y P
E
F L
O O
R
E
L E
I N
V
I N
V
M H
T
Y P
E
F L
O O
R
E
L E
I N
V
I N
V
M H
T
Y P
E
F L
O O
R
E
L E
I N
V
I N
V
M H
T
Y P
E
F L
O O
R
E
L E
I N
V
I N
V
ROAD ℄ 546.61 546.58 546.56 546.53 546.51 546.49 546.46 546.44 546.42 546.39 546.37 546.35 546.32 546.30 546.28 546.25 546.23 546.21 546.18 546.16 546.13 546.11 546.08 546.04 546.01 545.97 545.92 545.85 545.78 545.69 545.59 545.47 545.35 545.21 545.06 544.90 544.73 544.56 544.41 544.28 544.17
F
WOODS
OH/E
O H/E
OH/E
OH/E
O
H
E
O
H
E
O
H
E
WOODS
WOODS
TOP OF ASBESTOS LANDFILL BERM
T
B
E
S
T
N
D
F
I
R
M
BRUSH
BRUSH
WOODS
O
H
E O
H
E
WOODS
BRUSH
BRUSH
O
H
E
MH# 51
MH# 52
MH# 53
MH# 54
O
H
E
30'
20'
AP-5987
AP-5988
FLUSHED WATER
DISCHARGE POINT
MIN 50-FEET FROM MH
90°
125'
STATION=39+00
OFFSET=30.0 FT
STATION=40+00
OFFSET=30.0 FT
STATION=41+00
OFFSET=30.0 FT
STATION=42+00
OFFSET=30.0 FT
STATION=44+00
OFFSET=30.0 FT
STATION=45+00
OFFSET=30.0 FT
STATION=46+00
OFFSET=30.0 FT
STATION=47+00
OFFSET=30.0 FT
R70.0'
R75.0'
R80.0
R 15' (TYP)
NORTHING: 3,896,085.27
EASTING: 1,474,539.76
NORTHING: 3,896,280.88
EASTING: 1,474,259.35
NORTHING: 3,896,584.57
EASTING: 1,473,966.49
STATION=43+00
OFFSET=30.0 FT
40+00
41+00
42+00
43+00
00 40' 80'
ALASKA DISTRICT
D A
T E
D E
S C
R I P
T I O
N A
P P
D
D E
S I G
N E
D
B
Y
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
E E
T
A L A
S K
A
D
I S
T R
I C
T
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
J B
E R
A
L A
S
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
A N
S I
D
S I Z
E
F I L E
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
D R
A W
I N
G
T R
A C
K I N
G A
C T
I O
N D
A T
E M
A R
K D
E S
C R
I P
T I O
N M
A
E
L S
B
A
L A
S K
A
F
T
E N
D
S
T E
A M
W
A T
I L I D
U C
T
T
O
S
O U
O P
AM#02
O
W
K B
R
F T
Q W
E I E
A F
D r a w i n g
X
U
N I F
I E
D E
N T
E J o b s E
I E
D w g s C
A D
X r e f P a n d P
M o d e l
F i l e d s t s a v e d o n
P
M w a s p l o t t e d b y
G i l l
T h o m a s
J
C
A
R M
Y
C
E P
S o n
P
M
VERIFY SCALES: IF THIS LINE 0 2"
DOES NOT MEASURE 2", ADJUST SCALE ACCORDINGLY.
U T
I L I D
U C
T
S
T
O
G
S
C H
M I D
T
S
G
E P
P E
R T
T
G
I L
L
T
G
I L
L
C I V
I L
P a n d
P
M o d e l
F i l e d w g
C-104
P L A
O
F I L E
S
Scale: 1" = 40'
UTILIDUCT PLAN - STA 38+00 TO 48+00
E1
Scale: 1" = 40'
UTILIDUCT PROFILE - STA 38+00 TO 48+00
A1
GRAVEL ACCESS ROAD
TURNAROUND, TYPICAL
DIMENSIONS (FIELD LOCATE)
NOTES:
1. PROJECT LIMIT ADJACENT TO TRACKS IS A
MINIMUM 12-FEET FROM NEAREST RAIL.
2. GROUNDWATER SYMBOLS SHOWN ON THE
PROFILE REPRESENT THE HIGHEST
GROUNDWATER TABLE ELEVATIONS MEASURED
DURING OR AFTER DRILLING. TEST BORINGS
WERE COMPLETED BETWEEN 4-APR-2017 AND
9-APR-2017.
PROTECT UTILITY
POLE IN PLACE
PROTECT UTILITY
POLE IN PLACE
LEGEND
WETLANDS
PROJECT LIMITS
GRAVEL ACCESS ROAD
REMOVABLE
NON-TRAFFIC LID
E1
C-204
C-307
A3
C-307
A3
C-335
A3
C-319
A3
DE-CHLORINATED WATER MAY BE
DISCHARGED TO THIS 250' x 250' SQUARE AREA
DISCONTINUOUS
PERMAFROST MAY BE
FOUND BETWEEN STA
39+00 AND 42+50
S-502
U
P D
A T
L L O
B
B
G
2 2 e v a t i o n
E l e v a t i o n
48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00
F G
E G
QUARRY ROAD CROSSING
.1
-0.30%
-0 .7
-0.05%
.1
-0.30%
-0 .7
-0.05%
S T
A
S T
A
S T
A
INSTALL 24-INCH
CPEP CULVERT
IE EAST: 542.25
IE WEST: 542.25
(FIELD LOCATE TO
LOW POINT ON EAST
SIDE OF UTILIDUCT)
(FIELD LOCATE TO
LOW POINT ON EAST
SIDE OF UTILIDUCT)
FG
GRAVEL
ACCESS ROAD ℄
ENSURE A MIN 8"
COVER OVER RIGID
INSULATION
INSTALL 12 INCH
CPEP CULVERT
IE EAST: 543.55
IE WEST: 543.50
INSTALL 12 INCH
CPEP CULVERT
IE EAST: 543.55
IE WEST: 543.50
AP-5986
AP-5985
M H
T
Y P
E
F L
O O
R
E
L E
I N
V
I N
V
M H
T
Y P
E
F L
O O
R
E
L E
I N
V
I N
V
M H
T
Y P
E
F L
O O
R
E
L E
I N
V
I N
V
S T
A
ROAD ℄ 544.17 544.07 544.00 543.94 543.90 543.88 543.88 543.90 543.94 543.99 544.06 544.13 544.20 544.27 544.36 544.56 544.90 545.33 545.68 545.68 545.32 544.86 544.64 544.80 545.35 546.23 547.16
EG
J
J
E
J
G
R
A
V
A
D
WOODS
WOODS
WOODS
WOODS
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
C
O
M
C
O
M
C
O
M
C
O
M
C
O
M
C
O
M
C
O
M
C
O
M
C
O
M
C
O
M
O
H
E
O
H
E
BRUSH
BRUSH
BRUSH
BRUSH
O
H
/E
WOODS
WOODS
GRAVEL
PAD
G
R
A
V
O
U
L
D
E
R
G
R
A
V
O
U
L
D
E
R
Q
U
A
R
Y
A
D
MH# 55
MH# 56
MH# 57
MH# 58
GRAVEL
PAD
AP-5985
AP-5986
STATION=48+00
OFFSET=31.5 FT
STATION=49+00
OFFSET=24.4 FT
STATION=50+00
OFFSET=24.6 FT
STATION=52+00
OFFSET=28.0 FT
STATION=53+00
OFFSET=27.9 FT
STATION=54+00
OFFSET=29.9 FT
R135.0'
R35.0'
NORTHING: 3,896,840.24
EASTING: 1,473,801.84
NORTHING: 3,897,060.06
EASTING: 1,473,612.65
48+00
49+00
50+00
J
E
J
C
O
M
35'
9'
00 40' 80'
ALASKA DISTRICT
D A
T E
D E
S C
R I P
T I O
N A
P P
D
D E
S I G
N E
D
B
Y
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
E E
T
A L A
S K
A
D
I S
T R
I C
T
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
J B
E R
A
L A
S
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
A N
S I
D
S I Z
E
F I L E
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
D R
A W
I N
G
T R
A C
K I N
G A
C T
I O
N D
A T
E M
A R
K D
E S
C R
I P
T I O
N M
A
E
L S
B
A
L A
S K
A
F
T
E N
D
S
T E
A M
W
A T
I L I D
U C
T
T
O
S
O U
O P
AM#02
O
W
K B
R
F T
Q W
E I E
A F
D r a w i n g
X
U
N I F
I E
D E
N T
E J o b s E
I E
D w g s C
A D
X r e f P a n d P
M o d e l
F i l e d s t s a v e d o n
P
M w a s p l o t t e d b y
G i l l
T h o m a s
J
C
A
R M
Y
C
E P
S o n
P
M
VERIFY SCALES: IF THIS LINE 0 2"
DOES NOT MEASURE 2", ADJUST SCALE ACCORDINGLY.
U T
I L I D
U C
T
S
T
O
G
S
C H
M I D
T
S
G
E P
P E
R T
T
G
I L
L
T
G
I L
L
C I V
I L
P a n d
P
M o d e l
F i l e d w g
C-105
P L A
O
F I L E
S
Scale: 1" = 40'
UTILIDUCT PLAN - STA 48+00 TO 58+00
E1
Scale: 1" = 40'
UTILIDUCT PROFILE - STA 48+00 TO 58+00
A1
INSTALL MANUAL
SWING GATE
RELOCATE R15-1
GRADE CROSSING
SIGN HERE
INSTALL ROADSIDE SUMP ALARM ON R15-1
SIGNPOST A MIN 5' ABOVE FINISH GRADE,
FACING ROADWAY
PLACE BOULDERS
(EACH SIDE OF GATE)
INSTALL 12"
CPEP CULVERTS
INSTALL24" CPEP
CULVERT EXTENSION
LEGEND
WETLANDS
PROJECT LIMITS
GRAVEL ACCESS ROAD
REMOVABLE KEYED
VEHICLE TRAFFIC LID
REMOVABLE
NON-TRAFFIC LID
S-502
E1
S-503
F1
SEE INSERT
NOTE:
1. GROUNDWATER SYMBOLS SHOWN ON THE
PROFILE REPRESENT THE HIGHEST
GROUNDWATER TABLE ELEVATIONS
MEASURED DURING OR AFTER DRILLING.
TEST BORINGS WERE COMPLETED BETWEEN
4-APR-2017 AND 9-APR-2017.
C-501
E5
C-501
A1
C-503
A7
C-503
E1
A1
C-204
C-319
A3
C-335
A3
C-323
A3
ME
INSERT
GRAVEL ACCESS ROAD TURNAROUND,
SEE STA 42+50 FOR DIMENSIONS
(CROSSING OVER UTILIDUCT MUST BE
BETWEEN STA 50+50 AND MH#55)
DE-CHLORINATED WATER MAY BE
DISCHARGED TO THIS 250' x 250'
SQUARE AREA (SEE C-104)
U
P D
A T
L L O
B
B
G
2 2 e v a t i o n
E l e v a t i o n
58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00 67+00 68+00
F G
E G
-0.18%
0.24%
0.25%
0.25%
-0.18%
0.24%
0.25%
0.25%
FG
EG
ENSURE A MIN 8"
COVER OVER RIGID
INSULATION
AP-5983
AP-5984
M H
M H
T
Y P
E
F L
O O
R
E
L E
I N
V
I N
V
M H
T
Y P
E
F L
O O
R
E
L E
I N
V
I N
V
M H
T
Y P
E
F L
O O
R
E
L E
I N
V
I N
V
M H
T
Y P
E
F L
O O
R
E
L E
I N
V
I N
V
M H
R
E
F L
O O
R
E
L E
I N
V
I N
V
M H
T
Y P
E
F L
O O
R
E
L E
I N
V
I N
V
ESU-2
O
H
E
O
H
E
O
H
E
O
H
E
O H
/E
O
H
E
O
H
E
O
H
E
WOODS
WOODS
O
H E
C
O
M
C
O
M
C O
M
C
O
M
C
O
M
C
O
M
C
O
M
C O
M
C O
M
C
O
M
C
O
M
COM
C
O
M
C
O
M
C
O
M
BRUSH
I N
D
U
S
T R
I A
L
D
R
I V
E
Q
U
A
R
A
D
G
R
A
V
E
L
S
H
O
U
L D
E
R
G
R
A
V
O
U
L
D
E
R
MH# 58
MH# 59
MH# 60
MH# 61
MH# 62
P
O
L
P
O
L
P
O
L
P
O
L
AP-5983
AP-5984
00 40' 80'
ALASKA DISTRICT
D A
T E
D E
S C
R I P
T I O
N A
P P
D
D E
S I G
N E
D
B
Y
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
E E
T
A L A
S K
A
D
I S
T R
I C
T
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
J B
E R
A
L A
S
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
A N
S I
D
S I Z
E
F I L E
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
D R
A W
I N
G
T R
A C
K I N
G A
C T
I O
N D
A T
E M
A R
K D
E S
C R
I P
T I O
N M
A
E
L S
B
A
L A
S K
A
F
T
E N
D
S
T E
A M
W
A T
I L I D
U C
T
T
O
S
O U
O P
AM#02
O
W
K B
R
F T
Q W
E I E
A F
D r a w i n g
X
U
N I F
I E
D E
N T
E J o b s E
I E
D w g s C
A D
X r e f P a n d P
M o d e l
F i l e d s t s a v e d o n
P
M w a s p l o t t e d b y
G i l l
T h o m a s
J
C
A
R M
Y
C
E P
S o n
P
M
VERIFY SCALES: IF THIS LINE 0 2"
DOES NOT MEASURE 2", ADJUST SCALE ACCORDINGLY.
U T
I L I D
U C
T
S
T
O
G
S
C H
M I D
T
S
G
E P
P E
R T
T
G
I L
L
T
G
I L
L
C I V
I L
P a n d
P
M o d e l
F i l e d w g
C-106
P L A
O
F I L E
S
LEGEND
PROJECT LIMITS
Scale: 1" = 40'
UTILIDUCT PLAN - STA 58+00 TO 68+00
E1
Scale: 1" = 40'
UTILIDUCT PROFILE - STA 58+00 TO 68+00
A1
REMOVABLE
NON-TRAFFIC LID
C-335
A3
C-327
A3
C-335
A3
C-335
A3
C-335
A3
NOTE:
1. GROUNDWATER SYMBOLS SHOWN ON THE
PROFILE REPRESENT THE HIGHEST
GROUNDWATER TABLE ELEVATIONS
MEASURED DURING OR AFTER DRILLING.
TEST BORINGS WERE COMPLETED BETWEEN
4-APR-2017 AND 9-APR-2017.
S-502
U
P D
A T
L L O
B
B
G
2 2
NEW 20" STEAM
NEW 12" WATER
NEW 4" SUMP DISCHARGE LINE
NEW 8" CONDENSATE
RETURN
NEW CONDENSATE RETURN
ALIGNMENT GUIDE
NEW STEAM ALIGNMENT GUIDE
NEW CONDENSATE RETURN
ALIGNMENT GUIDE
NEW STEAM
EXPANSION
JOINT
NEW 45° ELBOWS
NEW 2'x2'x2' SUMP PIT
NEW SUMP PUMP
NEW ACCESS LADDER
NEW ACCESS OPENING
NEW STEAM DRIP LEG
NEW TRAP ASSEMBLY
NEW 22.5° ELBOWS
NEW 20" STEAM
NEW 12" WATER
NEW 4" SUMP DISCHARGE LINE
NEW 8" CONDENSATE
RETURN
SCALE: 1/2" = 1'-0"
MANHOLE TYPE C (22.50° L) NEW PLAN
6'-6"
6'-6"
18'-6
22'-8"
3'-0"
5'-10
4'-11
22.50°
A
B
NEW UTILIDUCT
ALIGNMENT
NEW UTILIDUCT
ALIGNMENT
A3
C-317
D3
C-317
A2
C-318
D8
C-318
E2
C-318
4'-0"
4'-0"
4'-0"
4'-0"
NEW ACCESS LADDER
NEW 4" EXPANSION JOINT
ANCHOR
(TYPICAL)
GENERAL MANHOLE NOTES:
1. SEE SHEET S-601 FOR FLOOR, WALL AND ROOF DIMENSIONS AND FOR
REINFORMENT SCHEDULES.
2. DRIP LEG AND TRAP ASSEMBLY. PROVIDE DRIP LEG(S) AND TRAP
ASSEMBLY(S) WHERE SHOWN AND AS SHOWN ON SHEET C-621.
3. PRESSURE GAUGES. PRESSURE GAUGES SHALL BE PROVIDED ON EACH
SIDE OF SHUT OFF VALVES AND WHERE INDICATED. PRESSURE GAUGES
FOR STEAM AND CONDENSATE LINES SHALL BE INSTALLED AS SHOWN IN
DETAIL 3 ON SHEET C-621.
4. BLOWDOWNS. BLOWDOWNS SHALL BE PROVIDED ON EACH DRIP LEG
AND WHERE INDICATED. BLOWDOWNS FOR STEAM AND CONDENSATE
LINES SHALL BE INSTALLED AS SHOWN IN DETAILS 1 AND 4 ON SHEET
C-621.
5. DRAINS. WATER MAIN DRAINS SHALL BE PROVIDED IN EACH MANHOLE.
SUMP DISCHARGE DRAINS SHALL BE PROVIDED IN MANHOLES
IDENTIFIED IN DETAIL E10 ON SHEET C-502.
6. SUMP PUMPS. SUMP PUMP SHALL BE INSTALLED AS SHOWN ON SHEET
C-625 AND AS REQUIRED ON ELECTRICAL DRAWINGS. ALL NEW
MANHOLE FLOORS SHALL BE SLOPED TO DRAIN TOWARDS THE SUMP
PIT. NEW GRATING SHALL BE INSTALLED OVER SUMP PIT, FOR ALL NEW
AND EXISTING MANHOLES WITH A SUMP PIT.
7. PROVIDE MANHOLE VENTILATION PIPES AS SHOWN ON SHEET C-505
AND AS LOCATED ON THE S-100 SERIES SHEETS.
8. PROVIDE PIPING IDENTIFICATION MARKERS ON PIPING WITHIN
MANHOLES AS STIPULATED IN SECTIONS 33 05 29.00 29, 33 05 33.00 29
AND 33 05 37.00 29.
SUMP STROBE
ALARM FOUNDATION
FLOOR ANCHOR
NEW MANHOLE LOCATIONS
MH TYPE
C
C
MH NUMBER
MH# 64
MH# 64
POINT
A
B
NORTHING
3898469.39
3898485.35
EASTING
1472704.30
1472694.42
ALASKA DISTRICT
D A
T E
D E
S C
R I P
T I O
N A
P P
D
D E
S I G
N E
D
B
Y
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
E E
T
A L
A S
S
T R
I C
T
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
J B
E R
A
L A
S
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
A N
S I
D
S I Z
E
F I L E
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
D R
A W
I N
G
T R
A C
K I N
G A
C T
I O
N D
A T
E M
A R
K D
E S
C R
I P
T I O
N M
A
E
L S
B
A
L A
S K
A
F
T
E N
D
S
T E
A M
W
A T
I L I D
U C
T
T
O
S
O U
O P
AM#02
O
W
K B
R
F T
Q W
E I E
A F
D r a w i n g
X
U
N I F
I E
D E
N T
E J o b s E
I E
D w g s C
A D
E
I E
C d s t s a v e d o n
A
M w a s p l o t t e d b y
G i l l
T h o m a s
J
C
A
R M
Y
C
E P
S o n
P
M
VERIFY SCALES: IF THIS LINE 0 2"
DOES NOT MEASURE 2", ADJUST SCALE ACCORDINGLY.
M A
N H
O
P
L
N
W
A
N
J
F
A B
R I Z
Z I O
B
G
O E
R I N
G
E P
P E
R T
G
T
A C
K E
S
G
T
A C
K E
S T
G
I L
L
C I V
I L
E I E
C d w g
C-316
L A
R G
E
S
C A
E
A N
H O
L E
S
S
T
O
A
M
D
M
E N
S I O
N S
G J T
NEW 4" SUMP DISCHARGE LINE
NEW 8" CONDENSATE
RETURN
NEW STEAM ALIGNMENT GUIDE
NEW CONDENSATE RETURN
ALIGNMENT GUIDE
NEW 45° ELBOWS
NEW 2'x2'x2' SUMP PIT
NEW 45° ELBOWS
NEW ACCESS LADDER
NEW ACCESS
NEW ACCESS OPENING
NEW STEAM EXPANSION JOINT
NEW STEAM DRIP LEG
NEW TRAP
ASSEMBLY
NEW 20" STEAM
NEW 12" WATER
NEW 22.5° ELBOWS
NEW 4" SUMP DISCHARGE LINE
NEW 8" CONDENSATE
NEW 22.5° ELBOWS
NEW CONDENSATE EXPANSION JOINT
NEW CONDENSATE RETURN
ALIGNMENT GUIDE
NEW 2" GATE VALVE
NEW 2" UNION
NEW 2" CHECK VALVE
NEW MANHOLE SECTION
SCALE: 1/2" = 1'-0"
A3
C-317
NEW MANHOLE SECTION
SCALE: 1/2" = 1'-0"
D3
C-317
2'-4"
3'-6"
1'-2"
7'-0"
NEW 4" EXPANSION JOINT
NEW 4'x4' ACCESS HATCH
NEW 4'x4' ACCESS HATCH
ALASKA DISTRICT
D A
T E
D E
S C
R I P
T I O
N A
P P
D
D E
S I G
N E
D
B
Y
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
E E
T
A L
A S
S
T R
I C
T
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
J B
E R
A
L A
S
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
A N
S I
D
S I Z
E
F I L E
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
D R
A W
I N
G
T R
A C
K I N
G A
C T
I O
N D
A T
E M
A R
K D
E S
C R
I P
T I O
N M
A
E
L S
B
A
L A
S K
A
F
T
E N
D
S
T E
A M
W
A T
I L I D
U C
T
T
O
S
O U
O P
AM#02
O
W
K B
R
F T
Q W
E I E
A F
D r a w i n g
X
U
N I F
I E
D E
N T
E J o b s E
I E
D w g s C
A D
E
I E
C d s t s a v e d o n
A
M w a s p l o t t e d b y
G i l l
T h o m a s
J
C
A
R M
Y
C
E P
S o n
P
M
VERIFY SCALES: IF THIS LINE 0 2"
DOES NOT MEASURE 2", ADJUST SCALE ACCORDINGLY.
M A
N H
O
P
L
N
C
T I O
O
F
J
F
A B
R I Z
Z I O
B
G
O E
R I N
G
E P
P E
R T
G
T
A C
K E
S
G
T
A C
K E
S T
G
I L
L
C I V
I L
E I E
C d w g
C-317
L A
R G
E
S
C A
E
A N
H O
L E
S
S
T
O
A
M
D
M
E N
S I O
N S
G
NEW 4" SUMP DISCHARGE LINE
NEW 8" CONDENSATE
RETURN
NEW CONDENSATE RETURN
ALIGNMENT GUIDE
NEW STEAM ALIGNMENT GUIDE
NEW CONDENSATE RETURN
ALIGNMENT GUIDE
NEW STEAM EXPANSION JOINT
NEW 45° ELBOWS
NEW 2'x2'x2'
SUMP PIT
NEW SUMP PUMP
NEW CONDENSATE EXPANSION JOINT
NEW ACCESS LADDER
NEW ACCESS OPENING
NEW ACCESS LADDER
NEW ACCESS OPENING
NEW STEAM
DRIP LEG
NEW TRAP ASSEMBLY
NEW 45° ELBOWS
NEW 45°
ELBOWS
NEW 20" STEAM
NEW 12" WATER
NEW 4" SUMP DISCHARGE LINE
NEW 8" CONDENSATE
RETURN
SCALE: 1/2" = 1'-0"
MANHOLE TYPE E (45.00° L) NEW PLAN
6'-6"
6'-6"
14'-4"
22'-8"
4'-8"
6'-7
5'-2
NEW UTILIDUCT
ALIGNMENT
45.00°
NEW UTILIDUCT ALIGNMENT
A3
C-325
E2
C-325
A2
C-326
D8
C-326
E2
C-326
4'-0"
4'-0"
4'-0"
4'-0"
ANCHOR
(TYPICAL)
GENERAL MANHOLE NOTES:
1. SEE SHEET S-601 FOR FLOOR, WALL AND ROOF DIMENSIONS AND FOR
REINFORMENT SCHEDULES.
2. DRIP LEG AND TRAP ASSEMBLY. PROVIDE DRIP LEG(S) AND TRAP
ASSEMBLY(S) WHERE SHOWN AND AS SHOWN ON SHEET C-621.
3. PRESSURE GAUGES. PRESSURE GAUGES SHALL BE PROVIDED ON EACH
SIDE OF SHUT OFF VALVES AND WHERE INDICATED. PRESSURE GAUGES
FOR STEAM AND CONDENSATE LINES SHALL BE INSTALLED AS SHOWN IN
DETAIL 3 ON SHEET C-621.
4. BLOWDOWNS. BLOWDOWNS SHALL BE PROVIDED ON EACH DRIP LEG
AND WHERE INDICATED. BLOWDOWNS FOR STEAM AND CONDENSATE
LINES SHALL BE INSTALLED AS SHOWN IN DETAILS 1 AND 4 ON SHEET
C-621.
5. DRAINS. WATER MAIN DRAINS SHALL BE PROVIDED IN EACH MANHOLE.
SUMP DISCHARGE DRAINS SHALL BE PROVIDED IN MANHOLES
IDENTIFIED IN DETAIL E10 ON SHEET C-502.
6. SUMP PUMPS. SUMP PUMP SHALL BE INSTALLED AS SHOWN ON SHEET
C-625 AND AS REQUIRED ON ELECTRICAL DRAWINGS. ALL NEW
MANHOLE FLOORS SHALL BE SLOPED TO DRAIN TOWARDS THE SUMP
PIT. NEW GRATING SHALL BE INSTALLED OVER SUMP PIT, FOR ALL NEW
AND EXISTING MANHOLES WITH A SUMP PIT.
7. PROVIDE MANHOLE VENTILATION PIPES AS SHOWN ON SHEET C-505
AND AS LOCATED ON THE S-100 SERIES SHEETS.
8. PROVIDE PIPING IDENTIFICATION MARKERS ON PIPING WITHIN
MANHOLES AS STIPULATED IN SECTIONS 33 05 29.00 29, 33 05 33.00 29
AND 33 05 37.00 29.
SUMP STROBE
ALARM FOUNDATION
FLOOR ANCHOR
NEW MANHOLE LOCATIONS
MH TYPE
E
E
MH NUMBER
MH# 57
MH# 57
POINT
A
B
NORTHING
3897154.08
3897161.48
EASTING
1473508.03
1473491.80
ALASKA DISTRICT
D A
T E
D E
S C
R I P
T I O
N A
P P
D
D E
S I G
N E
D
B
Y
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
E E
T
A L
A S
S
T R
I C
T
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
J B
E R
A
L A
S
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
A N
S I
D
S I Z
E
F I L E
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
D R
A W
I N
G
T R
A C
K I N
G A
C T
I O
N D
A T
E M
A R
K D
E S
C R
I P
T I O
N M
A
E
L S
B
A
L A
S K
A
F
T
E N
D
S
T E
A M
W
A T
I L I D
U C
T
T
O
S
O U
O P
AM#02
O
W
K B
R
F T
Q W
E I E
A F
D r a w i n g
X
U
N I F
I E
D E
N T
E J o b s E
I E
D w g s C
A D
E
I E
C d s t s a v e d o n
A
M w a s p l o t t e d b y
G i l l
T h o m a s
J
C
A
R M
Y
C
E P
S o n
P
M
VERIFY SCALES: IF THIS LINE 0 2"
DOES NOT MEASURE 2", ADJUST SCALE ACCORDINGLY.
M A
N H
O
P
L
N
A
N
J
F
A B
R I Z
Z I O
B
G
O E
R I N
G
E P
P E
R T
G
T
A C
K E
S
G
T
A C
K E
S T
G
I L
L
C I V
I L
E I E
C d w g
C-324
L A
R G
E
S
C A
E
A N
H O
L E
S
S
T
O
A
M
D
M
E N
S I O
N S
G J T
NEW 4" SUMP DISCHARGE LINE
NEW 8" CONDENSATE
RETURN
NEW STEAM ALIGNMENT GUIDE
NEW CONDENSATE RETURN
ALIGNMENT GUIDE
NEW 45° ELBOWS
NEW 2'x2'x2' SUMP PIT
NEW 45° ELBOWS
NEW ACCESS LADDER
NEW ACCESS
NEW ACCESS
NEW STEAM EXPANSION JOINT
NEW STEAM DRIP LEG
NEW TRAP ASSEMBLY
NEW 20" STEAM
NEW 12" WATER
NEW 45° ELBOWS
NEW 4" SUMP DISCHARGE LINE
NEW 8" CONDENSATE
NEW 45° ELBOWS
NEW 2" GATE VALVE
NEW 2" UNION
NEW 2" CHECK VALVE
NEW CONDENSATE EXPANSION JOINT
NEW CONDENSATE RETURN
ALIGNMENT GUIDE
NEW MANHOLE SECTION
SCALE: 1/2" = 1'-0"
A3
C-325
NEW MANHOLE SECTION
SCALE: 1/2" = 1'-0"
E2
C-325
2'-4"
3'-6"
1'-2"
7'-0"
NEW 4" EXPANSION JOINT
NEW 4" EXPANSION JOINT
NEW 4'x4' ACCESS HATCH
NEW 4'x4' ACCESS HATCH
ALASKA DISTRICT
D A
T E
D E
S C
R I P
T I O
N A
P P
D
D E
S I G
N E
D
B
Y
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
E E
T
A L
A S
S
T R
I C
T
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
J B
E R
A
L A
S
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
A N
S I
D
S I Z
E
F I L E
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
D R
A W
I N
G
T R
A C
K I N
G A
C T
I O
N D
A T
E M
A R
K D
E S
C R
I P
T I O
N M
A
E
L S
B
A
L A
S K
A
F
T
E N
D
S
T E
A M
W
A T
I L I D
U C
T
T
O
S
O U
O P
AM#02
O
W
K B
R
F T
Q W
E I E
A F
D r a w i n g
X
U
N I F
I E
D E
N T
E J o b s E
I E
D w g s C
A D
E
I E
C d s t s a v e d o n
A
M w a s p l o t t e d b y
G i l l
T h o m a s
J
C
A
R M
Y
C
E P
S o n
P
M
VERIFY SCALES: IF THIS LINE 0 2"
DOES NOT MEASURE 2", ADJUST SCALE ACCORDINGLY.
M A
N H
O
P
L
N
C
T I O
O
F
J
F
A B
R I Z
Z I O
B
G
O E
R I N
G
E P
P E
R T
G
T
A C
K E
S
G
T
A C
K E
S T
G
I L
L
C I V
I L
E I E
C d w g
C-325
L A
R G
E
S
C A
E
A N
H O
L E
S
S
T
O
A
M
D
M
E N
S I O
N S
G
NEW 4" SUMP DISCHARGE LINE
NEW 8" CONDENSATE
RETURN
NEW CONDENSATE RETURN
ALIGNMENT GUIDE
NEW STEAM ALIGNMENT GUIDE
NEW CONDENSATE RETURN
ALIGNMENT GUIDE
NEW STEAM EXPANSION JOINT
NEW 45° ELBOWS
NEW 2'x2'x2' SUMP PIT
NEW SUMP PUMP
NEW CONDENSATE EXPANSION JOINT
NEW ACCESS LADDER
NEW ACCESS
OPENING
NEW ACCESS
LADDER
NEW ACCESS
OPENING
NEW STEAM
DRIP LEG
NEW TRAP
ASSEMBLY
45° ELBOWS
NEW 45°
ELBOWS
NEW 20" STEAM
NEW 12" WATER
NEW 4" SUMP DISCHARGE LINE
NEW 8" CONDENSATE
RETURN
SCALE: 1/2" = 1'-0"
MANHOLE TYPE F (45.00° R) NEW PLAN
6'-6"
6'-6"
14'-4"
22'-8"
4'-8"
6'-7
5'-2
NEW UTILIDUCT
ALIGNMENT
45.00°
NEW UTILIDUCT
ALIGNMENT
A4
C-329
E2
C-329
A2
C-330
D8
C-330
E3
C-330
4'-0"
4'-0"
4'-0"
4'-0"
NEW 4"
EXPANSION
JOINT
ANCHOR
(TYPICAL)
GENERAL MANHOLE NOTES:
1. SEE SHEET S-601 FOR FLOOR, WALL AND ROOF DIMENSIONS AND FOR
REINFORMENT SCHEDULES.
2. DRIP LEG AND TRAP ASSEMBLY. PROVIDE DRIP LEG(S) AND TRAP
ASSEMBLY(S) WHERE SHOWN AND AS SHOWN ON SHEET C-621.
3. PRESSURE GAUGES. PRESSURE GAUGES SHALL BE PROVIDED ON EACH
SIDE OF SHUT OFF VALVES AND WHERE INDICATED. PRESSURE GAUGES
FOR STEAM AND CONDENSATE LINES SHALL BE INSTALLED AS SHOWN IN
DETAIL 3 ON SHEET C-621.
4. BLOWDOWNS. BLOWDOWNS SHALL BE PROVIDED ON EACH DRIP LEG
AND WHERE INDICATED. BLOWDOWNS FOR STEAM AND CONDENSATE
LINES SHALL BE INSTALLED AS SHOWN IN DETAILS 1 AND 4 ON SHEET
C-621.
5. DRAINS. WATER MAIN DRAINS SHALL BE PROVIDED IN EACH MANHOLE.
SUMP DISCHARGE DRAINS SHALL BE PROVIDED IN MANHOLES
IDENTIFIED IN DETAIL E10 ON SHEET C-502.
6. SUMP PUMPS. SUMP PUMP SHALL BE INSTALLED AS SHOWN ON SHEET
C-625 AND AS REQUIRED ON ELECTRICAL DRAWINGS. ALL NEW
MANHOLE FLOORS SHALL BE SLOPED TO DRAIN TOWARDS THE SUMP
PIT. NEW GRATING SHALL BE INSTALLED OVER SUMP PIT, FOR ALL NEW
AND EXISTING MANHOLES WITH A SUMP PIT.
7. PROVIDE MANHOLE VENTILATION PIPES AS SHOWN ON SHEET C-505
AND AS LOCATED ON THE S-100 SERIES SHEETS.
8. PROVIDE PIPING IDENTIFICATION MARKERS ON PIPING WITHIN
MANHOLES AS STIPULATED IN SECTIONS 33 05 29.00 29, 33 05 33.00 29
AND 33 05 37.00 29.
SUMP STROBE
ALARM FOUNDATION
FLOOR ANCHOR
NEW MANHOLE LOCATIONS
MH TYPE
F
F
MH NUMBER
MH# 59
MH# 59
POINT
A
B
NORTHING
3897342.68
3897359.38
EASTING
1473093.97
1473087.72
ALASKA DISTRICT
D A
T E
D E
S C
R I P
T I O
N…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .