H.01.01_S-102_Full_Size_(22x34).pdf
PDF 444 KB Posted
- Attached to
- Bethel Bank Stabilization Federal contract opportunity
- Solicitation number
- W911KB-17-R-0052
About this file
S-102 Drawing Full Size
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| H.01.01_AM_3_Half_Size_(11x17)_(1).pdf | ||
| A.07.24_Solicitation_Amendment3.pdf | ||
| H.01.01_AM_3_Full_Size_(22x34).pdf | ||
| H.01.01_S-102_Half_Size_(11x17).pdf | ||
| A.07.24_Solicitation_Amendment.pdf | ||
| Amendment_0001.pdf | ||
| A.07.03_Solicitation.pdf | ||
| A.07.03_SolicitationDrawingsHalf-Size_(11x17).pdf | ||
| A.07.03_SolicitationDrawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
B
C B
C
B
C
B
C
B
C
B
C
B
-50
P
L
P
L
P L
P
L
P L
PL
P
L
P
L
P L
P
L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
PL PL PL PL PL PL PL PL PL PL PL PL
P L
P L
P L
P L
P L
P L
EAST AVE.
51.04
R
O
A
D
T
O
S
M
A
L
H
R
B
O
R
CONSTRUCTION BOUNDARY
K U
S K
O K
W
IM
R
IV
E R
M A
T C
H
L I N
E
50250-25
FULL SCALE: 1" = 25'
S E
E
S
H E
E
P
G
P
G
P
G
P
G
P
G
P
G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P
G
P
G
P
G
P
G
SEE NOTE 3
SEE NOTE 1
POSSIBLE 11th PILE IN PG58, FIELD VERIFY, EXTEND
WALE TO LAST PILE
S E
E N
O T
E
S
S
TYP
T Y
P
A
S
S
F
S-102 S-501
NOTE: THIS ELEVATION
IS A SCHEMATIC AND IS
NOT BASED ON
SURVEY INFORMATION,
USE FOR REFERENCE
PURPOSES ONLY.
SUNKEN PILE ELEVATION
SCALE: 1" = 10'
S-102 S-102
EL =
+10' MLLW ±
B E
T S
P L
A N
S
S-102
S I T
E
P
L A
N
I I
O
F
I I
N
T
E D
C E
P O
A E
C G
D
B
L I S
S
E C
G
H
H
K
E
I S
S E
S
R C
T
R C
T
S T
R U
C T
U R
A L
ALASKA DISTRICT
D R
A W
I N
G
F I L
E
D W
G
S
C A
L E
P L
A
L E
D A
T E
A C
T I O
N S
Y M
D R
A W
N
R E
S I D
E N
T
E
N G
I N
E E
R
D A
T E
S T
A T
E
P R
I M
E
C
O N
T R
A C
T O
R
D A
T E
D E
S C
R I P
T I O
N A
P P
D
C I T
Y
C O
N T
R A
C T
O R
C O
N T
R A
R E
C O
M M
E N
D E
D
A P
P R
O V
E D
S U
B M
I T
T E
D
D E
S I G
N E
D
R E
V I E
W E
D
C H
I E
F
R A
N C
H
C H
I E
C
T I O
N
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
A N
C H
O R
A G
E
A
L A
S K
A
C O
R P
S
O
F
E
N G
I N
E E
R S
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
D r a w i n g
X
U
N I F
I E
D E
N C
W J o b s B
E T
D w g s C
A D
B
E T
S d w g l a s t s a v e d o n
P
M w a s p l o t t e d b y
T e d r i c k
R o b e r t
I V
U
A
R M
Y
C
E P
S o n
P
M
12N
R
N
S
T
R
U
C
T
I
O
N
B
E T
B E
T
P
N o
W K
B R
J U
Y
AM#1
E A
L
K H
E A
D
W
A
D
I E
B A
C K
S
B E
T H
E L
A
L A
S K
VERIFY SCALES: IF THIS LINE 0 2"
DOES NOT MEASURE 2", ADJUST SCALE ACCORDINGLY.
PGX
NEW DYWIDAG THREADBARS, WALE, ANCHOR
BEAM (THIS CONTRACT), (E) PIPE PILES UNO
EXISTING 24" STEEL PIPE PILE WALL
WITH #7 REBAR TIEBACKS.
EXISTING 3" THERMOTUBE SIPHON LOCATED
AT ANCHOR PILES.
CONSTRUCTION BOUNDARY
EXISTING MONUMENT
PILE GROUP X
LEGEND
NOTES (SEE G-002 FOR ABBREVIATIONS):
1. FOUR PIPE PILES JUST UPSTREAM OF THE ANGLE POINT IN THE SEAWALL
(STA. 15+20± SCL) WERE RESET IN APRIL OF 2000. REPAIRS INCLUDED
INSTALLING: 1) A 16' LONG, HSS 10x6x1/2 WALE W/ WALE TO PILE
CONNECTIONS SIMILAR TO DETAILS SHOWN IN THIS CONTRACT; 2) TWO 2
3/4"Ø A36 TIE RODS W/ TURNBUCKLES AND A WELDED-LAPPED SPLICE; 3) A 7'
LONG, HSS 12x8x1/2 ANCHOR BEAM PLACED BEHIND THE ANCHOR PILES; AND
4) PILE TOPS WERE TACK WELDED TOGETHER TO HOLD THEM IN ALIGNMENT
PRIOR TO INSTALLING WALE. THE WALE, TIE- BACK AND ANCHOR BEAM WERE
INSTALLED AT APPROX +5' MLLW. CONTRACTOR SHALL REMOVE AND
PROPERLY DISPOSE OF ALL ELEMENTS OF THIS PREVIOUSLY INSTALLED
TIE-BACK SYSTEM THAT CONFLICT WITH THE INSTALLATION OF THE TIE-BACK
SYSTEM SHOWN IN THIS CONTRACT.
2. TWENTY-FOUR (24) PILES IN THIS AREA HAVE SUBSIDED. ALIGNMENT OF THE
PILES REMAINS TYPICAL OF OTHER SECTION OF THE BULKHEAD, HOWEVER
THE TOP OF PILE ELEVATIONS FORM A SAG CURVE WITH A MAXIMUM
DISPLACEMENT OF APPROX 2.25'. CONTRACTOR SHALL WELD EXTENSIONS
ON EXISTING PILES TO PROVIDE A UNIFORM TOP OF PILE ELEVATION.
EXISTING PILES HAVE SOME DENTS IN THE TOP EDGE. CUT (E) PILES DOWN
AND STRAIGHTEN TO REMOVE DENTS AS REQUIRED TO PROVIDE A
CONTINUOUS WELD BETWEEN THE EXISTING PILE AND THE NEW SECTION OF
MATCHING PILE. TWO LENGTHS (APPROX 60') OF 24" CITY OF BETHEL. PIPE
PILE HAVE BEEN LAID HORIZONTALLY BEHIND THIS SUNKEN SECTION OF
BULKHEAD. THE CONTRACTOR SHALL REMOVE THESE TWO SECTIONS OF
PIPE PILE AND STAGE THEM ALONG THE BULKHEAD FOR REMOVAL BY
OTHERS.
3. THREE MOORING POSTS HAVE 10' LONG SECTIONS OF HSS 6x6 WALE WELDED
DIRECTLY TO THE BULKHEAD PILES. WALE IS AT FINISH GRADE AND VISIBLE
WITHOUT EXCAVATION. REMOVE WALE AS REQUIRED FOR INSTALLATION OF
NEW WORK UNDER THIS CONTRACT.
4. B ROCK HAS BEEN PLACED BY THE CITY OF BETHEL FOR SINK HOLE REPAIR
ON THE LANDWARD SIDE OF THE EXISTING PIPE PILE BULKHEAD. THE
APPROXIMATE LOCATION OF A 20' WIDE X 30' LONG X 7' THICK B ROCK LAYER
IS BETWEEN STA 17+00 AND 19+50 SCL. EXACT LOCATION AND DIMENSIONS
ARE UNKNOWN. CONTACT THE CITY OF BETHEL PORT DIRECTOR FOR
ADDITIONAL INFORMATION. THE B ROCK IS CURRENTLY NOT VISABLE, IT IS
COVERED WITH AN UNKNOWN THICKNESS OF SAND/SILT BACKFILL ON THE
SURFACE. THE CONTRACTOR SHALL REMOVE AND STOCKPILE THIS B ROCK
ONSITE. THE CITY OF BETHEL WILL HAUL THE ROCK OFFSITE. THE
CONTRACTOR SHALL FILL THE DEPRESSION WITH BACKFILL MATERIAL UPON
COMPLETION OF THE PIPE PILE BULKHEAD STRUCTURAL WORK.
PL
PROPERTY LINE
AutoCAD SHX Text
AutoCAD SHX Text
24 JUL 2017
AutoCAD SHX Text
AM#1
AutoCAD SHX Text
(1) REVISE NOTE 2
AutoCAD SHX Text
RCT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
S-102 SITE PLAN - II OF II
File details come from the government source that posted it. Updated .