A.07.03_SolicitationDrawings.pdf
PDF 17 MB Posted
- Attached to
- Bethel Bank Stabilization Federal contract opportunity
- Solicitation number
- W911KB-17-R-0052
About this file
Solicitation Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A.07.24_Solicitation_Amendment3.pdf | ||
| H.01.01_AM_3_Half_Size_(11x17)_(1).pdf | ||
| H.01.01_AM_3_Full_Size_(22x34).pdf | ||
| H.01.01_S-102_Full_Size_(22x34).pdf | ||
| H.01.01_S-102_Half_Size_(11x17).pdf | ||
| A.07.24_Solicitation_Amendment.pdf | ||
| Amendment_0001.pdf | ||
| A.07.03_Solicitation.pdf | ||
| A.07.03_SolicitationDrawingsHalf-Size_(11x17).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EAST BULKHEAD - WALE AND
TIEBACKS
W911KB-17-R-0052
BETHEL, ALASKA
BET011
RFP, 21 JUNE 2017
TABLE OF CONTENTS
Sht REF. Number Sheet Title
GENERAL: GENERAL
1 G-001 COVER SHEET
2 G-002 GENERAL NOTES AND ABBREVIATIONS
SURVEY & MAPPING: PLANS
3 V-101 LOCATION AND VICINITY MAP
CIVIL: PLANS
4 C-101 GENERAL SITE PLAN
STRUCTURAL: PLANS
5 S-101 SITE PLAN - I OF II
6 S-102
SITE PLAN - II OF II
STRUCTURAL: DETAILS
7 S-501
DETAILS I
8 S-502 DETAILS II
9 S-503 DETAILS III
STRUCTURAL: PHOTOS
10 S-901 SITE PHOTOS I
11 S-902 SITE PHOTOS II
12 S-903 SITE PHOTOS III
P2 NO. 102728
of Engineers
Alaska District
US Army Corps
D r a w i n g
X
U
N I F
I E
D E
N C
W J o b s B
E T
D w g s C
A D
B
E T
G d w g l a s t s a v e d o n
P
M w a s p l o t t e d b y
T e d r i c k
R o b e r t
C
I V
U
S A
R M
Y
C
E P
O A o n
P
M
Drawing # 7-BET-154-10-01 Sheet 1 of 12
ABBREVIATIONS (NOT ALL USED IN THESE DRAWINGS)
@ AT
# NUMBER, POUND, POUNDS
& AND
2L DOUBLE ANGLE
℄ CENTERLINE
Ø DIAMETER, ROUND
AB ANCHOR BOLT
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
AKDOT ALASKA DEPARTMENT OF TRANSPORTATION
ALUM ALUMINUM
APPROX APPROXIMATE, APPROXIMATELY
ASTM AMERICAN SOCIETY FOR TESTING AND
MATERIALS
AVE AVENUE
AWS AMERICAN WELDING SOCIETY
BJ BAR JOIST
BLDG BUILDING
BLKG BLOCKING
BOTT BOTTOM
BP BASE PLATE
C AMERICAN STANDARD CHANNELS
CB CATCH BASIN
CFS CUBIC FEET PER SECOND
CHKR CHECKER
CIP CAST IN PLACE
CJP COMPLETE JOINT PENETRATION
CL CENTERLINE
CLR CLEAR
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CONC CONCRETE
COND CONDITION
CONN(S) CONNECTION(S)
CONT CONTINUOUS
COORD'S COORDINATES
CSK COUNTERSINK
DET(S) DETAIL(S)
DICA DRILL-IN-CONCRETE-ANCHOR
DIM(S) DIMENSION(S)
DIST DISTANCE
DO DITTO
DTI DIRECT TENSION INDICATOR
DWG(S) DRAWING(S)
DS DROP STRUCTURE, DOWNSTREAM
(E) EXISTING
EA EACH
EF EACH FACE
EL ELEVATION, EARTHQUAKE LOAD
ES EACH SIDE
EW EACH WAY
EXP EXPANSION
EXT EXTERIOR
f`c COMPRESSIVE STRENGTH
FAB FABRICATION
FBW FLOATING BREAKWATER
FF FINISH FLOOR
FH FLAT HEAD
FIO FOR INFORMATION ONLY
FLR FLOOR
FRT FIRE RETARDANT TREATED
FS FAR SIDE
FT FOOT OR FEET
FT³ CUBIC FEET
R RADIUS
RBW RUBBLEMOUND BREAKWATER
REBAR REINFORCING STEEL BAR(S)
RELAY USED RAILROAD RAIL
REINF REINFORCING, REINFORCEMENT,
REINFORCED
REQD REQUIRED
RO ROUGH OPENING
RP RADIUS POINT
RS RIGHT SIDE
S AMERICAN STANDARD STEEL SHAPE, SOUTH,
SPACING
SCL SEAWALL CENTERLINE
SCHED SCHEDULE
SDMH STORM DRAIN MANHOLE
SECT SECTION
SHT SHEET
SIM SIMILAR
SLH SHORT LEG HORIZONTAL
SLV SHORT LEG VERTICAL
SOG SLAB ON GRADE
SPEC(S) SPECIFICATION(S)
SPI SEDIMENT PROFILE IMAGING
SQ SQUARE
SS STAINLESS STEEL
SSL(S) SHORT-SLOTTED HOLE(S)
SSMH SANITARY SEWER MANHOLE
ST STRUCTURAL TEE FROM THE S SERIES
SECTION, STREET
STD STANDARD, STANDARD-WEIGHT PIPE
STL STEEL
SYM SYMMETRICAL
T TOP
TBLT TIMBER BOLT
T&B TOP & BOTTOM
THK THICK(NESS)
THRU THROUGH
TOC TOP OF CONCRETE
TR TELEPHONE RISER
TRANS TRANSVERSE
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
UHMW-PE ULTRA HIGH MOLECULAR WEIGHT
POLYETHYLENE
US UPSTREAM
USACE U.S. ARMY CORPS OF ENGINEERS
VERT VERTICAL
W W SERIES SECTION, WEST, WIDE
W/ WITH
W/O WITHOUT
WL WORK LINE
WP WORK POINT
WT WEIGHT, STRUCTURAL TEE FROM W SERIES
SECTION
WV WATER VALVE
WWF WELDED WIRE FABRIC
XS EXTRA-STRONG WEIGHT PIPE
XXS DOUBLE-EXTRA-STRONG WEIGHT PIPE
YD(S) YARD(S)
YD³ CUBIC YARD
GA GAGE OR GAUGE
GAL GALLON(S)
GALV GALVANIZE(D), GALVANIZING
GR GRADE
H HIGH
HAS HEADED ANCHOR STUD
HDG HOT-DIPPED GALVANIZED
HGT HEIGHT
HOR HORIZONTAL
HS HIGH-STRENGTH
HSB HIGH-STRENGTH BOLT
HSS HOLLOW STRUCTURAL SECTION
HYD FIRE HYDRANT
IE INVERT ELEVATION
INT INTERIOR, INTERSECTION
IP IRON PIPE
JB JUNCTION BOX
JT JOINT
JST JOIST
K-FT KIP-FEET
KIP 1,000 POUNDS
kN KILONEWTON(S)
L ANGLE, LONG
LB(S) POUND(S)
LIW LOAD INDICATING WASHER(S)
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONG LONGITUDINAL
LS LEFT SIDE
LSL(S) LONG-SLOTTED HOLE(S)
M STEEL SHAPE FROM THE
MISCELLANEOUS SECTION
MAX MAXIMUM
MBR(S) MEMBERS(S)
MI MALLEABLE IRON
MILS THOUSANDTHS OF AN INCH
MIN MINIMUM
MISC MISCELLANEOUS
MIW MALLEABLE IRON WASHER
MON MONUMENT
MPa MEGAPASCAL(S)
MPH MILES PER HOUR
MT STRUCTURAL TEE FROM THE M SERIES
SECTION
N NORTH
NIC NOT IN CONTRACT
No. NUMBER
NOM NOMINAL
NPS NOMINAL PIPE SIZE
NS NEAR SIDE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OPP OPPOSITE
ORIG ORIGINAL
OVS OVERSIZED HOLE(S)
PBL PROJECT BASELINE
PC POINT OF CURVATURE
PG PILE GROUP
PJP PARTIAL JOINT PENETRATION
PL PLATE(S)
PLF POUNDS PER LINEAR FOOT
PSI POUNDS PER SQUARE INCH
PT POINT OF TANGENCY
PVI PLAN VIEW IMAGING
WORK TO BE PERFORMED AS PART OF THIS CONTRACT INCLUDES THE SECTION OF PIPE PILE BULKHEAD
COMPOSED OF TIED, TWENTY-FOUR INCH DIAMETER, PIPE PILES, UPSTREAM OF BROWN'S SLOUGH, BETWEEN
STATIONS 11+40 AND 21+51 SEAWALL CENTERLINE (SCL) ALIGNMENT. WORK ON THIS TIED BULKHEAD
CONSISTS OF INSTALLING #18 DYWIDAG TIE RODS AND TUBE STEEL WALES. (NOTE: THE STATIONING GIVEN
ABOVE IS APPROXIMATE AND SHALL NOT BE USED TO DEFINE THE BULKHEAD LENGTH.) THE FOLLOWING
INSTRUCTIONS AND LIMITATIONS SHALL BE ENFORCED DURING THE PERFORMANCE OF THIS WORK.
SURCHARGE LOADING ON AREA WITHIN 56 FEET OF BULKHEAD SHALL BE LIMITED TO MINIMUM EQUIPMENT
REQUIRED TO PERFORM WORK. EXCAVATED MATERIAL MAY BE PLACED ADJACENT TO ANCHOR PILES A
MINIMUM OF FORTY FEET AWAY FROM BULKHEAD. NO OTHER STOCKPILING OF MATERIALS WILL BE
ALLOWED WITHIN FIFTY-SIX FEET OF BULKHEAD.
2. SEQUENCE OF WORK AT EXISTING PILES SHALL BE AS FOLLOWS (SEE SHEET S-503 FOR WORK AT BOAT
RAMP):
A. EXCAVATE FOR WORKING SPACE REQUIRED FOR INSTALLATION OF WALES, TIE RODS, AND ANCHOR
BEAMS. THIS EXCAVATION WORK NEED NOT BE LIMITED TO A GROUP OF TEN BULKHEAD PILES.
B. INSTALL WALES.
C. INSTALL ANCHOR BEAM, PROVIDING SHIMS AS REQUIRED. CONNECTION OF ANCHOR BEAM TO ANCHOR
PILES SHALL BE BY WELDING.
D. INSTALL TIE RODS. TIE RODS SHALL BE SUPPORTED AT EIGHT FOOT INTERVALS PRIOR TO ANY
TIGHTENING. HEX NUTS SHALL BE "SNUGGED TIGHT" TO ELIMINATE SLACK FROM TIE RODS. THE
CONTRACTOR SHALL ENSURE THAT TIE RODS ARE TIGHTENED IN A BALANCED MANNER AND THAT THE
CONNECTION OF THE ANCHOR BEAM TO THE ANCHOR PILES IS NOT DAMAGED BY TWISTING. DO NOT
DRIVE OVER TIE RODS PRIOR TO PLACING ONE LIFT OF BACKFILL, EXCEPT AS REQ'D BY A SMALL, TRACKED DOZER TO SPREAD BACKFILL SOIL AS LIMITED BY NOTE "H" BELOW.
E. BOTH TIE RODS IN A PILE GROUP SHALL BE CHECKED FOR TIGHTNESS AND ANCHOR BEAM
CONNECTION LOCK NUTS SHALL BE SECURELY TIGHTENED PRIOR TO BACKFILLING.
F. DRIVE, CUT, AND TACK WELD WASHOUT PROTECTION ANGLES.
G. PLACE GEOTEXTILE FABRIC ON SHORE SIDE OF BULKHEAD FROM TOP OF WALE TO TOP OF
FILL/BACKFILL.
H. BACKFILL TO ORIGINAL CONDITION WITH MINIMUM 95% COMPACTION. BACKFILL SHALL BE FILTER
MATERIAL WITHIN 2' OF BULKHEAD. USE BACKFILL SOIL TO PROTECT TIE RODS FROM DOZER TRACKS &
BLADE DURING BACKFILL PLACEMENT.
3. WALE SPLICES SHALL BE LOCATED BETWEEN GROUPS OF TEN BULKHEAD PILES. CONTRACTOR SHALL BE
RESPONSIBLE FOR VERIFYING IN PLACE DIMENSIONS OF BULKHEAD WALLS IN ORDER TO MEET ONE INCH
MAXIMUM SPACING REQUIREMENT AT WALE SPLICES.
4. CONTRACTOR SHALL VERIFY IN PLACE DIMENSIONS OF CURVED PILE BULKHEADS PRIOR TO FABRICATING
BENT WALES.
5. ANCHOR BEAMS MAY BE VERTICALLY STAGGERED ±4" FROM +6 MLLW ELEVATION AT ANGLE POINTS AND
CURVED PILE BULKHEADS TO ELIMINATE POTENTIAL CONFLICT WHERE ANCHOR PILE GROUPS ARE
CLOSELY SPACED.
6. DISTANCES GIVEN FROM BULKHEAD TO ANCHOR PILES ARE APPROXIMATE AND SHALL BE VERIFIED TO
FINALIZE TIE ROD LENGTHS.
7. ALL EXCAVATION SHALL CONFORM TO THE LATEST EDITION OF U.S. ARMY CORPS OF ENGINEERS "SAFETY
AND HEALTH REQUIREMENTS MANUAL" EM 385-1-1.
8. ALL WELDING SHALL BE WITH E70XX OR EQUIVALENT ELECTRODES.
9. ALL NEW STEEL ITEMS (EXCLUDING PIPE PILES) SHALL BE HOT DIP GALVANIZED IN ACCORDANCE WITH
THE CONTRACT SPECIFICATIONS.
10. SEAL WELD ALL EDGES, CORNERS, AND ENDS OF WELDED CONNECTIONS NOT OTHERWISE SHOWN TO BE
WELDED.
11. PILE CAPS, AND A GUARD RAIL SYSTEM OF STEEL PIPE RISERS AND CABLE "RAILS" ARE PRESENT ON
PORTIONS OF THE BULKHEAD - SEE PHOTO SHEETS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
REMOVAL AND REPLACEMENT OF THESE ITEMS AS NECESSARY TO ACCOMPLISH THE CONTRACT WORK.
AT A MINIMUM, REMOVAL OF THE PILE CAPS, WHERE PRESENT, SHALL BE REQUIRED IN ORDER TO INSTALL
THE WASHOUT PROTECTION ANGLES. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO
REMOVE, PROTECT DURING STORAGE, AND REPLACE THESE ITEMS TO THE SAME LOCATION WHERE THEY
WERE ORIGINALLY LOCATED. MINOR AMOUNTS OF STRAIGHTENING, USING HAND TOOLS, SHALL BE
ASSUMED NECESSARY FOR THE REINSTALLATION. THIS STRAIGHTENING SHALL BE LIMITED TO THAT
NECESSARY FOR REINSTALLATION AND WILL NOT BE INTERPRETED TO RESTORE THE ITEMS TO "AS NEW"
CONDITION. THE PILE CAPS ARE BOLTED IN PLACE FROM THE TOP - SEE PHOTOS 14 AND 15 WHERE THE
BOLTS AND AN EXAMPLE OF THE CLIP BELOW MAY BE SEEN. REPLACEMENT OF SOME OF THESE
FASTENERS SHALL BE ANTICIPATED AND SHALL BE INCIDENTAL TO THE OTHER WORK ON THIS CONTRACT.
12. REMOVE AND PROPERLY DISPOSE OF ALL EXISTING TREES, BRUSH, AND WOODY DEBRIS WITHIN THE
CONSTRUCTION BOUNDARY - SEE PHOTO SHEETS. REMOVE AND DISPOSE OF ALL MAN-MADE
CONSTRUCTION MATERIALS AND DEBRIS BURIED WITHIN THE EXCAVATION LIMITS - SEE PHOTO 4. THE
TOTAL QUANTITY OF MAN-MADE MATERIALS AND DEBRIS WITHIN THE EXCAVATION LIMITS IS ASSUMED TO
NOT EXCEED 10 CUBIC YARDS AND IS ASSUMED TO FIT IN A STANDARD 10 CUBIC YARD DUMP TRUCK BOX.
NO SEPARATE PAYMENT SHALL BE MADE FOR THIS WORK AND IT SHALL BE CONSIDERED INCIDENTAL TO
THE OTHER WORK ON THIS CONTRACT.
13. THE EXISTING SURFACE ORGANICS WITHIN THE CONSTRUCTION BOUNDARY (SUCH AS GRASS AND SOD
BUT NOT INCLUDING TREES, BRUSH AND WOODY DEBRIS - SEE NOTE 12 ABOVE) MAY REMAIN WITHIN THE
EXCAVATED MATERIAL. THE STOCKPILING AND/OR SUBSEQUENT PLACEMENT OF THIS MATERIAL SHALL
BE CONTROLLED TO PREVENT IT FROM BEING INCLUDED IN FILL OR BACKFILL BELOW THE ELEVATION OF
THE NEW TIEBACKS.
14. ELEVATION OF NEW TIEBACK COMPONENTS ARE SHOWN CENTERED AT ELEVATION +6' MLLW UNLESS
NOTED OTHERWISE. THIS ELEVATION SHALL BE TAKEN RELATIVE TO AN APPROXIMATE AVERAGE
ELEVATION FOR THE TOP OF THE EXISTING BULKHEAD PILES AND SHALL NOT REQUIRE TYING INTO
CURRENT VERTICAL CONTROL.
GENERAL NOTES
ALASKA DISTRICT
D R
A W
I N
G
F I L
E
D W
G
S
C A
L E
P L
A
L E
D A
T E
A C
T I O
N S
Y M
D R
A W
N
R E
S I D
E N
T
E
N G
I N
E E
R
D A
T E
S T
A T
E
P R
I M
E
C
O N
T R
A C
T O
R
D A
T E
D E
S C
R I P
T I O
N A
P P
D
C I T
Y
C O
N T
R A
C T
O R
C O
N T
R A
N
R E
C O
M M
E N
D E
D
A P
P R
O V
E D
S U
B M
I T
T E
D
D E
S I G
N E
D
R E
V I E
W E
D
C H
I E
F
B
R A
N C
H
C H
I E
E C
T I O
N
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
A N
C H
O R
A G
E
A
L A
S K
A
C O
R P
S
O
F
E
N G
I N
E E
R S
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
D r a w i n g
X
U
N I F
I E
D E
N C
W J o b s B
E T
D w g s C
A D
B
E T
G d s t s a v e d o n
P
M w a s p l o t t e d b y
T e d r i c k
R o b e r
A
R M
Y
C
E P
S o n
P
M
12N
N
S
T
R
U
C
T
I
O
N
B
E T
B E
T
P
N o
W K
B R
J U
RFP
E A
L
K H
E A
D
W
A L
D
E
B A
C K
S
B E
T H
E L
A
L A
S K
VERIFY SCALES: IF THIS LINE 0 2"
DOES NOT MEASURE 2", ADJUST SCALE ACCORDINGLY.
T
E D
C E
P O
A E
C G
D
B
L I S
S
E C
G
H
H
K
E
I S
S E
S
R C
T
R C
T
G E
N E
R A
L
B E
T
G
G E
N E
R A
L
G-002
G E
N E
R A
L
N
O T
B
R E
V I A
T I O
N S
AutoCAD SHX Text
1. SURCHARGE LOADING ON AREA WITHIN 56 FEET OF BULKHEAD SHALL BE LIMITED TO MINIMUM EQUIPMENT
SCALE IN FEET
0 200 400 800
EXISTING BETHEL BANK STABILIZATION PROJECT
COMPLETED BY THE CORPS OF ENGINEERS
OCTOBER 1997 (BASELINE STA. 12+15 TO 94+15).
THIS CONTRACT
(APPROX PBL STA 95+40 TO 104+35)
E
X
I
S
T
I
G
A
B
I
L
I
Z
A
T
I
P
O
J
E
C
T
R
I
G
H
S
C
E
N
D
I
S
K
O
K
W
V
E
R
EAST ADDITION
BULKHEAD (SEAWALL)
B
R
O
W
N
O
U
CITY DOCK
O
C K
A
T S
T
B
A
N
K
BS-20
FIRST AVENUE
BULKHEAD
BS-40
BS-50
BS-60
BM-"MAD"
BS-70
PROJECT BASELINE
(PBL)
MISSION ROAD
BULKHEAD
PIPE PILE
STOCKPILE
AREA
PETRO
DOCK
H
I
G
F
E
C
D
B
A
11 74
K
U
S
K
O
K
W
V
E
R
A
P
T
L
AP-76TL
A
P
A
P
A
P
T
L
A
P
T
L
A
P
A
P
A
P
T
L
A
P
T
L
A
P
A
P
R
I P
R
A
P
-50
-40
-20
-30
-40
-3
SEE INSET BELOW
N
SCALE IN FEET
0 100
PROJECT LIMITS
THIS CONTRACT
EXISTING BETHEL BANK STABILIZATION PROJECT BROWN'S
SLOUGH TO SMALL BOAT HARBOR ENTRANCE "B" ROCK
PLACEMENT COMPLETED BY THE CORPS OF ENGINEERS
SEPTEMBER 2007 (BASELINE STA. 93+10 TO 104+75).
INSET (THIS CONTRACT)
200 400
K U
S K
O K
W
IM
R
IV
E R
-50
T
B
A
N
K
A
POINT A
CITY DOCK
B
R
O
W
N
O
U
G
H
CONSTRUCTION
BOUNDARY
PERFORM PIPE-PILE-SEAWALL
STRUCTURAL WORK
CONSTRUCTION
BOUNDARY
(E) B-ROCK SCOUR
PROTECTION
R
O
A
R
B
O
R
P R
O J E
C T
B A
S E
L
IN
E
P B
L
S
E
A
W
A
N
T
E
R
L
I
C
L
51.04
ALASKA DISTRICT
D R
A W
I N
G
F I L
E
D W
G
S
C A
L E
P L
A
L E
D A
T E
A C
T I O
N S
Y M
D R
A W
N
R E
S I D
E N
T
E
N G
I N
E E
R
D A
T E
S T
A T
E
P R
I M
E
C
O N
T R
A C
T O
R
D A
T E
D E
S C
R I P
T I O
N A
P P
D
C I T
Y
C O
N T
R A
C T
O R
C O
N T
R A
R E
C O
M M
E N
D E
D
A P
P R
O V
E D
S U
B M
I T
T E
D
D E
S I G
N E
D
R E
V I E
W E
D
C H
I E
A
N C
H
C H
I E
C
T I O
N
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
A N
C H
O R
A G
E
A
L A
S K
A
C O
R P
S
O
F
E
N G
I N
E E
R S
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
D r a w i n g
X
U
N I F
I E
D E
N C
W J o b s B
E T
D w g s C
A D
B
E T
V d w g l a s t s a v e d o n
P
M w a s p l o t t e d b y
T e d r i c k
R o b e r
A
R M
Y
C
E P
S o n
P
M
12N
N
S
T
R
U
C
T
I
O
N
B
E T
B E
T
P
N o
W K
B R
J U
RFP
E A
L
K H
E A
D
W
A
E
B A
C K
S
B E
T H
E L
A
L A
S
B E
T V
P L
A N
S
V-101
L O
C A
T I O
N
A
C
I N
I T
Y
M
A P
T
E D
C E
P O
A E
C G
D
B
L I S
S
E C
G
H
H
K
E
I S
S E
S
R C
T
R C
T
S U
R V
Y
P
P I N
G
NOTES:
1. HORIZONTAL CONTROL BASED ON U.S. ARMY CORPS OF
ENGINEERS (COE) MONUMENTS "BS 50" AND "BS 60" USING A
LOCAL COORDINATE SYSTEM. FROM BETHEL BANK
STABILIZATION SURVEY DATED JULY 1991 BY COE.
2. VERTICAL CONTROL IS IN U.S. SURVEY FEET, BASED ON MEAN
LOWER LOW WATER, U.S. COASTAL AND GEODETIC SURVEY
BM-NO. 7 1970 LOCATED 8.5' NORTH OF THE S.E. CORNER OF
THE ALASKA NATIONAL GUARD STEPS LEADING TO THE
ENTRANCE AS 27.12'.
3. SOUNDINGS WERE OBTAINED WITH AN ODOM HYDROTRAC
ECHOSOUNDER MARK II TRANSDUCER, SERIAL NUMBER 11216.
HORIZONTAL POSITIONING WAS PROVIDED BY ASHTECH
Z-EXTREME GPS RECEIVER UTILIZING KINEMATIC GPS. HYPACK
HYDROGRAPHIC SOFTWARE WAS USED TO INTEGRATE DATA.
UPLANDS WERE SURVEYED WITH ASHTECH Z-12 GPS RECEIVER
OPERATING IN A KINEMATIC MODE.
4. THIS DRAWING INDICATES THE GENERAL CONDITION OF THE
RIVER'S BATHYMETRY AT THE TIME OF THE SURVEY.
5. THIS SURVEY CONDUCTED BY WHPACIFIC, INC. FROM SEPT. 10
TO SEPT. 14, 2009 AS A CONDITION SURVEY OF THE COE BANK
STABILIZATION PROJECT COMPLETED IN OCTOBER 1997.
CONTOURS AND ELEVATIONS SHOWN ARE IN FEET MLLW.
6. ORIGINAL SURVEY FOR BETHEL BANK STABILIZATION PROJECT
WAS PERFORMED BY ALASKA DISTRICT COE IN JULY 1991.
HORIZONTAL CONTROL PROJECTION WAS TANGENT PLANE
RECTANGULAR, HOLDING BLM MONUMENT AT THE
INTERSECTION OF BRIDGE AND SECOND AVE.S (US SURVEY
3230B) AS N 10,555.64, E 7,756.94, AND RECORD BEARING OF N
76° 58' 15" W TO ALASKA STATE D.O.T. MONUMENT AT THE
INTERSECTION OF SECOND AVE. AND TUNDRA ST.
COORDINATES PROVIDED BY HIGH PHUKAN CONSULTING
ENGINEERS FROM ALASKA TIDELAND SURVEY NO. 1346.
7. KUSKOKWIM RIVER FLOW AT BETHEL VARIES BETWEEN 40,000
AND 108,000 CFS DURING THE SUMMER MONTHS (AVE. MONTHLY
FLOW). AVERAGE DAILY FLOWS VARY FROM 40,000 TO 320,000
CFS.
8. BORE HOLE LOCATIONS SHOWN ARE APPROXIMATE AND WERE
NOT LOCATED BY SURVEY. SEE SPECIFICATION 31 00 00 FOR
BORE HOLE LOGS. BORE HOLES ARE IDENTIFIED BY: AP-XXXX
9. WATER SURFACE ELEVATIONS AND RIVER CURRENT
VELOCITIES VARY SIGNIFICANTLY WITH TIDES AND RIVER
DISCHARGE. WATER LEVELS ABOVE +10' MLLW OCCUR DURING
FLOOD EVENTS.
10. THE AVERAGE DATE FOR RIVER FREEZE-UP IS 29 OCTOBER.
THE AVERAGE DATE FOR RIVER BREAK-UP IS 15 MAY.
11. THERE IS NO CONTRACTOR STAGING AREA PROVIDED FOR THIS
CONTRACT.
12. THE CONTRACTOR SHALL FIELD LOCATE ALL ABOVE GROUND
AND BURIED UTILITIES WITHIN THE CONSTRUCTION BOUNDARY
PRIOR TO EXCAVATION FOR THE PIPE PILE STRUCTURAL WORK.
13. THE CONTRACTOR MAY PURCHASE BACKFILL MATERIAL FOR
THE PROJECT FROM THE CITY'S BORROW PIT LOCATED
ADJACENT TO THE AIRPORT (CONTACT THE CITY OF BETHEL).
ADDITIONAL SURVEY NOTES:
1. THE USACE PERFORMED A CONDITION SURVEY OF THE BETHEL SMALL BOAT HARBOR ON JUNE 20-25, 2016.
PRIMARY PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 7, NAD83 2011 (2010.00), IN US
SURVEY FEET BASED ON A FULLY CONSTRAINED STATIC GPS NETWORK HOLDING THE PUBLISHED NAD83 2011
(2010.00) EPOCH VALUES OF NGS CORS STATIONS: "MEKORYUPK_AK2008 CORS ARP" (PID DL6420); "BETHEL
WAAS CORS ARP" (PID DK4091); "DILLINGHAMAK2007 CORS ARP" (PID DL6426).
LOCAL PROJECT HORIZONTAL CONTROL IS ALASKA STATE PLANE, ZONE 7, NAD83 2011 (2010.00), IN US
SURVEY FEET HOLDING 3.75" FLAT ALUMINIUM SC "BH-D 1998" AS N 2,481,244.46, E 1,687,288.26 AND 0.25"
STAINLESS STEEL ROD "946 6477 B" AS N 2,481,197.72, E 1,684,072.362.
2. VERTICAL CONTROL IS MEAN LOWER LOW WATER (MLLW=0.0'), BASED ON THE NOAA/NOS TIDAL BENCH MARK
LIST "9466477 BETHEL, KUSKOKWIM RIVER, ALASKA", PUBLISHED 1/14/11. THIS TIDAL DATUM IS BASED ON THE
1983-2001 TIDAL EPOCH AND IS REFERENCED BY HOLDING NOAA/NOS TIDAL BENCH MARK "NO 7 1970"
(VM#19661) AS 26.98'.
3. VERTICAL TIES TO THE NATIONAL SPATIAL REFERENCE SYSTEM ARE BASED ON PUBLISHED NAVD88 (GEOID
12B) ELEVATIONS HOLDING NOAA/USACE TIDAL BENCHMARK "946 6477 B" (PID BBCC65/VM#19664) AS 17.50'.
2016 BETHEL SBH SURVEY CONTROL DATA
STATION N* E* ELEV. DESCRIPTION
946 6477 B 2,481,198 1,684,072
10.58 0.25" STEEL ROD
946 6477 C 2,481,229 1,684,304
10.01 0.25" STEEL ROD
BH-D 1998
2,481,244 1,687,288
8.50 3.75" ALUM STAMPED CAP
N
STATE MAP
BETHEL
ANCHORAGE
PROJECT
SITE
FAIRBANKS
ALASKA
JUNEAU
K
U
S
K
O
K
W
I
M
R
I
V
E
R
PROJECT SITE
B
R
I S
T
Y
SCALE IN MILES
B
A
I
L
E
T
160°
60°
162°
TULUKSAK
BETHEL
KWETHLUK
KULVAGAVIK
EEK
164°
N
VICINITY MAP
N
CITY
BORROW
PIT
BETHEL
AIRPORT
K
U
S
K
O
K
W
V
E
R
S
T
E
A
M
B
O
A
T
S
L
O
U
G
H
SMALL BOAT HARBOR
PROJECT SITE
BETHEL
LOCATION MAP
SCALE IN MILES
1 0 1 2
TIDAL DATA, BETHEL, ALASKA
LEVEL
ELEV. (FT. MLLW)
EST. HIGHEST TIDE +7.0
MEAN HIGHER HIGH WATER (MHHW)
+3.66
MEAN HIGH WATER (MHW)
+2.76
MEAN SEA LEVEL +1.62
MEAN TIDE LEVEL +1.55
MEAN LOW WATER (MLW)
+0.34
MEAN LOWER LOW WATER (MLLW)
+0.0
EST. LOWEST TIDE -3.0
PROJECT BASELINE (PBL) DATA
STATION POINT N E DISTANCE BEARING
95+00 A 10,051.57 8,515.25
1,320.00 N 84° 00' 01" W
81+80 B 10,189.54 7,202.48
1,970.00 S 81° 50' 00" W
62+10 C 9,909.70 5,252.46
269.00 S 71° 26' 43" W
59+41 D 9,824.10 4,997.44
1,355.01 S 59° 59' 41" W
45+86 E 9,146.49 3,824.03
1,254.70 S 44° 23' 50" W
33+31 F 8,250.00 2,946.21
1,103.00 S 24° 57' 28" W
22+28 G 7,250.00 2,480.80
798.00 S 12° 48' 01" W
14+30 H 6,471.83 2,304.00
256.00 N 0° 00' 00"
11+74 I 6,215.83 2,304.00
HORIZONTAL SURVEY CONTROL MONUMENTS
SURVEY
MON.
ELEV
GRID COORDINATES
NORTHING EASTING
GRID
BEARING
TO
STATION
GRID
DISTANCE
DESCRIPTION
BS-20
16.99 10,100.63 7,730.39
N 3° 20' 23" E
BLM SI 2ND
& BRIDGE
455.78
STANDARD ALUMINUM CAP (SAC) IN
CONCRETED PVC, 0.3' DEEP, NEAR END
HEADWALL, FIRST AVE. BULKHEAD
BS-40
8.61 9,987.99 5.989.81
S 83° 56' 21" W BS-50 741.50
SAC IN CONCRETED PVC, NEAR END OF
GUARDRAIL, AT ANGLE POINT HEADWALL,
FIRST AVE. BULKHEAD
BS-50
19.29 9,909.70 5,252.46
S 62° 15' 59" W BS-60
1,036.78
SAC IN CONCRETED PVC, 16' FROM
CHAIN LINK FENCE: 16' FROM
GUARDRAIL: NEAR STAIRS
BS-60
25.94 9,427.23 4,334.78
S 35° 45' 14" W BS-70
3,221.86
SAC IN CONCRETED PVC, BETWEEN
GUARDRAIL AND BANK LINE: PROJECTED
PI OF CURVE IN GUARDRAIL: 0.4' DEEP
BS-70
34.80 6,812.58 2,452.24 __________ __________ __________
SAC IN CONCRETED PVC, 0.3' DEEP, 27'
FROM SATELLITE DISH NEAR STAIRS
DOWN BANK: 8.5' FROM LIGHT POLE.
BM-MAD
14.54
SBC SET AT NORTH END OF WOOD
CAPPED SHEETPILE AND SOUTH END OF
36" STEEL PIPE BULKHEAD PILES ON TOP
CENTER OF SOUTHERN MOST PILE.
* DO NOT USE FOR HORIZONTAL CONTROL ON THIS PROJECT.
SOURCE: NOAA/NOS TIDAL BENCH MARK LIST 946647.
ESTIMATED HIGHEST AND LOWEST TIDES ARE NOT FROM
NOAA TIDE STATION DATA.
C
B
C
B
C
B
C
B
C B
C
B
C
B
C
B
C
B
C
B
C
B
-50
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
P L
P L
P L
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
PL PL PL PL PL
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P
L
P
L
P
L
P
L
P
L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P
L
P
L
P
L
P L
P L
P L
P
L
P
L
P
L
P L
P L
P L
P L
P L
(E) B-ROCK
ATS 1346
TRACT B
ATS 1346
TRACT B
BLK 6
15D
ATS 1346
TRACT B
USS 3790
BLK 9
BLK 9
BLK 9
11 12
BLK 10
13 14
BLK 10
BLK 10
E
A
E
EAST AVE.
E
A
E
EM
51.04
T
N
K
T
N
K
1-A
1-B
F
USS 3790
BLK 7
E
3B
BLK 7
USS 3790
ATS 1346
TRACT A
3A
USS 3790
BLK 8
ATS 1346
TRACT A
USS 3790
BLK 8
WC 2 MC 21 TRACT A
" ALUMINUM MON
WC 1 MC 21 TRACT A
" ALUMINUM MON
BLM MON
2" IP
WC 2 MC 1 TRACT A
" ALUMINUM MON
WC 1 MC 1 TRACT A
" ALUMINUM MON
ATS 1346
" ALUMINUM
MON
MC 1 TRACT B
" ALUMINUM MON
P R
O J E
C T
B A
S E
L
IN
E
P B
L
S
E
A
W
A
N
T
E
R
L
I
C
L
S
T A
S
C
A
S
C L
(E) H-PILE
AND TIMBER
BULKHEAD
EXISTING
SHEET PILE
BULKHEAD
(E) SHEET PILE CELLS
POINT A
SEE NOTE B
SEE NOTE 8
(E) PIPE PILE SEAWALL
K U
S K
O K
W
IM
R
IV
E R
INSTALL PIPE PILE SEAWALL TIEBACKS
AND PERFORM STRUCTURAL STEEL WORK
STA. 11+40 (SCL) TO 21+51.04 (SCL)
(SEE SHEETS S-101 THRU S-302 FOR DETAILS)
B R
O W
N
O
U G
H
BETHEL CITY DOCK
R
O
A
R
B
O
R
S
M
A
R
B
O
R
E
N
T
R
A
N
A
N
N
E
L
CONSTRUCTION BOUNDARY
CONSTRUCTION BOUNDARY
P T = 21+51.04
STEEL PILES
STEEL PILES
STEEL PILES
WOOD PILES
SHEET PILES
B
U
I
L
D
I
N
G
B
L
D
G
B
L
D
G
B
U
I L
D
I N
G
A
T R
A C
T A
T R
A C
T B
120600-60
FULL SCALE: 1" = 60'
CONSTRUCTION BOUNDARY
COORDINATES
POINT
CB1
CB2
CB3
CB4
CB5
CB6
CB7
CB8
CB9
CB10
CB11
CB12
NORTHING
10,096.88
10,108.81
10,110.79
10,088.10
9,929.90
9,913.62
9,954.28
9,929.28
9,876.99
9,841.67
9,860.59
10,046.63
EASTING
8,564.49
8,624.38
8,634.19
8,638.76
8,859.76
9,066.68
9,440.78
9,445.91
9,399.99
9,074.96
8,834.51
8,574.62
DESCRIPTION
ANGLE PT
ANGLE PT
ANGLE PT
ANGLE PT
ANGLE PT
ANGLE PT
2 1/2" ALUM MON
ANGLE PT
ANGLE PT
ANGLE PT
ANGLE PT
ANGLE PT
ALASKA DISTRICT
D R
A W
I N
G
F I L
E
D W
G
S
C A
L E
P L
A
L E
D A
T E
A C
T I O
N S
Y M
D R
A W
N
R E
S I D
E N
T
E
N G
I N
E E
R
D A
T E
S T
A T
E
P R
I M
E
C
O N
T R
A C
T O
R
D A
T E
D E
S C
R I P
T I O
N A
P P
D
C I T
Y
C O
N T
R A
C T
O R
C O
N T
R A
R E
C O
M M
E N
D E
D
A P
P R
O V
E D
S U
B M
I T
T E
D
D E
S I G
N E
D
R E
V I E
W E
D
C H
I E
A
N C
H
C H
I E
C
T I O
N
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
A N
C H
O R
A G
E
A
L A
S K
A
C O
R P
S
O
F
E
N G
I N
E E
R S
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
D r a w i n g
X
U
N I F
I E
D E
N C
W J o b s B
E T
D w g s C
A D
B
E T
C d s t s a v e d o n
P
M w a s p l o t t e d b y
T e d r i c k
R o b e r
A
R M
Y
C
E P
S o n
P
M
12N
N
S
T
R
U
C
T
I
O
N
B
E T
B E
T
P
N o
W K
B R
J U
RFP
E A
L
K H
E A
D
W
A
E
B A
C K
S
B E
T H
E L
A
L A
S
T
E D
C E
P O
A E
C G
D
B
L I S
S
E C
G
H
H
K
E
I S
S E
S
R C
T
R C
T
C I V
I L
B E
T
C
P L
A N
S
C-101
G E
N E
R A
L
S
I T
E
P
L A
N
NOTES:
1. EXISTING ROCK PROTECTION LINES SHOWN ARE APPROXIMATE.
2. EXISTING ROCK ON THE RIVER SIDE AT THE BASE OF THE PIPE
PILE SEAWALL WAS PLACED DURING THE SUMMER OF 2007.
3. SURVEY DATA TAKEN SEPTEMBER 10 THRU SEPTEMBER 14,
2009. RIVER BOTTOM AND BANK-LINE ARE SUBJECT TO
SIGNIFICANT CHANGE DUE TO EROSION AND/OR DEPOSITION.
CONTOURS SHOWN MAY NOT NECESSARILY DEPICT CURRENT
BATHYMETRY.
4. SEE GENERAL SHEET G-002 AND STRUCTURAL SHEETS S-101
THRU S-302 FOR INSTALLATION OF WALE, TIEBACKS, AND NEW
PILES AT BOAT RAMP.
5. EXISTING PIPE PILE SEAWALL HAS NOT BEEN SURVEYED.
SEAWALL CENTERLINE (SCL) ALIGNMENT SHOWN IS
APPROXIMATE AND BASED ON AERIAL PHOTOGRAPHY. THE
CONTRACTOR SHALL ESTABLISH THE ACTUAL SEAWALL
ALIGNMENT IN THE FIELD HOLDING STATION 10+00 (SCL) AS THE
CENTER POINT OF THE FIRST PIPE PILE ON THE EASTERN EDGE
OF BROWN'S SLOUGH. SEAWALL ALIGNMENT IS BASED ON PIPE
PILE CENTER POINTS.
6. EXISTING THERMOTUBE SIPHONS HAVE NOT BEEN SURVEYED.
LOCATION OF THE THERMOTUBES SHOWN IS APPROXIMATE AND
BASED ON AERIAL PHOTOGRAPHY. THE CONTRACTOR SHALL
ESTABLISH THE ACTUAL THERMOTUBE LOCATIONS IN THE FIELD
PRIOR TO EXCAVATION FOR NEW TIEBACKS.
7. PROJECT BASELINE (PBL) IS ALSO SHOWN FOR REFERENCE.
THIS LINE WAS USED AS THE BASIS FOR THE PREVIOUS COE
BANK STABILIZATION PROJECT AND HAS BEEN USED AS
CONTROL FOR ANNUAL CONDITION SURVEYS PERFORMED BY
ASCG, INC. FOR THE CITY OF BETHEL.
8. FOUR PIPE PILES JUST UPSTREAM OF THE ANGLE POINT IN THE
SEAWALL (STA 15+20± SCL) WERE REMOVED AND RESET IN
APRIL OF 2000. SEE SHEET S-102 FOR DETAILS.
9. ALL: BUILDINGS; CONTAINERS; BOATS; VEHICLES; AND
MISCELLANEOUS, UN-BURIED, MAN-MADE, DEBRIS ALONG THE
SEAWALL TIEBACK SYSTEM ALIGNMENT WILL BE MOVED BY
OTHERS PRIOR TO EXCAVATION FOR THE NEW TIEBACKS. THE
CONTRACTOR SHALL COORDINATE WITH THE CITY OF BETHEL'S
PORT DIRECTOR FOR TIMING OF SUCH REMOVALS TO PRECEDE
STRUCTURAL STEEL WORK SCHEDULED FOR THIS CONTRACT.
EXISTING LIGHT AND POWER POLES WILL BE REMOVED AND
RELOCATED BY OTHERS PRIOR TO STRUCTURAL STEEL WORK.
NOTES CONTINUED:
10. MOORING RIVER BASED EQUIPMENT TO THE BULKHEAD OR THE
RIVER BANK IS PROHIBITED. BARGE ANCHORS SHALL BE USED
IN THE RIVER ONLY AND SHALL BE POSITIONED AND MARKED TO
PERMIT SAFE NAVIGATION BY OTHER VESSELS.
11. THE CONTRACTOR SHALL COORDINATE WITH THE CITY OF
BETHEL'S PORT DIRECTOR TO ENSURE THAT ITS BARGE AND
EQUIPMENT AND OPERATIONS DO NOT IMPACT OR IMPEDE
NAVIGATION AND CARGO UNLOADING AT THE CITY DOCK AND
SEAWALL BULKHEADS. THE CONTRACTOR SHALL LIMIT
CONSTRUCTION ACTIVITY TO WITHIN THE CONSTRUCTION
BOUNDARY SHOWN. EXCLUSIVE USE OF THE AREA WITHIN THE
CONSTRUCTION BOUNDARY SHOWN IS NOT PROVIDED. THE
CONTRACTOR SHALL COORDINATE WITH THE CITY OF BETHEL'S
PORT DIRECTOR FOR ANY RESTRICTIONS, WHARFAGE FEES,
ETC FOR USE OF THIS AREA.
N
A. THE CONTRACTOR SHALL CONFINE ALL CONSTRUCTION
TO WITHIN THE CONSTRUCTION BOUNDARY SHOWN.
B. THE CONSTRUCTION BOUNDARY SHALL FOLLOW THE FACE
OF THE EXISTING PIPE PILE SEAWALL BETWEEN POINTS 1
AND 7 ON THE RIVER SIDE.
C. CB7 IS A 2
" ALUMINUM MONUMENT MARKED WC 1 MC 21
TRACT A.
EXISTING 24" STEEL PIPE
PILE WALL WITH TIEBACKS.
EXISTING 3" THERMOTUBE SIPHON
LOCATED AT ANCHOR PILES.
EXIST. "B" ROCK PROTECTION
(APPROX.) (PLACED IN 2007)
EXIST. "B" ROCK SLOPE
PROTECTION (PLACED in 1998)
EXISTING LIGHT POLE
EXISTING BUILDINGS
EXISTING MONUMENT
CONSTRUCTION BOUNDARY
LEGEND:
C
B
C
B
C
B
C
B
C
B
X X
X
X
P
L
P
L
P
L
P
L
P
L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
PL
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
S
E
A
W
A
N
T
E
R
L
I
C
L
EXISTING
SHEET PILE
BULKHEAD
B R
O W
N
O
U G
H
BETHEL CITY DOCK
KUSKOKWIM RIVER
M A
T C
H
L I N
E S
E
E
X
I S
T
I
L
E
B
U
L
K
H
E
E
A
W
A
L
L
S
TYP
F
S-101 S-501
P
G
A
S
S
T
Y
P
REMOVE AND STOCKPILE (E) SHEET
PILES AT BOAT RAMP, FILL BOAT RAMP
DEPRESSION TO MATCH (E) GRADE ON
EITHER SIDE AND COMPACT FILL TO 95%
OF MAXIMUM DENSITY. THE (E) SHEET
PILES WILL BE HAULED OFFSITE BY THE
CITY OF BETHEL.
50250-25
FULL SCALE: 1" = 25'
S
G
P
G
P
G
P
G
P
G
P
G
P
G
P
G
P
G
P
G
P
G
P
G
P
G
P
G
P
G
P
G
P
G
P
G
P
G
P
G
P
G
P
G
P
G
P
G
P
G
A
S
S
B E
T S
P L
A N
S
S-101
S I T
E
P
L A
N
I
O
F
I I
T
E D
C E
P O
A E
C G
D
B
L I S
S
E C
G
H
H
K
E
I S
S E
S
R C
T
R C
T
S T
R U
C T
U R
A L
ALASKA DISTRICT
D R
A W
I N
G
F I L
E
D W
G
S
C A
L E
P L
A
L E
D A
T E
A C
T I O
N S
Y M
D R
A W
N
R E
S I D
E N
T
E
N G
I N
E E
R
D A
T E
S T
A T
E
P R
I M
E
C
O N
T R
A C
T O
R
D A
T E
D E
S C
R I P
T I O
N A
P P
D
C I T
Y
C O
N T
R A
C T
O R
C O
N T
R A
R E
C O
M M
E N
D E
D
A P
P R
O V
E D
S U
B M
I T
T E
D
D E
S I G
N E
D
R E
V I E
W E
D
C H
I E
A
N C
H
C H
I E
C
T I O
N
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
A N
C H
O R
A G
E
A
L A
S K
A
C O
R P
S
O
F
E
N G
I N
E E
R S
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
D r a w i n g
X
U
N I F
I E
D E
N C
W J o b s B
E T
D w g s C
A D
B
E T
S d w g l a s t s a v e d o n
P
M w a s p l o t t e d b y
T e d r i c k
R o b e r
A
R M
Y
C
E P
S o n
P
M
12N
N
S
T
R
U
C
T
I
O
N
B
E T
B E
T
P
N o
W K
B R
J U
RFP
E A
L
K H
E A
D
W
A
E
B A
C K
S
B E
T H
E L
A
L A
S
NOTE: SEE SHEET G-002 FOR ABBREVIATIONS.
GENERAL PIPE PILE BULKHEAD NOTES:
LAYOUT SHOWN HAS NOT BEEN SURVEYED. LAYOUT IS BASED ON THE APPROXIMATE METHOD OF USING AN AERIAL PHOTOGRAPH.
THERMOTUBE LOCATIONS SHOWN ARE APPROXIMATE AND THE ANCHOR PILES SHOWN HAVE BEEN PLACED ON THE DRAWINGS BASED
ON THE APPROXIMATE LOCATION OF THE THERMOTUBES. FINAL LAYOUT SHALL BE BASED ON THE RESULT OF THE CONTRACTOR'S
SURVEY WITH EXCAVATION AS REQUIRED TO LOCATE THE ANCHOR PILES.
EXISTING AS-BUILT INFORMATION INDICATES THAT EACH ANCHOR PILE GROUP (2 - 24"Ø x 30' LONG STEEL PIPE PILES, DRIVEN
SIDE-BY-SIDE BUT NOT ATTACHED TO EACH OTHER) SUPPORT TEN (10) BULKHEAD PILES (24"Ø x 40' LONG STEEL PIPE PILES, ALSO NOT
ATTACHED TO EACH OTHER). EXISTING TIE-BACKS ARE #7 REBAR IN A RADIAL PATTERN TO EACH BULKHEAD PILE (ASSUMED TO BE 5
PER ANCHOR PILE). EXISTING TIE-BACKS ARE AT +4' MLLW PER AS-BUILT INFORMATION.
AS-BUILT INFORMATION, AND FIELD INSPECTION OF A COUPLE OF ANCHOR PILE GROUPS THAT ARE EXPOSED, INDICATES THAT THE
THERMOTUBES ARE LOCATED BEHIND THE ANCHOR PILES, AS SHOWN. WHERE THERMOTUBE DOES NOT CONFLICT, PLACE ANCHOR
BEAM IN THE PREFERRED POSITION, BEHIND THE ANCHOR PILES.
NOTES:
1. STRUCTURAL WORK ON PILE GROUPS 1 THRU 7 (PG1 THRU PG7) IS NOT PART OF THIS CONTRACT.
2. THE CENTER OF THE FIRST PIPE PILE (CLOSEST TO STA 10+00) OF PILE GROUP 8 (PG8) IS LOCATED AT APPROXIMATELY SCL STA
11+40.
PGX
NEW DYWIDAG THREADBARS, WALE, ANCHOR
BEAM (THIS CONTRACT), (E) PIPE PILES UNO
EXISTING 24" STEEL PIPE PILE WALL
WITH #7 REBAR TIEBACKS.
EXISTING 3" THERMOTUBE SIPHON LOCATED
AT ANCHOR PILES.
CONSTRUCTION BOUNDARY
EXISTING MONUMENT
PILE GROUP X
LEGEND
PL
PROPERTY LINE
C B
C
B
C
B
C
B
C
B
C
B
-50
P
L
P
L
P L
P
L
P L
PL
P
L
P
L
P L
P
L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
PL PL PL PL PL PL PL PL PL PL PL PL
P L
P L
P L
P L
P L
P L
EAST AVE.
51.04
R
O
A
R
B
O
R
CONSTRUCTION BOUNDARY
K U
S K
O K
W
IM
R
IV
E R
M A
T C
H
L I N
E
50250-25
FULL SCALE: 1" = 25'
S E
E
S
H E
P
G
P
G
P
G
P
G
P
G
P
G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P G
P
G
P
G
P
G
P
G
SEE NOTE 3
SEE NOTE 1
POSSIBLE 11th PILE IN PG58, FIELD VERIFY, EXTEND
WALE TO LAST PILE
S E
E N
O T
E
S
S
TYP
T Y
P
A
S
S
F
S-102 S-501
NOTE: THIS ELEVATION
IS A SCHEMATIC AND IS
NOT BASED ON
SURVEY INFORMATION,
USE FOR REFERENCE
PURPOSES ONLY.
SUNKEN PILE ELEVATION
SCALE: 1" = 10'
S-102 S-102
EL =
+10' MLLW ±
B E
T S
P L
A N
S
S-102
S I T
E
P
L A
N
I I
O
F
I I
T
E D
C E
P O
A E
C G
D
B
L I S
S
E C
G
H
H
K
E
I S
S E
S
R C
T
R C
T
S T
R U
C T
U R
A L
ALASKA DISTRICT
D R
A W
I N
G
F I L
E
D W
G
S
C A
L E
P L
A
L E
D A
T E
A C
T I O
N S
Y M
D R
A W
N
R E
S I D
E N
T
E
N G
I N
E E
R
D A
T E
S T
A T
E
P R
I M
E
C
O N
T R
A C
T O
R
D A
T E
D E
S C
R I P
T I O
N A
P P
D
C I T
Y
C O
N T
R A
C T
O R
C O
N T
R A
R E
C O
M M
E N
D E
D
A P
P R
O V
E D
S U
B M
I T
T E
D
D E
S I G
N E
D
R E
V I E
W E
D
C H
I E
A
N C
H
C H
I E
C
T I O
N
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
A N
C H
O R
A G
E
A
L A
S K
A
C O
R P
S
O
F
E
N G
I N
E E
R S
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
D r a w i n g
X
U
N I F
I E
D E
N C
W J o b s B
E T
D w g s C
A D
B
E T
S d w g l a s t s a v e d o n
P
M w a s p l o t t e d b y
T e d r i c k
R o b e r
A
R M
Y
C
E P
S o n
P
M
12N
N
S
T
R
U
C
T
I
O
N
B
E T
B E
T
P
N o
W K
B R
J U
RFP
E A
L
K H
E A
D
W
A
E
B A
C K
S
B E
T H
E L
A
L A
S
PGX
NEW DYWIDAG THREADBARS, WALE, ANCHOR
BEAM (THIS CONTRACT), (E) PIPE PILES UNO
EXISTING 24" STEEL PIPE PILE WALL
WITH #7 REBAR TIEBACKS.
EXISTING 3" THERMOTUBE SIPHON LOCATED
AT ANCHOR PILES.
CONSTRUCTION BOUNDARY
EXISTING MONUMENT
PILE GROUP X
LEGEND
NOTES (SEE G-002 FOR ABBREVIATIONS):
1. FOUR PIPE PILES JUST UPSTREAM OF THE ANGLE POINT IN THE SEAWALL
(STA. 15+20± SCL) WERE RESET IN APRIL OF 2000. REPAIRS INCLUDED
INSTALLING: 1) A 16' LONG, HSS 10x6x1/2 WALE W/ WALE TO PILE
CONNECTIONS SIMILAR TO DETAILS SHOWN IN THIS CONTRACT; 2) TWO 2
3/4"Ø A36 TIE RODS W/ TURNBUCKLES AND A WELDED-LAPPED SPLICE; 3) A 7'
LONG, HSS 12x8x1/2 ANCHOR BEAM PLACED BEHIND THE ANCHOR PILES; AND
4) PILE TOPS WERE TACK WELDED TOGETHER TO HOLD THEM IN ALIGNMENT
PRIOR TO INSTALLING WALE. THE WALE, TIE- BACK AND ANCHOR BEAM WERE
INSTALLED AT APPROX +5' MLLW. CONTRACTOR SHALL REMOVE AND
PROPERLY DISPOSE OF ALL ELEMENTS OF THIS PREVIOUSLY INSTALLED
TIE-BACK SYSTEM THAT CONFLICT WITH THE INSTALLATION OF THE TIE-BACK
SYSTEM SHOWN IN THIS CONTRACT.
2. TWENTY-FOUR (24) PILES IN THIS AREA HAVE SUBSIDED. ALIGNMENT OF THE
PILES REMAINS TYPICAL OF OTHER SECTION OF THE BULKHEAD, HOWEVER
THE TOP OF PILE ELEVATIONS FORM A SAG CURVE WITH A MAXIMUM
DISPLACEMENT OF APPROX 2.25'. CONTRACTOR SHALL WELD EXTENSIONS
ON EXISTING PILES TO PROVIDE A UNIFORM TOP OF PILE ELEVATION.
EXISTING PILES HAVE SOME DENTS IN THE TOP EDGE. DENTS SHALL BE
STRAIGHTENED AS REQUIRED TO PROVIDE A CONTINUOUS WELD BETWEEN
THE EXISTING PILE TOP AND THE NEW SECTION OF MATCHING PILE. TWO
LENGTHS (APPROX 60') OF 24" CITY OF BETHEL. PIPE PILE HAVE BEEN LAID
HORIZONTALLY BEHIND THIS SUNKEN SECTION OF BULKHEAD. THE
CONTRACTOR SHALL REMOVE THESE TWO SECTIONS OF PIPE PILE AND
STAGE THEM ALONG THE BULKHEAD FOR REMOVAL BY OTHERS..
3. THREE MOORING POSTS HAVE 10' LONG SECTIONS OF HSS 6x6 WALE WELDED
DIRECTLY TO THE BULKHEAD PILES. WALE IS AT FINISH GRADE AND VISIBLE
WITHOUT EXCAVATION. REMOVE WALE AS REQUIRED FOR INSTALLATION OF
NEW WORK UNDER THIS CONTRACT.
4. B ROCK HAS BEEN PLACED BY THE CITY OF BETHEL FOR SINK HOLE REPAIR
ON THE LANDWARD SIDE OF THE EXISTING PIPE PILE BULKHEAD. THE
APPROXIMATE LOCATION OF A 20' WIDE X 30' LONG X 7' THICK B ROCK LAYER
IS BETWEEN STA 17+00 AND 19+50 SCL. EXACT LOCATION AND DIMENSIONS
ARE UNKNOWN. CONTACT THE CITY OF BETHEL PORT DIRECTOR FOR
ADDITIONAL INFORMATION. THE B ROCK IS CURRENTLY NOT VISABLE, IT IS
COVERED WITH AN UNKNOWN THICKNESS OF SAND/SILT BACKFILL ON THE
SURFACE. THE CONTRACTOR SHALL REMOVE AND STOCKPILE THIS B ROCK
ONSITE. THE CITY OF BETHEL WILL HAUL THE ROCK OFFSITE. THE
CONTRACTOR SHALL FILL THE DEPRESSION WITH BACKFILL MATERIAL UPON
COMPLETION OF THE PIPE PILE BULKHEAD STRUCTURAL WORK.
PL
PROPERTY LINE
NEW TIEBACK PLAN
SCALE: 1/2" = 1'-0"
F
S-101 S-102 S-501
EXISTING 3" SCHED 40 PIPE PILE FOR
THERMOTUBE, SHOWN BEHIND ANCHOR
PILES, IF LOCATED SO AS TO ALLOW
ANCHOR BEAM TO BE PLACED IN
PREFERED LOCATION, BEHIND ANCHOR
PILES, SEE
G
S-501 S-501
(E) 24" Ø PIPE PILE
PL 1" x 6" x 0'-6", TYP
HSS 18x6x
ANCHOR BEAM
H
S-501 S-501
6"x6" SHIM PL'S, THICKNESS
AS REQD TO ALIGN
ANCHOR BEAM, SEE
CONNECTION SAME AS WALE TO
BULKHEAD PILE CONNECTION
EXCEPT USE
" FILLET WELD IN
LIEW OF
" FOR ANCHOR BEAM
TO GUSSET PLATE WELD
7'-0"
D
S-501 S-501
CONTRACTOR'S OPTION FOR
FULL STRENGTH SPLICE,
CONTRACTOR SUBMIT
DETAILS FOR APPROVAL,
DYWIDAG COUPLER W/ LOCK
NUTS IS ACCEPTABLE
6'-0"
B
S-501 S-502
E
X C
E P
T
A
P P
R O
X
F
R
V E
D
B
U L K
H E
T
H R
O U
B
S
S
E
S
S
L4x4x x 14'-0", DRIVE TO TIP
ELEVATION OF -3' MLLW, CUT
OFF @ +9' MLLW & TACK
WELD TO PILES @ TOP ONLY,
MAINTAIN TIGHT CONTACT
TO MINIMIZE SILT WASHOUT
#18 DYWIDAG GALV
THREADBAR, GR 75,
OR EQUAL
DYWIDAG COUPLER WITH
LOCK NUT, OR EQUAL
EXISTING 24"Ø PIPE PILE
BULKHEAD, TYP GROUP OF 10
DRAINAGE HOLES,
SEE SPECIFICATIONS
ALIGNMENT PLAN
SCALE: 3/16" = 1'-0"
H
S-501 S-501
C
S-501 S-501
SHIM ANCHOR BEAM AS REQD
TO BRING WP WITHIN 1'-0" OF
CENTERLINE OF PILE GROUP,
SEE
SIM AT ANGLE POINT AND CURVED
SECTIONS OF BULKHEAD, SEE
STRUCTURAL SITE PLANS II & III
C PG
L
WP
ANCHOR BEAM SECTION
SCALE: 3" = 1'-0"
D
S-501 S-501
GUSSET PLATES NOT
SHOWN FOR CLARITY
ANCHOR PILE
WALL BEYOND
#18 DYWIDAG GALV
THREADBAR, GR 75,
OR EQUAL
+6' MLLW
PL 1" x 6" x 1'-0"
W/ 2
" Ø HOLE,
CENTERED
DYWIDAG HEX NUT AND
LOCK NUT, OR EQUAL
HSS 18x6x
ANCHOR BEAM
WALE SPLICE - FRONT VIEW
SCALE: 3" = 1'-0"
E
S-501 S-501
10"
HSS 12 x8x
1" MAX, SEE
NOTE 3 ON
SHEET G-002
SPLICE
PLATES BENT
AS REQD AT
CHANGES IN
BULKHEAD
ALIGNMENT
TYP
PREFERRED DETAIL
SCALE: 1/2" = 1'-0"
G
S-501 S-501
ALTERNATE
THERMOTUBE
LOCATIONS ALLOWING
ANCHOR BEAM TO BE
PLACED BEHIND
ANCHOR PILES, ALL
OTHER DETAILS AND
DIMENSIONS REMAIN
THE SAME
WALE SPLICE SECTION
SCALE: 3" = 1'-0"
B
S-501 S-501
E
S
S
HSS 12x8x
PL
x 4 x 0'-10", TYPICAL
PL
x 10 x 0'-10"
PIPE WALL
BEYOND
PL
x 5 x 0'-10"
CL EL =
+6' MLLW
ANCHOR BEAM SHIM DETAIL
SCALE: 1 1/2" = 1'-0"
C
S-501 S-501
HSS 18x6x
ANCHOR
BEAM
(E) ANCHOR PILE WALL
VARIES DUE TO
MISALIGNMENT OF
ANCHOR PILES
RELATIVE TO WALL
ALIGNMENT, 3" MAX
SHIM TO NEAREST
AS REQD FOR
ALIGNMENT AND HOLD
ALL PLIES TIGHT W/ NO
GAPS. PROVIDE 2"
LONG MINIMUM SHIM
TO SHIM WELDS AND
SHIM TO ANCHOR
BEAM WELDS ON BOTH
SIDES.
8'4'0-4'
SCALE: 3/16" = 1'-0"
4'2'0-2'
SCALE: 1/2" = 1'-0"
16"8"0-8"
SCALE: 1 1/2" = 1'-0"
8"4"0-4"
SCALE: 3" = 1'-0"
B E
T S
D E
T A
I L
S
S-501
D E
T A
I L
S
I
T
E D
C E
P O
A E
C G
D
B
L I S
S
E C
G
H
H
K
E
I S
S E
S
R C
T
R C
T
S T
R U
C T
U R
A L
ALASKA DISTRICT
D R
A W
I N
G
F I L
E
D W
G
S
C A
L E
P L
A
L E
D A
T E
A C
T I O
N S
Y M
D R
A W
N
R E
S I D
E N
T
E
N G
I N
E E
R
D A
T E
S T
A T
E
P R
I M
E
C
O N
T R
A C
T O
R
D A
T E
D E
S C
R I P
T I O
N A
P P
D
C I T
Y
C O
N T
R A
C T
O R
C O
N T
R A
R E
C O
M M
E N
D E
D
A P
P R
O V
E D
S U
B M
I T
T E
D
D E
S I G
N E
D
R E
V I E
W E
D
C H
I E
A
N C
H
C H
I E
C
T I O
N
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
A N
C H
O R
A G
E
A
L A
S K
A
C O
R P
S
O
F
E
N G
I N
E E
R S
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
D r a w i n g
X
U
N I F
I E
D E
N C
W J o b s B
E T
D w g s C
A D
B
E T
S d w g l a s t s a v e d o n
P
M w a s p l o t t e d b y
T e d r i c k
R o b e r
A
R M
Y
C
E P
S o n
P
M
12N
N
S
T
R
U
C
T
I
O
N
B
E T
B E
T
P
N o
W K
B R
J U
RFP
E A
L
K H
E A
D
W
A
E
B A
C K
S
B E
T H
E L
A
L A
S
0.0' MLLW
TYPICAL BULKHEAD SECTION
SCALE: 3/16" = 1'-0"
A
S-101 S-102S-502
56' ±
FILTER MATERIAL
BACKFILL WITHIN 2' OF
BACK FACE OF WALL
GEOTEXTILE FABRIC
W/ 2' HOR LEG AT BOTT
BACKFILL TO
ORIG COND
EXISTING GROUND
SURFACE (APPROX)
EXCAVATION
LINE (AS REQD)
56' LONG THERMOTUBE,
TYPICAL AT ANCHOR PILES
+10' ±
TOP OF ANCHOR
PILE EL = +9 ±
TOP OF WALL
PILE EL = +10 ±
EL =
+3' ±
WASHOUT
PROTECTION
ANGLE
ELEVATION OF EXISTING #7
REBAR TIE RODS (+4'), EXISTING
TIE RODS ARE PLACED IN A
RADIAL, OR FAN, PATTERN FROM
ANCHOR PILES TO BULKHEAD
ELEVATION OF NEW TIE
RODS (+6' MLLW)
24" Ø x 40' BULKHEAD PILE
24" Ø x 30'-0" ANCHOR
PILE (GROUP OF TWO)
TIP @ OR
BELOW -27'
TYP
TIE ROD TO WALE CONNECTION PLAN
SCALE: 3" = 1'-0"
B
S-501 S-502
TIE ROD TO WALE ELEVATION
SCALE: 3" = 1'-0"
C
S-502 S-502
C
S
S
TYP
6"
DYWIDAG COUPLER
AND LOCK NUT, OR
EQUAL
BEVEL COUPLER AND
GUSSETS AS REQD
FOR TIGHT FIT-UP
PL 1 x 6 x 0'-5
HSS WALE
#18 DYWIDAG THREADBAR
PIPE WALL
CL EL =
+6' MLLW
HSS 12x8x
WALE
TYP
4"
TYP
T Y
P
" THICK GUSSET
PLATE, TYPICAL
TYP
WALE CONNECTION PLAN
SCALE: 3" = 1'-0"
D
S-502 S-502
CUT PLAT TO FIT
PIPE CONTOUR
" SNIPE, TYP
CLEAN EXISTING PIPE
SURFACES TO EXPOSE CLEAN,
BARE STEEL PRIOR TO WELDING
EXISTING 24" Ø PIPE
PILE W/ 0.344" WALL
HSS 12x8x
4"
TYP
D
S-502 S-502
TYP WALE/ANCHOR BEAM TO PILE CONN
SCALE: 3" = 1'-0"
E
S-501 S-502
PIPE WALL (0.344" ORIG THK)
4"
" GUSSET
PLATE, TYP
HSS 12x8x
WALE
HSS 18x6x
ANCHOR BEAM
A
T
W
A L
E
A
T
A
N C
H O
R
B
M
CL EL =
+6' MLLW
VARIES DUE TO STAGGERED
ALIGNMENT OF PIPE
BULKHEAD (SHIMS REQD AT
ANCHOR PILES ONLY)
T
Y P
" TYP
5" MIN
AT ANCHOR BEAM
TYP, EXCEPT AS NOTED
FOR ANCHOR BEAM
8'4'0-4'
SCALE: 3/16" = 1'-0"
8"4"0-4"
SCALE: 3" = 1'-0"
B E
T S
D E
T A
I L
S
S-502
D E
T A
I L
S
I I
T
E D
C E
P O
A E
C G
D
B
L I S
S
E C
G
H
H
K
E
I S
S E
S
R C
T
R C
T
S T
R U
C T
U R
A L
ALASKA DISTRICT
D R
A W
I N
G
F I L
E
D W
G
S
C A
L E
P L
A
L E
D A
T E
A C
T I O
N S
Y M
D R
A W
N
R E
S I D
E N
T
E
N G
I N
E E
R
D A
T E
S T
A T
E
P R
I M
E
C
O N
T R
A C
T O
R
D A
T E
D E
S C
R I P
T I O
N A
P P
D
C I T
Y
C O
N T
R A
C T
O R
C O
N T
R A
R E
C O
M M
E N
D E
D
A P
P R
O V
E D
S U
B M
I T
T E
D
D E
S I G
N E
D
R E
V I E
W E
D
C H
I E
A
N C
H
C H
I E
C
T I O
N
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
A N
C H
O R
A G
E
A
L A
S K
A
C O
R P
S
O
F
E
N G
I N
E E
R S
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
D r a w i n g
X
U
N I F
I E
D E
N C
W J o b s B
E T
D w g s C
A D
B
E T
S d w g l a s t s a v e d o n
P
M w a s p l o t t e d b y
T e d r i c k
R o b e r
A
R M
Y
C
E P
S o n
P
M
12N
N
S
T
R
U
C
T
I
O
N
B
E T
B E
T
P
N o
W K
B R
J U
RFP
E A
L
K H
E A
D
W
A
E
B A
C K
S
B E
T H
E L
A
L A
S
0.0' MLLW
NEW BULKHEAD SECTION AT BOAT RAMP
SCALE: 3/16" = 1'-0"
A
S-101 S-503
56' ±
FILTER MATERIAL
BACKFILL WITHIN 2' OF
BACK FACE OF WALL
GEOTEXTILE FABRIC
W/ 2' HOR LEG AT BOTT
BACKFILL TO MATCH
ADJACENT GRADES
EXISTING GROUND
SURFACE (APPROX)
EXCAVATION
LINE (AS REQD)
+10' ±
TOP OF ANCHOR
PILE EL = +9 ±
TOP OF WALL
PILE EL = +10 ±
EL =
+3' ±
WASHOUT
PROTECTION
ANGLE
ELEVATION OF NEW TIE
RODS (+6' MLLW)
15x NEW 24" Ø x 40'
BULKHEAD PILES
NEW 24" Ø x 30'-0" ANCHOR
PILES (2 GROUPS OF TWO)
TIP @ OR
BELOW -27'
FILL PLACED PRIOR TO TIGHTENING
TIE RODS. PROVIDE MINIMUM SLOPE
REQ'D FOR DRAINAGE ADJACENT TO
WALL.
MAX FILL EL W/O TIGHT
TIE RODS = +4
4'
MIN
NOTE: SHEET PILES NOT
SHOWN FOR CLARITY.
B E
T S
D E
T A
I L
S
S-503
D E
T A
I L
S
I I I
T
E D
C E
P O
A E
C G
D
B
L I S
S
E C
G
H
H
K
E
I S
S E
S
R C
T
R C
T
S T
R U
C T
U R
A L
ALASKA DISTRICT
D R
A W
I N
G
F I L
E
D W
G
S
C A
L E
P L
A
L E
D A
T E
A C
T I O
N S
Y M
D R
A W
N
R E
S I D
E N
T
E
N G
I N
E E
R
D A
T E
S T
A T
E
P R
I M
E
C
O N
T R
A C
T O
R
D A
T E
D E
S C
R I P
T I O
N A
P P
D
C I T
Y
C O
N T
R A
C T
O R
C O
N T
R A
R E
C O
M M
E N
D E
D
A P
P R
O V
E D
S U
B M
I T
T E
D
D E
S I G
N E
D
R E
V I E
W E
D
C H
I E
A
N C
H
C H
I E
C
T I O
N
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
A N
C H
O R
A G
E
A
L A
S K
A
C O
R P
S
O
F
E
N G
I N
E E
R S
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
D r a w i n g
X
U
N I F
I E
D E
N C
W J o b s B
E T
D w g s C
A D
B
E T
S d w g l a s t s a v e d o n
P
M w a s p l o t t e d b y
T e d r i c k
R o b e r
A
R M
Y
C
E P
S o n
P
M
12N
N
S
T
R
U
C
T
I
O
N
B
E T
B E
T
P
N o
W K
B R
J U
RFP
E A
L
K H
E A
D
W
A
E
B A
C K
S
B E
T H
E L
A
L A
S
NOTES: (SEE SHEET G-002 FOR ABBREVIATIONS)
1. CONTRACTOR SHALL INSTALL FIFTEEN (15) BULKHEAD PILES AND TWO (2) ANCHOR PILE GROUPS.
a. PG15 CONSISTS OF EIGHT (8) BULKHEAD PILES AND PG16 CONSISTS OF SEVEN (7) BULKHEAD PILES.
b. THE EXISTING BOAT RAMP GAP IN THE BULKHEAD IS SLIGHTLY OVER 30' WIDE, PILES SHALL BE EVENLY SPACED TO FILL THE
EXISTING GAP.
c. ANCHOR PILES (2 GROUPS OF TWO) SHALL BE INSTALLED IN A SIMILAR FASHION TO EXISTING WORK.
d. PRIOR TO INSTALLATION AND TIGHTENING OF TIE RODS, FILL PLACED AGAINST THE NEW BULKHEAD PILES SHALL BE LIMITED
AS SHOWN ON SECTION A ON THIS SHEET.
e. ANCHOR BEAM SHALL BE PLACED IN THE PREFERRED POSITION, BEHIND THE ANCHOR PILES AS SHOWN.
f. TUBE STEEL WALE, ANCHOR BEAM, TIE RODS, WASHOUT PROTECTION ANGLE, GEOTEXTILE FABRIC, AND FILTER MATERIAL
BACKFILL SHALL BE CONSTRUCTED FOR PG15 THRU PG16 AS DETAILED ON SHEETS S-501 AND S-502.
g. AFTER TIE RODS ARE INSTALLED AND TIGHTENED, THE RAMP SHALL BE BACKFILLED TO MATCH ADJACENT GRADE ON EITHER
SIDE OF THE SHEET PILES.
h. PILE GROUPS 15 AND 16 DO NOT REQUIRE A THERMOTUBE.
2. PILE DRIVING TOLERANCES, CONDITIONS, AND DOCUMENTATION:
a. BULKHEAD PILES (PG15 AND PG16) SHALL BE DRIVEN TO WITHIN A HORIZONTAL TOLERANCE OF NO MORE THAN 2 INCHES, AT
THE TOP OF THE PILE, FROM THE STRAIGHT LINE POSITION DEFINED BY THE EXISTING ADJACENT PILES.
b. ANCHOR PILE TOPS SHALL BE TIGHT TO ONE ANOTHER AND MEET A 2" TOLERANCE FROM A LINE PARALLEL TO THE BULKHEAD
ALIGNMENT.
c. A VARIATION OF NO MORE THAN
INCH PER FOOT OF PILE LENGTH FROM THE VERTICAL WILL BE PERMITTED.
d. THE CONTRACTOR SHALL COORDINATE AND CONDUCT PIPE PILE INSTALLATION TAKING INTO ACCOUNT EXISTING B-ROCK THAT
MAY BE PRESENT WITHIN THE PG15 AND PG16 AREA (SEE NOTE 3 BELOW).
e. THE CONTRACTOR SHALL KEEP A COMPLETE AND ACCURATE RECORD OF EACH PILE DRIVEN. INDICATE PILE LOCATION, LENGTH, GROUND ELEVATION, WATER LEVEL, TIP ELEVATION, TOP AND/OR CUTOFF ELEVATION, PENETRATION IN SECONDS
PER FOOT (OR BLOWS PER FOOT IF AN IMPACT HAMMER IS REQUIRED) FOR THE ENTIRE LENGTH OF PENETRATION, HAMMER
DATA, AND NOTATIONS OF PILE BEHAVIOR DURING DRIVING. THE PILE RECORDS SHALL BE PROVIDED TO THE CONTRACTING
OFFICER'S REPRESENTATIVE WITHIN 7 DAYS AFTER PILE INSTALLATION.
3. THE SPECIFICATION FOR THE EXISTING B-ROCK PLACED IN 2007 WAS AS FOLLOWS:
THE ROCK, AFTER PROCESSING, SHALL BE ANGULAR AND CONFORM TO THE SIZE REQUIREMENTS INDICATED BELOW. NEITHER
THE BREADTH OR THICKNESS OF ANY PIECE OF B-ROCK SHALL BE LESS THAN ONE-THIRD ITS LENGTH. OPERATIONS OF
LOADING, PLACEMENT, OR STOCKPILING SHALL BE CONDUCTED IN A MANNER WHICH WILL PREVENT BREAKAGE.
a. B-ROCK SHALL BE WELL GRADED WITHIN THE FOLLOWING LIMITS:
ALLOWABLE PERCENT SMALLER
SPECIFIED ROCK WEIGHT (POUNDS) BY WEIGHT
400 100%
200 95%
60 25 - 50%
25 0 - 10%
NO MORE THAN 5% BY WEIGHT MAY PASS THE 1-INCH SIEVE.
PHOTO 7: LOOKING SOUTHEAST AT TOP OF SEAWALL AT CB11. 9/30/2016 PHOTO 8: LOOKING NORTHWEST FROM CB11 ALONG SEAWALL FACE TOWARDS BOAT
RAMP. 9/30/2016
PHOTO 9: LOOKING EAST ALONG SEAWALL FACE FROM CB11 TOWARDS CB10.
9/30/2016
PHOTO 4: EXPOSED GEOTEXTILE FABRIC ON EAST SIDE OF BOAT RAMP. 9/30/2016 PHOTO 5: LOOKING NORTHWEST ACROSS BOAT RAMP ALONG SEAWALL FACE. 9/30/2016 PHOTO 6: LOOKING SOUTHEAST ALONG SEAWALL FACE FROM BOAT RAMP TO CB11.
9/30/2016
PHOTO 1: LOOKING EAST AT CB12, BOAT RAMP, AND CB11 FROM CITY DOCK. 9/30/2016 PHOTO 2: LOOKING SOUTH AT BOAT RAMP FROM NEAR EAST AVENUE. 9/30/2016 PHOTO 3: LOOKING SOUTH AT BOAT RAMP FROM NEAR RAMP. 9/30/2016
B E
T S
P H
O T
O S
S-901
S I T
E
P
H O
T O
S
I
T
E D
C E
P O
A E
C G
D
B
L I S
S
E C
G
H
H
K
E
I S
S E
S
R C
T
R C
T
S T
R U
C T
U R
A L
ALASKA DISTRICT
D R
A W
I N
G
F I L
E
D W
G
S
C A
L E
P L
A
L E
D A
T E
A C
T I O
N S
Y M
D R
A W
N
R E
S I D
E N
T
E
N G
I N
E E
R
D A
T E
S T
A T
E
P R
I M
E
C
O N
T R
A C
T O
R
D A
T E
D E
S C
R I P
T I O
N A
P P
D
C I T
Y
C O
N T
R A
C T
O R
C O
N T
R A
R E
C O
M M
E N
D E
D
A P
P R
O V
E D
S U
B M
I T
T E
D
D E
S I G
N E
D
R E
V I E
W E
D
C H
I E
A
N C
H
C H
I E
C
T I O
N
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
A N
C H
O R
A G
E
A
L A
S K
A
C O
R P
S
O
F
E
N G
I N
E E
R S
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
D r a w i n g
X
U
N I F
I E
D E
N C
W J o b s B
E T
D w g s C
A D
B
E T
S d w g l a s t s a v e d o n
P
M w a s p l o t t e d b y
T e d r i c k
R o b e r
A
R M
Y
C
E P
S o n
P
M
12N
N
S
T
R
U
C
T
I
O
N
B
E T
B E
T
P
N o
W K
B R
J U
RFP
E A
L
K H
E A
D
W
A
E
B A
C K
S
B E
T H
E L
A
L A
S
PHOTO 16: LOOKING SOUTH-SOUTHWEST AT CURVED END OF SEAWALL AT CB8 AND
BEYOND. 9/30/2016
PHOTO 17: LOOKING NORTHWEST AT CB8 AND CB9 AT EAST END OF SEAWALL. 9/30/2016
PHOTO 18: LOOKING NORTH-NORTHWEST AT EAST END OF SEAWALL. 9/30/2016
PHOTO 13: LOOKING EAST ALONG SEAWALL FACE FROM CB10 (SUNKEN PILES AREA).
9/30/2016
PHOTO 14: LOOKING EAST-NORTHEAST AT CB9 AND CURVED SEAWALL FACE BEYOND.
9/30/2016
PHOTO 15: LOOKING SOUTHWEST AT CB8 AND CURVED SEAWALL FACE BEYOND. 9/30/2016
PHOTO 10: LOOKING EAST ALONG SEAWALL FACE BETWEEN CB11 AND CB10. 9/30/2016 PHOTO 11: LOOKING WEST ALONG SEAWALL FACE BETWEEN CB10 AND CB11. 9/30/2016 PHOTO 12: LOOKING EAST ALONG SEAWALL FACE AT CB10. 9/30/2016
B E
T S
P H
O T
O S
S-902
S I T
E
P
H O
T O
S
I I
T
E D
C E
P O
A E
C G
D
B
L I S
S
E C
G
H
H
K
E
I S
S E
S
R C
T
R C
T
S T
R U
C T
U R
A L
ALASKA DISTRICT
D R
A W
I N
G
F I L
E
D W
G
S
C A
L E
P L
A
L E
D A
T E
A C
T I O
N S
Y M
D R
A W
N
R E
S I D
E N
T
E
N G
I N
E E
R
D A
T E
S T
A T
E
P R
I M
E
C
O N
T R
A C
T O
R
D A
T E
D E
S C
R I P
T I O
N A
P P
D
C I T
Y
C O
N T
R A
C T
O R
C O
N T
R A
R E
C O
M M
E N
D E
D
A P
P R
O V
E D
S U
B M
I T
T E
D
D E
S I G
N E
D
R E
V I E
W E
D
C H
I E
A
N C
H
C H
I E
C
T I O
N
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
A N
C H
O R
A G
E
A
L A
S K
A
C O
R P
S
O
F
E
N G
I N
E E
R S
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
D r a w i n g
X
U
N I F
I E
D E
N C
W J o b s B
E T
D w g s C
A D
B
E T
S d w g l a s t s a v e d o n
P
M w a s p l o t t e d b y
T e d r i c k
R o b e r
A
R M
Y
C
E P
S o n
P
M
12N
N
S
T
R
U
C
T
I
O
N
B
E T
B E
T
P
N o
W K
B R
J U
RFP
E A
L
K H
E A
D
W
A
E
B A
C K
S
B E
T H
E L
A
L A
S
PHOTO 25: LOOKING NORTH-NORTHEAST AT BOAT RAMP. 9/30/2016 PHOTO 26: LOOKING NORTH-NORTHEAST AT FACE OF SEAWALL AT AND UPSTREAM FROM
CB12. 9/30/2016
PHOTO 27: LOOKING NORTHEAST AT CB12 AND FACE OF SEAWALL ON BOTH SIDES
OF THIS ANGLE POINT. 9/30/2016
PHOTO 22: LOOKING NORTHWEST AT FACE OF SEAWALL AT AND UPSTREAM FROM CB11.
9/30/2016
PHOTO 23: LOOKING NORTH AT CB11. 9/30/2016 PHOTO 24: LOOKING NORTH-NORTHEAST AT FACE OF SEAWALL NEAR SCL STA 14+00.
9/30/2016
PHOTO 19: LOOKING NORTH AT FACE OF SEAWALL AT AND UPSTREAM FROM SCL STA
18+00. 9/30/2016
PHOTO 20: LOOKING NORTH AT SUNKEN PILES JUST DOWNSTREAM FROM SCL STA 18+00.
9/30/2016
PHOTO 21: LOOKING NORTHEAST AT SUNKEN PILES JUST DOWNSTREAM FROM SCL STA
18+00. 9/30/2016
B E
T S
P H
O T
O S
S-903
S I T
E
P
H O
T O
S
I I I
T
E D
C E
P O
A E
C G
D
B
L I S
S
E C
G
H
H
K
E
I S
S E
S
R C
T
R C
T
S T
R U
C T
U R
A L
ALASKA DISTRICT
D R
A W
I N
G
F I L
E
D W
G
S
C A
L E
P L
A
L E
D A
T E
A C
T I O
N S
Y M
D R
A W
N
R E
S I D
E N
T
E
N G
I N
E E
R
D A
T E
S T
A T
E
P R
I M
E
C
O N
T R
A C
T O
R
D A
T E
D E
S C
R I P
T I O
N A
P P
D
C I T
Y
C O
N T
R A
C T
O R
C O
N T
R A
R E
C O
M M
E N
D E
D
A P
P R
O V
E D
S U
B M
I T
T E
D
D E
S I G
N E
D
R E
V I E
W E
D
C H
I E
A
N C
H
C H
I E
C
T I O
N
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
A N
C H
O R
A G
E
A
L A
S K
A
C O
R P
S
O
F
E
N G
I N
E E
R S
REFERENCE
NUMBER:
SHEET OF
US ARMY CORPS
OF ENGINEERS
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
D r a w i n g
X
U
N I F
I E
D E
N C
W J o b s B
E T
D w g s C
A D
B
E T
S d w g l a s t s a v e d o n
P
M w a s p l o t t e d b y
T e d r i c k
R o b e r
A
R M
Y
C
E P
S o n
P
M
12N
N
S
T
R
U
C
T
I
O
N
B
E T
B E
T
P
N o
W K
B R
J U
RFP
E A
L
K H
E A
D
W
A
E
B A
C K
S
B E
T H
E L
A
L A
S
| G-001 COVER SHEET |
| G-002 GENERAL NOTES AND ABBREVIATIONS |
| V-101 LOCATION AND VICINITY MAP |
| C-101 GENERAL SITE PLAN |
| S-101 SITE PLAN - I OF II |
| S-102 SITE PLAN - II OF II |
| S-501 DETAILS I |
| S-502 DETAILS II |
| S-503 DETAILS III |
| S-901 SITE PHOTOS I |
| S-902 SITE PHOTOS II |
| S-903 SITE PHOTOS III |
File details come from the government source that posted it. Updated .