Amendment_4_package.pdf

PDF 746 KB Posted

Attached to
EIE381 Earth Covered Magazines Federal contract opportunity
Solicitation number
W911KB-17-R-0006
Issued by
Department of the Army Corps of Engineers Engineering District Alaska

About this file

EIE381 - Amendment 04 - Package

View the file

Other files for this federal contract opportunity

Other files attached to EIE381 Earth Covered Magazines, newest first.
File Type Posted
A.03.09_EIE381_ESS_Vindicator_V5_Redacted_Version.pdf PDF
AM_05_package.pdf PDF
Am_03_EIE381_pkg.pdf PDF
A.07.24_Amendment_02_EIE381.pdf PDF
Solicitation_Amendment_01.pdf PDF
A.07.23_Solicitation_EIE381.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE/LOCATION: EIE381, EARTH COVERED MAGAZINES, EIELSON AFB, ALASKA

a. This amendment provides changes to the solicitation as indicated on the continuation page(s) of this document.

b. PROPOSAL DUE DATE IS UNCHANGED. VOLUME 1 REMAINS 6 FEBRUARY 2017 AT 1400 HOURS ALASKA TIME and VOLUME 2 REMAINS 13 FEBRUARY 2017 AT 1400 HOURS ALASKA TIME. Proposals shall be submitted in accordance w ith Section 00 21 00, paragraph 1.12, Proposal Submittals.

c. YOU ARE REQUIRED TO ACKNOWLEDTGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.

1. CONTRACT ID CODE PAGE OF PAGES

1 33

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Feb-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-17-R-0006

X 9B. DATED (SEE ITEM 11)

06-Jan-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Feb-2017

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

a. The following drawing is substituted for the superseded documents/sections:

S-001

b. The following revised documents/sections are substituted for the superseded documents/sections. The identifier “AM#004” appears before and after new and/or revised materials, except as noted below.

SECTION 01 11 01 – PROPOSAL SCHEDULE

-Revised CLIN 0005

SECTION 01 50 00 – TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

-Revised paragraphs 3.1 and 3.5.3

SECTION 03 30 00.00 10 – CAST IN PLACE CONCRETE

-Revised paragraph 3.1.5

SECTION 33 20 01 – UTILITIES

-Revised paragraph 3.1

NOTE: Revisions within the following documents do not contain the above referenced identifiers:

NONE

c. The following sections are deleted:

d. The following documents are added:

Bid Inquiry Contractor Report

e. The following revisions are incorporated:

f. Other:

(End of Summary of Changes)

ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME.

PS-1

W911KB-17-R-0006

PROPOSAL SCHEDULE

F-35A Earth Covered Magazines Eielson AFB, Alaska

BASE ITEMS

Item No.

Description Estimated Quantity

Unit Unit Price Amount

0001 Construct F-35A Earth Covered Magazines within the building 5-foot lines, Complete.

1 Job $ $

0002 Construct site work and utilities beyond the building 5-foot lines, Complete.

1 Job $ $

0003 Remove, Sample stockpile 50 Cubic Yards of POL Contaminated Soil including Construction of Holding Cells, Complete*

50 CY $ $

Total of Base Items 0001 and 0003 $

OPTION ITEMS

Item No.

Description Estimated Quantity

Unit Unit Price Amount

0004 Construct ground well, Complete 1 Job $_________ $_________

0005 Drill additional 45 feet depth for ground well, Complete ** 45 Feet $_________ $_________

0006 On ECM 6362 site, Haul away offsite 50 CY of debris or ash complete*

50 CY $_________ $_________

0007 On ECM 6362 site, Excavate “Massive ice with organic silt” or “Organic silt with excessive ice” below elevation 684 per surveyed cross section, complete

10 CY $_________ $_________

Total of Option Items 0004 thru 0007 $_________

AM#04...

AM#04...

AMENDMENT R004 F-35A EARTH COVERED MAGAZINES EIE381

EIELSON AFB, ALASKA

approved location. Install fencing to be able to restrain a force of at least 250 pounds against it.

2.2.4 Temporary Wiring

Provide temporary wiring in accordance with NFPA 241 and NFPA 70. Include frequent inspection of all equipment and apparatus.

PART 3 EXECUTION

3.1 EMPLOYEE PARKING

Contractor employees will park privately owned vehicles in an area designated by the Contracting Officer. AM#004...DELETED TEXT...AM#004.

AM#004... This area may not be within reasonable walking distance of the construction site. Contractor shall furnish transportation from employee parking area to construction site where employee parking is not within reasonable walking distance. Privately owned vehicles shall not be allowed in secured ECM area. Contractor-marked vehicles and material delivery vehicles will be allowed to enter secured area with an escort. ...AM#004 Contractor employee parking must not interfere with existing and established parking requirements of the government installation.

3.2 TEMPORARY BULLETIN BOARD

Locate the bulletin board at the project site in a conspicuous place easily accessible to all employees, as approved by the Contracting Officer.

3.3 AVAILABILITY AND USE OF UTILITY SERVICES

3.3.1 Temporary Utilities

Provide temporary utilities required for construction. Materials may be new or used, must be adequate for the required usage, not create unsafe conditions, and not violate applicable codes and standards.

3.3.2 Payment for Utility Services

a. The Government will make all reasonably required utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed will be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. Carefully conserve any utilities furnished without charge.

b. Reasonable amounts of the following utilities will be made available to the Contractor at the following rates: See Section 01 19 30.00 29 attachment #4 - Eielson AFB Utility Rates.

c. The point at which the Government will deliver such utilities or services and the quantity available is as indicated. Pay all costs incurred in connecting, converting, and transferring the utilities to the work. Make connections, including providing backflow-preventing devices on connections to domestic water lines; providing meters; and providing transformers; and make disconnections.

Section 01 50 00 Page 5

AMENDMENT R004 F-35A EARTH COVERED MAGAZINES EIE381

EIELSON AFB, ALASKA

3.5 CONTRACTOR'S TEMPORARY FACILITIES

Contractor-owned or -leased trailers must be identified by Government assigned numbers. Size and location of the number will comply with Eielson AFS Security rules. Apply the number to the trailer within 14 calendar days of notification, or sooner, if directed by the Government.

3.5.1 Safety

Protect the integrity of any installed safety systems or personnel safety devices. If entrance into systems serving safety devices is required, the Contractor must obtain prior approval from the Contracting Officer. If it is temporarily necessary to remove or disable personnel safety devices in order to accomplish contract requirements, provide alternative means of protection prior to removing or disabling any permanently installed safety devices or equipment and obtain approval from the Contracting Officer.

3.5.2 Administrative Field Offices

Provide and maintain administrative field office facilities within the construction area at the designated site. Government office and warehouse facilities will not be available to the Contractor's personnel.

3.5.3 Storage Area

Construct a temporary 6 foot high chain link fence around trailers and materials. AM#004...DELETED TEXT...AM#004 Fence posts may be driven, in lieu of concrete bases, where soil conditions permit. Do not place or store Trailers, materials, or equipment outside the fenced area unless such trailers, materials, or equipment are assigned a separate and distinct storage area by the Contracting Officer away from the vicinity of the construction site but within the installation boundaries. Trailers, equipment, or materials must not be open to public view with the exception of those items which are in support of ongoing work on any given day. Do not stockpile materials outside the fence in preparation for the next day's work. Park mobile equipment, such as tractors, wheeled lifting equipment, cranes, trucks, and like equipment within the fenced area at the end of each work day.

3.5.4 Supplemental Storage Area

Upon Contractor's request, the Contracting Officer will designate another or supplemental area for the Contractor's use and storage of trailers, equipment, and materials. This area may not be in close proximity of the construction site but will be within the installation boundaries. Fencing of materials or equipment will not be required at this site; however, the Contractor is responsible for cleanliness and orderliness of the area used and for the security of any material or equipment stored in this area.

Utilities will not be provided to this area by the Government.

3.5.5 Appearance of Trailers

a. Trailers utilized by the Contractor for administrative or material storage purposes must present a clean and neat exterior appearance and be in a state of good repair. Trailers which, in the opinion of the Contracting Officer, require exterior painting or maintenance will not be allowed on installation property.

Section 01 50 00 Page 8

Provide vapor retarder beneath the interior on-grade concrete floor slabs installed in accordance with ASTM E1643. Use the greatest widths and lengths practicable to eliminate joints wherever possible. Lap joints a minimum of 12 inches. Remove torn, punctured, or damaged vapor retarder material and provide new vapor barrier prior to placing concrete. For minor repairs, patches may be made using laps of at least 12 inches. Seal lapped joints and patch edges with pressure-sensitive adhesive or tape not less than 2 inches wide and compatible with the membrane. Place vapor retarder directly on underlying subgrade, base course, or capillary water barrier, unless it consists of crushed material or large granular material which could puncture the vapor retarder. In this case, a thin layer of approximately 1/2 inch of fine graded material should be rolled or compacted over the fill before installation of the vapor retarder to reduce the possibility of puncture. Control concrete placement so as to prevent damage to the vapor retarder.

3.1.4 Perimeter Insulation

Install perimeter insulation at locations indicated. Use adhesive where insulation is applied to the interior surface of foundation walls and may be used for exterior application.

3.1.5 Embedded Items

Before placement of concrete, determine that all embedded items are firmly and securely fastened in place as indicated on the drawings, or required.

Conduit and other embedded items must be clean and free of oil and other foreign matter such as loose coatings or rust, paint, and scale. The embedding of wood in concrete is permitted only when specifically authorized or directed. Temporarily fill voids in sleeves, inserts, and anchor slots with readily removable materials to prevent the entry of concrete into voids. AM#4...Deleted Text...AM#4

3.2 CONCRETE PRODUCTION

3.2.1 Batching Plant

Locate the batching plant offsite close to the project. Conform the batching plant to the requirements of NRMCA CPMB 100 and as specified;

however, rating plates attached to batch plant equipment are not required.

3.2.2 Batching Equipment

Use semiautomatic or automatic batching controls as defined in NRMCA CPMB 100. Provide a semiautomatic batching system with interlocks such that the discharge device cannot be actuated until the indicated material is within the applicable tolerance. Equip the batching system with accurate recorder or recorders that meet the requirements of NRMCA CPMB 100. Record the weight of water and admixtures if batched by weight. Provide separate bins or compartments for each size group of aggregate and type of cementitious material, to prevent intermingling at any time. Weigh aggregates either in separate weigh batchers with individual scales or, provided the smallest size is batched first, cumulatively in one weigh batcher on one scale. Do not weigh aggregate in the same batcher with cementitious material. If both portland cement and other cementitious material are used, they may be batched cumulatively, provided that the portland cement is batched first. Water may be measured by weight or volume. Do not weigh or measure water cumulatively with

F-35A ECM EIE381

Eielson AFB, Alaska

PART 2 PRODUCTS

2.1 CASING

Casing diameter shall be as shown, conforming to ASTM A53/A53M, black, Schedule 40, Type E or S, Grade A or B. Grounding wells shall match the depth as shown on the Drawings. All casing, and other well material shall be of compatible materials to prevent galvanic reaction between components of the completed well. Submit catalog data, and name of supplier, for well vaults, caps, airline oil filters for pneumatic drilling, pumps, and chemical specifications on drill lubricants, tracers, disinfecting agents, and drill fluid additives, if used. Catalog data shall include any information, written or otherwise, supplied by the manufacturers or suppliers of the above listed items.

2.1.1 Steel Casing and Couplings

Steel casing shall be new standard weight black steel pipe, conforming to ASTM A53/A53M 6 inch diameter, minimum 1/4 inch wall thickness. Joints shall be field welded in accordance with AWWA C206.

2.2 CEMENT GROUT

Cement grout shall consist of portland cement conforming to ASTM C 150, Type I or II, sand and water. Cement grout shall be proportioned not to exceed 6 gallons of water per cubic foot of cement, with a mixture of such consistency that the well can be properly grouted. No more than 5 percent by weight of bentonite powder may be added to reduce shrinkage.

PART 3 EXECUTION

3.1 PE WITNESS

Well installation activities shall be witnessed by a Registered Professional AM#4...Civil...AM#4 Engineer AM#4...or...AM#4 Geologist in accordance with Alaska Department of Environmental Conservation requirements, at the Contractor's expense.

3.2 PREPARATION

3.2.1 Decontamination

The drill rig, drill rods, drill bits, augers, temporary casing, well developing equipment, tremie pipes, grout pumping lines, and other associated equipment shall be cleaned with high-pressure hot water/steam prior to drilling at each well location. Decontamination shall be done in accordance with ASTM D5088 or ASTM D5608. Decontamination shall be performed at a central decontamination station. Cleaning shall be performed in an area that is remote from, and cross- or down-gradient from the well being drilled. Well casing shall be cleaned with high-pressure hot water immediately prior to installation in the well. The use of factory sealed (plastic wrapped) components does not waive this requirement for pre-installation cleaning.

3.2.2 Decontamination Station

Construct a temporary decontamination pad onsite. Berm the pad and slightly incline towards a sump located in one of the back corners of the

SECTION 33 20 01 Page 5

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Bid Inquiry Contractor Report All Inquiries

Project: F-35A Earth Covered Magazines Review: Bidder Inquiry (00001) (sorted by CommentID ) Displaying 107 inquiries.

Id Discipline Sheet Detail Spec 6790066 General 00 21 00 00 21 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Based upon the original solicitation, amendments 1 & 2, is this project still considered a design/build and a 2 phase proposal process. Amendment 2 provide clarification and design complete drawing. Please confirm if pricing is required for the proposal date of February 6, 2017.

On: Jan 11 2017.

Government Response. . This is a Design-bid-build one-step Best Value solicitation. As currently written, pricing information is still due on 6 Feb 2017 by 1400 hours, Alaska Time. On: Jan 12 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6792592 Contracting AM#2 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Page 4 of amendment #2 Site Visit. Do we need a POC for Base access and can you provide the building number for Eielson Resident Office?

On: Jan 12 2017.

Government Response. . Offerors who do not currently have base access privileges need to complete columns A - D of the EAL file and e-mail to Maj John Hammett (John.D.Hammett@usace.army.mil) immediately. Contact Maj Hammett at 450-9251 if you encounter any problems with access once you arrive at the Eielson Visitor Center (front gate). The Eielson Resident Office is located in the basement of the Civil Engineer building at 2310 Central Ave. On: Jan 15 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6792894 Other N/A N/A Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Based in the delay in receiving the drawings as well as the amendments to this project, is it possible to get an extension on the due date to February 14, 15, or 16?

On: Jan 13 2017.

Government Response. . Volume 1 contains no pricing information and is not dependent on information contained in the drawings. We need Volume 1 submitted 6 February as scheduled. As I mentioned in my 12 January email, I have no problem if you, Theresa, and Michelle concur with moving the due date for Volume 2 back a week. This allows us to proceed with source selections on 8 February, while allowing the offerors a little more time to gather pricing information, which should result in better pricing for the government. On: Jan 17 2017 Government Response. . The text below appends or clarifies ALL previous replies.

Please consider the following answer to be the correct answer to the bidder inquiry:

The Government is considering the possibility of providing two different proposal due dates - the first due date for Volume One and a slightly later date for Volume Two. If it is decided that this will be in the Government's best interest, it will be reflected in an amendment as soon as possible. On: Jan 19 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6793374 Communications RFP pgs 14 and 36 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Page 1 of 24ProjNet: Logged In User

2/2/2017https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll...

Please clarify the volume numbers. indicates that Pro Forma Information is Volume 3 and only require the original, one copy, and a CD. Pg. 36, 8.1, indicates that Volume 2 is Pro Forma Requirements. Please clarify the volume numbers and required copies of each.

On: Jan 13 2017.

Government Response. . As noted in my 12 January email and DrChecks comment 6692327, there is no Volume 3 required by the solicitation, only Volume 1 and Volume 2. Pro Forma Information is Volume 2.

For Volume 1, offerors should submit one original and three (3) copies of printed matter (Bound Volumes), as well as one (1) CD. For Volume 2, offerors should submit the original and one copy and one separate CD. On: Jan 17 2017 Government Response. . The text below appends or clarifies ALL previous replies.

Volume 3 is not required by the solicitation, only Volume 1 and Volume 2. For Volume 1, offerors should submit one original and three (3) copies of printed matter (Bound Volumes), as well as one (1) CD. For Volume 2, offerors should submit the original and one copy and one separate CD. On: Jan 19 2017 Government Response. . The text below appends or clarifies ALL previous replies.

The following answer should be considered the correct answer to the bidder inquiry:

The language in Section 00 21 00 will be corrected in an upcoming amendment to reflect Price and Pro Forma information as Volume 2. On: Jan 19 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6793631 Other Section 00 21 11 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 00 21 11, paragraph 3.3 states that Volumes 1 and 2 are limited to 75 pages combined. Does this requirement apply to this solicitation?

On: Jan 13 2017.

Government Response. . The 75 page limit applies to Volume 1 only. On: Jan 17 2017 Government Response. . The text below appends or clarifies ALL previous replies.

Para. 3.3 will be corrected in an upcoming amendment to state that the 75 page limit applies only to Volume 1. On: Jan 19 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6793632 Other Attachment 3 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Attachment 3 is included in the solicitation; however, no reference is made to where it should be included in our proposal (if at all)?

On: Jan 13 2017.

Government Response. . Key subcontractors will not be evaluated as part of this solicitation. Therefore, Attachment 3 for key subcontractor specialized experience is not required to be provided with proposal. On:

Jan 17 2017 Government Response. . The text below appends or clarifies ALL previous replies.

Key subcontractors will not be evaluated as part of this solicitation. Therefore, Attachment 3 for key subcontractor specialized experience is not required to be provided with proposal and the requirement will be removed by amendment. On: Jan 19 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6793820 Communications TS101 N/A Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that the telecommunications raceway is 1 each 4" SCH80, or are there 2 conduits and 1 is a spare.

On: Jan 13 2017.

Government Response. . Closed-Telecommunications raceway shall be (2) - 4" SCH80 conduits (one is spare), each shall have (2)-3" innerduct per note on TS101. On: Jan 31 2017 Current Request Status: Request Closed

Page 2 of 24ProjNet: Logged In User

Information for this report is procurement sensitive.

6793836 Communications E001 General Note 8 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

General note 8 states that all electrical equipment and wiring shall comply with NEC articles 500 & 501. With this being the case, the communications conduit from the exterior hand hole to each building will require a seal off when entering the building and thus prevent any future communications cabling from entering these buildings. Please confirm.

On: Jan 13 2017.

Government Response. . Closed-Correct, provide sealoffs at the building entrance. Similar to note 4/E-122. On: Jan 31 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6793851 Communications TS101 1 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please provide the conduit sizes from each hand hole to each building, as the conduit from hand hole to hand hole is stated to be 4" sch 80.

On: Jan 13 2017.

Government Response. . Closed-Conduit size from handhole to the ECM to be 2-4" SCH80 (one is spare). This will be clarified by amendment. On: Jan 31 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6794497 Electrical E-503 3 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Is the concrete hand hole for the add. alt. 1 included in the base bid or alt. 1. Please clarify.

On: Jan 13 2017.

Government Response. . Closed-The concrete handhole shown on E-503/3 is included as part of the additive alternate 1, and should be priced as part of CLIN 0004. On: Jan 23 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6794565 Civil B301-B305 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please provide the depth of the water table as the bore hole logs do not indicate the water table depth.

On: Jan 13 2017.

Government Response. . Closed-Water table is below the depth of the deepest bore hole drilled. For bidding purposes, offerors shall assume water table is 400' below grade, per keynote 1 on E-503, as part of base bid. If water table is deeper than 400', each 45' of drilling required to meet specifications for depth shall be covered under option CLIN 0005. On: Jan 23 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6795367 Plumbing S-301 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please advise regarding type and traffic-rating of grates to be provided for the trench drains.

On: Jan 16 2017.

Government Response. . Closed-Provide any non-corroding commercial grade trench drain that meets size, slope and drainage requirements as noted on the drawings. There is no wheel traffic anticipated on the trench drains On: Jan 31 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

Page 3 of 24ProjNet: Logged In User

6795397 Electrical E-001 Note 8 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Based on Note 8, is it acceptable to utilize MCHL cable within the ECM's and utilize Rigid/IMC for the feeds leaving the exterior panel entering the ECM's?

On: Jan 16 2017.

Government Response. . Closed-MCHL cable is not allowed On: Jan 31 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6795398 Electrical E-122 1 Note 7 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Should note 7 also be shown for detail 1 ECM 6355?

On: Jan 16 2017.

Government Response. . Closed-Yes. This note will be added to detail 1/E-122 by amendment. On: Jan 31 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6795584 Contracting 00 72 00 Contract Clauses Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The following are anticipated project duration and Notice to Proceed dates referenced in the RFP:

1 – FBO Ad calls out 357 days 2 – Standard Form 1442, Box #11 states 581 days 3 – 00 72 00 Contract Clauses, Paragraph 52.211-10 states to use 23 Jun 17 to 1 Nov 18 which is 495 day project duration.

4- 00 22 11 Proposal Submission Requirements, Paragraph 7.1.2 states anticipated Notice to Proceed date of 30 March 2017.

Please clarify which anticipated Notice to Proceed date and Project Duration to use for proposal purposes.

On: Jan 16 2017.

Government Response. . Closed-- 1 – FBO Ad is from the pre-solicitation notice which was an estimate at the time. Solicitation should be followed.

2 – Standard Form 1442, Box #11 states 581 days which is correct 3 – 00 72 00 Contract Clauses, Paragraph 52.211-10 will be revised by amendment to read 581 days after issuance of NTP 4- 00 22 11 Proposal Submission Requirements, Paragraph 7.1.2 states anticipated Notice to Proceed date of 30 March 2017--No change has been made.

-Anticipated Notice to Proceed date is 30 March 2017 and Project Duration is 581 days after issuance of NTP. On: Jan 23 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6795585 Construction Phasing 00 22 11 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Volume 1-Tab C-Factor 3-Proposed Contract Duration and Summary Schedule states that the anticipated NTP will be 30 March 2017, and FAR Clause 52.211-10 states that the assumed NTP shall be 23 June 2017. Please clarify what the anticipated NTP should be.

On: Jan 16 2017.

Government Response. . Closed--Reference Inquiry ID 6795584, FAR Clause 52.211-10 will be revised by amendment to read 581 days after issuance of NTP. Anticipated Notice to Proceed date is 30 March 2017 and Project Duration is 581 days after issuance of NTP. On: Jan 23 2017 Current Request Status: Request Closed

Page 4 of 24ProjNet: Logged In User

6795586 Structural C-103 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

A note pointing to the project boundaries states C-103, "Limit of Contractors excavation / equipment / staging 100 foot radius from back wall of proposed ECM." This foot print does not allow for much area to facilitate onsite pre-casting beds. Is there any other area available for pre-casting beds at the jobsite?

On: Jan 16 2017.

Government Response. . Closed-Due to safety considerations associated with storage of high explosives within the ECM area, long term work operations, including excavation, staging, and casting beds within the ECM fenced area shall be confined within the limits shown on C-103. If requested and if available, an area outside the fenced area, though not necessarily in close proximity, may be provided upon coordination with the Contracting Officer. On: Jan 23 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6795588 Structural A/S202 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

If the pre-cast concrete is fabricated offsite, can the panel sizes be altered to facilitate lifting and transportation methods? i.e, Side wall panels being reduced from 20 feet wide to 10 feet wide and back wall into three panels?

On: Jan 16 2017.

Government Response. . Closed-Due to DDESB approval provided based on the solicitation drawings, construction shall be done in compliance with the RFP requirements. Deviations from the structural design shall not be allowed. On: Jan 23 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6795593 LEED 01 74 19.01 29

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The Construction and Demolition Waste Management specification calls for LEED submittals and LEED record keeping. Please confirm that this project is not a going to be LEED certified.

On: Jan 16 2017.

Government Response. . Closed-The project is not required to be LEED certified. However, contractor will be required to develop a waste management plan in accordance with the requirements in Section 01 74

19.01 29. On: Jan 23 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6795599 Environmental 01 57 20.01 29 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that the Contractor will not be considered the Generator - as defined by the EPA - or any pre-existing hazardous or contaminated materials.

On: Jan 16 2017.

Government Response. . Closed-Contractor responsibilities with respect to reporting any discovered suspect materials or spills are identified in spec section 01 57 20.0129 and associated attachments. The section also defines contractor owned waste and responsibilities. On: Jan 30 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6795610 Structural S-001 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please provide the allowable temporary construction load that can be applied to the roof of an ECM during the backfilling process.

Page 5 of 24ProjNet: Logged In User

On: Jan 16 2017.

Government Response. . Closed-A 20 PSF construction Live Load may be applied to the roof in addition to the uniform soil layer shown on the drawings. The means and methods for how the soil is placed on the roof is per the Contractor. On: Jan 31 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6796173 General 6.1.1 Past Performance Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In section 6.1.1 it states that previously completed PPQ's may be submitted, however it also states that offerors shall not incorporate PPQs previously submitted for other RFPs.

Please confirm if we submit in this proposal previously completed PPQ's we have acquired for previous RFPs.

On: Jan 17 2017.

Government Response. . Closed-PPQs previously completed for projects in Tab A may be submitted as part of Tab B in this solicitation. Para 6.1.1 says Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. They must include a copy of the PPQ in the proposal.

On: Jan 23 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6796566 Electrical E-122 2 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Keynote #7 is shown beside the electrical panel on detail #2 but not on detail #1. Please confirm that panel PP6355 does not get a NEMA 3R enclosure with heater as stated in keynote #7.

On: Jan 17 2017.

Government Response. . Closed-Keynote 7 will be added to 1/E-122 by amendment. On: Jan 31 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6797367 Electrical ES102 & E-503 3 33 20 01 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

ES102 Sheet note #3 states that #4/0awg is exothermically welded to ground rods and detail 3 on E-503 shows 500kcmil clamped to grounds rods. Please clarify which to price for ADD ALT #1.

On: Jan 17 2017.

Government Response. . Closed-Clamp is acceptable for ground rod connection, use #4/0 AWG. Note 3 on ES-102 will be revised by amendment. On: Jan 31 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6797416 General N/A 6.1.1 Past Performance Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Since the ROM is 10 - 20 Million and this is a small business set aside, will projects under the $10 million threshold be considered?

On: Jan 17 2017.

Government Response. . Closed-There is no requirement that projects submitted for Specialized Experience or Past Performance be restricted to the $10M - $20M range. Projects under $10M will certainly be considered. Please refer to 00 22 11/5.2.5 which identify examples of relevancy to this project, which includes but may not be limited to size, type and complexity of the work. On: Jan 23 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6798433 Structural 1/S-303 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Page 6 of 24ProjNet: Logged In User

On detail 1/S-303, is the C12x20.7 continuous typical at all panel sides where panels butt to each other of just the corners? If not typical, what embeds are in place at panel edges to accept the welds on panel edges shown on A/S-202?

On: Jan 18 2017.

Government Response. . Closed-The C12x20.7 shall be located along the top and on the sides of each panel. On: Jan 31 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6798437 Structural S-201 A/S-303 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Elevation A/S-201 shows the retaining wall footings 1'-2" thick but section A/S-303 shows the retaining wall footings at 2'. Which is correct?

On: Jan 18 2017.

Government Response. . Closed-The retaining wall shall have a footing thickness of 2'-0". A/S-201 will be revised by amendment. On: Jan 31 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6798485 Structural S-705 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Is the High Security Hasp as detailed on S-705 a Contractor Furnished Item? If so, please provide the mounting location and mounting details.

On: Jan 18 2017.

Government Response. . Closed-Yes, the hasps are Contractor furnished and installed. Mounting location will be added to the drawings by amendment. On: Jan 31 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6798517 Construction Phasing 01 19 30.00 29 - 1.19 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specification Section 01 19 30.00 29 - 1.19 Scheduling of Work Within the Fenced ECM Area states that only two escorts will be made available per shift for two shifts per day. Would the government be willing to allocate one additional escort able to escort people to and from the ECM Gate to the project site? This would allow the contractor to work at two locations at once and still be able to receive material deliveries.

On: Jan 18 2017.

Government Response. . Closed-Manpower constraints do not allow the government to guarantee that more than two escorts can be provided per shift. Proposals shall be based on the stated requirements in the RFP. On: Jan 23 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6798528 Specifications 01 19 30.00 29 - 1.28 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specification Section 01 19 30.00 29 - 1.28 Dust Control requires that at a minimum one 2000 gallon water truck and one street sweeper need to be located on site 24 hours a day 7 days a week. Would it be permissible to only have dust control equipment on site when dust producing operations are taking place?

On: Jan 18 2017.

Government Response. . Closed-It will be permissible to have dust control equipment on site only when dust producing operations are taking place. This information will be incorporated by amendment. On: Jan 23 Current Request Status: Request Closed

Information for this report is procurement sensitive.

Page 7 of 24ProjNet: Logged In User

6798651 Contracting 00 73 00.00 29 Special Contract Requirements

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The Project Table of Contents indicate section 00 73 00.00 29 Special Contract Requirements is included in the RFP but this specification does not appear to be included. Is section 00 73 00.00 29 applicable to this RFP? If so, please provide.

On: Jan 18 2017.

Government Response. . Closed-Section 00 73 00.00 29 will be included by amendment On: Jan 23 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6798833 Civil C101 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Sheet C101 shows the outline of the new construction fill only. Since the contractor will be putting in the OSHA safe slopes, there will be a much bigger clearing and grubbing foot print than the one shown.

Can the designer show the affected excavation area for the OSHA 1 :1.5 slopes?

On: Jan 18 2017.

Government Response. . Closed-Drawings show size of buildings and indicate depth of excavation that may be required. Contractors shall determine means and methods to meet RFP requirements. On: Jan 23 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6798854 Civil C109 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The location of the footing drain is missing from the plan.

On: Jan 18 2017.

Government Response. . Closed-The location of the footing drain on C-109 will be shown on the amended sheet. On: Jan 31 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6798978 Construction Phasing 01 19 30.00 29-1.19 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Scheduling of Work within the Fenced ECM Area states that only two escorts will be made available per shift for two shifts per day. Would the government be willing to provide a cost per shift for each additional escort requested by the contractor so the contractor may pay for additional escorts? This would allow the contractor to work at two locations while also improving the flow of materials in and out of the Fenced ECM Area.

On: Jan 18 2017.

Government Response. . Closed-Escorts must be specially trained military personnel with appropriate clearance for the ECM area. The government cannot guarantee more than 2 escorts per shift will be available. Proposals shall be based on the RFP requirements. On: Jan 23 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6799146 Structural S-302 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Can the cast-in-place earth barrier shown at the head of the door be installed as a pre-cast unit?

On: Jan 18 2017.

Government Response. . Closed-No. Cast-in-place items shall be cast-in-place. On: Jan 31 2017

Page 8 of 24ProjNet: Logged In User

Current Request Status: Request Closed

6799624 Structural S-001 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Structural General Note 6.5 call for 6000 PSI non-shrink grout, conversely the structural details call for 5000 PSI non-shrink grout. Please clarify the required structural capacity of the non-shrink grout.

On: Jan 18 2017.

Government Response. . Closed-6000 PSI grout shall be used. The reference in the structural details will be revised by amendment. On: Jan 31 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6799657 Structural 03 30 00.00 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specification section 03 30 00.00 10 - 3.1.5 states "Do not Weld embedded metals within 12 inches of the surface of the concrete". Field welding will be required to make the connections between the precast wall and roof panels, and a large portion of this field welding will take place within 12" of hardened concrete. Will the required field welding as designed be acceptable?

On: Jan 18 2017.

Government Response. . Closed-The required field welding as shown in the construction documents is acceptable. Section 03 30 00.00 10 will be revised by amendment. On: Jan 31 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6799874 Contracting Section 01 35 26 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Will it be acceptable for the superintendent to also fulfill the duties of Site Safety and Health Officer (SSHO)?

On: Jan 18 2017.

Government Response. . Closed-The superintendent may not fulfill the duties of the Site and Health Officer (SSHO). On: Jan 23 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6799929 Structural S-001 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Structural general note 5.7 states that all exterior steel exposed to the weather what shall be hot dipped galvanized.

Specification section 05 12 00 - 2.5.2 states that the steel that is to be cast into the concrete shall be bare steel. The hot dipping process does not allow for portions of the piece of steel to be bare while coating the remainder. Will it be acceptable for the galvanized corrosion protection to be a zinc metalizing spray? This would allow for the embedded portions of the steel to remain bare guaranteeing proper bonding to the concrete. If not, please clarify what finish the embedded portions of the structural steel shall have.

On: Jan 18 2017.

Government Response. . Closed-Steel to be cast into concrete should remain bare steel. Any permanently exposed portions of these embeds will not require galvanizing; only painting. The structural general notes will be revised by amendment. On: Jan 31 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6799958 Communications T-502 27 10 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

27 10 00, 2.7.b. Media converters suitable for Class 1, Division 2 spaces. T-502 shows the media converters in Class 1, Div 2 enclosures. Does the spec apply?

Page 9 of 24ProjNet: Logged In User

On: Jan 18 2017.

Government Response. . Closed-Media converter does not have to be suitable for class 1 div 2 location if installed inside class 1 div 2 enclosure. On: Jan 31 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6799976 Communications T-502 27 10 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 27 10 00, 2.10 states enclosures are not required to be lockable. Drawing T-502, details 1, 2, & 3, notes 3, 3, & 1 respectively, state the enclosures are to be lockable. Please clarify.

On: Jan 18 2017.

Government Response. . Closed-Security and comm enclosures shown in details 1-4 shall be lockable as indicated on the Drawings. Section 27 10 00.2.10 will be revised by amendment. On: Jan 31 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6801435 Contracting 00 22 11 9.1.1 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Reference Pre-Award Information. The RFP indicates A certified statement listing is required of each JV partner. If the JV is newly formed, are present commitments, financial statements, number of years in business, and credit references also required from each JV partners?

On: Jan 19 2017.

Government Response. . Closed-Newly formed JV must follow the RFP guidelines and provide the required information as outlined in Section 00 22 11, paragraph 9.1.1. On: Jan 23 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6801440 Contracting 00 22 11 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 00 22 11 para. 5.1.1 appears to allow experience of a sister or affiliated company. However, para. 5.2.4 states "Experience of a parent, affiliate, or separate division will not be considered." Please clarify.

On: Jan 19 2017.

Government Response. . Closed-5.2.4. To receive credit for extent (amount) of experience, the Offeror shall demonstrate a history of recent, relevant experience. Experience of a parent, affiliate or separate division will not be considered, unless it has been determined applicable under paragraph 5.1.1. Experience under a previous business arrangement will not be considered relevant if the offeror's role on the submitted project is not considered relevant. On: Jan 23 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6801491 Construction Phasing 01 19 30.00 29 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Is there a location on Eielson AFB but outside the fenced ECM area that can be used for a parking lot to minimize private vehicles needing escort inside the fenced ECM area? Personnel could then be shuttled by Contractor provided bus at beginning and end of each shift.

On: Jan 19 2017.

Government Response. . Closed-There are two locations that can be made available and will be shown by amendment on Drawing C-002. One is on Husky Street and will require clearing, filling and leveling.

Another is by the fuel farms, which is quite a bit farther away. Privately owned vehicles will not be allowed in the secured area, so contractor will need to provide transportation where employee parking is not considered within reasonable walking distance. On: Jan 31 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6801494 Contracting Proposal Schedule

Page 10 of 24ProjNet: Logged In User

The listed table on the Proposal Schedule for the Base Items states 'Total of Base Items 0001 and 0003'. Please confirm this should state, 'Total of Base Items 0001 THRU 0003".

On: Jan 19 2017.

Government Response. . Closed-This should read "Total of Base Items 0001 THRU 0003" and will be updated with an amendment. On: Jan 23 2017 Current Request Status: Request Closed

Information for this report is procurement sensitive.

6801503 Construction Phasing 01 19 30.00 29-1.19 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

How long and what are the hours of the 2 shifts for the escorts that the government will be providing for work within the ECM?

On: Jan 19 2017.

Government Response. . Closed-The Air Force will attempt to be as flexible as possible and reasonable to accommodate the contractor's schedule. Generally each shift will be 8 hours. Start and finish hours for each shift will be coordinated in advance, but the goal is to have the escorts available during the hours most productive for the contractor. Requested schedules for escorts shall be provided a minimum of a week in advance.