Am_03_EIE381_pkg.pdf
PDF 9 MB Posted
- Attached to
- EIE381 Earth Covered Magazines Federal contract opportunity
- Solicitation number
- W911KB-17-R-0006
About this file
EIE381--Amendment 3 package
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A.03.09_EIE381_ESS_Vindicator_V5_Redacted_Version.pdf | ||
| AM_05_package.pdf | ||
| Amendment_4_package.pdf | ||
| A.07.24_Amendment_02_EIE381.pdf | ||
| Solicitation_Amendment_01.pdf | ||
| A.07.23_Solicitation_EIE381.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911KB-17-R-0006
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE/LOCATION: EIE381, EARTH COVERED MAGAZINES, EIELSON AFB, ALASKA
a. This amendment provides changes to the solicitation as indicated on the continuation page(s) of this document.
b. PROPOSAL DUE DATE IS UNCHANGED FOR VOLUME 1 AND REMAINS 6 FEBRUARY 2017 AT 1400 HOURS ALASKA TIME. VOLUME 2 HAS BEEN EXTENDED TO 13 FEBRUARY 2017 AT 1400 HOURS ALASKA TIME. Proposals shall be submitted in accordance with Section 00 21 00, paragraph 1.12, Proposal Submittals.
c. YOU ARE REQUIRED TO ACKNOWLEDTGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.
1. CONTRACT ID CODE PAGE OF PAGES
1 73
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Jan-2017
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-17-R-0006
X 9B. DATED (SEE ITEM 11)
06-Jan-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Jan-2017
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
a. The following drawings are substituted for the superseded documents/sections:
C-109, C-301 through C-306, E-122, ES102, S-002, S-101, S-201, S-301, S-302, T-111, TS101
b. The following drawings are incorporated:
B-300
c. The following revised documents/sections are substituted for the superseded documents/sections. The identifier “AM#003” appears before and after new and/or revised materials, except as noted below.
SECTION 00 11 01– PROPOSAL SCHEDULE
-Revised Table to read “Total of Base Items 0001 thru 0003”
SECTION 01 19 30.00 29 – SPECIAL ITEMS
-Revised paragraph 1.10
SECTION 01 33 00 – SUBMITTAL REGISTER
-Revised Spec Section 26 20 00
SECTION 07 13 53 – ELASTOMERIC SHEET WATERPROOFING
-Revised paragraph 3.6
SECTION 26 20 00 – INTERIOR DISTRIBUTION SYSTEM
-Revised paragraphs 1.1, 1.3
-Added paragraphs 2.3.1 thru 2.3.1.3, 3.1.14
SECTION 26 51 00 – INTERIOR AND EXTERIOR LIGHTING
-Revised paragraphs 1.6.1.a. and 2.2.1.a.
SECTION 27 10 00.2. 10 – BUILDING TELECOMMUNICATIONS CABLING SYSTEM
-Revised paragraphs 2.7, 2.8 and 2.10
SECTION 32 92 19 – SEEDING – PART 3 EXECUTION
-Revised Table 2.1.3 and paragraph 3.2.2.1
SECTION 33 82 00 – TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-Revised paragraphs 2.7.2.1. and 3.1.6.1.
-Replace SECTION 01 45 00.10 10 – QUALITY CONTROL SYSTEM (QCS) -with SECTION 01 45 00.15 10 – RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MOD (RMS CM)
NOTE: Revisions within the following documents do not contain the above referenced identifiers:
SECTION 00 21 00 – INSTRUCTIONS TO OFFERORS
-Revised paragraphs 1.12, 1.13
SECTION 00 22 11
-Revised Table of contents and paragraph 5.2.4
SECTION 00 72 00 – CONTRACT CLAUSES
-Revised 52.211-10-Alt I — Commencement, Prosecution, and Completion of Work
SECTION 00 73 46– WAGE DETERMINATIONS
-Replaced with AK1, dated 01/27/2017
d. The following sections are deleted:
SECTION 00 22 11
-Attachment 3
e. The following documents are added:
SECTION 00 73 00.00 29 SPECIAL CONTRACT REQUIREMENTS
f. The following revisions are incorporated:
NONE
g. Other:
NONE
(End of Summary of Changes)
ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME.
PS-1
PROPOSAL SCHEDULE
F-35A Earth Covered Magazines Eielson AFB, Alaska
BASE ITEMS
Item No.
Description Estimated Quantity
Unit Unit Price Amount
0001 Construct F-35A Earth Covered Magazines within the building 5-foot lines, Complete.
1 Job $ $
0002 Construct site work and utilities beyond the building 5-foot lines, Complete.
1 Job $ $
0003 Remove, Sample stockpile 50 Cubic Yards of POL Contaminated Soil including Construction of Holding Cells, Complete*
50 CY $ $
Total of Base Items 0001 thru 0003 $
OPTION ITEMS
Item No.
Description Estimated Quantity
Unit Unit Price Amount
0004 Construct ground well, Complete 1 Job $_________ $_________
0005 Drill additional 45 feet depth for ground well, Complete ** 45 Job $_________ $_________
0006 On ECM 6362 site, Haul away offsite 50 CY of debris or ash complete*
50 CY $_________ $_________
0007 On ECM 6362 site, Excavate “Massive ice with organic silt” or “Organic silt with excessive ice” below elevation 684 per surveyed cross section, complete
10 CY $_________ $_________
Total of Option Items 0004 thru 0007 $_________
AM#003...
AM#003...
AMENDMENT R003 F-35A EARTH COVERED MAGAZINES EIE381
EIELSON AFB, ALASKA
1.9 TRAFFIC CONTROL PLAN
The Contractor shall provide a traffic control plan and temporary signage plan to include, however not limited to, the contractor's method in providing road access to adjacent occupied buildings as well as safety measures for pedestrians and occupants of adjacent buildings.
Traffic Control Plan shall be submitted 60 days in advance of construction commencement. Any changes or modifications to the traffic control plan will require an additional 30-day Government review period. Detour and construction signage must be posted 7 days in advance of any closure or detour. Detours, temporary roads and closures must be coordinated through the Contracting Officer. Notification to newspapers & TV must be coordinated 30-days in advance of construction.
The traffic control plan shall present the placement and times of use for temporary traffic control devices in relation to the project site and construction activities. The traffic control devices shall follow the Manual on Uniform Traffic Control Devices (MUTCD) standards and shall be clearly identified in the traffic control plan. This includes but is not limited to standard sign designators, sizes and spacing to be per MUTCD standard.
The contractor shall provide and maintain access to parking lots and building Entrances.
1.10 DUST CONTROL
The Contractor shall maintain excavations, embankments, stockpiles, haul roads, permanent and temporary access roads, and all other work areas within or outside the project boundaries free from dust which would cause a hazard or nuisance. Sprinkling or similar methods shall be employed to control dust. The contractor shall retain sufficient, suitable equipment at the site and repeat applications at intervals as to keep all parts of the disturbed area damp at all times AM#003... DELETED TEXT....AM#003 AM#003...
It will be permissible to have dust control equipment on site only when dust producing operations are taking place One 2000 gallon water distributor truck and one street sweeper shall be on site when dust producing operations are taking place, except when freezing weather precludes sprinkling....AM#003 Dust control shall be performed as the work proceeds and whenever a dust nuisance or hazard occurs. There shall be no visible dust coming off the work site at any time, or from any vehicle hauling for the contractor. In addition the contractor shall ensure that no material of any type will fall off any vehicle while in transit. Any dirt or mud, which is tracked onto paved or surfaced roadways, shall be cleaned away within the day it is deposited. No separate or direct payment will be made for dust control and the cost thereof shall be considered incidental to and included in the contract price.
1.11 EGRESS LANE DURING CONSTRUCTION
The Contractor shall ensure one lane of emergency egress open in two directions during construction at all times. If road closure is required, then the contractor shall provide a letter for approval two weeks in advanced prior the shutting down road. If approved, the road shall not be closed more than 10 days at any time under any circustances.
Section 01 19 30.00 29 Page 5
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 20 PAGES
F-35A Earth Covered Magazines
09 90 00 SD-08 Manufacturer’s Instructions Application instructions
3.4.2Mixing 1.7.2Manufacturer's Material Safety
Data Sheets SD-10 Operation and Maintenance Data
2.1Coatings:
23 82 46.00 40 SD-03 Product Data
1.1.1 GEquipment and Performance
Data
2.1 GElectric Unit Heaters
2.2.1 GHeating Element
2.2.2 GControls
3.1.1 GCasings
2.2.3 GPropellers and Motors
SD-08 Manufacturer’s Instructions
1.1.1 GManufacturer's Instructions
26 20 00 SD-02 Shop Drawings 2.8Panelboards
2.3 GExterior Panel Enclosure
SD-03 Product Data 2.13Surge protective devices
2.3 GExterior Panel Enclosure
SD-06 Test Reports
3.5.4 GGrounding system test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
AM#3... ...AM#3
RTA F-35A Earth Covered Magazines EIE381
3.3.2.3 Protection
Protect membrane over horizontal surfaces from traffic during installation. Use only equipment with rubber tires. Provide walkway protection where heavy traffic from other trades is expected. Do not store material on membrane.
3.4 COMPOSITE, SELF-ADHERING MEMBRANE
Lap sheets at edges and ends a minimum of 2-1/2 inches over the preceding sheet. Provide all side laps a minimum 2-1/2 inches and end laps 5 inches .
Provide self-adhesive, mastic laps in accordance with manufacturer's recommendation. Roll or firmly press to adhere membrane to substrate.
Cover corners and joints with two layers of reinforcement by first applying a 12 inch width of membrane centered along the axis. Flash drains and projections with a second ply of membrane for a distance of 6 inches from the drain or projection. Finish exposed, terminated edges of membrane on horizontal or vertical surfaces with a toweled bead of mastic. Apply mastic around edges of membrane, and drains and projections. Apply mastic at end of each work day.
3.5 FLASHING
Flash penetrations through membrane. Seal all penetrations where reinforcing bars penetrate a waterproofing membrane with the appropriate sealant or mastic flashing component. Embed elastomeric membrane in a heavy coat of adhesive, except for self-adhering membrane. Position continuous metal reglets horizontally on footing and vertically on intersecting and connecting walls, and as specified in Section 07 60 00 FLASHING AND SHEET METAL. Metal reglets are to receive exposed edges of membrane waterproofing. Secure membrane into reglets by lead wedges and fill with cement as recommended in writing by manufacturer of waterproofing materials. Counterflash upper edge of membrane waterproofing and protective covering as specified in Section 07 60 00 FLASHING AND SHEET METAL.
3.6 PROTECTIVE COVERING
After installation has been inspected and approved by the Contracting Officer, apply a protective covering to the membrane waterproofing prior to backfilling. Protect vertical membrane waterproofing with a 1/2 inch minimum thickness of asphalt plank; 1/2 inch minimum thickness of fiberboard; or 1/8 inch minimum thickness of compatible water resistant bitumen type protection board with edges abutting adjacent edges and exposed surfaces covered by a taping system recommended by manufacturer of protection board. Cover horizontal membrane waterproofing with similar protection board.
-- End of Section --
Section 07 13 53 Page 7
AM#3...Deleted Text...AM#3
F-35A ECM EIE381
Eielson AFB, Alaska
SECTION 26 20 00
INTERIOR DISTRIBUTION SYSTEM
02/14
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM B1 (2013) Standard Specification for Hard-Drawn Copper Wire
ASTM B8 (2011) Standard Specification for Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard, or Soft
AM#3...
ASTM C578 (2015b) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation
. ..AM#3
ASTM D709 (2013) Laminated Thermosetting Materials
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms
IEEE 81 (2012) Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Ground System
IEEE C2 (2012; Errata 1 2012; INT 1-4 2012; Errata
2 2013; INT 5-7 2013; INT 8-10 2014; INT
11 2015) National Electrical Safety Code
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
ANSI C80.1 (2005) American National Standard for Electrical Rigid Steel Conduit (ERSC)
NEMA 250 (2014) Enclosures for Electrical Equipment (1000 Volts Maximum)
NEMA ICS 1 (2000; R 2015) Standard for Industrial Control and Systems: General Requirements
NEMA ICS 6 (1993; R 2011) Enclosures
NEMA KS 1 (2013) Enclosed and Miscellaneous
SECTION 26 20 00 Page 3
SD-02 Shop Drawings
Panelboards
AM#3...
Exterior Panel Enclosure ; G
...AM#3
Include wiring diagrams and installation details of equipment indicating proposed location, layout and arrangement, control panels, accessories, piping, ductwork, and other items that must be shown to ensure a coordinated installation. Identify circuit terminals on wiring diagrams and indicate the internal wiring for each item of equipment and the interconnection between each item of equipment. Indicate on the drawings adequate clearance for operation, maintenance, and replacement of operating equipment devices.
SD-03 Product Data
Surge protective devices
AM#3...
Exterior Panel Enclosure ; G
...AM#3 Include performance and characteristic curves.
SD-06 Test Reports
Grounding system test ; G
SD-10 Operation and Maintenance Data
Electrical Systems , Data Package 5; G
1.4 QUALITY ASSURANCE
1.4.1 Regulatory Requirements
In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" or "must" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer. Provide equipment, materials, installation, and workmanship in accordance with the mandatory and advisory provisions of NFPA 70 unless more stringent requirements are specified or indicated.
1.4.2 Standard Products
Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship and:
a. Have been in satisfactory commercial or industrial use for 2 years prior to bid opening including applications of equipment and materials under similar circumstances and of similar size.
b. Have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period.
SECTION 26 20 00 Page 6
2.2.2 Fittings for Rigid Metal Conduit
Threaded-type. Split couplings unacceptable.
2.2.3 Rigid Nonmetallic Conduit
PVC Type EPC-80 in accordance with NEMA TC 2, UL 651 .
2.2.4 Fittings for Rigid Nonmetallic Conduit
NEMA TC 3 for PVC, and UL 514B .
2.2.5 Liquid-Tight Flexible Metal Conduit, Steel
UL 360 .
2.2.6 Fittings for Flexible Metal Conduit
UL 514B . Ferrous fittings: Cadmium- or zinc-coated in accordance with
UL 514B .
2.3 CABINETS, JUNCTION BOXES, AND PULL BOXES
Volume greater than 100 cubic inches , UL 50 , hot-dip, zinc-coated, if sheet steel. AM#3... Submit exterior panel enclosure layout of interior equipment, conduit entrances and insulation construction details. ...AM#3
AM#3...
2.3.1 Board Insulation
Provide thermal insulating materials as recommended by manufacturer for each type of application indicated. Provide insulation with the following physical properties and in accordance with the following standards:
a. Extruded Preformed Cellular Polystyrene: ASTM C578 REV A
2.3.1.1 Thermal Resistance
As required with electric heaters to maintain temperatures indicated.
2.3.1.2 Other Material Properties
Provide thermal insulating materials with the following properties:
a. Rigid cellular plastics: Compressive Resistance at Yield: Not less than 10 pounds per square inch (psi) when measured according to
ASTM D1621.
b. Water Adsorption: Not more than 1 percent by volume when measured in accordance with paragraph 14 of ASTM C553.
C. Insulation protective covering: Non-conductive covering to protect edges of insulation from damage.
2.3.1.3 Prohibited Materials
Do not provide materials containing asbestos.
...AM#3
SECTION 26 20 00 Page 8
AM#3...
3.1.14 Insulated Enclosures
Insulation shall be installed on side and front of interior of enclosures indicated with clearances from heating elements and electrical connections. ...AM#3
3.2 FIELD FABRICATED NAMEPLATE MOUNTING
Provide number, location, and letter designation of nameplates as indicated. Fasten nameplates to the device with a minimum of two sheet-metal screws or two rivets.
3.3 WARNING SIGN MOUNTING
Provide the number of signs required to be readable from each accessible side. Space the signs in accordance with NFPA 70E.
3.4 FIELD APPLIED PAINTING
Paint electrical equipment as required to match finish of adjacent surfaces or to meet the indicated or specified safety criteria.
3.5 FIELD QUALITY CONTROL
Furnish test equipment and personnel and submit written copies of test results. Give Contracting Officer 5 working days' notice prior to tests.
3.5.1 Devices Subject to Manual Operation
Operate each device subject to manual operation at least five times, demonstrating satisfactory operation each time.
3.5.2 600-Volt Wiring Test
Test wiring rated 600 volt and less to verify that no short circuits or accidental grounds exist. Perform insulation resistance tests on wiring No. 6 AWG and larger diameter using instrument which applies voltage of approximately 500 volts to provide direct reading of resistance. Minimum resistance: 250,000 ohms.
3.5.3 Ground-Fault Receptacle Test
Test ground-fault receptacles with a "load" (such as a plug in light) to verify that the "line" and "load" leads are not reversed.
3.5.4 Grounding System Test
Test grounding system to ensure continuity, and that resistance to ground is not excessive. Test each ground rod for resistance to ground before making connections to rod; tie grounding system together and test for resistance to ground. Make resistance measurements in dry weather, not earlier than 48 hours after rainfall. Submit written results of each test to Contracting Officer, and indicate location of rods as well as resistance and soil conditions at time measurements were made.
-- End of Section --
SECTION 26 20 00 Page 20
1.5 QUALITY CONTROL
1.5.1 Luminaire Drawings
Include dimensions, accessories, and installation and construction details. Photometric data, including zonal lumen data, average and minimum ratio, aiming diagram, and computerized candlepower distribution data must accompany shop drawings.
1.5.2 LED Driver
Submit certification from the luminaire or driver manufacturer that ensures compatibility and operability between devices.
1.5.3 Luminaire Design Data
a. Provide safety certification and file number for the luminaire family that must be listed, labeled, or identified per the NFPA 70 (NEC).
Applicable testing bodies are determined by the US Occupational Safety Health Administration (OSHA) as Nationally Recognized Testing Laboratories (NRTL) and include: CSA (Canadian Standards Association), ETL (Edison Testing Laboratory), and UL (Underwriters Laboratories).
b. Provide long term lumen maintenance projections for each LED luminaire in accordance with IES TM-21 . Data used for projections must be obtained from testing in accordance with IES LM-80 .
1.5.4 Energy Efficiency
Submit data indicating lumens per watt efficacy and color rendering index of light source.
1.6 WARRANTY
Support all equipment items by service organizations which are reasonably convenient to the equipment installation in order to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
1.6.1 LED Luminaire Warranty
a. Provide a written AM#3...5 ...AM#3 year on-site replacement warranty for material, fixture finish, and workmanship. On-site replacement includes transportation, removal, and installation of new products.
(1) Include finish warranty to include failure and substantial deterioration such as blistering, cracking, peeling, chalking, or fading.
(2) Material warranty must include:
(a) All drivers.
(b) Replacement when more than 10 percent of LED sources in any lightbar or subassembly(s) are defective or non-starting.
b. Warranty period must begin on date of beneficial occupancy. Provide the Contracting Officer with signed warranty certificates prior to final payment.
SECTION 26 51 00 Page 5
1.6.1.1 Provide Luminaire Useful Life Certificate
Submit certification from the manufacturer indicating the expected useful life of the luminaires provided. The useful life must be directly correlated from the IES LM-80 test data using procedures outlined in IES TM-21 . Thermal properties of the specific luminaire and local ambient operating temperature and conditions must be taken into consideration.
PART 2 PRODUCTS
2.1 PRODUCT COORDINATION
Products and materials not considered to be luminaires, luminaire controls, or associated equipment are specified in Section 26 20 00
INTERIOR DISTRIBUTION SYSTEM.
2.2 LUMINAIRES
UL 1598 , NEMA C82.77 , and UL 8750 . Provide luminaires as indicated in luminaire schedule and NL plates or details on project plans. Provide luminaires complete with light sources of quantity, type, and wattage indicated. Provide all luminaires of the same type by the same manufacturer. Luminaires must be specifically designed for use with the driver.
2.2.1 LED Luminaires
Provide luminaires complete with power supplies (drivers) and light sources. Provide design information including lumen output and design life in luminaire schedule on project plans for LED luminaires.
LED luminaires must also meet the following minimum requirements:
a. Luminaires must have a minimum AM#3...5 ...AM#3 year manufacturer's warranty.
b. Luminaires must have a minimum L70 lumen maintenance value of 50,000 hours as calculated by IES TM-21 , with data obtained per IES LM-80 requirements.
c. Luminaire drive current value must be identical to that provided by test data for luminaire in question.
d. Luminaires must be tested to IES LM-79 and IES LM-80 standards, with the results provided as required in the Submittals paragraph of this specification.
e. Luminaires must be listed with the DesignLights Consortium 'Qualified Products List' when falling into category of "General Application" luminaires, i.e. Interior Directional, Display Case, Troffer, Linear Ambient, or Low/High Bay. Requirements are shown in the Designlights Consortium "Technical Requirements Table" at https://data.energystar.gov/dataset/EPA-Recognized-Laboratories-For-Lighting-Products/jgwf-7qrr
f. Provide Department of Energy 'Lighting Facts' label for each luminaire.
SECTION 26 51 00 Page 6 conductors, and grounding busbars as specified in Section 26 20 00 INTERIOR
DISTRIBUTION SYSTEM.
2.7 MEDIA CONVERTERS
SM fiber to copper media converter shall be capable of converting 1310nm SM fiber signal 10/100 base copper.
a. Temperature: -40 F - 104 F.
AM#3...Deleted Text...AM#3
c. Ports: 2 SC SM fiber ports; 2 RJ-45 ports for CAT 6.
d. Warranty: 5 years minimum.
e. Power requirements: 12 to 45 VDC terminal block connection with overload current protection.
f. Standards and certifications: UL 508, IEC 60068-2-27 (Shock), and IEC 60068-2-6 (Vibration).
g. Mean time between failures: 400,000 hours minimum.
AM#3...Deleted Text
2.8 Not Used...AM#3
2.9 EXTERIOR WALL PHONE ENCLOSURE
Weatherproof wall mount enclosure capable of being opened without use of tools. A CAT 6 telephone jack and duplex receptacle shall be capable of being installed centered in the back of the enclosure without compromising weatherproofing.
Front of enclosure shall have permanent label, 4 inches by 4 inches, black with white letters, with the international image for telephone and the word
"PHONE".
a. Enclosure: NEMA 3R.
b. Exterior Dimensions: 11 inches wide by 15 inches high by 10.5 inches deep (plus or minus an inch on each dimension).
c. Temperature: Minus 40 degrees F to plus 104 degrees F.
d. Material: Glass-reinforced polyester.
e. Color: Gray.
f. UL-listed.
2.10 EXPLOSION-PROOF CABINET FOR TELECOM AND SECURITY
Wall-mounted cabinet meeting requirements of NFPA 70 500 and 501 regarding Class 1, Division 2 locations. AM#3...Deleted Text...AM#3
a. Size: As shown on drawings.
SECTION 27 10 00 Page 13
EI E381 F35A Ear t h Cover ed Muni t i ons EI E381
AM#3
Cont r act i ng Of f i cer .
2. 1. 2 Pl ant i ng Dat es
Pl ant i ng Season Pl ant i ng Dat es
Season 1 May 15 t o August
2. 1. 3 Seed Mi x
AM#3...
Botanical Name
Common Name
Minimum Percent Pur e Seed
Mi ni mum Per cent Ger mi nat i on and Har d Seed
% Seed Mi x by wei ght
Festuca rubra
Acrtared Red Fescue
90 80 45
Poa pratensis
Par k or Alene Bluegrass
90 80 45
Lol i um sp. Annual Ryegrass
90 80 10
...AM#3
2. 2 TOPSOIL
2. 2. 1 On- Si t e Topsoi l
Sur f ace soi l s t r i pped and st ockpi l ed on s i t e and modi f i ed as necessar y t o meet t he r equi r ement s speci f i ed f or t opsoi l i n par agr aph ent i t l ed " Composi t i on. " When avai l abl e t opsoi l shal l be exi st i ng sur f ace soi l s t r i pped and st ockpi l ed on- si t e i n accor dance wi t h Sect i on 31 23 00. 00 20
EXCAVATI ON AND FI LL.
2. 2. 2 Of f - Si t e Topsoi l
Conf or m t o r equi r ement s speci f i ed i n par agr aph ent i t l ed " Composi t i on. " Addi t i onal t opsoi l shal l be f ur ni shed by t he Cont r act or .
2. 2. 3 Composition
Cont ai ni ng f r om 5 t o 10 per cent or gani c mat t er as det er mi ned by t he topsoil composi t i on t est s of t he Or gani c Car bon, 6A, Chemi cal Anal ysi s Met hod descr i bed i n DOA SSI R 42. Maxi mum par t i c l e s i ze, 3/ 4 i nch, wi t h maxi mum 3 per cent r et ai ned on 1/ 4 i nch scr een. The pH shal l be t est ed i n accor dance with ASTM D4972. Topsoi l shal l be f r ee of st i cks, st ones, r oot s, and ot her debr i s and obj ect i onabl e mat er i al s. Ot her component s shal l conf or m t o t he f ol l owi ng l i mi t s:
SECTI ON 32 92 19 Page 5 Desi gn Compl et e
EIE381 F35A Earth Covered Munitions EIE381
AM#3
following:
Hydroseeding Fertilizer 5 pounds per 1000 square feet .
3.2 SEEDING
3.2.1 Seed Application Seasons and Conditions
Immediately before seeding, restore soil to proper grade. Do not seed when ground is muddy frozen , snow covered or in an unsatisfactory condition for seeding. If special conditions exist that may warrant a variance in the above seeding dates or conditions, submit a written request to the Contracting Officer stating the special conditions and proposed variance.
Apply seed within twenty four hours after seedbed preparation. Sow seed by approved sowing equipment. Sow one-half the seed in one direction, and sow remainder at right angles to the first sowing.
3.2.2 Seed Application Method
Seeding method shall be hydroseeding.
3.2.2.1 Hydroseeding
AM#3...First, mix water and fiber. Wood cellulose fiber, paper fiber, or recycled paper shall be applied as part of the hydroseeding operation.
Fiber shall be added at 1,000 pounds, dry weight, per acre . Then add and mix seed and fertilizer to produce a homogeneous slurry. Seed shall be mixed to ensure broadcasting at the rate of 5 pounds per 1000 square feet .
When hydraulically sprayed on the ground, material shall form a blotter like cover impregnated uniformly with grass seed. Spread with one application with no second application of mulch... AM#3
3.2.3 Rolling
Immediately after seeding, firm entire area except for slopes in excess of 3 to 1 with a roller not exceeding 90 pounds for each foot of roller width.
3.2.4 Watering
Start watering areas seeded as required by temperature and wind conditions. Apply water at a rate sufficient to insure thorough wetting of soil to a depth of 2 inches without run off. During the germination process, seed is to be kept actively growing and not allowed to dry out.
3.3 PROTECTION OF TURF AREAS
Immediately after turfing, protect area against traffic and other use.
3.4 RESTORATION
Restore to original condition existing turf areas which have been damaged during turf installation operations at the Contractor's expense. Keep clean at all times at least one paved pedestrian access route and one paved vehicular access route to each building. Clean other paving when work in adjacent areas is complete.
-- End of Section --
SECTION 32 92 19 Page 7 Design Complete pairs), 24 gauge (6 to 2100 pairs), and 26 gauge (6 to 3000 pairs).
Copper conductor shall conform to the following:
2.7.1.1 Underground
Provide filled cable meeting the requirements of ICEA S-99-689 and RUS 1755 .390.
2.7.2 Fiber Optic Cable
As shown on drawings. Provide single-mode, 8/125-um, 0.10 aperture 1310 nm fiber optic cable in accordance with TIA-492CAAA or single-mode, 8/125-um, 0.10 aperture 1550 nm fiber optic cable in accordance with TIA-492E000 or multimode 62.5/125-um, 0.275 aperture fiber optic cable in accordance with TIA-492AAAA or multimode 50/125-um, 0.275 aperture fiber optic cable in accordance with TIA-492AAAB , TIA-472D000 , and ICEA S-87-640 including any special requirements made necessary by a specialized design. Provide 12 optical fibersor as indicated. Fiber optic cable shall be specifically designed for outside use with loose buffer construction. Provide fiber optic color code in accordance with TIA/EIA-598 . Fiber optic cables shall be rated for arctic conditions, -40 degrees F. Provide loose tube type.
2.7.2.1 Strength Members
Provide 6M utility-grade messenger wire, 5/16-inch galvanized steel.
Provide central, AM#3... non-metallic ...AM#3 strength members with sufficient tensile strength for installation and residual rated loads to meet the applicable performance requirements in accordance with ICEA S-87-640 . The strength member is included to serve as a cable core foundation to reduce strain on the fibers, and shall not serve as a pulling strength member.
2.7.2.2 Performance Requirements
Provide fiber optic cable with optical and mechanical performance requirements in accordance with ICEA S-87-640 .
2.7.3 Grounding and Bonding Conductors
Provide grounding and bonding conductors in accordance with RUS 1755 .200, TIA-607 , IEEE C2 , and NFPA 70 . Solid bare copper wire meeting the requirements of ASTM B1 for sizes No. 8 AWG and smaller and stranded bare copper wire meeting the requirements of ASTM B8, for sizes No. 6 AWG and larger. Insulated conductors shall have 600-volt, Type TW insulation meeting the requirements of UL 83 .
2.8 POLES AND HARDWARE
Provide poles and hardware as specified in Section 33 71 01 OVERHEAD
TRANSMISSION AND DISTRIBUTION.
2.9 CABLE TAGS IN HANDHOLES AND VAULTS
Provide tags for each telecommunications cable or wire located in handholes and vaults. Cable tags shall be stainless steel or polyethylene and labeled in accordance with TIA-606 . Handwritten labeling is unacceptable.
SECTION 33 82 00 Page 13 reel. As cable is paid off the reel, lubricate and inspect cable for sheath defects. When defects are noticed, stop pulling operations and notify the Contracting Officer to determine required corrective action.
Cable pulling shall also be stopped when reel binds or does not pay off freely. Rectify cause of binding before resuming pulling operations.
Provide cable lubricants recommended by the cable manufacturer. Avoid bends in cables of small radii and twists that might cause damage. Do not bend cable and wire in a radius less than 10 times the outside diameter of the cable or wire.
3.1.5.1 Cable Tensions
Obtain from the cable manufacturer and provide to the Contracting Officer, the maximum allowable pulling tension. This tension shall not be exceeded.
3.1.5.2 Pulling Eyes
Equip cables 1.25 inches in diameter and larger with cable manufacturer's factory installed pulling-in eyes. Provide cables with diameter smaller than 1.25 inches with heat shrinkable type end caps or seals on cable ends when using cable pulling grips. Rings to prevent grip from slipping shall not be beaten into the cable sheath. Use a swivel of 3/4 inch links between pulling-in eyes or grips and pulling strand.
3.1.5.3 Installation of Cables in Handholes and Vaults
Do not install cables utilizing the shortest route, but route along those walls providing the longest route and the maximum spare cable lengths.
Form cables to closely parallel walls, not to interfere with duct entrances, and support cables on brackets and cable insulators at a maximum of 4 feet . In existing handholes and vaults where new ducts are to be terminated, or where new cables are to be installed, modify the existing installation of cables, cable supports, and grounding as required with cables arranged and supported as specified for new cables. Identify each cable with corrosion-resistant embossed metal tags.
3.1.6 Aerial Cable Installation
Pole installation shall be as specified in Section 33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION. Where physical obstructions make it necessary to pull distribution wire along the line from a stationary reel, use cable stringing blocks to support wire during placing and tensioning operations. Do not place ladders, cable coils, and other equipment on or against the distribution wire. Wire shall be sagged in accordance with the data shown. Protect cable installed outside of building less than 8 feet above finished grade against physical damage.
AM#3...Deleted Text ...AM#3 3.1.6.1 Suspension Strand
Place suspension strand as indicated. Tension in accordance with the data indicated. When tensioning strand, loosen cable suspension clamps enough to allow free movement of the strand. Place suspension strand on the road side of the pole line. In tangent construction, point the lip of the suspension strand clamp toward the pole. At angles in the line, point the suspension strand clamp lip away from the load. In level construction place the suspension strand clamp in such a manner that it will hold the strand below the through-bolt. At points where there is an up-pull on the strand, place clamp so that it will support strand above the through-bolt. Make suspension strand electrically continuous throughout
SECTION 33 82 00 Page 16
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
AM#003...SECTION 01 45 00.15 10...AM#003
AM#003...RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)...AM#003
PART 1 AM#003...GENERAL
1.1 REFERENCES
1.2 Contract Administration
1.2.1 Correspondence and Electronic Communications
1.2.2 Other Factors
1.3 RMS SOFTWARE
1.3.1 RMS CONTRACTOR'S MODE (CM)
1.4 SYSTEM REQUIREMENTS
1.5 RELATED INFORMATION
1.5.1 RMS User Guide
1.6 CONTRACT DATABASE
1.7 DATABASE MAINTENANCE
1.7.1 Administration
1.7.1.1 Contractor Information
1.7.1.2 Subcontractor Information
1.7.1.3 Correspondence
1.7.1.4 Equipment
1.7.1.5 Management Reporting
1.7.1.6 Request For Information (RFI)
1.7.2 Finances
1.7.2.1 Pay Activity Data
1.7.2.2 Payment Requests
1.7.3 Quality Control (QC)
1.7.3.1 Daily Contractor Quality Control (CQC) Reports.
1.7.3.2 Deficiency Tracking.
1.7.3.3 QC Requirements
1.7.3.4 Three-Phase Control Meetings
1.7.3.5 Labor and Equipment Hours
1.7.3.6 Accident/Safety Reporting
1.7.3.7 Features of Work
1.7.3.8 Hazard Analysis
1.7.4 Submittal Management
1.7.5 Schedule
1.7.6 Import/Export of Data
1.8 IMPLEMENTATION
1.9 MONTHLY COORDINATION MEETING
1.10 NOTIFICATION OF NONCOMPLIANCE
PART 2 PRODUCTS
PART 3 EXECUTION...AM#003
-- End of Section Table of Contents --
Section 01 45 00.15 10 Page 1
Section 01 45 00.15 10 Page 2
AM#003...SECTION 01 45 00.15 10...AM#003
AM#003...RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)...AM#003
PART 1 AM#003...GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.2 Contract Administration
The Government will use the Resident Management System (RMS) to assist in its monitoring and administration of this contract. The Contractor uses the Government-furnished Construction Contractor Mode of RMS, referred to as RMS CS, to record, maintain, and submit various information throughout the contract period. The Contractor mode user manuals, updates, and training information can be downloaded from the RMS web site (http://rms.usace.army.mil). The joint Government-Contractor use of RMS facilitates electronic exchange of information and overall management of the contract. QCS provides the means for the Contractor to input, track, and electronically share information with the Government in the following areas:
Administration Finances Quality Control Submittal Monitoring Scheduling Import/Export of Data
1.2.1 Correspondence and Electronic Communications
For ease and speed of communications, exchange correspondence and other documents in electronic format to the maximum extent feasible between the Government and Contractor. Correspondence, pay requests and other documents comprising the official contract record are also be provided in paper format, with signatures and dates where necessary. Paper documents will govern, in the event of discrepancy with the electronic version.
1.2.2 Other Factors
Particular attention is directed to Contract Clause, "Schedules for Construction Contracts", Contract Clause, "Payments", Section 01 32 01.00 10 PROJECT SCHEDULE, Section 01 33 00 SUBMITTAL PROCEDURES, and Section 01 45 0
4.00 29 CONTRACTOR QUALITY CONTROL, which have a direct relationship to the reporting to be accomplished through RMS. Also, there is no separate payment for establishing and maintaining the RMS database; costs
Section 01 45 00.15 10 Page 3 associated will be included in the contract pricing for the work.
1.3 RMS SOFTWARE
RMS is a Windows-based program that can be run on a Windows based PC meeting the requirements as specified in Section 1.3. The Government will make available the RMS software to the Contractor after award of the construction contract. Prior to the Pre-Construction Conference, the Contractor will be responsible to download, install and use the latest version of the RMS software from the Government's RMS Internet Website.
Any program updates of RMS will be made available to the Contractor via the Government RMS Website as the updates become available.
1.3.1 RMS CONTRACTOR'S MODE (CM)
RMS Contractor's Mode or RMS CM is the replacement for Quality Control System or QCS. The database remains the same. References to RMS in this specification includes RMS CM.
1.4 SYSTEM REQUIREMENTS
The following is the minimum system configuration required to run RMS and Contractor Mode:
Minimum RMS System Requirements
Hardware
Windows-based PC 1.5 GHz 2 core or higher processor
RAM 8 GB
Hard drive disk 200 GB space for sole use by the QCS system
Monitor Screen resolution 1366 x 768
Mouse or other pointing device
Windows compatible printer Laser printer must have 4 MB+ of
RAM
Connection to the Internet minimum 4 Mbs per user
Software
MS Windows Windows 7 x 64 bit (RMS requires 64 bit O/S) or newer
Word Processing software Viewer for MS Word 2013, MS Excel 2013, or newer
Section 01 45 00.15 10 Page 4
Minimum RMS System Requirements
Microsoft.NET Framework Coordinate with Government QA Representative for free version required
Email MAPI compatible
Virus protection software Regularly upgraded with all issued manufacturer's updates and is able to detect most zero day viruses.
1.5 RELATED INFORMATION
1.5.1 RMS User Guide
After contract award, download instructions for the installation and use of RMS from the Government RMS Internet Website.
1.6 CONTRACT DATABASE
Prior to the pre-construction conference, the Government will provide the Contractor with basic contract award data to use for RMS. The Government will provide data updates to the Contractor as needed. These updates will generally consist of submittal reviews, correspondence status, Quality Assurance(QA) comments, and other administrative and QA data.
1.7 DATABASE MAINTENANCE
Establish, maintain, and update data in the RMS database throughout the duration of the contract at the Contractor's site office. Submit data updates to the Government (e.g., daily reports, submittals, RFI's, schedule updates, payment requests) using RMS. The RMS database typically includes current data on the following items:
1.7.1 Administration
1.7.1.1 Contractor Information
Contain within the database the Contractor's name, address, telephone numbers, management staff, and other required items. Within 7 calendar days of receipt of RMS software from the Government, deliver Contractor administrative data in electronic format in RMS.
1.7.1.2 Subcontractor Information
Contain within the database the name, trade, address, phone numbers, and other required information for all subcontractors. A subcontractor is listed separately for each trade to be performed. Assign each subcontractor/trade a unique Responsibility Code, provided in RMS. Within 7 calendar days of receipt of RMS software from the Government, deliver subcontractor administrative data in electronic format.
Section 01 45 00.15 10 Page 5
1.7.1.3 Correspondence
Identify all Contractor correspondence to the Government with a serial number. Prefix correspondence initiated by the Contractor's site office with "S". Prefix letters initiated by the Contractor's home (main) office with "H". Letters are numbered starting from 0001. (e.g., H-0001 or S-0001). The Government's letters to the Contractor will be prefixed with "C".
1.7.1.4 Equipment
Contain within the Contractor's RMS database a current list of equipment planned for use or being used on the jobsite, including the most recent and planned equipment inspection dates.
1.7.1.5 Management Reporting
RMS includes a number of reports that Contractor management can use to track the status of the project. The value of these reports is reflective of the quality of the data input, and is maintained in the various sections of RMS. Among these reports are: Progress Payment Request worksheet, Quality Assurance/Quality Control (QA/QC) comments, Submittal Register Status, Three-Phase Control checklists.
1.7.1.6 Request For Information (RFI)
Exchange all Requests For Information (RFI) using the Built-in RFI generator and tracker in RMS.
1.7.2 Finances
1.7.2.1 Pay Activity Data
Include within the RMS database a list of pay activities that the Contractor develops in conjunction with the construction schedule. The sum of pay activities equals the total contract amount, including modifications. Each pay activity must be assigned to a Contract Line Item Number (CLIN). The sum of the activities equals the amount of each CLIN.
The sum of all CLINs equals the contract amount.
1.7.2.2 Payment Requests
Prepare all progress payment requests using RMS. Complete the payment request worksheet, prompt payment certification, and payment invoice in RMS. Update the work completed under the contract, measured as percent or as specific quantities, at least monthly. After the update, generate a payment request report using RMS. Submit the payment request, prompt payment certification, and payment invoice with supporting data using RMS CM. If permitted by the Contracting Officer, email or a optical disc may be used. A signed paper copy of the approved payment request is also required and will govern in the event of discrepancy with the electronic version.
1.7.3 Quality Control (QC)
RMS provides a means to track implementation of the 3-phase QC Control System, prepare daily reports, identify and track deficiencies, document progress of work, and support other Contractor QC requirements. Maintain this data on a daily basis. Entered data will automatically output to the
Section 01 45 00.15 10 Page 6
RMS generated daily report. Provide the Government a Contractor Quality Control (CQC) Plan within the time required in Section 01 45 04.00 29 CONTRACTOR QUALITY CONTROL. Within seven calendar days of Government acceptance, submit a RMS update reflecting the information contained in the accepted CQC Plan: schedule, pay activities, features of work, submittal register, QC requirements, and equipment list.
1.7.3.1 Daily Contractor Quality Control (CQC) Reports.
RMS includes the means to produce the Daily CQC Report. The Contractor can use other formats to record basic Quality Control(QC) data. However, the Daily CQC Report generated by RMS must be the Contractor's official report. Summarize data from any supplemental reports by the Contractor and consolidate onto the RMS-generated Daily CQC Report. Submit daily CQC Reports as required by Section 01 45 04.00 29 CONTRACTOR QUALITY CONTROL.
Electronically submit reports to the Government within 24 hours after the date covered by the report. Also provide the Government a signed, printed copy of the daily CQC report.
1.7.3.2 Deficiency Tracking.
Use RMS to track deficiencies. Deficiencies identified by the Contractor will be numerically tracked using its Quality Control (QC) punch list items. Maintain a current log of its QC punch list items in the RMS database. The Government will log the deficiencies it has identified using its Quality Assurance (QA) punch list items. The Government's QA punch list items will be included in its export file to the Contractor.
Regularly update the correction status of both QC and QA punch list items.
1.7.3.3 QC Requirements
Develop and maintain a complete list of QC testing and required structural and life safety special inspections required by the International Code Council (ICC), transferred and installed property, and user training requirements in RMS. Update data on these QC requirements as work progresses, and promptly provide the information to the Government via RMS.
1.7.3.4 Three-Phase Control Meetings
Maintain scheduled and actual dates and times of preparatory and initial control meetings in RMS.
1.7.3.5 Labor and Equipment Hours
Log labor and equipment exposure hours on a daily basis. The labor and equipment exposure data will be rolled up into a monthly exposure report.
1.7.3.6 Accident/Safety Reporting
The Government will issue safety comments, directions, or guidance whenever safety deficiencies are observed. The Government's safety comments will be provided via RMS CM. Regularly update the correction status of the safety comments. In addition, utilize RMS to advise the Government of any accidents occurring on the jobsite. A brief supplemental entry of an accident is not to be considered as a substitute for completion of mandatory reports, e.g., ENG Form 3394 and OSHA Form 300.
Section 01 45 00.15 10 Page 7
1.7.3.7 Features of Work
Include a complete list of the features of work in the RMS database. A feature of work is associated with multiple pay activities. However, each pay activity (see subparagraph "Pay Activity Data" of paragraph "Finances") will only be linked to a single feature of work.
1.7.3.8 Hazard Analysis
Use RMS CM to develop a hazard analysis for each feature of work included in the CQC Plan. The Activity Hazard Analysis will include information required by EM 385-1-1, paragraph 01.A.13.
1.7.4 Submittal Management
The Government will provide the initial submittal register in electronic format. Thereafter, maintain a complete list of submittals, including completion of data columns. Dates when submittals are received and returned by the Government will be included. Use RMS CM to track and transmit submittals.