Amendment_2_package.pdf
PDF 41 MB Posted
- Attached to
- CORRECTED - EIE376 F-35 Hangar Propulsion MX Dispatch Federal contract opportunity
- Solicitation number
- W911KB-17-R-0001
About this file
Amendment 2 Package
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment__4_EIE376-package.pdf | ||
| A.07.24_Solic_Amendment__3_EIE376.pdf | ||
| Amendment_1_package.pdf | ||
| Sole_Source_J&A_package-all_items_Redacted_rev1_EIE376_F35.pdf | ||
| Sole_Source_J&As_EIE376_F35.pdf | ||
| 17R0001-EIE376_RFP-16_Mar_2017.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EIE376
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE/LOCATION: EIE376 F-35 Hangar Propulsion MX/Dispatch, Eielson AFB Alaska
a. This amendment provides changes to the solicitation as indicated on the continuation pages of this document.
b. PROPOSAL DUE DATE REMAINS 20 April 2017 at 1400 hours ALASKA TIME. Proposals shall be submitted in accordance w ith Section 00
21 00, paragraph 1.12, Proposal Submittals.
c. YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.
1. CONTRACT ID CODE PAGE OF PAGES
1 850
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Apr-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-17-R-0001
X 9B. DATED (SEE ITEM 11)
16-Mar-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Apr-2017
CODE
U.S. ARMY ENGINEER DISTRICT, ALASKA
CEPOA-CT-CW (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911KB-17-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 11 00 - STANDARD FORM (SF) 1442
The Issued By organization has changed from
U.S. ARMY ENGINEER DISTRICT, ALASKA
CEPOA-CT-CM
PO BOX 6898
JBER AK 99506-0898
to
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
SECTION SF 30 - BLOCK 14 MODIFICATION CONTINUATION PAGE
The following have been added by full text:
BLOCK 14 CONTINUATION PAGE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
a. The following drawings are substituted for the superseded documents/sections:
A-120, E-004, E-005, G-101 and M-303
b. The following drawings are added:
NONE
c. The following revised documents/sections are substituted for the superseded documents/sections. The identifier “AM #2” appears before and after new and/or revised materials, except as noted below.
REQUEST FOR PROPOSAL TABLE OF CONTENTS
- Revised Division 07 THERMAL AND MOISTURE PROTECTION 07 42 63.00 29
SECTION 01 91 00 – COMMISSIONING
- Revised paragraph 1.1 General
SECTION 06 61 16 – SOLID POLYMER (SOLID SURFACING) FABRICATIONS
- Revised paragraph 2.2.7, 2.3, 2.3.3, 2.3.5, 3.1.1, 3.1.2
SECTION 08 11 13 – STEEL DOORS AND FRAMES
- Revised paragraph 2.1.1.2, 2.3
SECTION 08 36 13 – SECTIONAL OVERHEAD DOORS
- Revised paragraph 2.2.1
SECTION 08 51 13 – ALUMINUM WINDOWS
- Revised paragraph 1.4.3, 1.11.2.1, SECTION 08 60 45 – TRANSLUCENT PANELS
- Revised paragraph 2.1.1.1, 2.1.1.2, 2.1.2 (1-5)
SECTION 08 81 00 – GLAZING
- Revised paragraph 2.2.1
SECTION 22 00 00 – PLUMBING, GENERAL PURPOSE
- Revised paragraph 2.4.4, 2.4.5
SECTION 23 21 13.00 20 – LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
- Revised paragraph 1.2
SECTION 26 05 00.00 50 – COMMON WORK RESULTS FOR ELECTRICAL - HEADBOLT OUTLET
INSTALLATION
- Revised paragraph 3.1(b)
SECTION 26 20 00 – INTERIOR DISTRIBUTION SYSTEMINSTALLATION
- Revised paragraph 2.25.4
SECTION 26 41 00 – LIGHTNING PROTECTION SYSTEM
- Revised paragraph 3.1.4
SECTION 26 27 14.00 20 – ELECTRICITY METERING
- Revised paragraph 2.1.1(a)
SECTION 32 13 11 – CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY
PAVEMENTS
- Revised paragraph 1.4.1(a)
SECTION 01 19 30.02 29 – SPECIAL ITEMS FOR EIELSON AFB PROJECTS
- Revised paragraph 1.24.5, 1.24.6
SECTION 01 78 00 – CLOSEOUT SUBMITTALS
- Revised paragraph 3.7, 3.10
SECTION 01 33 00 – SUBMITTAL REGISTER
- Add SD-02 Shop Drawings, Revised 1.7 Manufacturer’s Warranty
SECTION 07 42 63.00 29 – COMPOSITE FRAMING SUPPORT SYSTEM - THERMALLY
INSULATED GIRTS
- Add Entire Section
APPENDIX CC, Project Specific Requirements
NONE
APPENDIX E, Chemical Data Report
- NONE
APPENDIX AA, Additional Specifications
- NONE
NOTE: Revisions within the following documents do not contain the above referenced identifier:
d. The following sections are deleted:
NONE
e. The following documents are added:
-NONE
f. The following revisions are incorporated:
NONE
g. Other:
NONE
(End of Summary of Changes)
ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME.
(End of Summary of Changes)
PROJECT TABLE OF CONTENTS Page 1
AM#2 EIE376 F-35A Hangar/Propulsion/MX/Dispatch Design Complete
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 11 01 PROPOSAL SCHEDULE
00 21 00 INSTRUCTIONS, CONDITIONS AND NOTICES
00 22 11 PROPOSAL SUBMISSION REQUIREMENTS
00 45 00 REPRESENTATIONS & CERTIFICATIONS
00 72 00 CLAUSES
00 73 00.00 29 SPECIAL CONTRACT REQUIREMENTS
00 73 46 WAGE DETERMINATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 19 30.02 29 SPECIAL ITEMS FOR EIELSON AFB PROJECTS
Attachment 1 - AF Form 592
Attachment 2 - AF Form 103
Attachment 3 - Sample Letter
Attachment 4 - Eielson AFB Utility Rates – 2017
Attachment 5 - Control of Documents
01 22 00.00 10 PRICE AND PAYMENT PROCEDURES
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
Attachment 1 – Submittal Register
Attachment 2 - Transmittal ENG Form 4025-R
01 33 29 SUSTAINABILITY REPORTING
Attachment 1 - Air Force MILCON Sustainability
Requirements Scoresheet
Attachment 2 - LEED 2009 for New Construction and Major Renovations Project Checklist
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 36 00.00 29 RADIOACTIVE MATERIALS PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 45 04.00 29 CONTRACTOR QUALITY CONTROL
Attachment 1 - Contractor's Quality Control Report
01 45 35 SPECIAL INSPECTIONS
Attachment 1 - Statement of Special Inspections
Attachment 2 - Schedule of Special Inspections
01 50 00.04 29 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS FOR
EIELSON AFB PROJECTS
01 57 20.01 29 ENVIRONMENTAL PROTECTION
Attachment 1 - FY 16 Eielson AFB Environmental SOP
Attachment 2 – Aerosol Can Disposal Management
Procedure
Attachment 3 – Eielson Disposal Areas
Attachment 4 - Excavation DeWatering MEMO
Attachment 5 – Hazardous Waste Procedure Letters
PROJECT TABLE OF CONTENTS Page 2
01 57 34.00 29 STORM WATER POLLUTION PREVENTION MEASURES
Attachment 1 – SWPPP Delegation of Authority
Letter Template
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00 COMMISSIONING
Attachment 1 - EIE376 F-35 Hangar-Propulsion MX
Cx Plan
Attachment 2 - FPT Example Form
Attachment 3 - PFTC Example Form
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02 83 13.00 20 LEAD IN CONSTRUCTION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 MASONRY
04 22 53 MORTARLESS MASONRY VENEER
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 BOARD AND BLOCK INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 42 13 METAL WALL PANELS
07 42 63.00
29 AM#2…COMPOSITE FRAMING SUPPORT – THERMALLY INSULATED
GRITS…AM#2
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
07 95 00 EXPANSION CONTROL
PROJECT TABLE OF CONTENTS Page 3
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 33 23 OVERHEAD COILING DOORS
08 34 16.20 VERTICAL LIFT FABRIC DOORS
08 36 13 SECTIONAL OVERHEAD DOORS
08 51 13 ALUMINUM WINDOWS
08 60 45 TRANSLUCENT PANELS
08 71 00 DOOR HARDWARE
Attachment 1 – Hangar Hardware Sets
08 81 00 GLAZING
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR AND EXTERIOR SIGNAGE
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 36 00 COUNTERTOPS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 93 00 SITE FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 17.00 10 DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 18.00 10 PREACTION AND DELUGE SPRINKLER SYSTEMS, FIRE PROTECTION
Attachment 1 - UFC 4-211-01
21 13 20.00 20 LOW-LEVEL HIGH EXPANSION FOAM FIRE EXTINGUISHING FOR
AIRCRAFT HANGARS
Attachment 1 - UFC 4-211-01
21 30 00 FIRE PUMPS
PROJECT TABLE OF CONTENTS Page 4
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 00 99 AIRCRAFT COOLING UNITS
23 05 15 COMMON PIPING FOR HVAC
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 23.00 29 DIRECT DIGITAL CONTROL FOR HVAC, BACNET, CEPOA SPECIFIC
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 22 13.35 40 STEAM TRAPS
23 22 23.00 40 STEAM CONDENSATE PUMPS
23 22 25.00 40 STEAM VALVES
23 31 13.00 40 METAL DUCTS
23 35 00.00 10 OVERHEAD VEHICLE TAILPIPE EXHAUST REMOVAL SYSTEM(S)
23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS
23 73 13.00 40 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS
DIVISION 26 - ELECTRICAL
26 05 00.00 50 COMMON WORK RESULTS FOR ELECTRICAL - HEADBOLT OUTLET
INSTALLATION
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 13 01 PAD-MOUNTED DEAD-FRONT AIR INSULATED SWITCHGEAR
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 27 14.00 20 ELECTRICITY METERING
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 35 44 270 VDC SOLID STATE GROUND POWER UNIT
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
Attachment 1 - UFC 4-211-01
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
Attachment 1 - EIE376 F35A Hangar Propulsion MX Dispatch Data Report
PROJECT TABLE OF CONTENTS Page 5
AM#1...Attachment 2 – Revised Final Geotechnical Data
Report, EIE379, F35A Hangar/Squad Ops/AMU...AM#1
31 05 19 GEOTEXTILE
31 09 20.00 29 FIELD SCREEN TESTING OF SOILS FOR CHEMICAL CONTAMINATION
31 11 00 CLEARING AND GRUBBING
31 23 29 GROUND THAWING
31 23 30 DEEP DYNAMIC SOIL IMPROVEMENT
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSE
32 12 10 BITUMINOUS TACK COAT
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 11 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY
PAVEMENTS
32 13 73 COMPRESSION JOINT SEALS FOR EXTERIOR CONCRETE PAVEMENTS
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 05 29.00 29 WATER DISTRIBUTION SYSTEMS IN UTILIDORS
33 05 33.00 29 SEWERS IN UTILIDORS
33 05 37.00 29 HEAT DISTRIBUTION SYSTEMS IN UTILIDORS AND MANHOLES
33 05 41.00 29 UTILIDOR SYSTEM
33 11 00 WATER DISTRIBUTION
33 32 16 PACKAGED UTILITY WASTEWATER PUMPING STATIONS
33 40 00 STORM DRAINAGE UTILITIES
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.14 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING
-- End of Project Table of Contents --
SECTION 01 91 00
COMMISSIONING
08/16
PART 1 GENERAL
1.1 GENERAL
The requirements of this Section apply to, and are a component part of, each section of the specifications.
AM#2... Permanent steam supply for this area provided by project EIE405 is scheduled to be available by 30 August 2019. Contractor is advised that any commissioning activities requiring permanent steam supply may have to be scheduled after the EIE376 building is completed or Beneficiary Occupancy Date (BOD). ...AM#2
This Section includes:
1.1.1 Building Commissioning of the Following Systems:
a. HVAC components and equipment.
b. HVAC system: interaction of cooling, heating, and comfort delivery systems.
c. Direct Digital Control System (DDC): control hardware and software, sequence of operations, and integration of factory controls with DDC.
d. Lighting Control System.
e. Electrical Distribution System.
f. Electrical Metering System.
g. Lightning Protection System.
h. Domestic Hot Water System.
The Government, LEED Consultant, Architect/Engineer, or Commissioning Authority are not responsible for construction means, methods, job safety, or management function related to commissioning on the job site.
The commissioning process does not take away from or reduce the responsibility of the installing contractors to provide a finished and fully functioning product.
1.2 RELATED SECTIONS
a. Section 01 33 00 SUBMITTAL PROCEDURES
b. Section 01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS
CM)
c. Section 01 78 23 OPERATION AND MAINTENANCE DATA
d. Section 22 00 00 PLUMBING, GENERAL PURPOSE
SECTION 01 91 00 Page 1 April 12, 2017
e. Section 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST
SYSTEMS
f. Section 23 05 93 TESTING, ADJUSTING AND BALANCING FOR HVAC
g. Section 23 09 23.00 29 DIRECT DIGITAL CONTROL FOR HVAC, BACNET, CEPOA
SPECIFIC
h. Section 23 21 13.00 20 LOW TEMPERATURE WATER HEATING SYSTEM
i. Section 26 12 19.10 THREE PHASE PAD MOUNTED TRANSFORMERS
j. Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM
k. Section 26 27 14.00 20 ELECTRICITY METERING
l. Section 26 29 23 VARIABLE FREQUENCY DRIVESYSTEMS UNDER 600 VOLTS
m. Section 26 41 00 LIGHTNING PROTECTION SYSTEM
n. Section 26 51 00 INTERIOR LIGHTING
o. Section 26 56 00 EXTERIOR LIGHTING
1.3 COMMISSIONING DESCRIPTION
a. Work includes the completion of formal commissioning procedures on selected equipment and systems as outlined in the paragraph Related Sections above. Commissioning is defined as the process of verifying and documenting that the installation and performance of selected building systems meet the specified design criteria and therefore satisfies the design intent and the Government's operational needs.
The Contractor shall be responsible for participation in the commissioning process as outlined herein, and in subsequent sectional references and attachments throughout the Contract Documents.
Commissioning procedures will be designed and conducted under the direction of a Commissioning Authority (CxA) hired by the Government.
b. This section contains the general requirements for commissioning and a description of the commissioning process to be applied across all commissioned systems.
c. Testing and startup of HVAC equipment and systems.
d. Testing and startup of Plumbing hot water equipment.
e. Testing and startup of electrical distribution equipment and systems.
f. Testing and startup of electrical lighting equipment and systems.
g. Testing of electrical lightning protection systems.
h. Equipment and system verification checks.
i. Assistance in functional performance testing to verify testing and balancing, and equipment and system performance.
j. Provide qualified personnel to assist in commissioning tests, SECTION 01 91 00 Page 2 April 12, 2017 including seasonal testing.
k. Complete and endorse pre-functional performance test checklists provided by CxA to assure equipment and systems are ready for functional performance testing.
l. Complete and endorse functional performance test checklists provided by CxA to assure equipment and systems are fully operational and ready for functional performance testing.
m. Provide equipment, materials, and labor necessary to correct deficiencies found during commissioning process to fulfill contract and warranty requirements.
n. Provide operation and maintenance information and record drawings to Commissioning Authority for review verification and organization, prior to distribution.
o. Provide assistance to Commissioning Authority to develop, edit, and document system operation descriptions.
p. Provide training for systems specified in this Section with coordination by Commissioning Authority.
q. Equipment and Systems to Be Commissioned in accordance with the attached Commissioning Plan.
1.4 COMMISSIONING SUBMITTALS
1.4.1 Submittals
Assure an electronic copy of all required submittals is provided to the commissioning authority for concurrent review with Government required submittals for all commissioned systems and equipment.
1.4.2 Forms
Submit manufacturer recommended installation and startup forms for review along with equipment submittal.
1.4.3 Forms
Submit completed manufacturer startup forms with completed pre-functional checklists.
1.4.4 Test Reports
Indicate data on system verification form for each piece of equipment and system as specified.
1.4.5 Field Reports
Indicate deficiencies preventing completion of equipment or system verification checks equipment or system to achieve specified performance.
1.5 QUALITY CONTROL
Perform work in accordance with Commissioning Plan provided by Commissioning Authority.
SECTION 01 91 00 Page 3 April 12, 2017
1.6 CONTRACTOR AND EQUIPMENT OR SYSTEM INSTALLER COMMISSIONING
RESPONSIBILITIES
a. See attached Commissioning Plan for additional detailed procedures and responsibilities.
b. Support the commissioning process including integrating related commissioning activities into the construction process and schedule.
c. Assign a Commissioning Coordinator dedicated to the project.
Contractor's Commissioning Coordinator Responsibilities:
1. Overall management and coordination of the commissioning work performed by the Contractor and sub-contractors responsible for commissioned systems.
2. Coordinate Owner and CxA participation in scheduled commissioning activities. Provide contract required notice in advance of commissioning activities.
3. Collect, review and submit commissioning material and documentation to the CxA for approval prior to proceeding with commissioning activities including, but not limited to, Pre-functional Test Verification, TAB Verification, DDC PVT, Functional Testing, and DDC Endurance Testing.
4. Distribute issues lists to Contractors responsible for the commissioned systems.
d. Review and comment on preliminary functional tests provided by CxA.
Contractors responsible for the systems to be commissioned shall also review this information.
e. Provide access to commissioned systems including ladders, lifts, scaffolding, access panels and other equipment as required.
f. Attend commissioning meetings.
g. Provide training syllabi for training sessions to the Commissioning Authority.
h. Provide instructions and demonstrations for Owner's personnel.
i. Ensure subcontractors perform assigned commissioning responsibilities.
j. Ensure participation of equipment manufacturers in appropriate startup, testing, and training activities when required by individual equipment specifications.
k. Develop startup and initial checkout plan using manufacturer's startup procedures for equipment and systems to be commissioned.
l. During verification check and startup process, execute related portions of pre-functional checklists for equipment and systems to be commissioned, and complete pre-functional test checklists (PFTC) as provided by the Commissioning Authority.
m. Perform and document completed startup and system operational checkout
SECTION 01 91 00 Page 4 April 12, 2017 procedures, providing copy to Commissioning Authority.
n. Prior to startup, inspect, check, and verify correct and complete installation of equipment and system components for verification checks included in commissioning plan. When deficient or incomplete work is discovered, ensure corrective action is taken and re-check until equipment or system is ready for startup.
o. Provide manufacturer's representatives to execute starting of equipment. Ensure representatives are available and present during agreed upon schedules and are in attendance for duration to complete tests, adjustments and problem-solving. Ensure representatives are available and present during the control installer performance verification test (PVT) to demonstrate control sequences internal to their unit.
p. The Contractor shall perform equipment start-up per the approved start-up plan and start-up forms. The Contractor shall correct issues as they are discovered. The Contractor shall complete the installation and start-up forms as the work is complete and place the fully completed installation and start-up forms in the PFTC binder.
q. Coordinate with equipment manufacturers to determine specific requirements to maintain validity of warranties.
r. Provide personnel to assist Commissioning Authority during equipment or system verification checks and functional performance tests.
s. Resolve issues as noted on the commissioning issues log and communicate resolution to the CxA.
t. Prior to functional performance tests, review test procedures to ensure feasibility, safety and equipment protection and provide necessary written alarm limits to be used during tests.
u. Provide Operation and Maintenance manuals for installed equipment and systems.
v. Assist Commissioning Authority in performing functional performance tests on equipment and systems as specified.
w. Where required, the Contractor shall provide test equipment, whether specified or not, to execute the functional performance tests.
x. Perform operation and maintenance training sessions coordinated with the Commissioning Authority.
y. Participate in seasonal or deferred functional testing required.
z. Temperature Controls Installer Commissioning Responsibilities:
1. See attached Commissioning Plan for additional detailed procedures and responsibilities.
2. Attend commissioning meetings.
3. Review design for ability of systems to be controlled including the following:
SECTION 01 91 00 Page 5 April 12, 2017
- Confirm proper hardware requirements exist to perform functional performance testing.
- Confirm proper sizing of system control valves and actuators and control valve operation will result capacity control identified in Contract Documents.
- Confirm proper sizing of system control actuators and damper operation will result in proper damper positioning.
- Confirm sensors selected are within device ranges.
- Review sequences of operation and obtain clarification from Architect/Engineer.
- Indicate delineation of control between packaged controls and building automation system, listing BAS monitor points and BAS adjustable control points.
- Where packaged controls do not allow for the written sequence of operation to be completed, provide recommended modifications to the sequences of operation for packaged controlled equipment for review by the Architect/Engineer.
4. Inspect, check, and confirm proper operation and performance of control hardware and software provided in other HVAC sections.
5. Submit proposed procedures for performing automatic temperature control system commissioning and point-to-point checks to Commissioning Authority and Architect/Engineer.
6. Submit proposed procedures for performing automatic temperature control system performance verification test (PVT) checks to Commissioning Authority.
7. In conjunction with equipment installer, ensure representatives are available and present during the PVT to demonstrate control sequences internal to their unit and confirm overall control functionality.
8. Inspect check and confirm correct installation and operation of automatic temperature control system input and output device operation through point-to-point checks.
9. During verification check and startup process, execute related portions of pre-functional checklists for equipment and systems to be commissioned, and complete pre-functional test checklists (PFTC) as provided by the Commissioning Authority.
10. Perform training sessions to instruct Owner's personnel in hardware operations, software operation, programming, and application.
11. Demonstrate system performance and operation to Commissioning Authority during functional performance tests including each mode of operation.
12. Provide control system technician to assist during Commissioning Authority verification check and functional performance testing.
SECTION 01 91 00 Page 6 April 12, 2017
13. Provide control system technician to assist testing, adjusting, and balancing agency during performance of testing, adjusting, and balancing work.
14. Assist in performing operation and maintenance training sessions scheduled by Commissioning Authority.
15. Participate in seasonal or deferred functional testing required.
AA. Testing, Adjusting, and Balancing Agency Commissioning Responsibilities:
1. See attached Commissioning Plan for additional detailed procedures and responsibilities.
2. Attend commissioning meetings.
3. Perform assigned commissioning responsibilities as specified.
4. During TAB execution, execute related portions of pre-functional checklists for equipment and systems to be commissioned, and complete pre-functional test checklists (PFTC) as provided by the Commissioning Authority.
5. Participate in verification of testing, adjusting, and balancing report for verification or diagnostic purposes. Repeat sample of 10 percent of measurements contained in testing, adjusting, and balancing report as indicated in commissioning plan.
BB. Commissioning Authority's Commissioning Responsibilities:
1. See attached Commissioning Plan for additional detailed procedures and responsibilities.
2. Participate in the initial on-site commissioning coordination meeting held prior to installation of the commissioned systems.
3. Attend and lead commissioning meetings.
4. Distribute commissioning meeting minutes and agenda as well as assign action items after each meeting.
5. Conduct site observations and provide site observation report prior to functional testing.
6. Review the start-up plan and commissioning schedule as developed by the equipment installers and the Contractor.
7. Develop the commissioning functional test documents.
8. Review and approve various Contractor completed documents including system readiness checklists, start-up documents and TAB report as they are completed.
9. Direct and witness functional performance testing by Contractor.
10. Prepare and submit final commissioning report.
SECTION 01 91 00 Page 7 April 12, 2017
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 COORDINATION
a. Review, coordinate and accommodate work of other trades that interface with, affect or are affected by the work of this section.
b. Update construction schedule to reflect required commissioning work in the proper sequence.
3.2 EXAMINATION
a. Verify that building interior and systems are ready for required startup and testing prior to beginning of any required startup or test.
b. Assure all LEED requirements for IAQ are in place and maintained throughout any scheduled event under this section.
c. Provide all personnel and equipment required to perform commissioning testing for Pre-Functional Test Checklist completion, TAB Execution, DDC Performance Verification Testing, TAB Verification, Functional Performance Testing, DDC Endurance Testing, and as required, seasonal testing of all systems unable to be completely tested during closeout due to weather, ambient temperature, etc.
3.3 TRAINING
a. For all Owner instruction, the Contractor shall submit a training plan for each system. Training shall not proceed without approval of the training plan.
b. Provide qualified instructor acceptable to CxA and Government. Where possible, utilize startup technicians for training at time of startup of systems. Coordinate timing with the Government and CxA.
c. Training on systems and equipment operation and maintenance shall only be scheduled to commence after functional testing is satisfactorily completed, O&M manuals have been delivered and approved, the Systems Manual is complete and systems are verified to be 100% complete and functional.
d. The training plan must contain the following as a minimum:
1. Attendee sign-off sheet.
2. Required training hours specified in the project documents.
3. Detailed list of subject to be covered and durations.
4. Qualifications of training provider.
5. Training schedule including duration of each training session.
-- End of Section --
SECTION 01 91 00 Page 8 April 12, 2017
SECTION 06 61 16
SOLID POLYMER (SOLID SURFACING) FABRICATIONS
08/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D2583 (2013a) Indentation Hardness of Rigid Plastics by Means of a Barcol Impressor
ASTM D5116 (2010) Standard Guide for Small-Scale Environmental Chamber Determinations of Organic Emissions from Indoor Materials/Products
ASTM D570 (1998; E 2010; R 2010) Standard Test Method for Water Absorption of Plastics
ASTM D638 (2010) Standard Test Method for Tensile Properties of Plastics
ASTM D696 (2008; E 2013) Standard Test Method for Coefficient of Linear Thermal Expansion of Plastics Between -30 degrees C and 30 degrees C With a Vitreous Silica Dilatometer
ASTM E84 (2015b) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM G21 (2013) Determining Resistance of Synthetic Polymeric Materials to Fungi
CSA GROUP (CSA)
CSA B45.5-11/IAPMO Z124 (2011; Update 1 2012) Plastic Plumbing Fixtures - First Edition
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
ANSI/NEMA LD 3 (2005) Standard for High-Pressure Decorative Laminates
NSF INTERNATIONAL (NSF)
NSF/ANSI 51 (2012) Food Equipment Materials
SECTION 06 61 16 Page 1 April 15, 2017
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS Scientific Certification Systems (SCS)Indoor Advantage
TILE COUNCIL OF NORTH AMERICA (TCNA)
TCNA Hdbk (2013) Handbook for Ceramic, Glass, and Stone Tile Installation
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED BD+C (2009; R 2010) Leadership in Energy and Environmental Design(tm) Building Design and Construction (LEED-NC)
UL ENVIRONMENT (ULE)
ULE Greenguard UL Greenguard Certification Program
1.2 SYSTEM DESCRIPTION
a. Work under this section includes counter tops and locker benches and other items utilizing solid polymer (solid surfacing) fabrication as shown on the drawings and as described in this specification. Do not change source of supply for materials after work has started, if the appearance of finished work would be affected.
b. In most instances, installation of solid polymer fabricated components and assemblies will require strong, correctly located structural support provided by other trades. To provide a stable, sound, secure installation, close coordination is required between the solid polymer fabricator/installer and other trades to ensure that necessary structural wall support, cabinet counter top structural support, proper clearances, and other supporting components are provided for the installation of wall panels, countertops, shelving, and all other solid polymer fabrications to the degree and extent recommended by the solid polymer manufacturer.
c. Appropriate staging areas for solid polymer fabrications. Allow variation in component size and location of openings of plus or minus 1/8 inch.
1.3 SUSTAINABILITY REPORTING
Materials in this technical specification may contribute towards contract compliance with sustainability requirements. See Section 01 33 29 SUSTAINABILITY REPORTING for project LEED BD+C recycled content and LEED documentation requirements.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SECTION 06 61 16 Page 2 April 15, 2017
SD-02 Shop Drawings
Detail Drawings; G , Installation; G , SD-03 Product Data
Solid polymer material Qualifications Fabrications Certification VOC Content
SD-04 Samples
Material; G , Counter and Vanity Tops ; G , SD-06 Test Reports
Solid polymer material
SD-07 Certificates
Fabrications Qualifications
SD-10 Operation and Maintenance Data
Clean-up
SD-11 Closeout Submittals
LEED Documentation
1.5 QUALITY ASSURANCE
1.5.1 Qualifications
To ensure warranty coverage, solid polymer fabricators shall be certified to fabricate by the solid polymer material manufacturer being utilized.
Mark all fabrications with the fabricator's certification label affixed in an inconspicuous location. Fabricators shall have a minimum of 5 years of experience working with solid polymer materials. Submit solid polymer manufacturer's certification attesting to fabricator qualification approval.
1.5.2 Mock-ups
Submit Detail Drawings indicating locations, dimensions, component sizes, fabrication and joint details, attachment provisions, installation details, and coordination requirements with adjacent work. Prior to final approval of shop drawings, provide a full-size mock-up of a typical countertop where multiple units are required. The mock-up shall include all solid polymer components required to provide a completed unit. The mock-up shall utilize finishes in patterns and colors indicated on the drawings. Should the mock-up not be approved, re-work or remake it until approval is secured. Remove rejected units from the jobsite. Approved
SECTION 06 61 16 Page 3 April 15, 2017 mock-up may remain as part of the finished work.
1.5.3 Sustainable Design Certification
Product shall be third party certified in accordance with ULE Greenguard Gold, SCS Scientific Certification Systems Indoor Advantage Gold or equal. VOC content and emissions shall be determined by ASTM D5116.
Certification shall be performed annually and shall be current.
1.6 DELIVERY, STORAGE, AND HANDLING
Do not deliver materials to project site until areas are ready for installation. Deliver components and materials to the site undamaged, in containers clearly marked and labeled with manufacturer's name. Materials shall be stored indoors and adequate precautions taken to prevent damage to finished surfaces. Provide protective coverings to prevent physical damage or staining following installation, for duration of project.
1.7 WARRANTY
Provide manufacturer's warranty of ten years against defects in materials, excluding damages caused by physical or chemical abuse or excessive heat.
Warranty shall provide for material and labor for replacement or repair of defective material for a period of ten years after component installation.
PART 2 PRODUCTS
2.1 MATERIAL
Provide solid polymer material that is a homogeneous filled solid polymer;
not coated, laminated or of a composite construction; meeting CSA B45.5-11/IAPMO Z124 requirements. Material shall have minimum physical and performance properties specified. Superficial damage to a depth of 0.01 inch shall be repairable by sanding or polishing. Material thickness shall be as indicated on the drawings. In no case shall material be less than 1/4 inch in thickness. Submit a minimum 4 by 4 inch sample of each color and pattern for approval. Samples shall indicate full range of color and pattern variation. Approved samples shall be retained as a standard for this work. Submit test report results from an independent testing laboratory attesting that the submitted solid polymer material meets or exceeds each of the specified performance requirements.
Basis of Design Product: As listed on color and material legend on drawing.
2.1.1 Cast, 100 Percent Acrylic Polymer Solid Surfacing Material
Cast, 100 percent acrylic solid polymer material shall be composed of acrylic polymer, mineral fillers, and pigments and shall meet the following minimum performance requirements:
PROPERTY REQUIREMENT
(min. or max.)
TEST PROCEDURE
Tensile Strength 4000 psi (max.) ASTM D638
SECTION 06 61 16 Page 4 April 15, 2017
PROPERTY REQUIREMENT
(min. or max.)
TEST PROCEDURE
Hardness 55-Barcol Impressor (min.) ASTM D2583
Thermal Expansion .000023 in/in/F (max.) ASTM D696
Boiling Water Surface Resistance
No Change ANSI/NEMA LD 3 -3.05
High Temperature Resistance
No Change ANSI/NEMA LD 3 -3.06
Impact Resistance (Ball drop) ANSI/NEMA LD 3 -303
1/4 inch sheet 36 inches, 1/2 lb ball, no failure
1/2 inch sheet 140 inches, 1/2 lb ball, no failure
3/4 inch sheet 200 inches, 1/2 lb ball, no failure
Mold & Mildew Growth No growth ASTM G21
Bacteria Growth No growth ASTM G21
Liquid Absorption (Weight in 24 hrs.)
0.1 percent max. ASTM D570
Flammability ASTM E84
Flame Spread 25 max.
Smoke Developed 30 max.
Sanitation "Food Contact" approval NSF/ANSI 51
2.1.2 Acrylic-modified Polymer Solid Surfacing Material
Cast, solid polymer material shall be composed of a formulation containing acrylic and polyester polymers, mineral fillers, and pigments. Acrylic polymer content shall be not less than 5 percent and not more than 10 percent in order to meet the following minimum performance requirements:
PROPERTY REQUIREMENT
(min. or max.)
TEST PROCEDURE
Tensile Strength 4100 psi (max.) ASTM D638
Hardness 50-Barcol Impressor (min.) ASTM D2583
SECTION 06 61 16 Page 5 April 15, 2017
PROPERTY REQUIREMENT
(min. or max.)
TEST PROCEDURE
Thermal Expansion .000023 in/in/F (max.) ASTM D696
Boiling Water Surface Resistance
No Change ANSI/NEMA LD 3 -3.05
High Temperature Resistance
No Change ANSI/NEMA LD 3 -3.06
Impact Resistance (Ball drop) ANSI/NEMA LD 3 -303
1/4 inch sheet 36 inches, 1/2 lb ball, no failure
1/2 inch sheet 140 inches, 1/2 lb ball, no failure
3/4 inch sheet 200 inches, 1/2 lb ball, no failure
Mold & Mildew Growth No growth ASTM G21
Bacteria Growth No growth ASTM G21
Liquid Absorption (Weight in 24 hrs.)
0.6 percent max. ASTM D570
Flammability ASTM E84
Flame Spread 25 max.
Smoke Developed 100 max.
Sanitation "Food Contact" approval NSF/ANSI 51
2.1.3 Material Patterns and Colors
Patterns and colors for all solid polymer components and fabrications shall be those indicated on the project color and material legend on drawing and locker bench details. Pattern and color shall occur, and shall be consistent in appearance, throughout the entire depth (thickness) of the solid polymer material.
2.1.4 Surface Finish
Exposed finished surfaces and edges shall receive a uniform appearance.
Exposed surface finish shall be matte; gloss rating of 5-20unless indicated on the drawings.
SECTION 06 61 16 Page 6 April 15, 2017
2.2 ACCESSORY PRODUCTS
Accessory products, as specified below, shall be manufactured by the solid polymer manufacturer or shall be products approved by the solid polymer manufacturer for use with the solid polymer materials being specified.
2.2.1 Seam Adhesive
Seam adhesive shall be a two-part adhesive kit to create permanent, inconspicuous, non-porous, hard seams and joints by chemical bond between solid polymer materials and components to create a monolithic appearance of the fabrication. Adhesive shall be approved by the solid polymer manufacturer. Adhesive shall be color-matched to the surfaces being bonded where solid-colored, solid polymer materials are being bonded together. The seam adhesive shall be clear or color matched where particulate patterned, solid polymer materials are being bonded together.
2.2.2 Panel Adhesive
Panel adhesive shall be neoprene based panel adhesive meeting TCNA Hdbk, Underwriter's Laboratories (UL) listed. Use this adhesive to bond solid polymer components to adjacent and underlying substrates.
2.2.3 Silicone Sealant
Sealant shall be a mildew-resistant, FDA and OSHA Nationally Recognized Testing Laboratory (NRTL) listed silicone sealant or caulk in a clear formulation. The silicone sealant shall be approved for use by the solid polymer manufacturer. Use sealant to seal all expansion joints between solid polymer components and all joints between solid polymer components and other adjacent surfaces such as walls, floors, ceiling, and plumbing fixtures.
2.2.4 Conductive Tape
Conductive tape shall be manufacturer's standard foil tape, 4 mils thick, applied around the edges of cut outs containing hot or cold appliances.
2.2.5 Insulating Felt Tape
Insulating tape shall be manufacturer's standard product for use with drop-in food wells used in commercial food service applications to insulate solid polymer surfaces from hot or cold appliances.
2.2.6 Heat Reflective Tape
Heat reflective tape as recommended by the solid polymer manufacturer for use with cutouts for heat sources.
2.2.7 AM#2... DELETED TEXT...AM#2
AM#2... DELETED TEXT...AM#2
2.3 FABRICATIONS
Components shall be factory or shop fabricated to sizes and shapes indicated, to the greatest extent practical, in accordance with approved Shop Drawings and manufacturer's requirements. AM#2... DELETED TEXT...AM#2 Contours and radii shall be routed to template, with edges smooth.
SECTION 06 61 16 Page 7 April 15, 2017
Defective and inaccurate work will be rejected. Submit product data indicating product description, fabrication information, and compliance with specified performance requirements for solid polymer, joint adhesive, sealants, and heat reflective tape. Both the manufacturer of materials and the fabricator shall submit a detailed description of operations and processes in place that support efficient use of natural resources, energy efficiency, emissions of ozone depleting chemicals, management of water and operational waste, indoor environmental quality, and other production techniques supporting sustainable design and products.
2.3.1 Joints and Seams
Form joints and seams between solid polymer components using manufacturer's approved seam adhesive. Joints shall be inconspicuous in appearance and without voids to create a monolithic appearance.
2.3.2 Edge Finishing
Rout and finish component edges to a smooth, uniform appearance and finish. Edge shapes and treatments, including any inserts, shall be as detailed on the drawings. Rout all cutouts, then sand all edges smooth.
Repair or reject defective or inaccurate work.
2.3.3 Counter AM#2... DELETED TEXT...AM#2 Top Splashes
Fabricate backsplashes and end splashes from 1/2 inch thick solid surfacing material to be in conformance with dimensions and shapes as indicated on the drawings. Backsplashes and end splashes shall be provided for all counter tops AM#2... DELETED TEXT...AM#2 . Backsplashes shall be shop fabricated and be loose, to be field attached.
2.3.3.1 End Splashes
End splashes shall be provided loose for installation at the jobsite after horizontal surfaces to which they are to be attached have been installed.
2.3.4 Locker Bench
Locker bench shall be fabricated from 1/2" thick solid surfacing solid polymer material over wood substrate material. Dimensions, edge shape, and other details shall be as indicated on the drawings.
2.3.5 Counter AM#2... DELETED TEXT...AM#2 Tops
Fabricate all solid surfacing, solid polymer counter top AM#2... DELETED TEXT...AM#2 components from 1/2 inch thick material. Edge details, dimensions, locations, and quantities shall be as indicated on the Drawings. Counter tops shall be complete with 4 inch high AM#2...
backsplash ...AM#2 . Attach 2 inch wide reinforcing strip of polymer material under each horizontal counter top seam. Submit a minimum 1 foot wide by 6 inch deep, full size sample for each type of counter top shown on the project drawings. The sample shall include the edge profile and backsplash as detailed on the project drawings. Solid polymer material shall be of a pattern and color as indicated on the drawings. Sample shall include at least one seam. Approved sample shall be retained as standard for this work.
SECTION 06 61 16 Page 8 April 15, 2017
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Components
Install all components and fabricated units plumb, level, and rigid. Make field joints between solid polymer components using solid polymer manufacturer's approved seam adhesives, to provide a monolithic appearance with joints inconspicuous in the finished work. AM#2... DELETED TEXT...AM#2
3.1.1.1 Loose Counter Top Splashes
Mount loose splashes in the locations noted on the drawings. Loose splashes shall be adhered to the counter top with a color matched silicone sealant when the solid polymer components are solid colors. Use a clear silicone sealant to provide adhesion of particulate patterned solid polymer splashes to counter tops.
3.1.2 Silicone Sealant
Use a clear, silicone sealant or caulk to seal all expansion joints between solid polymer components and all joints between solid polymer components and other adjacent surfaces. AM#2... DELETED TEXT...AM#2 Sealant bead shall be smooth and uniform in appearance and shall be the minimum size necessary to bridge any gaps between the solid surfacing material and the adjacent surface. Bead shall be continuous and run the entire length of the joint being sealed.
3.2 CLEAN-UP
Components shall be cleaned after installation and covered to protect against damage during completion of the remaining project items.
Components damaged after installation by other trades will be repaired or replaced at the General Contractor's cost. Component supplier will provide a repair/replace cost estimate to the General Contractor who shall approve estimate before repairs are made. Submit a minimum of six copies of maintenance data indicating manufacturer's care, repair and cleaning instructions. Maintenance video shall be provided,if available.
Maintenance kit for matte finishes shall be submitted.
SECTION 06 61 16 Page 9 April 15, 2017
SECTION 08 11 13
STEEL DOORS AND FRAMES
02/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
ASTM INTERNATIONAL (ASTM)
ASTM A653/A653M (2015; E 2016) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A879/A879M (2012) Standard Specification for Steel Sheet, zinc Coated by the Electrolytic Process for Applications Requiring Designation of the Coating Mass on Each Surface
ASTM A924/A924M (2016a) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process
ASTM C578 (2015b) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation
ASTM C591 (2016) Standard Specification for Unfaced Preformed Rigid Cellular Polyisocyanurate Thermal Insulation
ASTM C612 (2014) Mineral Fiber Block and Board Thermal Insulation
ASTM D2863 (2013) Measuring the Minimum Oxygen Concentration to Support Candle-Like Combustion of Plastics (Oxygen Index)
ASTM E1300 (2012a; E 2012) Determining Load Resistance of Glass in Buildings
ASTM F2248 (2012) Standard Practice for Specifying an Equivalent 3-Second Duration Design…