SPECIFICATIONS_W911KB-16-R-0029.pdf
PDF 1 MB Posted
- Attached to
- TANANA LEVEE GUARDRAIL & PROJECT OFFICE FENCING, CHENA RIVER LAKES FLOOD CONTROL PROJECT, NORTH POLE, ALASKA
- Solicitation number
- W911KB-16-R-0029
About this file
Specifications for W911KB-16-R-0029
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911KB-16-R-0029_Amendment__1.pdf | ||
| CHL016_AM_1_Drawings.pdf | ||
| CHL016_Site_Visit_Sign_In.pdf | ||
| SOLICITATION_W911KB-16-R-0029.pdf | ||
| DRAWINGS_W911KB-16-R-0029.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
REQUEST FOR PROPOSAL
US Army Corps of Engineers Alaska District
CHL016
TANANA LEVEE GUARDRAIL & PROJECT
OFFICE FENCING
Chena River Lakes Flood Control Project
NORTH POLE, ALASKA
W911KB-16-R-0029
APRIL 12, 2016
DIVISION 00
TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 11 00 SF 1442
00 11 01 PROPOSAL SCHEDULE
00 21 00 INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
00 22 11 PROPOSAL SUBMISSION REQUREMENTS
00 45 00 REPRESENATIONS AND CERTIFICATIONS
00 72 00 CONTRACT CLAUSES
00 73 00.00 29 SPECIAL CONTRACT REQUIREMENTS
00 73 46 WAGE DETERMINATIONS
RTA TANANA LEVEE GUARDRAIL & PROJECT OFFICE FENCING CHL016
NORTH POLE, ALASKA
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 19 40.00 29 SPECIAL ITEMS (CIVIL WORKS)
01 22 00.00 10 MEASUREMENT AND PAYMENT
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 45 04.00 29 CONTRACTOR QUALITY CONTROL
01 57 20.01 29 ENVIRONMENTAL PROTECTION
01 78 00 CLOSEOUT SUBMITTALS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 19.00 10 INSULATED WIRE AND CABLE
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 19 40.00 29
SPECIAL ITEMS (CIVIL WORKS)
6/18/2013
PART 1 GENERAL
1.1 SCOPE
1.2 REFERENCES
1.3 SUBMITTALS
1.4 ACCIDENT PREVENTION PLAN
1.5 FIRE SAFETY
1.6 TESTS
1.7 WARRANTY OF CONSTRUCTION
1.7.1 Failures
1.8 CAMP FACILITIES
1.9 PARTNERING
1.10 WORK CLEARANCE (Utility Locates)
1.11 Utility Outages
1.12 Salvaged Materials and Property
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
-- End of Section Table of Contents --
SECTION 01 19 40.00 29 Page 1
SECTION 01 19 40.00 29
SPECIAL ITEMS (CIVIL WORKS)
6/18/2013
PART 1 GENERAL
1.1 SCOPE
Items included in this section cover special features and/or requirements which are not otherwise specified or indicated.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
Government acceptance is required for submittals with a "G" designation.
SD-01 Preconstruction Submittals
Accident Prevention Plan (APP); G
SD-06 Test Reports
1.4 ACCIDENT PREVENTION PLAN
The Accident Prevention Plan (APP) requirements listed in this section supplement those for the APP submittal discussed in Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS and EM 385-1-1.
1.5 FIRE SAFETY
The Contractor shall obtain a permit from the organization having jurisdiction over the job site for any welding or open flame work.
1.6 TESTS
The Contractor shall provide testing, except where specifically noted to be performed by the Government, in accordance with SECTION 01 45 04.00 29
CONTRACTOR QUALITY CONTROL.
SECTION 01 19 40.00 29 Page 2
1.7 WARRANTY OF CONSTRUCTION
1.7.1 Failures
Upon receipt of notice from the Government of failure of any part of warranted items during the warranty period, the affected part or parts shall be promptly replaced. Such replacement shall include furnishing and installing the necessary new part or parts, making all necessary repairs, restoring the affected item to the operating condition specified in this contract and making all such tests as are necessary to ensure that there are no remaining defects. Such tests shall be performed in the presence of representatives of the Using Agency indicated below. Upon final acceptance of the work or transfer of responsibility to the Government for operation and maintenance of the items covered, whichever is earlier, the Contractor shall be responsible to the Using Agency for the warranty provisions of this contract. A letter stating the applicable warranty provisions shall be furnished to the Contracting Officer in duplicate, in the format and text shown in the sample letter attached to this section.
U.S. Army Engineer District, Alaska P.O. Box 6898
JBER, Alaska 99506-6898
1.8 CAMP FACILITIES
There are no Government owned camp facilities at the job site for the Contractor's use.
1.9 PARTNERING
a. The Government intends to encourage the foundation of a cohesive partnership with the Contractor and its subcontractors. This partnership will be structured to draw on the strengths of each organization to identify and achieve reciprocal goals. The objectives are effective and efficient contract performance, intended to achieve completion within budget, on schedule, and in accordance with plans and specifications.
1.10 WORK CLEARANCE (Utility Locates)
Prior to any work at the project site, the Contractor shall locate all underground utilities. Contractor shall utilize the 811 Alaska Clear Dig process and follow its instructions and procedures. Contractor can also use the services of a private locate company to locate utility lines within the project boundaries. The contractor shall coordinate with the respective utility owners any activity requiring digging or work within close proximity to the identified utility lines. Contractor shall protect any utility lines found during construction in this contract. The suggested utility owners are: Alyeska Pipeline; ACS (phone and fiber); AT&T (phone and fiber); Alaska Railroad; GCI; Golden Valley Electric (primary power and transformer); Eielson AFB (fuel lines).
Both GVEA and ACS will locate their lines to the Nelson Road Boundary of the Chena Flood Control Project. Therefore, the services of a private locate firm shall be retained by the Contractor to provide locates in all work areas.
SECTION 01 19 40.00 29 Page 3
1.11 Utility Outages
Utility outages shall be coordinated with the Chena Project Office through the Contracting Officer at least 7 days prior to the planned utility interruption. Outage periods shall exclude Saturdays, Sundays and holidays.
1.12 Salvaged Materials and Property
The existing switchgear FCQ1 shown on plans shall be salvaged. Existing fencing materials and fabric shall be salvaged. Contractor shall disassemble the switchgear and protect its parts and components during removal. Contractor shall protect all fencing materials and components during removal and separate into equal parts all fencing materials. Fence fabric shall be rolled and banded. All switchgear and fencing materials shall be delivered to the Project Office. Coordinate with the Government for scheduling and exact locations to deliver the salvaged materials.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
SECTION 01 19 40.00 29 Page 4
S A M P L E L E T T E R
Contracting Officer Date__________________ Address (as stated in Notice of Award)
SUBJECT: Warranty Provisions, Contract
GENTLEMEN:
This is to acknowledge our responsibility in connection with the warranty provisions of this contract as set forth in the contract specifications.
The following items, equipment or systems furnished or installed under this contract are hereby warranted against defective design, material and workmanship for a period as indicated:
Warranted Item, Identification Warranty Expires at Equipment or System Serial Number, Etc. 11:59 PM Std. Time
Upon receipt of notice from the Government of failure of any part or parts of the warranted item, equipment, or system during the warranty period, the affected part or parts will be replaced promptly with new parts. Such replacement will include furnishing and installing the new part or parts, making all necessary repairs, restoring the item, equipment, or system to the operating condition specified in this contract and making all such tests as are necessary to ensure that there are no remaining defects. Such tests will be performed in the presence of the Representative of the Using Agency indicated below.
We are responsible to ______________________________________ for the warranty provisions of this contract. Correspondence regarding the failure of any of the preceding items, equipment or systems covered by the warranty provisions of this contract should be addressed to:
___________________________________ Telephone Number:
Very truly yours, Signed: ________________________________________ Title: _________________________________________ Organization: __________________________________ -- End of Section --
SECTION 01 19 40.00 29 Page 5
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
04/06
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 22 00.00 10 Page 1
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
04/06
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract job payments will be made are listed in the PROPOSAL SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular payment item, shall be included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 22 00.00 10 Page 2
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 33 00
SUBMITTAL PROCEDURES
05/11
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal Descriptions (SD)
1.1.2 Approving Authority
1.1.3 Work
1.2 SUBMITTALS
1.3 PREPARATION
1.3.1 Transmittal Form
1.4 VARIATIONS
1.4.1 Considering Variations
1.4.2 Proposing Variations
1.4.3 Warranting That Variations Are Compatible
1.4.4 Review Schedule Is Modified
1.5 SUBMITTAL REGISTER
1.5.1 Use of Submittal Register
1.5.2 Contractor Use of Submittal Register
1.5.3 Approving Authority Use of Submittal Register
1.5.4 Copies Delivered to the Government
1.6 SCHEDULING
1.7 GOVERNMENT APPROVING AUTHORITY
1.8 DISAPPROVED SUBMITTALS
1.9 APPROVED SUBMITTALS
1.10 ATTACHMENTS
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 33 00 Page 1
SECTION 01 33 00
SUBMITTAL PROCEDURES
05/11
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections.
Submittals are identified by Submittal Description (SD) numbers and titles as follows:
SD-01 Preconstruction Submittals
Submittals which are required prior to the start of construction.
Certificates of insurance
Surety bonds
List of proposed Subcontractors
List of proposed products
Construction progress schedule
Submittal register
Health and safety plan
Work plan
Quality Control(QC) plan
Environmental Protection Plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some
SECTION 01 33 00 Page 2 portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports.
Daily logs and checklists.
Final acceptance test and operational test procedure.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
Confined space entry permits.
Text of posted operating instructions.
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and (MSDS)concerning impedances, hazards and safety precautions.
SD-10 Operation and Maintenance Data
Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer's help and product line documentation necessary to maintain and install equipment. This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
SECTION 01 33 00 Page 3
This data is intended to be incorporated in an operations and maintenance manual or control system.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.
Interim "DD Form 1354" with cost breakout for all assets 30 days prior to facility turnover.
1.1.2 Approving Authority
Office or designated person authorized to approve submittal.
1.1.3 Work
As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with this section.
SD-01 Preconstruction Submittals
Submittal Register; G
1.3 PREPARATION
1.3.1 Transmittal Form
1.4 VARIATIONS
Variations from contract requirements require both Designer of Record (DOR) and Government approval pursuant to contract Clause FAR 52.236-21 and will be considered where advantageous to Government.
1.4.1 Considering Variations
Discussion with Contracting Officer prior to submission, after consulting with the DOR, will help ensure functional and quality requirements are met and minimize rejections and re-submittals. When contemplating a variation which results in lower cost, consider submission of the variation as a Value Engineering Change Proposal (VECP).
Specifically point out variations from contract requirements in transmittal
SECTION 01 33 00 Page 4 letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.
1.4.2 Proposing Variations
When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government, including the DOR's written analysis and approval. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item.
Clearly mark the proposed variation in all documentation.
1.4.3 Warranting That Variations Are Compatible
When delivering a variation for approval, Contractor, including its Designer(s) of Record, warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.
1.4.4 Review Schedule Is Modified
In addition to normal submittal review period, a period of 10 working days will be allowed for consideration by the Government of submittals with variations.
1.5 SUBMITTAL REGISTER
Prepare and maintain submittal register, as the work progresses. Do not change data which is output in columns (c), (d), (e), and (f) as delivered by Government; retain data which is output in columns (a), (g), (h), and
(i) as approved. A submittal register showing items of equipment and materials for which submittals are required by the specifications is provided as an attachment. This list may not be all inclusive and additional submittals may be required. The Government will provide the initial submittal register
Column (c): Lists specification section in which submittal is required.
Column (d): Lists each submittal description (SD No. and type, e.g. SD-02 Shop Drawings) required in each specification section.
Column (e): Lists one principal paragraph in specification section where a material or product is specified. This listing is only to facilitate locating submitted requirements. Do not consider entries in column (e) as limiting project requirements.
Thereafter, the Contractor is to track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the Government.
1.5.1 Use of Submittal Register
Submit submittal register. Submit with QC plan and project schedule.
Verify that all submittals required for project are listed and add missing submittals. Coordinate and complete the following fields on the register submitted with the QC plan and the project schedule:
SECTION 01 33 00 Page 5
Column (a) Activity Number: Activity number from the project schedule.
] Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.
Column (h) Contractor Approval Date: Date Contractor needs approval of submittal.
Column (i) Contractor Material: Date that Contractor needs material delivered to Contractor control.
1.5.2 Contractor Use of Submittal Register
Update the following fields in the Government-furnished submittal register program or equivalent fields in program utilized by Contractor with each submittal throughout contract.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (j) Action Code (k): Date of action used to record Contractor's review when forwarding submittals to QC.
Column (l) List date of submittal transmission.
Column (q) List date approval received.
1.5.3 Approving Authority Use of Submittal Register
Update the following fields in the Government-furnished submittal register program or equivalent fields in program utilized by Contractor.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (l) List date of submittal receipt.
Column (m) through (p) List Date related to review actions.
Column (q) List date returned to Contractor.
1.5.4 Copies Delivered to the Government
Deliver one copy of submittal register updated by Contractor to Government with each invoice request. Provide the Government with 1 electronic copy and 3 harcopies for each submittal.
1.6 SCHEDULING
Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. No delay damages or time extensions will be allowed for time lost in late submittals. A minimum of 30 calendar days, exclusive of mailing time, shall be allowed and shown on the register for Government review and approval of submittals..
SECTION 01 33 00 Page 6
a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential resubmittal of requirements.
b. Submittals called for by the contract documents will be listed on the register. If a submittal is called for but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not relieve the Contractor of supplying submittals required by the contract documents but which have been omitted from the register or marked "N/A."
c. Re-submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required.
d. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."
1.7 GOVERNMENT APPROVING AUTHORITY
When approving authority is Contracting Officer, the Government will:
a. Note date on which submittal was received.
b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.
c. Identify returned submittals with one of the actions defined in paragraph entitled, "Review Notations," of this section and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, stamp and date approved submittals. 1 copies of the approved submittal will be retained by the Contracting Officer and 1 copies of the submittal will be returned to the Contractor.
1.8 DISAPPROVED SUBMITTALS
Contractor shall make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the clause entitled, "Changes," is to be given to the Contracting Officer. Contractor is responsible for the dimensions and design of connection details and construction of work.
Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense.
If changes are necessary to submittals, the Contractor shall make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.9 APPROVED SUBMITTALS
The Contracting Officer's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that
SECTION 01 33 00 Page 7
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory construction of all work.
After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
1.10 ATTACHMENTS
Submittal Register ENG Form 4025-R
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 33 00 Page 8
S U
B M
IT
T
A L
F O
R M
,J an
P R
E V
IO
U
S E
D
IT
IO
N
IS
O
B S
O
LE
T E
P A
G E
O
F
P A
G E
S
W
1K B
-1 6-
R -0
T A
N A
N A
L E
V E
E G
U A
R D
R A
IL
P R
O
JE
C T
O F
F
IC
E F
E N
C
IN
G
.0
S
D -0
P re co ns tr uc tio n S ub m itt al s 1.
G
A cc id en t P re ve nt io n
P la n (A
P P
S
D -0
P re co ns tr uc tio n S ub m itt al s 1.
G
S ub m itt al R eg is te r
S D
-0
P re co ns tr uc tio n
S ub m itt al s
1.
G A cc id en t P re ve nt io n P la n
(A P
P
1.
6.
C ra ne
C rit ic al
L ift
P la n 1.
5.
1.
C ra ne
O pe ra to rs S
D -0
T es t R ep or ts 1.
N ot ifi ca tio ns a nd R ep or ts 1.
.2
A cc id en t R ep or ts
S D
-0
C er tif ic at es
1.
H ot w or k pe rm it
1.
Li ce ns e
C er tif ic at es
.0
S
D -0
P re co ns tr uc tio n S ub m itt al s 1.
G
E nv iro nm en ta l P ro te ct io n
P la n
S
D -0
P ro du ct D at a
1.
5.
W ar ra nt y
M an ag em en t P la n
W ar ra nt y T ag s
1.
S pa re P ar ts
D at a S
D -0
M an uf ac tu re r’s
In st ru ct io ns
1.
P re ve nt at iv e M ai nt en an ce 1.
C on di tio n
M on ito rin g (P re di ct iv e T es tin
g) 1.
In sp ec tio n
1.
5.
In st ru ct io ns
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
LE
A
N D
L O
C A
T
IO
N C
O N
T R
A C
T O
R
C O
N T
R A
C T
O R
S
C H
E D
U
LE
D A
T E
S C
O N
T R
A C
T O
R A
C T
IO
N
A P
P R
O V
IN
G
A U
T H
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f
(g
(h
(i) (j)
(k
(l) (m
(n
(o
(p
(q
(r
RTA
TANANA LEVEE GUARDRAIL & PROJECT OFFICE FENCING
CHL016
Section 01 33 00 Attch 1 Page 1 of 3
B M
IT
T
A L
F O
R M
,J an
P R
E V
IO
U
S E
D
IT
IO
N
IS
O
B S
O
LE
T E
P A
G E
O
F
P A
G E
S
W
1K B
-1 6-
R -0
T A
N A
N A
L E
V E
E G
U A
R D
R A
IL
P R
O
JE
C T
O F
F
IC
E F
E N
C
IN
G
S D
-1
O pe ra tio n an d M ai nt en an ce D at a
1.
O pe ra tio n an d M ai nt en an ce M an ua ls S
D -1
C lo se ou t S ub m itt al s 1.
2.
R ec or d
D ra w in gs
.5
S
D -0
S ho p
D ra w in gs 1.
3.
F en ce In st al la tio n 3.
F en ce
In st al la tio n
1.
3.
In st al la tio n D ra w in gs
1.
3.
Lo ca tio n of g at e, c or ne r, e nd , a nd pu ll po st s
1.
3.
G at e
A ss em bl y 2.
6.
G at e A ss em bl y
2.
6.
G at e
A ss em bl y 1.
3.
T ur ns til es 1.
3.
G at e H ar dw ar e an d
A cc es so rie s
2.
6.
G at e
H ar dw ar e an d A cc es so rie s S
D -0
P ro du ct D at a
1.
3.
F en ce
In st al la tio n
3.
F en ce In st al la tio n 1.
3.
G at e A ss em bl y
2.
6.
G at e
A ss em bl y 2.
6.
G at e A ss em bl y
1.
3.
G at e
H ar dw ar e an d A cc es so rie s 2.
6.
G at e H ar dw ar e an d
A cc es so rie s
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
LE
A
N D
L O
C A
T
IO
N C
O N
T R
A C
T O
R
C O
N T
R A
C T
O R
S
C H
E D
U
LE
D A
T E
S C
O N
T R
A C
T O
R A
C T
IO
N
A P
P R
O V
IN
G
A U
T H
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f
(g
(h
(i) (j)
(k
(l) (m
(n
(o
(p
(q
(r
Section 01 33 00 Attch 1 Page 2 of 3
B M
IT
T
A L
F O
R M
,J an
P R
E V
IO
U
S E
D
IT
IO
N
IS
O
B S
O
LE
T E
P A
G E
O
F
P A
G E
S
W
1K B
-1 6-
R -0
T A
N A
N A
L E
V E
E G
U A
R D
R A
IL
P R
O
JE
C T
O F
F
IC
E F
E N
C
IN
G
.5
S D
-0
M an uf ac tu re r’s In st ru ct io ns 1.
3.
F en ce In st al la tio n 3.
F en ce
In st al la tio n
1.
3.
G at e
A ss em bl y 2.
6.
G at e A ss em bl y
2.
6.
G at e
A ss em bl y 3.
H ar dw ar e
A ss em bl y 1.
3.
A cc es so rie s
S D
-1
O pe ra tio n an d M ai nt en an ce D at a
2.
E le ct ro
-M ec ha ni ca l L oc ks
2.
G at e O pe ra to r
3.
op er at in g an d m ai nt en an ce in st ru ct io ns
S U
B M
IT
T
A L
R E
G
IS
T E
R C
O N
T R
A C
T N
O
T
IT
LE
A
N D
L O
C A
T
IO
N C
O N
T R
A C
T O
R
C O
N T
R A
C T
O R
S
C H
E D
U
LE
D A
T E
S C
O N
T R
A C
T O
R A
C T
IO
N
A P
P R
O V
IN
G
A U
T H
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
T
IO
N
IT
E
M S
U B
M
IT
T E
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
T E
R
IA
L N
E E
D E
D B
Y
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
D A
T E
F W
D T
O A
P P
R A
U T
H
D A
T E
R C
D F
R O
M C
O N
T R
D A
T E
F W
D T
O O
T H
E R
R E
V
IE
W E
R
D A
T E
R C
D F
R O
M O
T H
R E
V
IE
W E
R
A C T I O N C O D E
D A
T E
O F
A C
T
IO
N
M A
IL
E
D T
O C
O N
T R
D A
T E
R C
D F
R M
A P
P R
A U
T H
R E
M A
R K
S
(a
(b
(c
(d
(e
(f
(g
(h
(i) (j)
(k
(l) (m
(n
(o
(p
(q
(r
Section 01 33 00 Attch 1 Page 3 of 3
H
EE
T
O
F
I ce rt if y th at t he a bo ve s ub m it te d it em s ha ve b ee n re vi ew ed in d et ai l a nd a re c or re ct a nd in s tr ic t co nf or m an ce w it h th e co nt ra ct d ra w in gs a nd s pe ci fi ca ti on s ex ce pt a s ot he r w is e st at ed
C H
EC
K O
N E:
T H
IS
I S A
N
EW
T R A
N S M
IT
T A
L T H
IS
I S A
R
ES
U B M
IT
T A
L
R A
N S M
IT
T A
L
D A
T E
R
EM
A R K S
C O
N T R A
C T R
EF
ER
EN
C
E D
O C
U M
EN
T
S
PE
C
IF
IC
A
T
IO
N S
EC
N
O
(C ov er o nl y on e se ct io n w it h ea ch t ra ns m it ta l)
T O
FR
O M
PR
O
JE
C
T T
IT
LE
A N
D L
O C
A T
IO
N
C O
N T R A
C T N
O
EN
C
LO
S U
R
ES
R
ET
U R N
ED
Li st b y It em
N o.
T R A
N S M
IT
T A
L O
F S H
O P
D R A
W
IN
G S
EQ
U
IP
M
EN
T D
A T A
M
A T
ER
IA
L
S A
M
PL
ES
O
R M
A N
U
FA
C T U
R
ER
'S C
ER
T
IF
IC
A
T
ES
O F
C O
M
PL
IA
N
C E
(R ea d in st ru ct io ns o n th e re ve rs e si de p rio r to in it ia ti ng t hi s fo rm
S
EC
T
IO
N I R
EQ
U
ES
T F
O R A
PP
R O
V A
L O
F T H
E
FO
LL
O
W
IN
G
IT
EM
S (T hi s se ct io n w ill b e in it ia te d by t he c on tr ac to r)
T R A
N S M
IT
T A
L N
N A
M E, T
IT
LE
A
N D
S
IG
N A
T U
R E
O F
A
PP
R O
V
IN
G A
U T H
O R
IT
Y D
A T E
S
EC
T
IO
N I I A
PP
R O
V A
L A
C T
IO
N
IT
EM
N O a.
D
ES
C R
IP
T
IO
N O
F
IT
EM
S
U B M
IT
T
ED
(T yp e si ze m od el n um be r/ et c.
b.
M
FG
O R C
O N
T R
C A
T
C U
R V
E D
R A
W
IN
G O
R B R O
C H
U R E
N O
(S ee in st ru ct io n no c.
N O
O
F C
O
PI
ES
d.
S
PE
C
PA
R A
N
O e.
D R A
W
IN
G S H
EE
T N
O f.
FO
C
N T R A
C T O
R U
S E
C O
D E g.
V A
R
IA
T
IO
N (S ee in st ru ct io n N o.
h.
FO
R
C E
U S E
C O
D E i.
N A
M E
A N
D S
IG
N
A T U
R E
O F
C O
N T R A
C T O
R
EN
G
F O
R M
-R
M
A R
(P ro po ne nt
C
EM
P-
C E)
ED
IT
IO
N
O F
S
EP
I S O
B S O
LE
T E.
(E R
-1
-1
C H
EC
K
O N
E:
T
H
IS
T R A
N S M
IT
T A
L
IS
FO
IO
G
V 'T
A
PP
R O
V A
L
Section 01 33 00 Attch 2 Page 1 of 2
IN
T R U
C T
IO
N S
S ec ti on
I w ill b e in it ia te d by t he C on tr ac to r in t he r eq ui re d nu m be r of c op ie s.
Ea ch t ra ns m it ta l s ha ll be n um be re d co ns ec ut iv el y in t he s pa ce p ro vi de d fo r "T ra ns m it ta l N o.
T hi s nu m be r, in a dd it io n to t he c on tr ac t nu m be r, w ill f or m a s er ia l nu m be r fo r id en ti fy in g ea ch s ub m it ta l.
F or n ew s ub m it ta ls o r re su bm it ta ls m ar k th e ap pr op ria te b ox on r es ub m it ta ls in se rt t ra ns m it ta l n um be r of la st s ub m is si on a s w el l a s th e ne w s ub m it ta l n um be r.
T he
It em
N o.
w ill b e th e sa m e
"I te m N o.
as in di ca te d on E
N G
F O
R M
-R f or e ac h en tr y on t hi s fo rm
S ub m it ta ls r eq ui rin g ex pe di ti ou s ha nd lin g w ill b e su bm it te d on a s ep ar at e fo rm
S ep ar at e tr an sm it ta l f or m w ill b e us ed f or s ub m it ta ls u nd er s ep ar at e se ct io ns o f th e sp ec if ic at io ns
A c he ck s ha ll be p la ce d in t he
V ar ia ti on co lu m n w he n a su bm it ta l i s no t in a cc or da nc e w it h th e pl an s an d sp ec if ic at io ns al so a w rit te n st at em en t to t ha t ef fe ct sh al l b e in cl ud ed in t he s pa ce p ro vi de d fo r "R em ar ks
Fo rm is s el f-tr an sm it ta l, le tt er o f tr an sm it ta l i s no t re qu ire d.
W he n a sa m pl e of m at er ia l o r M an uf ac tu re r' s C er ti fi ca te o f C om pl ia nc e is t ra ns m it te d, in di ca te
S am pl e" o r
"C er ti fi ca te in c ol um n c, S ec ti on
I
U .S
A rm y
C or ps o f En gi ne er s ap pr ov in g au th or it y w ill a ss ig n ac ti on c od es a s in di ca te d be lo w in s pa ce p ro vi de d in S ec ti on
I co lu m n i t o ea ch it em s ub m it te d.
In ad di ti on t he y w ill e ns ur e en cl os ur es a re in di ca te d an d at ta ch ed t o th e fo rm p rio r to r et ur n to t he c on tr ac to r.
he
C on tr ac to r w ill a ss ig n ac ti on c od es a s in di ca te d be lo w in
S ec ti on
I co lu m n g, t o ea ch it em s ub m it te d.
T H
E
FO
LL
O
W
IN
G A
C T
IO
N C
O D
ES
A
R E
G
IV
EN
T
O I T
EM
S S
U B M
IT
T
ED
A
A pp ro ve d as s ub m it te d.
B
A pp ro ve d, e xc ep t as n ot ed o n dr aw in gs
C
A pp ro ve d, e xc ep t as n ot ed o n dr aw in gs
R ef er t o at ta ch ed s he et r es ub m is si on r eq ui re d.
D
W ill b e re tu rn ed b y se pa ra te c or re sp on de nc e.
E
D is ap pr ov ed
S ee a tt ac he d)
F
R ec ei pt a ck no w le dg ed
FX
R ec ei pt a ck no w le dg ed do es n ot c om pl y as n ot ed w it h co nt ra ct r eq ui re m en ts
G
O th er
S pe ci fy
A pp ro va l o f it em s do es n ot r el ie ve t he c on tr ac to r fr om c om pl yi ng w it h al l t he r eq ui re m en ts o f th e co nt ra ct p la ns a nd s pe ci fic at io ns
(R ev er se o f
EN
G
F or m
-R
Section 01 33 00 Attch 2 Page 2 of 2
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 35 26
GOVERNMENTAL SAFETY REQUIREMENTS
02/12
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.3 SUBMITTALS
1.4 REGULATORY REQUIREMENTS
1.5 SITE QUALIFICATIONS, DUTIES AND MEETINGS
1.5.1 Personnel Qualifications
1.5.1.1 Site Safety and Health Officer (SSHO)
1.5.1.1.1 Contractor Quality Control (QC) Person:
1.5.1.2 Crane Operators
1.5.2 Personnel Duties
1.5.2.1 Site Safety and Health Officer (SSHO)
1.5.3 Meetings
1.5.3.1 Preconstruction Conference
1.6 ACCIDENT PREVENTION PLAN (APP)
1.6.1 EM 385-1-1 Contents
1.7 DISPLAY OF SAFETY INFORMATION
1.8 SITE SAFETY REFERENCE MATERIALS
1.9 EMERGENCY MEDICAL TREATMENT
1.10 NOTIFICATIONS and REPORTS
1.10.1 Accident Notification
1.10.2 Accident Reports
1.11 HOT WORK
1.12 RADIATION SAFETY REQUIREMENTS
1.13 FACILITY OCCUPANCY CLOSURE
1.14 SEVERE STORM PLAN
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 CONSTRUCTION AND OTHER WORK
3.1.1 Hazardous Material Exclusions
3.1.2 Unforeseen Hazardous Material
3.2 PRE-OUTAGE COORDINATION MEETING
3.3 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)
3.4 FALL HAZARD PROTECTION AND PREVENTION PROGRAM
3.4.1 Training
3.4.2 Fall Protection Equipment and Systems
3.4.2.1 Personal Fall Arrest Equipment
3.4.3 Horizontal Lifelines
3.4.4 Guardrails and Safety Nets
3.4.5 Rescue and Evacuation Procedures
3.5 EQUIPMENT
SECTION 01 35 26 Page 1
3.5.1 Material Handling Equipment
3.5.2 Weight Handling Equipment
3.5.3 USE OF EXPLOSIVES
3.6 EXCAVATIONS
3.6.1 Utility Locations
3.6.2 Utility Location Verification
3.6.3 Utilities Within and Under Concrete, Bituminous Asphalt, and
Other Impervious Surfaces
3.7 ELECTRICAL
SECTION 01 35 26 Page 2
SECTION 01 35 26
GOVERNMENTAL SAFETY REQUIREMENTS
02/12
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE A10.32 (2012) Fall Protection
ASSE/SAFE A10.34 (2001; R 2012) Protection of the Public on or Adjacent to Construction Sites
ASSE/SAFE Z359.1 (2007) Safety Requirements for Personal Fall Arrest Systems, Subsystems and Components
ASME INTERNATIONAL (ASME)
ASME B30.22 (2010) Articulating Boom Cranes
ASME B30.3 (2012) Tower Cranes
ASME B30.5 (2011) Mobile and Locomotive Cranes
ASME B30.8 (2010) Floating Cranes and Floating Derricks
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 10 (2013) Standard for Portable Fire Extinguishers
NFPA 51B (2014) Standard for Fire Prevention During Welding, Cutting, and Other Hot Work
NFPA 70E (2012; Errata 2012) Standard for Electrical Safety in the Workplace
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
10 CFR 20 Standards for Protection Against Radiation
29 CFR 1926 Safety and Health Regulations for Construction
SECTION 01 35 26 Page 3
29 CFR 1926.1400 Cranes & Derricks in Construction
29 CFR 1926.16 Rules of Construction
29 CFR 1926.500 Fall Protection
1.2 DEFINITIONS
b. High Visibility Accident. Any mishap which may generate publicity or high visibility.
c. Medical Treatment. Treatment administered by a physician or by registered professional personnel under the standing orders of a physician. Medical treatment does not include first aid treatment even through provided by a physician or registered personnel.
e. Recordable Injuries or Illnesses. Any work-related injury or illness that results in:
(1) Death, regardless of the time between the injury and death, or the length of the illness;
(2) Days away from work (any time lost after day of injury/illness onset);
(3) Restricted work;
(4) Transfer to another job;
(5) Medical treatment beyond first aid;
(6) Loss of consciousness; or
(7) A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in
(1) through (6) above.
f. "USACE" property and equipment specified in USACE EM 385-1-1 should be interpreted as Government property and equipment.
g. Weight Handling Equipment (WHE) Accident. A WHE accident occurs when any one or more of the eight elements in the operating envelope fails to perform correctly during operation, including operation during maintenance or testing resulting in personnel injury or death; material or equipment damage; dropped load; derailment; two-blocking; overload;
or collision, including unplanned contact between the load, crane, or other objects. A dropped load, derailment, two-blocking, overload and collision are considered accidents even though no material damage or injury occurs. A component failure (e.g., motor burnout, gear tooth failure, bearing failure) is not considered an accident solely due to material or equipment damage unless the component failure results in damage to other components (e.g., dropped boom, dropped load, roll over, etc.) Any mishap meeting the criteria described above shall be documented in both the Contractor Significant Incident Report (CSIR) submitted within five days both as provided by the Contracting Officer.
SECTION 01 35 26 Page 4
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Accident Prevention Plan (APP); G
Crane Critical Lift Plan
Proof of qualification for Crane Operators
SD-06 Test Reports
Notifications and Reports
Submit reports as their incidence occurs, in accordance with the requirements of the paragraph, "Notifications and Reports."
Accident Reports
SD-07 Certificates
Hot work permit
License Certificates
1.4 REGULATORY REQUIREMENTS
In addition to the detailed requirements included in the provisions of this contract, comply with the most recent edition of USACE EM 385-1-1, and the following federal, state, and local laws, ordinances, criteria, rules and regulations . Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work.
Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern.
1.5 SITE QUALIFICATIONS, DUTIES AND MEETINGS
1.5.1 Personnel Qualifications
1.5.1.1 Site Safety and Health Officer (SSHO)
The SSHO must meet the requirements of EM 385-1-1 section 1 and ensure that the requirements of 29 CFR 1926.16 are met for the project. Provide a Safety oversight team that includes a minimum of one (1) person at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO or an equally-qualified Designated Representative/alternate shall be at the work site at all times to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The
SECTION 01 35 26 Page 5
SSHO's training, experience, and qualifications shall be as required by EM 385-1-1 paragraph 01.A.17, entitled SITE SAFETY AND HEALTH OFFICER (SSHO), and all associated sub-paragraphs.
A Competent Person shall be provided for all of the hazards identified in the Contractor's Safety and Health Program in accordance with the accepted Accident Prevention Plan, and shall be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the the Contracting Officer for acceptance in consultation with the Safety Office.
1.5.1.1.1 Contractor Quality Control (QC) Person:
The Contractor Quality Control Person can be the SSHO on this project, even though the QC has safety inspection responsibilities as part of the QC duties.
1.5.1.2 Crane Operators
Meet the crane operators requirements in USACE EM 385-1-1, Section 16. In addition, for mobile cranes with Original Equipment Manufacturer (OEM) rated capacitates of 50,000 pounds or greater, designate crane operators as qualified by a source that qualifies crane operators (i.e., union, a government agency, or an organization that tests and qualifies crane operators). Provide proof of current qualification.
1.5.2 Personnel Duties
1.5.2.1 Site Safety and Health Officer (SSHO)
The SSHO shall:
a. Conduct daily safety and health inspections and maintain a written log which includes area/operation inspected, date of inspection, identified hazards, recommended corrective actions, estimated and actual dates of corrections. Attach safety inspection logs to the Contractors' daily quality control report.
b. Conduct mishap investigations and complete required reports. Maintain the OSHA Form 300 and Daily Production reports for prime and sub-contractors.
c. Maintain applicable safety reference material on the job site.
d. Attend the pre-construction conference, pre-work meetings including preparatory inspection meeting, and periodic in-progress meetings.
e. Implement and enforce accepted APPS and AHAs.
f. Maintain a safety and health deficiency tracking system that monitors outstanding deficiencies until resolution. Post a list of unresolved safety and health deficiencies on the safety bulletin board.
g. Ensure sub-contractor compliance with safety and health requirements.
h. Maintain a list of hazardous chemicals on site and their material safety data sheets.
SECTION 01 35 26 Page 6
Failure to perform the above duties will result in dismissal of the superintendent, QC Manager, and/or SSHO, and a project work stoppage.
The project work stoppage will remain in effect pending approval of a suitable replacement.
1.5.3 Meetings
1.5.3.1 Preconstruction Conference
a. Contractor representatives who have a responsibility or significant role in accident prevention on the project shall attend the preconstruction conference. This includes the project superintendent, site safety and health officer, quality control supervisor, or any other assigned safety and health professionals who participated in the development of the APP (including the Activity Hazard Analyses (AHAs) and special plans, program and procedures associated with it).
b. Discuss the details of the submitted APP to include incorporated plans, programs, procedures and a listing of anticipated AHAs that will be developed and implemented during the performance of the contract. This list of proposed AHAs will be reviewed at the conference and an agreement will be reached between the Contractor and the Contracting Officer's representative as to which phases will require an analysis.
In addition, establish a schedule for the preparation, submittal, review, and acceptance of AHAs to preclude project delays.
c. Deficiencies in the submitted APP will be brought to the attention of the Contractor at the preconstruction conference, and the Contractor shall revise the plan to correct deficiencies and re-submit it for acceptance. Do not begin work until there is an accepted APP.
d. The functions of a Preconstruction conference may take place at the Post-Award Kickoff meeting for Design Build Contracts.
1.6 ACCIDENT PREVENTION PLAN (APP)
Use a qualified person to prepare the written site-specific APP. Prepare the APP in accordance with the format and requirements of USACE EM 385-1-1 and as supplemented herein. Cover all paragraph and subparagraph elements in USACE EM 385-1-1, Appendix A, "Minimum Basic Outline for Accident Prevention Plan". Specific requirements for some of the APP elements are described below. The APP shall be job-specific and address any unusual or unique aspects of the project or activity for which it is written. The APP shall interface with the Contractor's overall safety and health program.
Include any portions of the Contractor's overall safety and health program referenced in the APP in the applicable APP element and made site-specific.
The Government considers the Prime Contractor to be the "controlling authority" for all work site safety and health of the subcontractors.
Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out. The APP shall be signed by the person and firm (senior person) preparing the APP, the Contractor, the on-site superintendent, the designated site safety and health officer, the Contractor Quality control Manager, and any designated CSP or CIH.
Submit the APP to the Contracting Officer 15 calendar days prior to the
SECTION 01 35 26 Page 7 date of the preconstruction conference for acceptance. Work cannot proceed without an accepted APP.
Once accepted by the Contracting Officer, the APP and attachments will be enforced as part of the contract. Disregarding the provisions of this contract or the accepted APP will be cause for stopping of work, at the discretion of the Contracting Officer, until the matter has been rectified.
Once work begins, changes to the accepted APP shall be made with the knowledge and concurrence of the Contracting Officer, project superintendent, SSHO and quality control manager. Should any severe hazard exposure, i.e. imminent danger, become evident, stop work in the area, secure the area, and develop a plan to remove the exposure and control the hazard. Notify the Contracting Officer within 24 hours of discovery.
Eliminate/remove the hazard. In the interim, take all necessary action to restore and maintain safe working conditions in order to safeguard onsite personnel, visitors, the public (as defined by ASSE/SAFE A10.34,) and the environment.
Copies of the accepted plan will be maintained at the office and at the job site.
Continuously review and ammend the APP, as necessary, throughout the life of the contract. Incorporate unusual or high-hazard activities not identified in the original APP as they are discovered.
1.6.1 EM 385-1-1 Contents
In addition to the requirements outlined in Appendix A of USACE EM 385-1-1, the following is required:
a. Crane Critical Lift Plan.
Prepare and sign weight handling critical lift plans for lifts over 75 percent of the capacity of the crane or hoist (or lifts over 50 percent of the capacity of a barge mounted mobile crane's hoists) at any radius of lift; lifts involving more than one crane or hoist; lifts of personnel; and lifts involving non-routine rigging or operation, sensitive equipment, or unusual safety risks. Submit 15 calendar days prior to on-site work and include the requirements of USACE EM 385-1-1, paragraph 16.H. and the following:
(1) For lifts of personnel, demonstrate compliance with the requirements of
29 CFR 1926.1400.
(2) For barge mounted mobile cranes, barge stability calculations identifying barge list and trim based on anticipated loading; and load charts based on calculated list and trim. The amount of list and trim shall be within the crane manufacturer's requirements.
1.7 DISPLAY OF SAFETY INFORMATION
Within one calendar day(s) after commencement of work, erect a safety bulletin board at the job site. Where size, duration, or logistics of project do not facilitate a bulletin board, an alternative method, acceptable to the Contracting Officer, that is accessible and includes all mandatory information for employee and visitor review, shall be deemed as meeting the requirement for a bulletin board. Include and maintain information on safety bulletin board as required by EM 385-1-1, section 01.A.07. Additional items required to be posted include:
SECTION 01 35 26 Page 8
a. Hot work permit.
1.8 SITE SAFETY REFERENCE MATERIALS
Maintain safety-related references applicable to the project, including those listed in the article "References." Maintain applicable equipment manufacturer's manuals.
1.9 EMERGENCY MEDICAL TREATMENT
Contractors will arrange for their own emergency medical treatment.
Government has no responsibility to provide emergency medical treatment.
1.10 NOTIFICATIONS and REPORTS
1.10.1 Accident Notification
Notify the Contracting Officer as soon as practical, but no more than four hours after any accident meeting the definition of Recordable Injuries or Illnesses or High Visibility Accidents, property damage equal to or greater than $2,000, or any weight handling equipment accident. Within notification include contractor name; contract title; type of contract;
name of activity, installation or location where accident occurred; date and time of accident; names of personnel injured; extent of property damage, if any; extent of injury, if known, and brief description of accident (to include type of construction equipment used, PPE used, etc.).
Preserve the conditions and evidence on the accident site until the Government investigation team arrives on-site and Government investigation is conducted.
1.10.2 Accident Reports
a. Conduct an accident investigation for recordable injuries and illnesses, for Medical Treatment defined in paragraph DEFINITIONS, property damage accidents resulting in at least…
This is the start of the file's text. The full file is on GovTribe.