About this file

REVISED DRAWINGS

View the file

Other files

File Type Posted
W911KB-16-R-0029_Amendment__1.pdf PDF
CHL016_Site_Visit_Sign_In.pdf PDF
SPECIFICATIONS_W911KB-16-R-0029.pdf PDF
SOLICITATION_W911KB-16-R-0029.pdf PDF
DRAWINGS_W911KB-16-R-0029.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ALASKA DISTRICT

OF ENGINEERS

US ARMY CORPS

D r a w i n g

F i l e

D w g

S c a l e

P l o t

S c a l e

D a t e

A c t i o n

D r a w n

R E

S I D

E N

T

E

N G

I N

E E

R

D a t e

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R

D a t e

D e s c r i p t i o n A p p v d

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

C T

N

O

R e c o m m e n d e d

A p p r o v e d

S u b m i t t e d

D e s i g n e d

R e v i e w e d

B r a n c h i e f

S e c t i o n

C h i e f

Reference number:

Sheet of

HGFEDCBA

D r a w i n g x U

N I F

I E

D E

N C

W J o b s C

H L

D w g s C

A D

C

H L C d w g l a s t s a v e d o n

A

M w a s p l o t t e d b y

D a w a g

M a r i o n

E

P

A o

A

M

R C

H

N O

R T

H

P

O L E

A

L A

S K

A

ALASKA DISTRICT

OF ENGINEERS

US ARMY CORPS

D r a w i n g

F i l e

D w g

S c a l e

P l o t

S c a l e

D a t e

A c t i o n

D r a w n

R E

S I D

E N

T

E

N G

I N

E E

R

D a t e

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R

D a t e

D e s c r i p t i o n A p p v d

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R e c o m m e n d e d

A p p r o v e d

S u b m i t t e d

D e s i g n e d

R e v i e w e d

B r a n i e f

S e c t i o n

C h i e

Sheet of

HGFEDCBA

D r a w i n g x U

N I F

I E

D E

N C

W J o b s C

H L

D w g s C

A D

C

H L C d w g l a s t s a v e d o n

A

M w a s p l o t t e d b y

D a w a g

M a r i o

A

R C

H

N O

R T

H

P

O L E

A

L A

S K

A

P L A

N S

S I T

E

P

L A

N

C

H E

R O

J E

F F

I C

E

S

T

E D

S U

B M

I T

T E

D

B

Y

O

F F

I C

E

S

Y M

B O

L

R E

V I E

W

O

F F

I C

E

S

Y M

B O

L

C I V

I L

SITE PLAN - CHENA PROJECT OFFICE LOCATION

EXISTING WOODEN FENCE SHALL

BE REMOVED BY OTHERS. SEE

NOTE 1

CHENA PROJECT OFFICE

PROVIDE A NEW SLIDER GATE;

REFERENCE DETAIL A ON

SHEET C-106 FOR LOCATION

NTS

GATE LOCATON AT CHENA PROJECT OFFICE

REMOVE EXISTING SWING GATE

AND REPLACE WITH NEW SLIDER

GATE; SEE NOTE 2.

EXISTING FENCE LINE

EXISTING FENCE LINE

NOTES:

1. THE NEW FENCE ALIGNMENT IS ONLY

APPROXIMATE. THE SURVEY DOES NOT PROVIDE

THE LOCATION OF THE EXISTING SECURITY FENCE

AND WOODED FENCE. THE CONTRACTOR SHALL

FIELD LOCATE WITH THE CONTRACTING OFFICER

REPRESENTATIVE.

A. THE NEW SECURITY FENCE LINE SHALL BEGIN

AT THE EXISTING SECURITY FENCE THAT

BOUNDS THE CHENA PROJECT OFFICE. THE

HEIGHT OF THE SECURITY FENCE SHALL

MATCH THE CHENA PROJECT OFFICE'S FENCE

LINE.

B. THE NEW SECURITY FENCE LINE ALIGNMENT

SHALL BE LINEAR. BEGIN ALIGNMENT AT THE

NEAREST POST OF THE EXISTING FENCE.

C. THE END OF ALIGNMENT SHALL BE AT

ACCESS ROAD.

D. PROVIDE GREEN PRIVACY SLATS ON THE NEW

SECURITY FENCE.

E. THE EXISTING WOODEN FENCE SHALL BE

REMOVED BY OTHERS. COORDINATE WITH

THE CONTRACTING OFFICER

REPRESENTATIVE.

F. PROVIDE GROUNDING EVERY 100 FEET

AND/OR FRACTION.

2. REMOVE THE EXISTING SWING GATE AND

REPLACE WITH A NEW ELECTRIC SLIDER GATE;

REFERENCE SHEET C-506 FOR DETAIL OF

ELECTRIC SLIDER GATE. THE CONTRACTOR MAY

BE REQUIRED TO REMOVE EXISTING FENCE TO

INSTALL THE NEW GATE. THE CONTRACTOR

SHALL REPLACE EXISTING FENCE AS REQUIRED,

NEW FENCE SHALL MATCH EXISTING.

3. REFERENCE SHEET C-902 FOR SITE PHOTOS.

EXISTING SECURITY FENCE;

LOCATION IS APPROXIMATE

A

C-506

FOR GATE DETAIL SEE

A

C-507

A

NEW SECURITY FENCE; SEE NOTE 1

FOR FENCE DETAIL SEE

NTS

A D

D E

D

N

O T

E

ALASKA DISTRICT

OF ENGINEERS

US ARMY CORPS

D r a w i n g

F i l e

D w g

S c a l e

P l o t

S c a l e

D a t e

A c t i o n

D r a w n

R E

S I D

E N

T

E

N G

I N

E E

R

D a t e

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R

D a t e

D e s c r i p t i o n A p p v d

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R e c o m m e n d e d

A p p r o v e d

S u b m i t t e d

D e s i g n e d

R e v i e w e d

B r a n i e f

S e c t i o n

C h i e

Sheet of

HGFEDCBA

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s C

H L

D w g s C

A D

E

L E

C T

R I

G

T

E

O

P E

R A

T O

E

C I F

I C

A T

I O

N d w g l a s t s a v e d o n

A

M w a s p l o t t e d b y

O q u e n d o

J o s e

A

R C

H

N O

R T

H

P

O L

E

A

L A

S K

A

ALASKA DISTRICT

OF ENGINEERS

US ARMY CORPS

D r a w i n g

F i l e

D w g

S c a l e

P l o t

S c a l e

D a t e

A c t i o n

D r a w n

R E

S I D

E N

T

E

N G

I N

E E

R

D a t e

S T

A T

E

P R

I M

E

C

O N

T R

A C

T O

R

D a t e

D e s c r i p t i o n A p p v d

C I T

Y

C O

N T

R A

C T

O R

C O

N T

R A

R e c o m m e n d e d

A p p r o v e d

S u b m i t t e d

D e s i g n e d

R e v i e w e d

B r a n i e f

S e c t i o n

C h i e

Sheet of

HGFEDCBA

D r a w i n g

X

U

N I F

I E

D E

N C

W J o b s C

H L

D w g s C

A D

E

L E

C T

R

T

E

O

P E

R A

T O

E

C I F

I C

A T

I O

N d w g l a s t s a v e d o n

A

M w a s p l o t t e d b y

O q u e n d o

J o s e

A

R C

H

N O

R T

H

P

O L

E

A

L A

S K

A

P L A

N S

E L E

C T

R

T

E

O

P E

R A

T O

E

C I F

I C

A T

I O

N

T

E D

S U

B M

I T

T E

D

B

Y

O

F F

I C

E

S

Y M

B O

L

R E

V I E

W

O

F F

I C

E

S

Y M

B O

L

E L E

C T

R I C

A L

SECTION 02829

ELECTRIC GATE OPERATORS

PART 1 GENERAL

1.1 SECTION INCLUDES

A. ELECTRIC GATE OPERATORS:

1. HEAVY-DUTY, INDUSTRIAL, GEAR-DRIVEN SLIDE GATE OPERATORS SIMILAR OR EQUAL

TO LIFTMASTER MODEL SL585. HEAVY-DUTY INDUSTRIAL SWING GATE OPERATOR

SIMILAR OR EQUAL TO LIFTMASTER SW490.

1.2 REFERENCES

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA): NEMA ICS 6 - INDUSTRIAL

CONTROL AND SYSTEMS: ENCLOSURES.

B. UNDERWRITERS LABORATORIES (UL): UL 325 - STANDARD FOR SAFETY FOR DOOR,

DRAPERY, GATE, LOUVER, AND WINDOW OPERATORS AND SYSTEMS.

C. UNDERWRITERS LABORATORIES (UL): UL 991 - STANDARD FOR TESTS FOR

SAFETY-RELATED CONTROLS EMPLOYING SOLID-STATE DEVICES.

D. INTERNATIONAL ORGANIZATION FOR STANDARDIZATION: ISO 9001 - QUALITY MANAGEMENT

SYSTEMS.

1.3 SUBMITTALS

A. SUBMIT UNDER PROVISIONS OF SECTION 01 33 00 SUBMITTAL PROCEDURES.

B. PRODUCT DATA: EQUIPMENT LIST, SYSTEM DESCRIPTION, ELECTRICAL WIRING DIAGRAMS

FOR INSTALLATION, AND MANUFACTURER'S DATA SHEETS ON EACH PRODUCT TO BE USED,

INCLUDING:

1. PREPARATION INSTRUCTIONS AND RECOMMENDATIONS.

2. STORAGE AND HANDLING REQUIREMENTS AND RECOMMENDATIONS.

3. INSTALLATION METHODS.

C. SHOP DRAWINGS: SUBMIT SHOP DRAWINGS SHOWING LAYOUT, PROFILES, AND PRODUCT

COMPONENTS, INCLUDING ANCHORAGE, EDGE CONDITIONS, AND ACCESSORIES.

1. OPERATION, INSTALLATION, AND MAINTENANCE MANUALS INCLUDING WIRING

DIAGRAMS.

2. RISERS, LAYOUTS, AND SPECIAL WIRING DIAGRAMS SHOWING ANY CHANGES TO

STANDARD DRAWINGS.

D. MANUFACTURER QUALIFICATIONS

E. INSTALLER QUALIFICATIONS.

1.4 DELIVERY, STORAGE, AND HANDLING

A. DELIVER, STORE, AND HANDLE MATERIALS AND PRODUCTS IN STRICT COMPLIANCE WITH

MANUFACTURER'S INSTRUCTIONS AND INDUSTRY STANDARDS.

B. STORE PRODUCTS INDOORS IN MANUFACTURER'S ORIGINAL CONTAINERS AND

PACKAGING, WITH LABELS CLEARLY IDENTIFYING PRODUCT NAME AND MANUFACTURER.

PROTECT FROM DAMAGE.

1.5 QUALITY ASSURANCE

A. MANUFACTURER QUALIFICATIONS: ISO 9001 CERTIFIED MANUFACTURER.

B. INSTALLER QUALIFICATIONS: INSTALLATION PERFORMED BY FACTORY AUTHORIZED

CONTRACTOR SPECIFICALLY TRAINED IN GATE OPERATION SYSTEMS OF THE TYPE FOUND

WITHIN THIS SECTION AND WITH MINIMUM OF 3 YEAR EXPERIENCE IN THE INSTALLATION OF

SIMILAR GATE OPERATOR EQUIPMENT.

1.6 WARRANTY

A. MANUFACTURER'S STANDARD LIMITED WARRANTY:

1. WARRANTY PERIOD: 2 YEARS.

PART 2 PRODUCTS

2.1 MANUFACTURERS

A. ACCEPTABLE MANUFACTURER: LIFTMASTER; 845 LARCH AVENUE; ELMHURST, IL 60126-1196

OR EQUAL.

B.

2.2 GATE OPERATORS

A. GATE OPERATORS: LIFTMASTER SL585 INDUSTRIAL GEAR-DRIVEN SLIDE GATE OPERATOR.

SIMILAR OR EQUAL EQUIPMENT WILL BE ACCEPTED.

COMPLIANCE: UL 325 LISTED, UL 991 AND CSA C22.2 NO. 247 STANDARDS.

RATINGS: CLASS I.

a. RATINGS: CLASS II.

b. RATINGS: CLASS III.

c. RATINGS: CLASS IV.

2. WARRANTY: 2 YEARS.

3. OPERATOR SPEED: 11 INCHES (279.4 MM) PER SECOND FOR SLIDING GATE.

4. ELECTRICAL POWER REQUIREMENTS: 115/208/230V AC, SINGLE PHASE, 60 HZ.

5. ACCESSORY ELECTRICAL POWER REQUIREMENTS: 24V AC.

6. GEAR REDUCTION: 20:1 WORMGEAR REDUCER IN SYNTHETIC OIL BATH.

7. MOTOR: MINIMUM 1/2 HP, CONTINUOUS DUTY FOR SLIDING GATE.

a. CAPACITY: SUPPORTS GATE LENGTHS UP TO 45 FEET (13 M) AND GATE WEIGHTS UP

TO 1,000 POUNDS (454 KG) FOR SLIDING GATE. GATE WEIGHT UP TO 900 POUNDS AND 19

FEET MAXIMUM GATE WIDTH FOR SWING GATE.

b. RECOMMENDED CYCLES PER HOUR: 20.

8. METAL FRAME: 7-GAUGE PRE-GALVANIZED STEEL.

9. CHASSIS: POWDER-COATED GALVANIZED STEEL.

10. ENCLOSURE: WEATHER-RESISTANT, LOCKABLE, 16-GAUGE STEEL COVER.

11. CHAIN: #50 NICKEL-PLATED, 25 FEET (7620 MM) SUPPLIED WITH EACH SLIDING GATE

UNIT.

12. GEARBOX: ALL-WEATHER.

13. INTEGRATED 3-BUTTON CONTROL STATION: 3-BUTTON CONTROL STATION

INCORPORATED INTO THE OUTSIDE OF THE CONTROL BOX.

14. INHERENT OBSTRUCTION SENSING: OFFERS SEPARATE FORCE ADJUSTMENTS FOR

BOTH THE OPEN AND CLOSED DIRECTIONS. IF THE GATE STRIKES AN OBSTRUCTION, A

CLOSING GATE WILL REVERSE TO OPEN AND AN OPENING GATE WILL STOP.

15. EXTERNAL OBSTRUCTION SENSING: INPUT CONNECTIONS ARE PROVIDED FOR

EXTERNAL CONTACT AND NON-CONTACT SENSORS, SUCH AS PHOTO EYES AND EDGE

DEVICES.

16. LED INDICATORS: OPERATOR INPUT, STATUS AND DIAGNOSTIC LEDS.

17. CONTROL INPUTS: ALLOW THE CONNECTION OF OPTIONAL EXTERNAL DEVICES LIKE

LOOP DETECTORS, ACCESS CONTROL SYSTEMS AND RADIO RECEIVERS.

18. DIGITAL LOGIC CONTROL: SUPPORTS LONG-DISTANCE CONTROL WIRING RUNS OF

OVER

1,000 FEET (305 M).

19. SURGE AND SPIKE PROTECTION: CIRCUITRY DESIGNED TO PROVIDE PROTECTION

FROM EXTERNAL SPIKES OR SURGES.

20. WARNING DEVICE: UL 325 COMPLIANT ENTRAPMENT WARNING ALARM HAS ABILITY TO

BE SET FOR PRE-OPERATION WARNING; PROVIDES 3-SECOND WARNING PRIOR TO AND

DURING GATE MOVEMENT.

21. LOOP DETECTOR INPUTS: COMPATIBLE WITH EXIT, SHADOW AND INTERRUPT LOOP

DETECTORS.

22. EXTERNAL ALARM RESET BUTTON: ALLOWS FOR QUICK RESET OF THE GATE

OPERATOR WHEN THE ALARM HAS BEEN ACTIVATED.

23. TIMER OPERATION: ADJUSTABLE TIMER CAN BE SET FROM 1 TO 180 SECONDS FOR

AUTOMATIC CLOSE OPERATION. UNIT AUTOMATICALLY RESETS UPON RECEIVING ANY

ADDITIONAL OPEN COMMANDS. PROVIDE OVERRIDE CAPABILITY FOR THE GATE TO

REMAIN OPEN INDEFINITELY FOR ROUTINE DAY OPERATION. AT OTHER TIMES AS

REQUIRED BY USER, THE TIMER FUNCTION SHALL BE ACTIVATED.

24. MAXIMUM RUN TIMER: PROTECTS AGAINST DAMAGE TO THE GATE AND OPERATOR BY

LIMITING THE UNIT'S RUN TIME TO 120 SECONDS.

25. EXTERNAL MANUAL DISCONNECT: ALLOWS GATE TO BE OPENED IN THE EVENT OF A

POWER LOSS WITHOUT REMOVING THE OPERATOR COVER.

26. MECHANICAL BRAKING: THE MECHANICAL BRAKING SYSTEM ADDS SUBSTANTIAL GATE

POSITION CONTROL AT ALL POINTS IN TRAVEL. THE SOLENOID-ACTUATED BRAKE

SYSTEM ALSO PREVENTS THE GATE FROM BEING BACK-DRIVEN.

27. LIMIT SETTINGS: DRIVEN LIMIT NUT SWITCHES ARE FULLY ADJUSTABLE.

28. LOCKABLE HINGED ACCESS DOOR: WEATHER-RESISTANT, LOCKABLE, HINGED DESIGN

ALLOWS ACCESS TO THE UNIT'S ELECTRONICS FOR INSTALLATION OR SERVICING

NEEDS.

29. REMOTE CONTROL OPERATION: PROVIDE REMOTE CONTROL OPERATION VIA

INDIVIDUAL VEHICLE MOUNTED REMOTE CONTROL UNITS. REMOTE CONTROL UNITS

SHALL BE BATTERY OPERATED AND PROVIDE PUSH BUTTON ACTION FOR OPEN AND

CLOSE OPERATION OF THE GATES AT ANY TIME WHEN A VEHICLE APPROACHES THE

GATE OR FROM THE OFFICE BUILDING.

30. ACCESSORIES: PROVIDE THE OPTIONAL ACCESSORIES LISTED BELOW.

a. LIFTMASTER THERMOSTATICALLY CONTROLLED FIN-TYPE HEATER.

b. LIFTMASTER AUXILIARY CONTACT BLOCKS.

c. PROVIDE 12 REMOTE CONTROL UNITS WITH FRESH BATTERIES.

PART 3 EXECUTION

3.1 EXAMINATION AND PREPARATION

A. INSPECT AND PREPARE SUBSTRATES USING THE METHODS RECOMMENDED BY THE

MANUFACTURER FOR ACHIEVING BEST RESULT FOR THE SUBSTRATES UNDER PROJECT

CONDITIONS.

B. DO NOT PROCEED WITH INSTALLATION UNTIL SUBSTRATES HAVE BEEN PREPARED USING

THE METHODS RECOMMENDED BY THE MANUFACTURER AND DEVIATIONS FROM

MANUFACTURER'S RECOMMENDED TOLERANCES ARE CORRECTED. COMMENCEMENT OF

INSTALLATION CONSTITUTES ACCEPTANCE OF CONDITIONS.

C. IF PREPARATION IS THE RESPONSIBILITY OF ANOTHER INSTALLER, NOTIFY ARCHITECT IN

WRITING OF DEVIATIONS FROM MANUFACTURER'S RECOMMENDED INSTALLATION

TOLERANCES AND CONDITIONS.

3.2 INSTALLATION

A. INSTALL IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. TEST FOR PROPER

OPERATION AND ADJUST UNTIL SATISFACTORY RESULTS ARE OBTAINED.

3.3 PROTECTION

A. PROTECT INSTALLED PRODUCTS UNTIL COMPLETION OF PROJECT.

B. TOUCH UP, REPAIR OR REPLACE DAMAGED PRODUCTS BEFORE SUBSTANTIAL

COMPLETION.

END OF SECTION

M

V

I S

D

T

CHL016-C-101
CHL016-C-102
CHL016-C-105
CHL016-C-106
CHL016-C-506
CHL016-E-102

File details come from the government source that posted it. Updated .