AM_3_W911KB-16-R-0015.pdf
PDF 205 KB Posted
- Attached to
- River Revetment Phase III, Unalakleet, Alaska
- Solicitation number
- W911KB-16-R-0015
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911KB-16-R-0015_AM_6.pdf | ||
| Dwgs-UNK337747A-AM_6-22x34.pdf | ||
| AM_5.pdf | ||
| W911KB-16-R-0015_Amendment__4.pdf | ||
| W911KB-16-R-0015_Amendment__2.pdf | ||
| 16R0015-0001.pdf | ||
| W911KB-16-D-0015_Dwgs_RFP-11x17.pdf | ||
| W911KB-16-R-0015_RFP_Dwgs.pdf | ||
| W911KB-16-R-0015_RFP.pdf | ||
| W911KB-16-R-0015_RFP_Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE/LOCATION: River Revetment Phase III, Unalakleet, Alaska
PROPOSAL DUE DATE remains 5 August 2016, 2:00 PM Alaska Time.
Proposals shall be submitted in accordance w ith Section 00 21 00, Paragraph 1.10 Proposal Submittals. This Amendment provides changes to the solicitation as indicated on page 2 of this document.
YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.
1. CONTRACT ID CODE PAGE OF PAGES
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-16-R-0015
X 9B. DATED (SEE ITEM 11)
06-Jul-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Aug-2016
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911KB-16-R-0015
SUMMARY OF CHANGES
AMENDMENT #0003
• The following drawings are substituted for the superseded drawings:
NONE
• The following revised documents are substituted for the superseded documents. The identifier “AM#03” appears before and after new and/or revised material and replacement pages are provided, except as noted:
Specs SECTION 01 22 00.00 10 Paragraph 1.1.3.1 – replacement page attached
• The following documents/drawings are deleted:
NONE
• The following documents are added:
NONE
• The following revisions are incorporated:
Wage Determination is updated from AK160001 07/01/2016 AK1 to AK160001
07/29/2016 AK1
Bidder Inquiry Report attached
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 73 46 - WAGE DETERMINATIONS SCHEDULES
The following have been added by full text:
WAGE DETERMINATION JUL 29
General Decision Number: AK160001 07/29/2016 AK1
Superseded General Decision Number: AK20150001
State: Alaska
Construction Types: Building and Heavy
Counties: Alaska Statewide.
BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 01/22/2016 2 02/26/2016 3 03/04/2016 4 04/01/2016 5 04/15/2016 6 04/29/2016 7 06/10/2016 8 06/17/2016 9 07/01/2016 10 07/15/2016 11 07/29/2016
ASBE0097-001 01/01/2016
Rates Fringes
Asbestos Workers/Insulator (includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems).........................$ 37.38 19.55
ASBE0097-002 01/01/2016
Rates Fringes
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 37.38 19.55
BOIL0502-002 01/01/2013
Rates Fringes
BOILERMAKER......................$ 42.97 26.60
BRAK0001-002 06/30/2016
Rates Fringes
Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 39.81 19.01 Tile & Terrazzo Finisher.........$ 33.94 19.01
CARP1501-001 09/01/2014
Rates Fringes
MILLWRIGHT.......................$ 35.74 21.29
CARP2520-003 09/01/2014
Rates Fringes
Diver Stand-by....................$ 41.65 23.34 Tender......................$ 40.65 23.34 Working.....................$ 81.45 23.34 Piledriver Carpenter...................$ 37.34 23.34 Piledriver; Skiff Operator and Rigger..................$ 37.34 23.34 Sheet Stabber...............$ 36.59 22.59
Welder......................$ 42.90 23.34
DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:
50-100 feet $1.00 per foot 101 feet and deeper $2.00 per foot
ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:
5-50 FEET $1.00 PER FOOT/DAY
51-100 FEET $2.00 PER FOOT/DAY
101 FEET AND ABOVE $3.00 PER FOOT/DAY
SATURATION DIVING:
The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP4059-001 09/01/2014
Rates Fringes
CARPENTER
Carpenter...................$ 37.34 23.34 Lather/Drywall Applicator...$ 36.59 22.59
ELEC1547-004 04/01/2016
Rates Fringes
CABLE SPLICER....................$ 39.82 3%+24.96
ELECTRICIAN......................$ 39.49 3%+24.36
ELEC1547-005 04/01/2016
Line Construction
Rates Fringes
CABLE SPLICER....................$ 52.27 3%+30.33
Linemen (Including Equipment Operators, Technician)...........$ 50.52 3%+30.33 Powderman........................$ 48.52 3%+30.33
TREE TRIMMER.....................$ 35.84 3%+22.56
ELEV0019-002 01/01/2016
Rates Fringes
ELEVATOR MECHANIC................$ 52.50 29.985+a+b
FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays:
New Year's Day; Memorial Day; Independence Day;
Labor Day; Veteran's Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day
ENGI0302-002 04/01/2016
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 40.03 22.10
GROUP 1A....................$ 41.79 22.10
GROUP 2.....................$ 39.26 22.10
GROUP 3.....................$ 38.54 22.10
GROUP 4.....................$ 32.33 22.10
TUNNEL WORK
GROUP 1....................$ 44.03 22.10
GROUP 1A...................$ 45.97 22.10
GROUP 2....................$ 43.19 22.10
GROUP 3....................$ 42.39 22.10
GROUP 4....................$ 35.56 22.10
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Roller: Breakdown, Intermediate, and Finish; Back Filler; Barrier Machine (Zipper); Beltcrete with power pack and similar conveyors; Bending Machine;
Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine; Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Hydralifts or Transporters, all track or truck type,(b) Derricks;
Crushers; Deck Winches-Double Drum; Ditching or Trenching Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb and Gutter Machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell, and Snow Cat; Hydro Ax: Feller Buncher and similar; Loaders (2 1/2 yards through 5 yards, including all attachments): Forklifts with telescopic boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps; Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:
Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Scrapers-through 40 yards; Service Oiler/Service Engineer; Sidebooms-under 45 tons; Shot Blast Machine; Shovels, Backhoes, Excavators with all attachments, and Gradealls (3 yards and under), Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine; Sub-grader (Gurries, Reclaimer, and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler
GROUP 1A: Camera/Tool/Video Operator (Slipline), Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Clamshells and Draglines (over 3 yards),
(b) Tower cranes; Licensed Water/Waste Water Treatment Operator; Loaders over 5 yds.; Certified Welder, Electrical Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor, Roto-mill/Profiler (finish: when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w.
and over; Quad; Screed; Shovels, Backhoes, Excavators with all attachments (over 3 yards), Sidebooms over 45 tons;
Slip Form Paver, C.M.I. and similar types; Scrapers over 40 yards;
GROUP 2: Boiler-fireman; Cement Hog and Concrete Pump Operator; Conveyors (except as listed in group 1); Hoist on steel erection; Towermobiles and Air Tuggers;
Horizontal/Directional Drill Locator;Licensed Grade Technician; Loaders, (i.e., Elevating Grader and Material Transfer Vehicle); Locomotives: rod and geared engines;
Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under 16 inches; Waste/ Waste Water Treatment Operator.
GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;
Bombardier (tack or tow rig); Boring Machine; Brooms-power;
Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber Green and similar types (b) Forklifts or Lumber Carrier (on construction job site) (c) Forklifts with Tower (d) Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey (air, steam, gas and electric) Speeders; Mechanics (light duty); Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 200 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor
GROUP 4: Rig Oiler/Crane Assistant Engineer;Parts and Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter; Steam Cleaner; Drill Helper.
FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Crane Assistant Engineer shall be required on cranes over 85 tons or over 100 feet of boom.
IRON0751-003 07/01/2015
Rates Fringes
Ironworkers:
BRIDGE, STRUCTURAL,
ORNAMENTAL, REINFORCING
MACHINERY MOVER, RIGGER,
SHEETER, STAGE RIGGER,
BENDER OPERATOR.............$ 36.25 28.05
FENCE, BARRIER INSTALLER....$ 32.75 28.05
GUARDRAIL INSTALLERS........$ 33.75 28.05
GUARDRAIL LAYOUT MAN........$ 33.49 28.05
HELICOPTER, TOWER...........$ 37.25 28.05
LABO0341-005 04/01/2016
Rates Fringes
Laborers: South of the 63rd Parallel & West of Longitude 138 Degrees
GROUP 1.....................$ 30.00 26.17
GROUP 2.....................$ 31.00 26.17
GROUP 3.....................$ 31.90 26.17
GROUP 3A....................$ 35.18 26.17
GROUP 3B....................$ 38.72 23.46
GROUP 4.....................$ 19.57 26.17
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 33.00 26.17
GROUP 2....................$ 34.10 26.17
GROUP 3....................$ 35.09 26.17
GROUP 3A...................$ 38.70 26.17
GROUP 3B...................$ 42.59 23.46
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump
Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
* LABO0942-001 04/01/2016
Rates Fringes
Laborers: North of the 63rd Parallel & East of Longitude 138 Degrees
GROUP 1.....................$ 30.00 26.17
GROUP 2.....................$ 31.00 26.17
GROUP 3.....................$ 31.90 26.17
GROUP 3A....................$ 35.18 26.17
GROUP 3B....................$ 38.72 23.46
GROUP 4.....................$ 19.57 26.17
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 33.00 26.17
GROUP 2....................$ 34.10 26.17
GROUP 3....................$ 35.09 26.17
GROUP 3A...................$ 38.70 26.17
GROUP 3B...................$ 42.59 23.46
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine
Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
PAIN1959-001 09/01/2015
NORTH OF THE 63RD PARALLEL
Rates Fringes
PAINTER
BRUSH/ROLLER PAINT OR WALL
COVERER.....................$ 32.07 20.01
TAPING, TEXTURING,
STRUCTURAL PAINTING,
SANDBLASTING, POT TENDER,
FINISH METAL, SPRAY,
BUFFER OPERATOR, RADON
MITIGATION, LEAD BASED
PAINT ABATEMENT, HAZARDOUS
MATERIAL HANDLER............$ 32.59 20.01
PAIN1959-002 02/01/2016
SOUTH OF THE 63RD PARALLEL
Rates Fringes
PAINTER
Brush, Roller, Sign, Paper and Vinyl, Swing Stage, Hand Taper/Drywall, Structural Steel, and Commercial Spray............$ 30.31 19.76 Machine Taper/Drywall.......$ 31.56 19.76 Spray-Sand/Blast, Epoxy and Tar Applicator..........$ 31.66 19.76
PAIN1959-003 01/01/2016
NORTH OF THE 63RD PARALLEL
Rates Fringes
GLAZIER..........................$ 37.88 20.74
PAIN1959-004 07/01/2012
Rates Fringes
FLOOR LAYER: Carpet.............$ 30.09 13.02
PAIN1959-006 01/01/2016
SOUTH OF THE 63RD PARALLEL
Rates Fringes
GLAZIER..........................$ 37.88 20.74
PLAS0867-001 02/01/2016
Rates Fringes
PLASTERER
North of the 63rd parallel..$ 37.25 20.41 South of the 63rd parallel..$ 37.00 20.41
PLAS0867-004 02/01/2016
Rates Fringes
CEMENT MASON/CONCRETE FINISHER
North of the 63rd parallel..$ 37.25 20.41 South of the 63rd parallel..$ 37.00 20.41
* PLUM0262-002 07/01/2016
East of the 141st Meridian
Rates Fringes
Plumber; Steamfitter.............$ 37.52 26.47
PLUM0367-002 07/01/2015
South of the 63rd Parallel
Rates Fringes
Plumber; Steamfitter.............$ 40.00 21.70
* PLUM0375-002 07/01/2016
North of the 63rd Parallel
Rates Fringes
Plumber; Steamfitter.............$ 40.81 24.25
PLUM0669-002 01/01/2015
Rates Fringes
SPRINKLER FITTER.................$ 43.75 22.57
SHEE0023-003 07/01/2015
South of the 63rd Parallel
Rates Fringes
SHEET METAL WORKER...............$ 40.79 22.38
SHEE0023-004 07/01/2015
North of the 63rd Parallel
Rates Fringes
SHEET METAL WORKER...............$ 45.93 21.44
TEAM0959-003 09/01/2015
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 39.29 21.17
GROUP 1A....................$ 40.56 21.17
GROUP 2.....................$ 38.03 21.17
GROUP 3.....................$ 37.21 21.17
GROUP 4.....................$ 36.63 21.17
GROUP 5.....................$ 35.87 21.17
GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon (250 Bbls and above); Tireman, Heavy Duty/Fueler
GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps (driver under load)
GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;
Dump Trucks (including Rockbuggy and Trucks with pups) over 20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;
Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards; Partsman;
Stringing Truck
GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Oil Distributor Drivers; Trucks/Jeeps (push or pull); Traffic Control Technician
GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;
Tireman (light duty); Dump Trucks (including Rockbuggy and Truck with pups) up to and including 10 yards; Track Truck Equipment; Grease Truck; Flat Beds, dual rear axle; Hyster Operators (handling bulk aggregate); Lumber Carrier; Water Wagon, semi; Water Truck, dual axle; Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and Swing attachments, over 5 tons; Front End Loader with Forks; Bus Operator over 30 passengers; All Terrain Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam Distributor Truck/dual axle; Hydro-seeders, dual axle;
Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire Truck/Ambulance Driver; Combination Truck-fuel and grease;
Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield); Ready Mix, up to and including 7 yards;
GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;
Gear/Supply Truck; Bus Operator, Up to 30 Passengers;
Rigger/Swamper
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
AM#3 RIVER REVETMENT PHASE III UNK337747A
UNALAKLEET, ALASKA
SECTION 01 22 00.00 10
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract job payments will be made are listed in the PROPOSAL SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job, shall be included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1.1 Base Item 0001: Mobilization and Demobilization
Payment will be made for costs associated with mobilization and demobilization, as defined in Special Clause PAYMENT FOR MOBILIZATION AND DEMOBILIZATION. This proposal item also includes all costs associated with project bonding requirements.
1.1.1.1 Unit of Measure
Unit of measure: job.
1.1.2 Base Item 0002: Clearing and Grubbing
1.1.2.1 Payment
Payment will be made for costs associated with operations necessary for all clearing and grubbing operations.
1.1.2.2 Unit of Measure
Unit of measure: job.
1.1.3 Base Item 0003: Place Modified Diaphragm Piles
1.1.3.1 Payment
Payment will be made for costs associated with operations necessary for construction of the: modified diaphragm face sheets, tail walls, termination piles and all associated sheet pile work; AM#3... aluminum anodes; and fish processor outfall ...AM#3. Contract drawings reflect Optional Item 0007: Option 1 (see below). Without award of Optional Item 0007: Option 1, drive and cut all face sheets as shown and ease all edges and corners at top of sheets.
1.1.3.2 Unit of Measure
Unit of measure: job.
Section 01 22 00.00 10 Page 1
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Contractor Report All Inquiries
Project: Unalakleet Revetment Phase III Sheet Pile Review: Unalakleet Revetment Ph III Bidder Inquiry (00001) (sorted by CommentID ) Displaying 10 inquiries.
Id Discipline Sheet Detail Spec
6608656 Civil 2.1, Section 31 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Quality tests for quarry rock, subbase, and surface coarse are listed in 2.1.3, 2.1.4, and 2.1.5.
3.1 states "Obtain borrow material from local sources".
1. What is considered local, only Unalakleet, or a certain radius from Unalakleet?
2. Are there approved source(s) that the testing is not required, or what happens if no local source meets the quality tests?
On: Jul 21 2016.
Government Response. . 1. Please see AM#2 posted to www.fbo.gov on 26 July 2016.
2. All sources shall be tested per the specification requirements On: Jul 26 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6608738 Civil 00 22 11 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
If a Contractor completes the pricing on the Proposal Schedule per the bid documents, would price deductions for alternate means and methods be considered? If so, where in the proposal should we list the deductions and the explanations for the deductions?
On: Jul 21 2016.
Government Response. . Proposals shall meet all RFP requirements. After award, the Contractor is encouraged to propose value engineering changes, however the Government has no obligation to accept any such changes. On: Jul 26 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6610734 Structural S-201 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm the sheet pile and pipe pile are to be uncoated (no paint or galvanizing).
On: Jul 24 2016.
Government Response. . Yes, sheet piles and pipe piles are to be uncoated. On: Jul 26 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6614147 Structural S-501,502,503 05 50 15 2.2.1 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Further on the coatings issue, the ladder is galvanized according to 2.2.1. Are anything else to be galvanized, such as the bollards, bull rail, or fender top plate?
On: Jul 27 2016.
Government Response. . No, the ladders are the only galvanized items. On: Jul 30 2016 Current Request Status: Request Closed
Page 1 of 3ProjNet: Logged In User
Information for this report is procurement sensitive.
6616133 Structural S102 Modified Diaphragm Quantities Table
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Note * 1. states:
ALL SHEET PILE AND ASSOCIATED Y-PILE AND SWC LENGTHS ARE 31 FT.
This appears to the be the length form tip to final grade. Is the Contractor to allow additional length to allow for fresh heading and settlement after backfilling? Normally a supply length would be specified of say 35' supply length.
On: Jul 28 2016.
Government Response. . The supply length is 31 feet, reference Note 1 in the quantity table for each of sheets S-101 through S-103. See: S-201 for as-driven top elevation in sections without bull rail; S-301 for tail wall as-driven and cut off (cut off applies only to first sheet from Y-pile) elevations; F/S-501 for typical face sheet as-driven and cut off elevations; and B/S-504 for face sheet as-driven and cut off elevations at ladders. Also see Section 31 41 16, paragraph 3.2.2.2 Driving, subparagraph e., which states in part "A tolerance of 3 inches below the indicated top elevation will be permitted if pile settlement exceeds the 6 inch amount indicated." On: Jul 30 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6616142 Specifications 31 00 00 Earthwork 3.4 Backfilling, Filling and Compaction
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is compaction testing required during fill backfilling?
On: Jul 28 2016.
Government Response. . No, however see Section 31 00 00 for backfilling, filling and compaction requirements. On: Jul 30 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6616145 Structural S-504 D - Closure Pile Plan Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Are closure piles to be galvanized, coated or bare?
On: Jul 28 2016.
Government Response. . Bare. On: Jul 30 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6616146 Structural S-301 A - Typical Cell Section Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing S-301 show anodes below Elev. 0. Can the Anodes be welded to the sheets before Driving so that the welding shown on S-504, Detail C can occur in the dry for good quality control and not after sheets are driven?
On: Jul 28 2016.
Government Response. . Yes, this also applies to the welding of the pipe stub, eccentric reducer, and steel flange to the face sheet for the Fish Processor Outfall Line as shown on sheet C-302. On: Jul 30 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6616161 Specifications W(11KB-16-R-0015 RFP 1442-101 (page 3 of the document)
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
We request a one (1) week extension on the submission date of August 5.
Page 2 of 3ProjNet: Logged In User
On: Jul 28 2016.
Government Response. . As there have been no major revisions to the specifications, the Project Manager has declined to extend the submission date. On: Jul 30 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6616165 Civil C-302 A - Fish Processor Outfall Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Which bid item is this work to be included?
On: Jul 28 2016.
Government Response. . Amendment #3 to be released 1 August 2016 will include revision to Specification Section 01 22 00.00 10:
"1.1.3.1 Payment
Payment will be made for costs associated with operations necessary for construction of the:
modified diaphragm face sheets, tail walls, termination piles and all associated sheet pile work;
AM#3... aluminum anodes; and fish processor outfall ...AM#3. Contract drawings reflect Optional Item 0007: Option 1 (see below). Without award of Optional Item 0007: Option 1, drive and cut all face sheets as shown and ease all edges and corners at top of sheets." On: Aug 01 2016 Current Request Status: Request Closed
Information for this report is procurement sensitive.
Report Complete
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Patent 11/892,984 ProjNet property of ERDC since 2004.
Page 3 of 3ProjNet: Logged In User
(END OF SUMMARY OF CHANGES)