Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The subject solicitation W911KB-14-T-00006 is hereby amended as follow s:

A. The Scope of w ork has been revised to clarify dates for reporting, please see revised SOW dated 24 FEB 2014.

B. Additional clarif ication for vendors’ questions and answ erers are included.

C. The date/time for receipt of offers is changed from 28 Feb 2014 at 2:00 p.m. Alaska time to 7 Mar 2014 at 2:00 p.m.

D. All other terms and conditions remain the same.

POC for this action is bradley.d.elavitt@usace.army.mil

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Feb-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-14-T-0006

X 9B. DATED (SEE ITEM 11)

14-Feb-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Feb-2014

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KB-14-T-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

Q & A

QUESTIONS AND ANSWERS

Question 0001-01: Can the proposal be submitted via email or by mail? If email is permitted, please provide the appropriate email address.

Response 0001-01: If submitting electronically please only submit to bradley.d.leavitt@usace.army.mil

Question 0001-02: There are no proposal page limits or proposal structure requirements within the RFP. Are we permitted to devise our own proposal structure?

Response 0001-02: Proposal page limit is not to exceed 4 pages. Complete the schedule and in addition provide breakdown of cost per tasks in the Statement of work. Also include personnel resumes performing those tasks. Resumes are not counted toward page count.

Question 0001-03: Was there an incumbent for this project and if so, who was it?

Response 0001-03: Wood Canyon Group held the last contract which was a single year with four one year options.

Question 0001-04: There are old dates listed within the solicitation regarding the period of performance and schedule of activities. Can you provide an updated schedule?

Response 0001-04: Due to the impending deadline for the Tier II report, the Government will adjust the 2013 Tier II effort for support for the next reporting period. Please see revised scope of work.

Question 0001-05: Is there a budget limit that we are expected to stay within as we develop our proposal?

Response 0001-05: The magnitude for this purchase order is under the simplified acquisition threshold.

Question 0001-06: Are you looking for just a lump sum quote on page 2? Do you require separate quote for Tier 2 and TRI reporting? If it requires a more in depth proposal, please provide what you would want include.

mailto:bradley.d.leavitt@usace.army.mil

Response 0001-06: Please organize your proposal based on tasks, then include personnel needed to accomplish those tasks.

Question 0001-07: Can you provide a list or number of chemicals, especially EHS, on the facility?

Response 0001-07: The 2013 Tier II report will be available for Contractor review and use to develop the 2014 Tier II report. Also, the 2012 TRI will be made available for Contractor use for the 2013 TRI report development. This is the only information that will be provided.

Question 0001-08: This is a pretty quick deadline, please provide what information you have from 2012 submittal. There are some changes from in the program that needs to be incorporated so it would be helpful.

Response 0001-08: Due to the impending deadline for the Tier II reports, the Government will adjust the 2013 Tier II effort for support for the next reporting period. The 1 March 2014 deadline no longer applies. Please see revised scope of work.

Question 0001-09: How long will it will take to award the contract?

Response 0001-09: The Contract is anticipated to be awarded by 15 March 2014.

Please note the schedule change in the revised scope of work.

Question 0001-10: Section 5.0 states, EPCRA Tier II reports are due 3/1/2014. This due date is prior to the proposal deadline of 3/7/2014. Also, based on information provided in the Solicitation, it appears there is an estimate of 104 buildings (+/- 10 buildings) so the likelihood of completing the Tier II reports would take ~ a couple of hundred man hours to complete (a rough estimate at this point). Will the solicitation be revised to reflect a realistic due date for the Tier II reports?

Response 0001-10: Due to the impending deadline for the Tier II reports, the Government will adjust the 2013 Tier II effort for support for the next reporting period. The 1 March 2014 deadline no longer applies. Please see revised scope of work.

Question 0001-11: Section 3.6 of the SOW states “The Contractor shall complete and submit draft Form R’s for Fort Wainwright’s main post, contiguous training ranges and non-contiguous training ranges, as determined by the technical memorandum detailing the post’s reporting requirements and Army guidance. These shall be submitted to the Government for review and comment by 1 May 2014.”

Are the “technical memorandum detailing the post’s reporting requirements and Army guidance” available for our review at this time? Will the accumulation of data required for Form R reporting be collected by the selected contractor or others?

Response 0001-11: The 2012 TRI will be made available for Contractor’s use for the 2013 TRI report development. Besides coordination/consultation with the Installation, this is the only information that will be provided.

REVISED SOW

Revised Scope of Work Solicitation W911KB-14-T-0006

Emergency Planning and Community Right-to-Know

Tier II and Toxic Inventory Release Reports Fort Wainwright, Fairbanks, Alaska

Alaska District, U. S. Army Corps of Engineers

24 February 2014

1.0 Introduction

The Emergency Planning and Community Right-to-Know Act (EPCRA) was established to provide the public with information regarding hazardous chemicals in their communities, to enhance community awareness of chemical hazards, and to facilitate the development of State and local emergency response.

Extremely Hazardous Substances (EHS) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) chemicals present above Reportable Quantities (RQ) or Threshold Planning Quantities (TPQ) are subject to reporting under Section 302 of EPCRA. The State of Alaska also requires municipalities to report hazardous substances under Alaska Statute Section 29.39.500.

All organizations and units on Fort Wainwright are directed to complete an inventory of all hazardous materials used to support their missions and to attach Material Safety Data Sheets (MSDS) for each material listed on the survey form. To comply with federal and state community right-to-know regulations, the named Army posts and facilities are required to submit a Tier II report of all hazardous materials used or stored equal or greater to RQ or TPQ to the State Emergency Planning Committee (SERC), the Local Emergency Planning Committee (LERC), and post fire departments. EPCRA Tier II forms are standardized forms established to report these hazardous materials. The Tier II reports compile the Tier II forms for each respective post.

Section 313 of EPCRA established the Toxics Release Inventory. TRI tracks the management of certain toxic chemicals that pose a threat to human health and the environment. Facilities in different industry sectors must annually report how much of each chemical they managed through recycling, energy recovery, treatment and environmental releases. TRI reporting forms must be submitted to EPA, and cover any environmental release and other management issues of toxic chemicals that occurred during the previous calendar year.

The information submitted by facilities is compiled in the Toxics Release Inventory and made available to the public through the TRI website: www.epa.gov/tri. TRI helps support informed decision-making by industry, government, non-governmental organizations and the public.

2.0 Objective

The objective of this scope of work is to generate annual EPCRA Tier II and TRI reports for Fort Wainwright. EPCRA reports for Fort Wainwright have been completed for 1990 through 2012.

The contractor shall furnish all necessary labor, equipment, materials, and transportation necessary to perform the work described in this Statement of Work (SOW). The Contractor shall provide adequate professional supervision and quality control to assure the accuracy, quality, completeness, and progress of the required work. Work shall be performed in accordance with common industry standards/practices and all applicable federal, state and local regulations. The Contractor shall be responsible for identifying the applicable federal, state and local regulations that will affect this contract.

3.0 Description of Tasks

The Contractor shall prepare the Tier II and TRI reports for the 1 January to 31 December time period. The Tier II reports detail the inventory of hazardous material used and stored by units and organizations within Fort Wainwright; the TRI reports all releases, including on-site releases (including disposal), on-site recycling, off-site transfers, pollution prevention activities, and releases of lead, mercury, dioxin and other persistent, bioaccumulative and toxic (PBT) chemicals.

The following describes the required tasks to be performed1:

3.1 Task 1- Project Management

The Contractor shall manage and control all work activities, including subcontracted services, associated with this scope. Monthly status reports consisting of a brief summary of work that was completed the previous month, work planned for future month(s), and other pertinent project information are required. These reports shall be submitted via email to the U.S. Army Corps of Engineers – Alaska District (USACE) Contracting Officer, Contracting Officer’s Representative (COR), and Project Manager (PM) no later than the 7th day of the calendar month following the month covered by the report.

1 Note: Tasks have been renumbered from the original scope of work.

The Contractor shall submit a detailed schedule within ten (10) days of award of this contract showing the periods in which work will be performed and milestone dates to complete the planning, fieldwork, and reporting tasks. The project schedule shall be provided in Gantt chart format and shall include dates for starting and completing critical features of the work. The Contractor shall update and resubmit the schedule when changes to the schedule are realized and with each monthly status report submission.

The Contractor shall participate in quarterly progress meetings. The purpose of these meetings is to discuss project status and results. Presentation materials shall be prepared for these meetings. Materials shall be provided for review ten (10) days prior to each meeting. Meeting minutes shall be prepared by the Contractor and provided to the USACE PM within seven days of the conclusion of each meeting.

3.2 Task 2- Fort Wainwright Field Visit

The Contractor shall visit individual units at Fort Wainwright to gather, update provide a thorough check of the information sufficient to populate and update EPCRA Tier II forms used for the 2014 EPCRA Tier II reports. A thorough check consists of the verification and/or identification of all units, their names, and locations; update of chemical inventories; and the determination of hazardous chemicals, materials, munitions used and/or wastes quantities meeting or exceeding reporting thresholds on the respective posts and facilities. Coordination with the U.S. Army, Alaska shall occur to identify all units present on post. Table 1 lists buildings and corresponding units visited for the 2013 report. This list is subject to change; the Contractor should structure his or her proposal to account for the fact that an additional ten buildings/inspections may be added and/or deleted. Some units and/or buildings not listed may have changed material handling practices from previous years altering reportable quantities. The Contractor shall update the building list and make any changes regarding unit names and building locations and the Contractor shall include these changes in the 2014 EPCRA Tier II reports.

3.3 Task 3- Completion of Draft Form R’s (Toxic Release Inventory Forms) for Fort Wainwright

The Contractor shall complete and submit draft Form R’s for Fort Wainwright’s main post, contiguous training ranges and non-contiguous training ranges, as determined by the technical memorandum detailing the post’s reporting requirements and Army guidance.

These shall be submitted to the Government for review and comment by 1 May 2014.

The reports shall be consistent with historical reports (specifically the 2012 version), Army Regulation 200-1 Chapter 7-4(d)(3), and with EPA 260-R-14-001.

3.4 Task 4 – Completion of Final Form R’s for Fort Wainwright

After review and comment, the Contractor shall incorporate the comments and submit Final Form R’s pursuant to Army Regulation 200-1 Chapter 7-4(d)(3). These are required to be complete by 1 July 2014.

3.5 Task 5- Draft Tier II Reports for Fort Wainwright

The Contractor shall prepare a draft EPCRA Tier II Report for Fort Wainwright. For efficiency and accuracy, the Contractor should use prior EPCRA Tier II reports as a template and reference for this work. In preparing the draft EPRCA Tier II report, the Contractor shall:

a. Update inventory forms at all units and organizations at Fort Wainwright. These forms detail inventory of chemicals used or stored during the calendar year.

b. Review all MSDSs for EHS and CERCLA chemicals used or stored at quantities equal to or above RQ and TPQ. These chemicals are listed in 40 CFR 302.4 and 40 CFR 355.20. The following quantities are also reported as requested by the LEPC – Fairbanks.

• Any quantity of hazardous material of the hazard class identified in the federal placarding regulations as:

(A) Poison Gas Hazard Division No. 2.3 and Poisons 6.1;

(B) Explosives 1.1;

(C) Explosives 1.2 and 1.3, excluding smokeless gun powder, black powder and ammunition;

(D) Flammable Solid Divisions 4.1, 4.2, and 4.3;

(E) Radioactive Hazard Class 7;

• A hazardous chemical or a hazardous material other than one described above, if handled in a single day in an amount greater than 4,500 pounds. A hazardous chemical and a hazardous material are defined in Alaska Statute 29.35.590;

• Extremely hazardous substances in a quantity equal to or more than 500 pounds or the threshold planning quantity, whichever is less;

• Acute hazardous wastes in a quantity equal or greater than 2.2 pounds. Acute hazardous wastes are defined in Alaska Statute 29.35.590;

• Hazardous wastes in a quantity equal or greater than 220 pounds. Hazardous wastes are defined in 40 CFR 261 and Alaska Statute 46.03.900;

• Compressed gasses equal to or more than 1,000 cubic feet for those gases with National Fire Protection Association (NFPA) Placard ratings of 1 or 2 in any category (Health, Flammability, Instability, Special Precautions); and

• Compressed gases equal to or more than 200 cubic feet and less than 1000 cubic feet for those gases in NFPA placard ratings of 3 or 4 in any category.

c. Compile these results into a database.

d. Prepare EPCRA Tier II reports in accordance with 42 U.S.C. 11022, 40 CFR 370.41, and Alaska Statute 29.35.500. Use the 2012 EPCRA Tier II reports to facilitate the preparation of the 2013 EPCRA Tier II Report. The State of Alaska Tier II form shall be used in lieu of the Tier II form described in 40 CFR 370.41, as requested by Fort Wainwright Public Works. Both forms require similar information. The electronic Tier II form including instructions may be obtained from the LEPC-Fairbanks point-of-contact. A hard copy of the Tier II form may also be obtained from the LEPC point of contact for Fairbanks or the Fairbanks Community-Right-to Know (CRTK) Program point of contact. The report shall also include a section defining the reporting thresholds, physical and health hazards, storage codes, and temperature and pressure condition codes used in the Tier II forms; and

e. Include Petroleum products:

(A) Above ground tanks – 5,000 gallons

(B) Underground tanks – 10,000 gallons

(C) LNG/LPN – 2,000 pounds

Each building shall be considered a separate facility. Therefore, material stored or used in a particular building would be reported if it met or exceeded the reportable threshold.

Additional information regarding specific Fairbanks requirements may be obtained from the Local Emergency Planning Committee (LEPC) – Fairbanks. The Fairbanks LEPC point of contact is as follows:

Fairbanks LEPC Lisa Howard 800 Cushman Street Fairbanks, AK 99701 907-450-6602 Email: llhoward@ci.fairbanks.ak.us

3.6 Task 6- Review Conference

The Contractor shall be prepared to host a teleconference to discuss comments made by reviewers on the draft documents. The Contractor shall be responsible for keeping detailed minutes of the review telecon. The minutes shall be submitted in written text form along with the annotated comments stating the disposition of each comment addressed. The annotated comments shall be submitted with the final submittals.

3.7 Task 7- Final Tier II Reports for Fort Wainwright

The Contractor shall incorporate the comments discussed at the review conference into the Final EPCRA Tier II report for Fort Wainwright. The Final 2014 EPCRA Tier II reports are due 1 March 2015.

4.0 Submittals

The Contractor shall deliver all submittals to the Project Manager for this project at the USACE, Alaska District. The Contractor shall send a letter of transmittal listing the material submitted with each submission. The letter shall reference the project title, number, and location.

Complete submission must be received before the Government will review such submission;

partial submission will not be allowed without prior approval.

All draft and final reports shall each be submitted as separate documents. All required site drawings shall be of engineering quality with sufficient detail to show interrelations of major features on the site map (i.e., north arrows, keys, scales, etc.). When drawings are required, data may be combined to reduce the number of drawings. Plans shall consist of 8-1/2 inch by 11inch pages with drawings folded, if necessary, to this size. A decimal paragraphing system shall be used.

Draft reports shall be submitted electronically via email. The draft shall include a cover sheet specifying the following items: name of base/ facility, the year for which the report covers, date generated, and the title of the submittal specifying a draft document.

Final reports shall be submitted both in hard copy and electronically on CD-ROM. One copy of the logs for each base shall be submitted on separate discs. The final shall include a cover sheet specifying the following items: name of base/ facility, the year for which the report covers, date generated, and the title of the submittal specifying a final document.

5.0 Schedule/Period of Performance

Work will begin upon receipt of the Notice to Proceed (NTP). The Contractor shall work with Government representatives to schedule the work such that the EPCRA reporting requirements are met. The 2013 Toxic Release Inventory Final Form R’s are due 1 July 2014. The EPCRA Tier II reports are due 1 March 2015. The Period of Performance for this contract will end on approximately 30 March 2015.

6.0 Personnel Qualifications

All team members must be designated at the onset of the project and must remain in the actively involved in the project throughout the duration of this contract as long as they are employed by the Contractor. Substitute team members must be approved by the KO or their representative.

The Contractor will designate one point of contact for all matters associated with this project.

Assigned team members shall have, at minimum, the following qualifications:

• The lead team member should have, at a minimum, a 4-year degree in chemistry, environmental science, engineering, geology, or a related field.

• One team member must have working knowledge of CERCLA, its provisions and requirements; federal transportation regulations, and RCRA, its provisions and requirements particularly the handling and characterization of hazardous wastes.

• One team member shall be proficient in The EPA Toxics Release Inventory (TRI) regulations and have experience in preparing Community Planning and Community Right-to know Tier II reporting

7. Authority and Points of Contact

The USACE Contracting Officer is the only person with the authority to act as agent of the Government under this contract. Only the Contracting Officer has authority to:

(1) Direct or negotiate any changes in the Statement of Objectives or specifications;

(2) Modify or extend the period of performance;

(3) Change the delivery schedule; or

(4) Otherwise change any terms and conditions of this contract.

The USACE Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract. In the event the Contractor makes any changes at the direction of any person other than the USACE Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof.

The Government will conduct periodic inspections of the Contractor’s work to determine compliance with the requirements of this contract. The USACE Contracting Officer will notify the Contractor of any work that is determined to be noncompliant with the contract requirements.

The Contractor shall take immediate corrective action after receipt of such notice. The USACE Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective actions have been taken.

Points of Contact:

Project Manager Mr. Robert Brock

CEPOA-PM-C

P.O. Box 6898 Elmendorf AFB, AK 99506 P: 907-753-5612

Technical Lead Mike Utley

CEPOA-EN-EE

P.O. Box 6898 Elmendorf AFB, AK 99506 P: 907-753-2691

Contracting Officer:

Christine Dale

CEPOA-CT

P.O. Box 6898 Elmendorf AFB, AK 99506 P: 907-753-2691

Email:

robert.d.brock@usace.army.mil

Email:

michael.d.utley@usace,army.mil

Email:

christine.a.dale@usace,army.mil

8. General Requirements

All reports and data generated under this contract are the property of the government and distribution by the Contractor to any source, unless previously authorized by the USACE Contracting Officer, is prohibited. The Contractor shall not make available to the news media or publicly disclose any data generated or reviewed under this contract. When approached by the news media, the Contractor shall refer them to the Contracting Officer for response. Project reports and data generated under this contract shall become the property of the government and distribution to any other source by the Contractor is prohibited.

8.1 Contractor Manpower Reporting

The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for environmental investigations and support at various sites on Ft Wainwright, Alaska via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at: http://www.ecmra.mil/ http://www.ecmra.mil/ http://www.ecmra.mil/

Table 1: Fort Wainwright Building/Facility Tier II Reporting Facilities for 2013

Building Number Facility

1004 472 MP, B 6-17, C 6-17, HHT 6-17, & HHC 1-52

1049 Administrative Building 1051 Installation Safety Office 1054 Fire Station 3

1060 507 SIG CO

1171 Ski Lodge 1185 Ski Area Maintenance 1557 Hangar 1, 1-52 AVN A, B, & D CO 1565 1-52 AVN & 6-17 Maintenance & POL 2077 Hangars 7 & 8, 6-17 CAV & 1-52 AVN 2078 Forward Area Refueling Point 2088 Hangar 6, 1-52 AVN C CO 2092 Golf Course Club House 2093 Golf Club House Recreational Shelter 2096 Golf Course Grounds Maintenance

2104 6-17 CAV A, B, C, D, & F CO

2116 Alert Holding Area (AHA) 2210 Ammunition Upload Facility 2295 Consolidated Motor Pool 2297 Tactical Equipment Maintenance Facility

2299 1-52 E CO

2400 Rail Offload Facility 3004 Fire Station 1 3015 DPW Contractor Maintenance 3018 DPW Contractor Shops 3019 DPW General Purpose Storage 3023 DPW Environmental Division 3030 DOL Supply & Support

3210 3-21 INF

3212 3-21 INF

3213 1-5 INF

3214 1-5 INF

3406 Kamish Medical / Dental Clinic 3408 Burger King 3415 73rd ENG

3417 1-25 SBCT

3425 2/8 FA Motor Pool 3437 Administrative Building

3440 A TRP 5-1 CAV

3442 B TRP 5-1 CAV

3444 C TRP 5-1 CAV

3446 184th MICO

3448 HHT 5-1 CAV

3450 D-52 INF

3451 176th SIG

3465 65 EOD

3479 472 Military Police 3480 Installation Maintenance Division (IMD II) 3484 Consolidated Fuel Point 3485 5/1 CAV Motor Pool 3487 Brigade Warehouse, 25 BSB 3489 Hazardous Material Storage 3490 Installation Maintenance Division (IMD) 3492 1/5 HHC & 3/21 HHC Motor Pool

3494 BTB & 1-24 HHC CRT

3498 Brigade Consolidated Motor Pool 3562 AAFES Service Station 3567 MEDDAC Warehouse 3702 Bowling Alley 3703 AAFES Shopping Center Commissary

3708 2-8 FA

3709 Physical Fitness Center

3711 6-17 CAV D CO

3712 2-8 FA

3713 123 C CO

3716 2-8 FA

3720 1-52 D CO

3730 Auto Crafts Shop 4050 DCA Outdoor Recreation Issue & Maintenance 4063 539 Transportation CO 4076 Bassett Army Community Hospital 4161 9 Army Band 4390 Fire Station 2 5110 Fort Wainwright Range Control 5010 DLA Disposition Services Complex

RHQ01: BSB-FMC & BSB-HHC

RHQ02: BSB-DC

RHQ04: BSB-BSMC

RHQ05: 1-5 INF

RHQ08: 1-5 INF

Beales Range (DTA)

Black Rapids Training Complex

Bolio Lake Complex (DTA)

CACTF Vehicle Instrumentation Building (DTA)

CRTC Test Track (DTA)

Meadows Shelter (DTA)

Mississippi Range (DTA)

Texas Range (DTA)

UAV Facility (DTA)

Washington Range (DTA)

Construction Site: Barracks

Construction Site: Maintenance Hangar

Construction Site: Northern Lights Housing

Construction Site: Organizational Storage

FWA Housing: Bassett Infill

FWA Housing: Bear Paw 1 & 2

FWA Housing: Denali Village

FWA Housing: New North Town

FWA Housing: North Haven Community Center

FWA Housing: Old Gertsch Heights

FWA Housing: Taku Gardens

Blair Lakes Range (USAF)

Oklahoma Range (Eielson AFB Range)

Yukon Range (Eielson AFB Range)

(End of Summary of Changes)

3.3 Task 3- Completion of Draft Form R’s (Toxic Release Inventory Forms) for Fort Wainwright
The Contractor shall complete and submit draft Form R’s for Fort Wainwright’s main post, contiguous training ranges and non-contiguous training ranges, as determined by the technical memorandum detailing the post’s reporting requirements and Army guid...
3.4 Task 4 – Completion of Final Form R’s for Fort Wainwright
After review and comment, the Contractor shall incorporate the comments and submit Final Form R’s pursuant to Army Regulation 200-1 Chapter 7-4(d)(3). These are required to be complete by 1 July 2014.
The Contractor shall incorporate the comments discussed at the review conference into the Final EPCRA Tier II report for Fort Wainwright. The Final 2014 EPCRA Tier II reports are due 1 March 2015.

File details come from the government source that posted it. Updated .