A.1.9_Area_3_Hydro_Axe_attch05.pdf
PDF 1017 KB Posted
- Attached to
- Chena River Lakes Flood Control Project: Tree and Brush Clearing Federal contract opportunity
- Solicitation number
- W911KB-14-T-0003
About this file
Area 3 Hydro Axe
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 14-T-0003-0004_Amend.pdf | ||
| 14-T-0003-0003_Amend.pdf | ||
| 14-T-0003-0003_Amend.pdf | ||
| 14-T-0003-0002_Amend.pdf | ||
| Amend_0002_Chena_Hydro-Axe_Area_4_Rev_Mar_3.pdf | ||
| 14-T-0003-0001_Amend.pdf | ||
| W911KB-14-T-0003.pdf | ||
| A.1.9_Seepage_ditch_Road_attch01.pdf | ||
| A.1.9_All_Hydro_Axing_Areas_8_attch02.pdf | ||
| W911KB-14-T-0003_Tree_ _Brush_Chena.pdf | ||
| A.1.9_Area_1_Hydro_Axe_attch03.pdf | ||
| A.1.9_Area_2_Hydro_Axe_attch04.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Legend Hydro Axe
Area 3 HYDRO AXE
0 975 1,950487.5 Feet
Hydro-Axing areas Floodway/Seepage Collector Channel
Chena River Lakes Flood Control Project
Area 3 Hydro Axe
The seepage channel road/berm on the Steep slope toward the west for the entire length of the channel road from the Project Office to the weir.
File details come from the government source that posted it. Updated .