Mowing Floodway/Seepage Collector Channel and Seed/Grain Planting
Solicitation number
W911KB-13-T-0010
Issued by

About this file

Amendment 0004

View the file

Other files

File Type Posted
13-T-0010-0006Proposal_Sched.pdf PDF
Mowing_8_5X17_Portrait_Final.pdf PDF
W911KB-13-T-0010-0005.pdf PDF
13-T-0010-0003ChenaMowing.pdf PDF
w911kb-13-T-0010-0002.pdf PDF
W911KB-13-T-0010-0001.pdf PDF
13-T-0010ChenaMowing.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WC1JUW30179993

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Reference Purchase Order Title and Location Moving Floodw ay/Seepage Collector Channel land See/Grain Plainting, Chena River Lakes Flood Project.

1.The above numbered Purchase Order is hereby modif ied to answ er questions and answ ers.

2.Extend the proposal due date from March 5, 2013 to March 8, 2013 at 2:00p.m. Alaska Standard time.

3.Contracting POC for this Amendment is Yolanda Ikner, 907-753-2553

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Mar-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-13-T-0010

X 9B. DATED (SEE ITEM 11)

19-Feb-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Mar-2013

CODE

U.S. ARMY ENGINEER DISTRICT, ALASKA

ATTN: CEPOA-CT( W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KB-13-T-0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

PROPOSAL DUE DATE

Proposal due date for this solicitation has been exteneded from March 5, 2013 to March 8, 2013.

QUESTION AND ANSWER

QUESTION: 0004-03

Amendment 0002, page 5 of 8, 2.2 "Seed/Grain Planting and Fertilization" -under Description and Nature of Work: "The Contractor shall be required to apply fertilizer and plant a specified acreage on the floodway and other areas of Project Lands to barley, oats, peas, sunflower, brome, clover and other seed/grains...." This part of the amendment implies that approximately 6 seed types may need to be applied. Can 6 seed types be mixed in 2 hoppers of the seeder? Or, will Contractor only be allowed to place one seed type per hopper?

ANSWER 0004-03: Seeds are not mixed in the hopper. The Contractor shall plant one seed type in a specific area. After that the Contractor may be required to plant another seed type in another area. This year it will more than likely be sunflowers first and then oats.