DWGS-FTR251A-RFP.pdf
PDF 22 MB Posted
- Attached to
- FTR251A Demolition of Wood Frame Barracks Portion of Building 39600 at Nike Site Summit near JBER, Alaska
- Solicitation number
- W911KB-12-R-0003
About this file
FTR251A DRAWINGS W911KB-12-R-0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12-R-0003 Amend 0004.pdf | ||
| 12-R-0003 Amend 0003.pdf | ||
| DWGS-FTR251A-AM 2.pdf | ||
| 12-R-0003 AM 2.pdf | ||
| 12-R-0003-0001.pdf | ||
| SPECS-FTR251A-RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALASKA DISTRICT U.S. ARMY CORPS OF ENGINEERS
W911KB-12-R-0003
RFP - FTR251A/PN 061561, 01 MAY 2012
JBER - RICHARDSON, ALASKA
REF.
NUM.
SHEET TITLESHT
REF.
NUM.
SHEET TITLESHT
REF.
NUM.
SHEET TITLESHT
REF.
NUM.
SHEET TITLESHT
REF.
NUM.
SHEET TITLESHT
A
R
C
T
I
C
V
L
L
E
Y
D
A
R
C
T
I
C
V
L
L
E
Y
D
SUMMIT SITE ROAD
TYPICAL POST BASE
SCALE: 3/4"=1'-0"
LOCATION AND HAUL ROUTE
1" = 1500'
NOTES:
1. SITE SUMMIT IS A HISTORICAL SITE AND SHALL BE PROTECTED FROM
UNNECESSARY DAMAGE. CARE SHALL BE TAKEN WHEN DEMOLISHING
THE BUILDING.
2. ACCESS TO SITE SUMMIT IS LIMITED TO THE SUMMER MONTHS DUE
TO HARSH WEATHER CONDITIONS MOST OF THE YEAR. ALL WORK
CONDUCTED AT SITE SUMMIT WILL TAKE PLACE DURING THIS TIME.
TYPICALLY, STAFF CAN ONLY VISIT THE SITE BETWEEN MID-JUNE AND
MID-OCTOBER, WITH ACCESS DURING THE WINTER VIRTUALLY
IMPOSSIBLE. SEE SPECIFICATION 01 19 30.00 29.
3. THE CONTRACTOR SHALL DEMOLISH BUILDING 39600. ONLY THE
WOOD PORTION OF THE STRUCTURE SHALL BE DEMOLISHED, SEE SHEET
CD105 THROUGH CD107 AND SHEET CD116 THROUGH CD118. SEE SHEETS
CD108 & CD109 FOR PRESERVATION WORK TO BE PERFORMED ON
BUILDING 3900. ALL CONCRETE STRUCTURES SHALL REMAIN INCLUDING
FOUNDATIONS, SLABS, WALLS AND TIE DOWN BLOCKS. THE FLAG POLE AT
THE FRONT OF BUILDING SHALL REMAIN AND BE PROTECTED FROM ANY
DISTURBANCE.
4. THE CLAMSHELLS SHALL BE RETAINED AND PROTECTED FROM ANY
DISTURBANCE.
5. PROVIDE A TEMPORARY FENCE SEPARATING THE WEST PORTION OF
THE SITE FROM THE DEMOLITION ACTIVITIES. LOCATION SHOWN ON
DRAWING IS APPROXIMATE. PROVIDE A LOCKABLE ACCESS POINT SO
THAT AUTHORIZED PERSONNEL CAN ACCESS THE WEST SIDE OF SITE
SUMMIT.
6. CONTRACTOR SHALL COORDINATE WITH BASE PERSONNEL FOR
ACCESS TO THE SITE. THE CONTRACTOR MAY STOCKPILE DEMOLITION
DEBRIS AT THE LOCATION INDICATED ON SHEET CD104.
7. ACCESS TO MUNICIPALITY. LANDFILL SHALL BE THROUGH THE
GLENN HIGHWAY AND MUNICIPALITY. ACCESS GATE AT THE HILAND ROAD.
8. THIS PORTION OF THE ROAD IS RESTRICTED ACCESS THREE DAYS
PER WEEK AND CLOSED TWO DAYS A WEEK AS DEFINED IN SPECIFICATION
01 19 30.00 29. SEE THE SPECIFICATION FOR FURTHER INFORMATION.
9. PHOTOGRAPHY IS PROHIBITED UNLESS WRITTEN APPROVAL IS
GRANTED BY THE JBER PUBLIC AFFAIRS OFFICE. OTHER SITE SPECIFIC
PHOTOGRAPHY RESTRICTIONS WILL BE COVERED IN THE RANGE
CONTROL SAFETY BRIEFING.
10. CONTAMINATED SOIL IS KNOWN TO EXIST AT THE PROJECT SITE.
EXCAVATION ON THE SITE IS PROHIBITED.
11. CONTRACTOR SHALL CLEAN UP ALL DEBRIS WITH IN THE TEMPORARY
FENCED AREA. DEBRIS CONSISTS OF ANY ITEM THAT APPEARS TO HAVE
BEEN A PART OF THE BUILDING AT ONE TIME, SUCH SIDING, FLASHING OR
PORTIONS OF THE WOOD STRUCTURE.
CONTINUED ON
SHEET G101
UPPER SITE SUMMIT
INSET A
INSET A - UPPER SITE SUMMIT
1" = 100'
SEE NOTE 5
39601
39600
39604
39603
ELECTRICAL NOTES:
1. EXISTING CCTV SURVEILLANCE CAMERAS TO BE RELOCATED. TWO LOCATIONS:
ONE ON SOUTHWEST END; ONE ON SOUTHEAST END. GOVERNMENT WILL
DISCONNECT ALL POWER AND SIGNAL TO THE CAMERAS BEFORE WORK BEGINS.
REMOVE EXISTING CAMERA, MOUNTING HARDWARE AND WIRING FROM ITS PRESENT
LOCATION ON THE BUILDING. REINSTALL ON TEMPORARY STRUCTURES TO PERMIT
DEMOLITION OF FACILITY. REINSTALL ON NEW POLES AT FINAL LOCATION ONCE
DEMOLITION IS COMPLETE. NOTE THAT EXISTING BEDROCK WILL NOT PERMIT
ADEQUATE EXCAVATION TO SUPPORT STANDARD TEMPORARY POLES.
2. EXISTING LOCATION OF NEMA 3R SPLICE BOX, SURFACE MOUNTED ON SOUTH
END OF BUILDING. BOX CONTAINS 1-2" CONDUIT AND 2-3/4" CONDUITS. BOX CONTAINS
TWO CIRCUITS EACH OF: MINIATURE COAX CABLE CMR, TWO #10 POWER CABLES, ONE
5000UE TWO CONDUCTOR CABLE CL3R, AND ONE RG-6 COAX CABLE IN 3/4" CONDUIT;
ONE CIRCUIT FOR EACH CAMERA. REMOVE 3/4" RACEWAY AND CIRCUITS FROM J-BOX
TO CAMERAS AS REQUIRED TO ACCOMMODATE DEMOLITION. RACEWAY AND CIRCUITS
MAY BE REUSED FOR TEMPORARY CAMERA INSTALLATION. PROVIDE PERMANENT NEC
COMPLIANT SUPPORT FOR 2" C AND J-BOX TO REMAIN ONCE FACILITY DEMOLITION IS
COMPLETE.
3. EXISTING UNDERGROUND 2" RIGID CONDUIT WITH POWER LINE AND SIGNAL
CABLE TO EXISTING SPLICE BOX . CONTRACTOR SHALL VERIFY AND LOCATE ITS EXACT
LOCATION AND ROUTING AND PROVIDE PROTECTION TO PREVENT DAMAGE DURING
DEMOLITION. PROTECT CONDUIT AND WIRING FOR REUSE.
4. NEW 25 FOOT METAL POLE INSTALLED ON EXISTING FLOOR SLAB TO REMAIN,
POLE TO BE DESIGNED FOR A 130 MPH WIND SPEED, FOLLOW TYPICAL POST BASE
DETAIL BELOW, AT EXISTING CAMERA LOCATION BUT SET BACK 12 INCHES CLEAR FROM
SLAB EDGE. MOUNT ONE OF THE CCTV CAMERA AT TOP OF POLE USING ITS SALVAGED
MOUNTING HARDWARE AND NEW MOUNTING PLATE. INSTALL NEW CIRCUITS AND RIGID
METAL CONDUIT FROM EXISTING J-BOX TO REMAIN TO NEW POLE MOUNTED CAMERA,
SPLICING TO EXISTING CIRCUITS IN J-BOX.
5. PROVIDE TWO NEW MOUNTING PLATES OF 6"W X 12"H X 1/4", HOT DIPPED
GALVANIZED STEEL AND 2 SETS OF 4-1/2" THROUGH BOLTS, WASHERS, AND NUTS;
ONE SET FOR EACH CAMERA. MOUNT ONE PLATE ON TOP OF EACH NEW POLE.
6. NEW 25 FOOT METAL POLE INSTALLED ON EXISTING FLOOR SLAB TO REMAIN,
FOLLOW TYPICAL POST BASE DETAIL BELOW, POLE TO BE DESIGNED FOR A 130 MPH
WIND SPEED, EXISTING CAMERA LOCATION BUT SET BACK 12 INCHES CLEAR FROM
SLAB EDGE. MOUNT CCTV CAMERA NO. 1 USING ITS OWN SALVAGED HARDWARE AND
NEW STEEL PLATE AT TOP OF POLE. INSTALL NEW CIRCUITS AND RIGID METAL
CONDUIT FROM EXISTING J-BOX TO REMAIN TO NEW POLE MOUNTED CAMERA,
SPLICING TO EXISTING CIRCUITS IN J-BOX.
7. EXISTING 20' WOOD POLE TO BE DEMOLISHED.
GENERAL ELECTRICAL NOTES ON CAMERA RELOCATION
1. CONTRACTOR IS ADVISED THAT THE MAXIMUM DOWNTIME FOR CAMERAS 1 AND 2
IS 7 DAYS. ALL WORK RELATED TO THE CAMERA RELOCATION SHALL BE
COMPLETED WITHIN THIS TIME LIMIT.
2. FINAL ENERGIZE AND SIGNAL WILL BE PROVIDED BY THE GOVERNMENT FOR
OPERATION VERIFICATION. CONTRACTOR SHALL PROVIDE ANY ADJUSTMENTS
REQUIRED TO PROVIDE A FULLY FUNCTIONAL AND OPERATIONAL SYSTEM.
3. CONTRACTOR SHALL CONTACT JBER SECURITY CENTER TO OBTAIN CLEARANCE
FOR THE CAMERA RELOCATION WORK AND TO DE-ENERGIZE THE SYSTEM BEFORE
WORK BEGINS AND TO RE-ENERGIZING THE SYSTEM AFTER RELOCATION, AND FOR
TESTING OF FINAL INSTALLATION.
4. CONTRACTOR SHALL PROVIDE ALL REQUIRED MISCELLANEOUS HARDWARE
SUCH AS, FLEX CONDUIT, FITTINGS, CONNECTORS, BOLTS, ETC, FOR CONDUIT, BOX,
AND CAMERA REINSTALLATION ON NEW POLES TO PROVIDE A COMPLETE AND
USEABLE SYSTEM AFTER DEMOLITION OF THE BUILDING.
5. CONTRACTOR TO SUBMIT CABLE PRODUCT DATA, CAMERA MOUNTING DETAILS,
AND CAMERA POLE DESIGN DATA FOR APPROVAL.
CLAMSHELLS
CLAMSHELLS
APPROXIMATE LOCATION
OF FLAGPOLE
LOWER SITE SUMMIT
INSET A SHEET CD104
ARCTIC VALLEY
GATE
SITE SUMMIT ROAD
GATE
RESTRICTED
ROAD ACCESS
SEE NOTE 8.
NOTES:
1. THE CONTRACTOR SHALL NOT BE PERMITTED BEYOND THIS
POINT DURING RESTRICTED ACCESS TIMES. THIS PORTION OF THE
ROAD IS RESTRICTED ACCESS THREE DAYS PER WEEK AND CLOSED
TWO DAYS AS DEFINED IN SPECIFICATION 01 19 30.00 29. SEE THE
SPECIFICATION FOR FURTHER INFORMATION.
2. THIS IS THE TEMPORARY STOCKPILE LOCATION. THE INTENT OF
THE AREA IS TO PROVIDE THE CONTRACTOR A LOCATION FOR
TEMPORARY STORAGE OF DEBRIS MATERIAL DURING TIMES OF
RESTRICTED ROAD ACCESS. THE CONTRACTOR SHALL RETURN THE
AREA BACK TO ITS ORIGINAL CONDITION BEFORE THE COMPLETION OF
WORK.
INSET B - LOWER SITE SUMMIT
1" = 100'
TEMPORARY
STOCKPILE LOCATION
SEE NOTE 2
HAUL ROUTE
RESTRICTED
ROAD ACCESS
SEE NOTE 1
39223
39230
39225
39199
39240
39226
EXTERIOR-NORTH WING EXTERIOR-CONCRETE PORTION TO REMAIN EXTERIOR-SOUTH WING
INTERIOR-GENERATOR INTERIOR-ELECTRIC CABINET IN GENERATOR ROOM INTERIOR-GENERATOR
INTERIOR-BOILER INTERIOR-REPAIR AND UTILITIES ROOM
RE-CIRCULATING PUMPS
INTERIOR-TYPICAL BATHROOM
BUILDING 39600 ASBESTOS HOMOGENEOUS MATERIALS LIST
OTHER HAZARDOUS MATERIALS SUMMARY
INTERIOR-1ST SARGEANT OFFICE
EXTERIOR-TYPICAL WALL CONDITION
INTERIOR-2ND FLOOR CORRIDOR INTERIOR-KITCHEN
File details come from the government source that posted it. Updated .